SPMYM325Q5019 SF18.pdf
PDF 1 MB Posted
- Attached to
- Screws Federal contract opportunity
- Solicitation number
- SPMYM325Q5019
About this file
This is a Request for Quotation (RFQ) issued by the Defense Logistics Agency Maritime Portsmouth for various types of hex head capscrews, socket flat countersunk head self-locking cap screws, and socket head cap screws to be delivered to Portsmouth Naval Shipyard. The RFQ includes 21 Contract Line Item Numbers (CLINs) covering the hardware items and associated data requirements/certifications, with quantities ranging from 10 to 60 pieces per CLIN.
The solicitation (SPMYM325Q5019) is a small business set-aside with responses due by January 31, 2025. Delivery is required within 90 days after contract award on an FOB Destination basis. Vendors must provide country of origin for each line item and if not the actual manufacturer, must provide the manufacturer's name, location and business size. The items require various certifications including Certificates of Compliance and Certification/Data Reports. Key technical requirements include zinc coating per ASTM B633-23, material specifications per FF-S-85F(3) and FF-S-86H, and specific marking requirements. Quotes may be submitted electronically, via fax, or mail to the contracting officer Robert Dowdle.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Exhibits.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PORTSMOUTH NAVAL SHIPYARD
PORTSMOUTH NAVAL SHIPYARD
RECEIVING OFFICER
BLDG 170, 2ND FLOOR,
CODE KMC
KITTERY ME 03904
TEL: 207-438-5521 FAX:
SEE SCHEDULE
REQUEST FOR QUOTATIONS
(THIS IS NOT AN ORDER) 1
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED RATING
DO-C9SPMYM325Q5019 21-Jan-2025 5a. ISSUED BY
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this
Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State, and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e) (f)
SEE SCHEDULE
AMOUNT
% No. %
NOTE: Additional provisions and representations [ ] are [ ] are not attached.
13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15. DATE OF
QUOTATION
16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)
TELEPHONE NO.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)
PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)
THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE
6. DELIVER BY (Date)
SEE SCHEDULE
AND/OR DMS REG. 1
UNDER BDSA REG. 2
4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE
REQUEST NO.
DLA MARITIME PORTSMOUTH
PORTSOUTH NAVAL SHIPYARD
ATTN: ROBERT DOWDLE
EMAIL: ROBERT.DOWDLE@DLA.MIL
KITTERY ME 03904-5000
9. DESTINATION (Consignee and address, including ZIP Code)
7. DELIVERY
[ ]X FOB
DESTINATION
[ ] OTHER
(See Schedule)
31-Jan-2025(Date)
PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.
207-438-4504ROBERT S. DOWDLE
(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:
