Exhibit_A_-_Technical_Requirements.pdf
PDF 991 KB Posted
- Attached to
- Alternating Current Generator: 6115-01-520-641 Federal contract opportunity
- Solicitation number
- SPRBL1-19-Q-0018
About this file
Exhibit A - Technical Requirements
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRBL119Q0018-0001.pdf | ||
| Attachment_0003_-_Special_Packaging_Instructions_AG00000573.pdf | ||
| SPRBL119Q0018.pdf | ||
| Attachment_0001_-_Drawings_-_0116-1120.pdf | ||
| Attachment_0002_-_ECP.PDF |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit A Issue: 30 November 2018
SPRBL1-19-Q-0018
TECHNICAL REQUIREMENTS
ARMS ID ZL0095
NSN: 6115-01-520-6411
100kW Alternating Generator
SPRBL1-19-Q-0018
APPLICABLE DOCUMENTS
Military and Federal Standards MIL-STD-2073-1E Standard Practice for Military Packaging MIL-STD-129-R Military Marking for Shipment & Storage
Military and Federal Specifications
Other Documents SPI AG00000573 Special Packaging Instructions
Commercial Documents ISPM 15 Regulation of Wood Packaging Material in International Trade
Security Documents
CECOM G2 OPSEC
CONFIGURATION BASELINE
The applicable Configuration Baselines (CB), for the listed Configuration Item (CI) and/or Computer Software Configuration Item (CSCI), are as listed in the table below.
NSN Nomenclature Part Numbers/Drawings 6115-01-520-6411 Alternating Current Generator 431PSL6309 / 0116-1120
Requirements for Configuration Management.
Product Definition Information. The Product Definition Information describes a product’s performance, functional and physical attributes, including the requirements and design information (specifications, drawings, design descriptions and software). Interfaces, including interfaces with other products, are also documented in
SPRBL1-19-Q-0018
the Product Definition Information. The Product Definition Information shall be specified by the Contractor’s Commercial Item Part Number (CIPN).
Configuration Change Process. The contractor shall establish a system for managing the configuration changes to the CIPN baseline.
CIPN Configuration Baseline. The Contractor’s Commercial Item Part Number (CIPN), as defined by the Contractor’s specifications, drawings, catalog page, etc, at the time of award of this contract, shall form the Configuration Baseline for this acquisition.
The applicable Configuration Baseline (CB) for the listed Configuration Item (CI)/Computer Software Configuration Item (CSCI) is as follows:
CI/CSCI CB
PN 431PSL6309 Alternating Current Generator, MARATHON ELECTRIC MANUFACTURING, CAGE Code 38151
Configuration. Each CI/CSCI, as developed/built and delivered, shall conform to the cited CB and (if applicable) and any subsequent CB’s that will be made contractually binding by the Procuring Contracting Officer (PCO).
Application Management.
Application Management. In performing Application Management, the Government must assess the impact of design changes to the Configuration Item. The Government is the Configuration Management authority on application management for all external applications and for all Major changes that affect the Commercial Item Part Number (CIPN) specified in paragraph Product Definition Information. A Major change is defined as any change that will impact any of the following conditions of the CIPN:
(a) Overall performance and Form, Fit, Function and Interface (F3I) Characteristics.
(b) Reliability, Maintainability and Survivability
(c) Electromagnetic Interference (EMI), air worthiness certification, or other pertinent requirement.
(d) Safety
(e) Support, operational and training requirements
(f) Impact on Technical Manuals, Repair Parts and Special Tools Lists (RPSTLs), DMWRs, Provisioning Parts List (PPL), etc.
(g) Impact on Cost and/or Schedule.
(h) Impact on test equipment, support equipment and associated software.
(i) Software.
Application Activity. The Government is an Application Activity (AA) for changes that affect the Contractor’s CIPN. The Government does not possess document change authority over the changes affecting the CIPN. As part of the Government’s Application Management process, the Government as AA does have a right to review or be notified of changes made by the Contractor that will affect any of the conditions identified in Application Management. Any changes that affect these conditions shall be submitted for Government review
SPRBL1-19-Q-0018
or notification IAW the procedures outlined below. Configuration changes not directly affecting the configuration baseline conditions identified in Application Management do not require Government review or notification.
Departures from CB. Changes that affect the CIPN conditions cited in paragraph Application Management shall be submitted for Government review or notification in accordance with this TRD and the DD Form 1423 for DI- MISC-80711A. Upon receipt of notification, the Government will review the impact of the change.
SPRBL1-19-Q-0018
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Original Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
A001 TDP X TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Alternating Generator
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
Scientific and Technical Reports Configuration Management
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MISC-80711A TRD: Para Departures from CB
RDER-PRP-G INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
LT ASREQ SEE ITEM 16
a. ADDRESSEE
b. COPIES
SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft
Final
SEE ITEM 16 Reg Repro
16. REMARKS: Data Item Description DI-MISC-80711A: Delete block 10 instructions entirely and follow instructions in Request For Change.