d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS
SPMYM325Q5019
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 10 Each
HEX HEAD CAPSCREW
FFP
HEX HEAD CAPSCREWS 5/8-18UNF-2A X 4" FF-S-85F(3) TYPE-II, GRADE-
5. ZINC COATED IAW ASTM B633-23 TY-II, SC-I.
FOB: Destination
NSN: 5305
MILSTRIP: N3904050034001
PN/CN: 5305
PURCHASE REQUEST NUMBER: N3904050034001
PSC CD: 5305
NET AMT
0002 1 Each
DATA REQUIREMENTS FOR CLIN 0001
FFP
Exhibit A, SEQ A001: CDRL DI-MISC-81356A (Certificate of Compliance) FOB: Destination
PN/CN: 5305
0003 1 Each
DATA REQUIREMENTS FOR CLIN 0001
FFP
Exhibit A, SEQ A002: CDRL DI-MISC-80678 (Certification / Data Report) FOB: Destination
0004 10 Each
HEX HEAD CAPSCREW
FFP
EXACT SAME AS ITEM-0001
FOB: Destination
NSN: 5305
MILSTRIP: N3904050034002
PN/CN: 5305
PURCHASE REQUEST NUMBER: N3904050034002
0005 1 Each
DATA REQUIREMENTS FOR CLIN 0004
FFP
Exhibit B, SEQ B001: CDRL DI-MISC-81356A (Certificate of Compliance) FOB: Destination
0006 1 Each
DATA REQUIREMENTS FOR CLIN 0004
FFP
Exhibit B, SEQ B002: CDRL DI-MISC-80678 (Certification / Data Report) FOB: Destination
0007 50 Each
HEX HEAD CAPSCREW
FFP
EXACT SAME AS ITEM-0001
FOB: Destination
NSN: 5305
MILSTRIP: N3904050034003
PN/CN: 5305
PURCHASE REQUEST NUMBER: N3904050034003
0008 1 Each
DATA REQUIREMENTS FOR CLIN 0007
FFP
Exhibit C, SEQ C001: CDRL DI-MISC-81356A (Certificate of Compliance) FOB: Destination
0009 1 Each
DATA REQUIREMENTS FOR CLIN 0007
FFP
Exhibit C, SEQ C002: CDRL DI-MISC-80678 (Certification / Data Report) FOB: Destination
0010 30 Each
SOCKET FLAT C/S HEAD SLF LKG CAP SCREW
FFP
SOCKET FLAT COUNTERSUNK HEAD SLF LKG CAP SCREW ANGLE,
0.625-11UNRC-3A X 1.500 IN. LG. MFR IAW FF-S-86H TYPE IV (MOD).
MOD IS MINIMUM 12% ELONGATION IN 4 DIA. MAT'L IS ALLOY STEEL.
SLF LKG IAW MIL-DTL-18240F AMEND 1 TYPE "ANY". MARKINGS OF A
MINIMUM (6) DOTS (APPROXIMATELY 0.032 DIA) RAISED OR
DEPRESSED (APPROXIMATELY 0.010) SHALL BE PLACED ON THE
HEAD OF THE FASTENER (TOP PREFERRED. SIDE LOCATION IF
NECESSARY).
FOB: Destination
NSN: 5305
MILSTRIP: N3904050084011
PN/CN: 5305
PURCHASE REQUEST NUMBER: N3904050084011
0011 1 Each
DATA REQUIREMENTS FOR CLIN 0010
FFP
Exhibit D, SEQ D001: CDRL DI-MISC-81356A (Certificate of Compliance) FOB: Destination
0012 1 Each
DATA REQUIREMENTS FOR CLIN 0010
FFP
Exhibit D, SEQ D002: CDRL DI-MISC-80678 (Certification / Data Report) FOB: Destination
0013 60 Each
SOCKET FLAT C/S HEAD SLF LKG CAP SCREW
FFP
Same as Item 0010 FOB: Destination
NSN: 5305
MILSTRIP: N3904050084012
PN/CN: 5305
PURCHASE REQUEST NUMBER: N3904050084012
0014 1 Each
DATA REQUIREMENTS FOR CLIN 0013
FFP
Exhibit E, SEQ E001: CDRL DI-MISC-81356A (Certificate of Compliance) FOB: Destination
0015 1 Each
DATA REQUIREMENTS FOR CLIN 0013
FFP
Exhibit E, SEQ E002: CDRL DI-MISC-80678 (Certification / Data Report) FOB: Destination
0016 30 Each
SOCKET HEAD CAP SCREW
FFP
SOCKET HEAD CAP SCREW, 0.625-11UNRC-3A X 1.750 IN. LG.
MANUFACTURE IAW ASTM A574-21(MOD). MOD IS MINIMUM 12%
ELONGATION IN 4 DIA. MAT'L IS ALLOY STEEL.