The contractor shall prepare and submit RFCs for Government review in accordance with the SOW section for Configuration Management (Para Departures from CB) when there is a change or departure from a contractual baseline.
All RFCs shall be submitted for Government review or notification IAW para Departures from CB within 5 working days of Contractor approval and prior to presentation for acceptance, but not later than 30 days, of any such product.
Data shall be submitted and exchanged electronically in Microsoft Office suite of applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to Government review and approval.
If the CDRL Data Deliverable is priced and is not NSP (Not Separately Priced), then an electronic DD Form 250 will be required via the Wide Area Workflow website in order for the contractor to receive payment for the data deliverable (see section G of the Contract). E-mail notification is required with any electronic submission.
RDER-PRP-G
PCO
ACO
QAR
15. TOTAL 0 4 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Edward Engbert
RDER-PRP-G
Mechanical Engineer
Mark L. Caringi
RDER-PRP-G
Chief, Power Environmental Branch
SPRBL1-19-Q-0018
Request For Change (RFC). The Request For Change (RFC) includes both the engineering change and the supporting documentation by which the change is described and suggested. An RFC describes changes to the CI/CSCI and associated Contractor documents and data (if applicable) that are affected by the proposed engineering change. The RFC also describes a full impact analysis of the effect of the change on the logistics, interface, design, cost and schedule requirements of the CIPN.
RFCs could be generated as any of the following categories: Change Directive; Change Request; Engineering Change Package;
Engineering Change Proposal; Engineering Change Request; Engineering Change Memo; Engineering Change Notice.
RFCs may contain some of the following elements:
(a) A unique change identifier; identification of originating organization and responsible individual.
(b) Change classification,
(c) Identification of product(s) (including components and interfacing products) affected by the change.
(d) Change description and scope (including effects on performance, operation, maintenance, servicing, operation and maintenance training, repair parts, support and test equipment, cost, schedule, and any other effect on physical, functional, and logistics characteristics of the CIPN).
(e) Reason and justification for the change and consequences of not incorporating the change.
(f) Estimated cost increase or savings.
(g) Change implementation (and effectivity) and impact on delivery schedule.
(h) Criteria, if any, for retrofitting products.
Contractor-approved changes that adversely impact any of the CIPN conditions listed in paragraph Application Management may require re-evaluation by the Government of the CIPN. Re-evaluation may include operational testing re- assessment or re-assessment of the logistics impact of the proposed change. An approved change to the design of the CIPN must be verified to ascertain that the CIPN has achieved the functional attributes and requirements specified in the baselined Product Definition Information (CIPN) and that it is adequate for its intended purposes. The Government is not obligated to accept any CIPNs that no longer meet the Government’s requirements as established by the CIPN at the time of contract award.
Part Revisions See above statement regarding RFCs.
PACKAGING
Wood Packing Material
SPRBL1-19-Q-0018
Wood Packaging Material in compliance with ISPM 15, Regulation of Wood Packaging Material in International Trade, is applicable.
Wood packing material includes pallets. See DLAD 52.247-9012 Requirements for Treatment of Wood Packaging Material (WPM).
Military Packaging Military Packaging in accordance with MIL-STD-2073-1E is applicable.
Preservation, Packing and Marking Instructions
DS7029 - DS7033 LEGEND
Qty Quantity Prot Req Protection Required PKG-REF Packaging Reference (Military/Federal Specification or Standard) SPI Special Packaging Instruction LPK Level of Packing QUP Quantity per Unit Pack ICQ Intermediate Container Quantity Pkg Reqmt Codes Packaging Requirement Codes when PKG-REF cites MIL-STD-2073-1E The below codes are for special markings:
PC Project Code WG Warranty/Guarantee SL Shelf Life BC Bar Code FMS Foreign Military Sales
SPRBL1-19-Q-0018
DS7029 - DS7033
NSN Prot Req PKG-REF or SPI LPK QUP ICQ Special Markings
Pkg J. J J J J J J J J J Reqmt I. II. III. IV. V. VI. VII. VII.a IX X Codes (MP) (CD) (PM) (WM) (CD) (CT) (UC) (IC) (PK) (SM)
6115-01-520-6411 Military MIL-STD-2073-1E B 001 - 41 1 00 00 00 0 MG 00 - 00 BC
SPRBL1-19-Q-0018
CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1
CDRL List
CDRL
Data Line No. DID Identification Title A001 DI-MISC- 80711A Scientific and Technical Reports – Configuration Control
| TECHNICAL REQUIREMENTS |
| Part Revisions |
| See above statement regarding RFCs. |
| PACKAGING |
| Military Packaging |
| Preservation, Packing and Marking Instructions |
| CDRL List |
File details come from the government source that posted it.