FOB: Destination
NSN: 5305
MILSTRIP: N3904050084013
PN/CN: 5305
PURCHASE REQUEST NUMBER: N3904050084013
0017 1 Each
DATA REQUIREMENTS FOR CLIN 0016
FFP
Exhibit F, SEQ F001: CDRL DI-MISC-81356A (Certificate of Compliance) FOB: Destination
0018 1 Each
DATA REQUIREMENTS FOR CLIN 0016
FFP
Exhibit F, SEQ F002: CDRL DI-MISC-80678 (Certification / Data Report) FOB: Destination
0019 60 Each
SOCKET HEAD CAP SCREW
FFP
Same as Item 0016 FOB: Destination
NSN: 5305
MILSTRIP: N3904050084014
PN/CN: 5305
PURCHASE REQUEST NUMBER: N3904050084014
0020 1 Each
DATA REQUIREMENTS FOR CLIN 0019
FFP
Exhibit G, SEQ G001: CDRL DI-MISC-81356A (Certificate of Compliance) FOB: Destination
0021 1 Each
DATA REQUIREMENTS FOR CLIN 0019
FFP
Exhibit G, SEQ G002: CDRL DI-MISC-80678 (Certification / Data Report) FOB: Destination
Section C - Descriptions and Specifications
DLA PROCUREMENT NOTES
C02 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components (DEC 2016) The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer.
In the event that manufacturing phase-out or discontinuance of production of such items is contemplated, the contractor is required to notify the contracting officer and publish the discontinuance in the Government-Industry Data Exchange Program (GIDEP), where feasible; and to provide immediate advance notice of production phase-out to DLA DMSMS at dscc.dmsms@dla.mil.
C03 Contractor Retention of Supply Chain Traceability Documentation (JUN 2023)
(1) By submitting a quotation or offer, the contractor, if it is not the manufacturer of the item, is confirming it currently has, or will obtain before delivery, and shall retain documented evidence (supply chain traceability documentation), as described in paragraph (2) of this procurement note, demonstrating the item is from the approved manufacturer and conforms to the technical requirements.
(2) At a minimum, the supply chain traceability documentation for the item shall include: basic item description, part number and/or national stock number, manufacturing source, manufacturing source’s Commercial and Government Entity (CAGE) code, and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to item(s) acceptance by the Government. The documentation should also include, if available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers. In addition, the contractor will obtain and supply any quality requirements necessary to prove the material meets the technical description. Evidence of quality consist of test results, material certifications, and manufacturing process sheets, identified by the technical data.
(3) Contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance Program (CDAP) website (http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection-Avoidance-Program/ ).
(4) The contractor shall immediately make documentation available to the contracting officer upon request.
The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for six years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.
C04 Unused Former Government Surplus Property (SEP 2021) To be considered for award, the offeror must complete and submit the following representation with their offer.
Additional supporting documentation to demonstrate the surplus material offered was previously owned by the Government and meets solicitation requirements must be provided within 24 hours of request by the contracting officer.
(1) The material is new, unused, and not of such age or so deteriorated as to impair its usefulness or safety. Yes [__] No [__] The material conforms to the technical requirements cited in the solicitation (e.g., Commercial and Government Entity (CAGE) Code and part number, specification, etc.). Yes [__] No __ The material conforms to the revision letter/number, if any is cited. Yes [__] No [__] Unknown __ If No, the revision does not affect form, fit, function, or interface. Yes__ No __ Unknown __ The material was manufactured by:
(Name): ______________________________________________________________________ (Address): ___________________________________________________________________
(2) The offeror currently possesses the material Yes __ No __ If yes, the offeror purchased the material from a Government selling agency or other source.
Yes __ No __ If yes, complete the following:
Government Selling Agency: ___________________________________________________ Contract Number: ____________________________________________________________ Contract Date: (Month, Year): __________________________________________________ Other Source: ________________________________________________________________ Address: ____________________________________________________________________ Date Acquired: (Month/Year) ___________________________________________________
(3) The material has been altered or modified. Yes __ No __ If Yes, complete the following:
Name of the company that performed the alternation or modification:
[(Address): __________________________________________________________________ Complete description of the alterations or modifications.
(4) The material has been reconditioned. Yes __ No __ If Yes, complete the following:
(i) The price offered includes the cost of reconditioning /refurbishment. Yes __ No __
(ii) Name of the company that reconditioned the material.
(iii) Description of any work done or to be done, including the components to be replaced and the applicable rebuild standard.
The material contains cure-dated components. Yes __ No __ If Yes, complete the following:
(i) The price includes replacement of cure-dated components. Yes __ No __
(ii) Cure date: ____________________
(5) The material has data plates attached. Yes __ No __ If Yes, insert all information contained on the data plate.
(6) The offered material is in its original package. Yes __ No __ If yes, complete the following:
Contract Number ______________________________________________________________
NSN_________________________________________________________________________
CAGE Code__________________________________________________________________ Part Number __________________________________________________________________ Other Markings/Data___________________________________________________________
(7) The offeror has supplied this same material (National Stock Number) to the Government before.
Yes __ No __ If Yes, complete the following:
(i) The material being offered is from the same original Government contract number as that provided previously. Yes __ No __
(ii) State below the Government Agency and contract number under which the material was previously provided:
Agency ______________________________________________________________________ Contract Number_______________________________________________________________
(8) The material is manufactured in accordance with a specification or drawing. Yes __ No __ If Yes, complete the following:
(i) The specification/drawing is in the possession of the offeror. Yes __ No __
(ii) The offeror has stated the applicable information below: Yes __ No __ Specification/Drawing Number ___________________________________________________ Revision (if any) _______________________________________________________________ Date__________________________________________________________________________
(9) The material has been inspected for correct part number and for absence of corrosion or any obvious defects.
Yes __ No __ If Yes, complete the following:
(i) Material has been re-preserved. Yes __ No __
(ii) Material has been repackaged. Yes __ No __
(iii) Percentage of material that has been inspected is ____%; and/or
(iv) Number of items inspected is _______
(v) A written report was prepared. Yes __ No __ The offeror agrees that in the event of award and notwithstanding the provisions of the solicitation, inspection and acceptance of the surplus material will be performed at source or destination subject to all applicable provisions for source or destination inspection.
The offeror will forward one of the following, within 24 hours of request by the contracting officer, to demonstrate that the material being offered was previously owned by the Government (offeror check which one applies):
___ For national or local sales, conducted by sealed bid, spot bid or auction methods, a solicitation/Invitation For Bid and corresponding DLA Disposition Services Form 1427, Notice of Award, Statement and Release Document.
___ For DLA Disposition Services Commercial Venture (CV) Sales, the shipment receipt/delivery pass document and invoices/receipts used by the original purchaser to resell the material.
___ When the above documents are not available, or if they do not identify the specific NSN being acquired, a copy or facsimile of all original package markings and data, including NSN, commercial and Government entity (CAGE) code and part number, and original contract number. (This information has already been provided in paragraph (6) of this procurement note Yes __ No __) ___ When none of the above are available, other information to demonstrate that the offered material was previously owned by the Government. Describe:
This procurement note only applies to offers of Government surplus material. Offers of commercial surplus, manufacturer’s overruns, residual inventory resulting from terminated Government contracts, and any other material that meets the technical requirements in the solicitation but was not previously owned by the Government will be evaluated in accordance with the DLAD procurement note L04, Offers for Part Numbered Items.
If requested by the contracting officer, the offeror shall furnish sample units, in the number specified, to the contracting officer or to another location specified by the contracting officer, within 10 days after the contracting officer's request. The samples will be furnished at no cost to the Government. All such samples not destroyed in evaluation will be returned at the offeror's expense. The samples will be evaluated for form, fit, and function with subassembly, assembly, or equipment with which the items are to be used. End items furnished under any contract award to the offeror furnishing the samples can include the returned samples, and all acceptable end items will have a configuration identical to the samples. If specific tests of the samples' performance are made by the Government, the offeror will be furnished the results of such tests prior to a contract being entered into. In addition to any other inspection examinations and tests required by the contract, the performance of the end items will be required to be as good as that of the samples submitted.
In the event of award, the contractor will be responsible for providing material that is in full compliance with all requirements in the contract or order. The surplus material to be furnished must meet the requirements of the current contract or order, whether or not the material met Government requirements in existence at the time the material was initially manufactured or sold to the Government. If higher-level contract quality requirements apply to the material being acquired, those requirements do not apply to surplus material furnished under this contract.
C14 Correction of Nonconforming Packaging or Marking (MAY 2020)
(1) The Government may correct nonconforming packaging or marking for receipts of DLA- owned materiel if the estimated costs of correction are $1,000 or less. The contracting officer will advise the contractor of the discrepancy and that the Government has corrected the packaging or marking. The contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government’s costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies.
(2) If the estimated costs of correction for receipts of DLA-owned materiel are more than $1,000, the contracting officer will advise the contractor of the discrepancy and have the materiel returned to the contractor for correction/resubmittal; or, if there are urgent requirements, have the Government remediate the discrepancy at the contractor’s expense. If the Government remediates the discrepancy, the contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government’s costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies.
C20 Vendor Shipment Module (VSM) (JUL 2024) C20 Vendor Shipment Module (VSM) (JUL 2024)
(1) The DLA Vendor Shipment Module (VSM) is a web-based system for DLA contractors to obtain current shipping addresses, two-dimensional bar-coded shipping labels in accordance with MIL-STD-129, bills of lading, packing lists, and other shipping documentation. Contractors using VSM do not need to contact the transportation office prior to shipping items. Contractors shall use VSM to print labels for f.o.b. destination contracts; and to print labels and arrange for shipping for f.o.b. origin contracts. All contractors will use VSM to obtain shipping labels no more than two (2) days prior to shipment to ensure the current destination address is used.
(2) To obtain information for contracts administered by DLA or to register as a VSM user, the contractor shall contact the DLA VSM Helpdesk at (800) 456-5507 or via email to delivery@dla.mil.
(a) Before contacting the Government to advise that material is ready to ship, the contractor shall complete its VSM profile, to include regular business hours and observed holidays. The Government may request reimbursement for occurrences when the Government sends carrier equipment but is unable to pick-up a shipment because the material was unavailable, or the contractor facility was closed.
(3) To obtain information for contracts administered by DCMA, the contractor shall contact the DCMA that are for contracts where the ultimate destination is outside the contiguous United States, hazardous material, foreign military sales (FMS), or contracts requiring Transportation Protective Service, the contractor shall contact the DCMA Transportation to determine the cognizant Transportation Office at dcma.stlouis-mo.hq.mbx.transportation-inbox@mail.mil.
(b) Shipping instruction request (SIR). The SIR is DCMA’s contractor interface which automates the shipping process by reducing data entry and cycle time and facilitates data collection for management of the process.
Suppliers use SIR to send requests for shipping instructions to the DCMA Transportation Office. The SIR is designed to improve DCMA's ability to track and efficiently field requests to improve the timing and quality of shipments from contractors.
(1) Contracting officers at DLA Aviation, DLA Land and Maritime, and DLA Troop Support shall include procurement note C21 in solicitations and contracts if DCMA administers the contract and any of the following apply:
(i) Contracts where ultimate destination is outside the contiguous United States;
(ii) Hazardous material (HAZMAT) contracts;
(iii) Foreign Military Sales (FMS);
(iv) Contracts requiring Transportation Protective Service.
CLAUSES INCORPORATED BY FULL TEXT
MERCURY CONTROL (SUPPLIES)
Mercury or mercury containing compounds shall not be intentionally added or come in direct contact with hardware or supplies furnished under this contract.
CORRECTION OF CERTIFICATIONS:
Data deliverables which have been submitted to the receipt inspection activity shall not be modified or corrected by the contractor after submittal without approval from the Material Logistics group, Code 245. The change must be apparent on the amended certification and must be provided by the appropriate source (e.g., changes to a mechanical testing report must be performed by the testing facility vice a distributor). Corrected certifications must include the signature of the authorized representative making the change. If the change is initialed and dated, it must be initialed by the same person whose signature appears on the certification. Typed initials on corrected certifications are not acceptable. If the change is made by an authorized representative other than the original authorized representative, the change shall be signed by the authorized representative making the change. Statements substantiating the reason and/or justification for the change must be provided on the certification or in separate correspondence unless the change is administrative in nature (specification revision changes and qualitative or quantitative test data changes are technical and require written justification). When changes are made to certifications or rework is performed on material, Certificates of Compliance/Conformance (COC) must be resigned and dated to affirm that the contract and specifications have been met. The revised COC is required to be provided and dated on or after the date of revised certification. The COC does not require an explanation or rationale by the vendor, provided justification for change is identified elsewhere. Where supplementary data (i.e., not contract deliverables) is provided after the date on the COC, or administrative changes are made to the supporting certifications, the COC may stand as is.
MARKING AND CERTIFICATION REQUIREMENTS FOR CONTROLLED INDUSTRIAL MATERIAL
A certificate of quality conformance shall be furnished with each heat or lot of material supplied. The certification report shall be signed by the contractor’s authorized representative responsible for insuring that the material being delivered shall be in accordance with all specification and contract requirements.
A certificate of test shall be furnished and shall contain the actual test results of all specified chemical and mechanical tests performed. The results shall be quantitative data in the units required by the specification. One copy of each certificate shall be placed inside each material package or attached in a waterproof plastic envelope to the material supplied.
The material shall be marked as required by the manufacturing/material specification or referenced marking specification. A traceability number, i.e. (heat, lot, contract number, call number, or vendor trace code number) shall be marked on the box or package, placed inside each material package or attached to the package in a waterproof plastic envelope. The traceability number will also be recorded on all certificate(s) for material received.
Where temporary marking methods are applicable, Type A marking in accordance with MIL-STD-792 is also acceptable. (NOTE: For pipe & tube – Vibro Etch is not allowed when wall thickness for pipe is under 0.119” and 0.135” for tube.)
Unless otherwise required by the specification, fasteners do not require the heat or lot number to be marked on each piece in the lot, provided they are segregated and properly packaged with a traceability number as specified above.
Small items that are unable to be properly marked by marking methods mentioned may either be packaged and the complete markings shall appear on the package, or tagged with a tag attached to each item.
When required by the specification, (e.g. MIL-DTL-1222), fasteners shall be marked with the material symbol, the manufacture’s symbol, and the lot number. For fasteners less than ½” inch, if all the marking on the item can not be applied due to space limitations, the marking shall be applied using the following order of precedence: material symbol, manufacture’s symbol, lot number. The material symbol is mandatory for all fasteners. Marking not included on small fasteners shall be placed on the container.
NOTE: If more than one heat is used to make up a shipment lot, the test results of all heats shall be furnished.
SPECIFICATION CHANGES
No changes to specification or other contract technical requirements are allowed without Contracting Officer approval.
Section D - Packaging and Marking
The contractor shall mark all shipments of military packaged items in accordance with MIL-STD-129 (Latest Revision) “Marking for Shipment and Storage” and all commercially packaged items in accordance with ASTM-D- 3951 (Latest Revision) “Standard Practice for Commercial Packaging.
PREPARATION FOR DELIVERY (COMMERCIALLY PACKAGED ITEMS)
Preservation, packaging and packing shall be in accordance with ASTM Designation D-3951(Latest Revision), “Standard Practice for Commercial Packaging
PROHIBITED PACKING MATERIALS
The use of asbestos or excelsior is prohibited. In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material. Loose fill polystyrene is prohibited for shipboard use.
Section E - Inspection and Acceptance
E05 Product Verification Testing (MAY 2020)
(1) Product verification testing (PVT) under this procurement note will only apply when the contracting officer specifically invokes it in writing. The contracting officer may invoke PVT at or after contract award. If the contracting officer invokes PVT at contract award, the contract will explicitly state this testing requirement. If the contracting officer invokes PVT after contract award, the contracting officer shall notify the contractor and the cognizant DCMA ACO. The Government will perform PVT testing at a Government-designated testing laboratory.
(2) The contractor shall not ship or deliver any material until it receives notification of the acceptable PVT results, unless the contracting officer directs it to do so in writing The Government will provide the PVT results to the contractor within 20 business days after receipt at the Government testing facility, unless the Government specifies otherwise in writing.
(3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3; and maintain and make available all records evidencing those details if requested by the Government. When the Government finds evidence of risk associated with the contractor’s sampling process, the Government may witness and evaluate the contractors sampling process. The contractor shall randomly select samples from the production lot(s), unless the contracting officer specifies otherwise in writing. The contractor shall ship the selected PVT samples with a copy of the system of record receiving report (i.e., WAWF, DD Form 250, or commercial shipping document) and the contractor’s signed DD Form 1222. The contractor shall prepare the shipping container(s) by marking the external packages in bold letters, “Product Verification Test Samples – Do Not Post to Stock," Contract Number [contractor insert] and Lot/Item Number [contractor insert]” adjacent to the MIL-STD-129 (latest revision) identification markings. The contractor shall use a hard copy of the system of record receiving report as a packing list, in accordance with DFARS Appendix F. The contractor shall mark the exterior of the shipping container in accordance with MIL-STD- 129 (latest revision), paragraph 5.11. The contractor shall send samples by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express). The contractor shall include the following in the interior package:
(a) Hard copies of the contract;
(b) Material certifications/process operation sheets; and
(c) Drawings used to manufacture the units and return shipping information.
(4) The Government will return samples that pass testing and are not destroyed during evaluation to the contractor at the Government's expense for the contractor to include as part of the total contract quantity to be delivered under the contract. The contractor and Government may agree to dispose of samples not destroyed when the cost of the item does not justify the shipping expense. If the Government does not return approved samples that pass testing to the contractor, the Government will consider those samples as part of the contract quantity for payment and delivery.
(5) If samples fail testing, the Government may reject the entire contract lot from which the contractor took the samples. The Government may, at its discretion, retain samples that fail testing without obligation to the contractor.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government
0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 0014 Destination Government Destination Government 0015 Destination Government Destination Government 0016 Destination Government Destination Government 0017 Destination Government Destination Government 0018 Destination Government Destination Government 0019 Destination Government Destination Government 0020 Destination Government Destination Government 0021 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-1 Contractor Inspection Requirements APR 1984
INSPECTION AND ACCEPTANCE (DESTINATION)
Inspection and acceptance of the supplies or services to be furnished hereunder shall be made at destination by the receiving activity. Receiving activity shall execute acceptance certificate on the applicable inspection and receiving report form: DD Form 1155, Standard Form 44, DD form 250, or the Wide Area Workflow (WAWF) Receipt and Acceptance Receiving Report. The executed payment copy shall be forwarded to the paying office within four (4) workdays thereafter.
NOTICE OF CONSTRUCTIVE ACCEPTANCE PERIOD
Contractors are hereby advised that the constructive acceptance period established in accordance DFARS 232.904 and, as applicable in either 52.212-4 (i) (2) or 52.232-25 (a) (5) (I) (Prompt Payment), is revised to 45 calendar days in lieu of 7 calendar days.
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 90 dys. ADC 10 PORTSMOUTH NAVAL SHIPYARD
PORTSMOUTH NAVAL SHIPYARD
RECEIVING OFFICER
BLDG 170, 2ND FLOOR,
CODE KMC
KITTERY ME 03904
207-438-5521 FOB: Destination
N39040
0002 90 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0003 90 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0004 90 dys. ADC 10 (SAME AS PREVIOUS LOCATION)
0005 90 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0006 90 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0007 90 dys. ADC 50 (SAME AS PREVIOUS LOCATION)
0008 90 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0009 90 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0010 90 dys. ADC 30 (SAME AS PREVIOUS LOCATION)
0011 90 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0012 90 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0013 90 dys. ADC 60 (SAME AS PREVIOUS LOCATION)
0014 90 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0015 90 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0016 90 dys. ADC 30 (SAME AS PREVIOUS LOCATION)
0017 90 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0018 90 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0019 90 dys. ADC 60 (SAME AS PREVIOUS LOCATION)
0020 90 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0021 90 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
52.211-17 Delivery of Excess Quantities SEP 1989 52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.247-34 F.O.B. Destination JAN 1991
52.211-9 DESIRED AND REQUIRED TIME OF DELIVERY (JUN 1997)
(a) The Government desires delivery to be made according to the following schedule:
DESIRED DELIVERY SCHEDULE
90 Days
WITHIN DAYS
OFFEROR'S PROPOSED DELIVERY SCHEDULE
WITHIN DAYS
ITEM NO. QUANTITY AFTER DATE
OF CONTRACT
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed or otherwise furnished to the successful offeror results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day the award is dated. Therefore, the offeror shall compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(End of clause)
CONSIGNMENT INSTRUCTIONS FOR DELIVERIES TO THE PORTSMOUTH NAVAL SHIPYARD
Consign Parcel Post shipments to Portsmouth, NH 03801.
For access to the Portsmouth Naval Shipyard (PNS), contact PNS Security Pass Office at 207-438-2235/2614.
MARK SHIPPING DOCUMENTS: “Notify Receiving Officer, Portsmouth Naval Shipyard prior to arrival for delivery instructions. Telephone: 207-438-5521/5206”.
NOTICE: CARRIER’S DRIVERS ENTERING PORTSMOUTH NAVAL SHIPYARD MUST BE UNITED
STATES CITIZENS BY BIRTH OR MUST CARRY EVIDENCE OF NATURALIZATION.
Except by special arrangement, shipments will be received only between the hours of 7:00 AM and 2:30 PM local time, Monday through Friday (Federal Holidays excepted).
Section G - Contract Administration Data
G01 Additional Wide Area Workflow (WAWF) Information (AUG 2017) Contractors shall include the Transportation Control Number (TCN) and carrier shipment tracking information when submitting the DD250/iRAPT Receiving Report in Wide Area Workflow (WAWF) in order to assist with material inspection and acceptance.
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order: TBD
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
COMBO
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
N/A
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC TBD
Issue By DoDAAC SPMYM3
Admin DoDAAC** SPMYM3
Inspect By DoDAAC N39040
Ship To Code N39040
Ship From Code N/A
Mark For Code TBD
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) N/A
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
N/A
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
Section H - Special Contract Requirements
H10 Awardee Requires No Access to DLA Controlled Technical Data or Information for Contract Performance (FEB 2020) Awardee has confirmed it will not require access to DLA controlled technical data or information for contract performance, and it will provide items that conform to the current revision of applicable technical data.
SPECIAL PROVISIONS FOR THREADED PRODUCTS
The Government reserves the right to use variable or attribute gaging during Government inspection for acceptance or rejection of those products delivered in accordance with this procurement document.
Clarification of thread rolling requirements in accordance with MIL-DTL-1222.
In order to qualify for “Alternate Mechanical Testing” found in MIL-DTL-1222J paragraph 4.5.2.7 and utilize the mechanical properties for the starting bar stock in lieu of performing yield strength or proof stress testing on finished fasteners all of the subsequent provisions found in MIL-DTL-1222J paragraphs 4.5.2.7 a through e must be met. If any single provision is not met, all required mechanical testing must be performed on the finished full sized fasteners. These provisions are explained as follows:
a. Proper product lot control and traceability must be in place.
b. No heat treatment (including hot heading and hot forming), cold forming, drawing, rolling and thread rolling may be performed on the starting bar, fastener blanks or finished fasteners after the completion of the mechanical testing on the starting bar.
c/d. The proper size starting bar must be selected to ensure mechanical properties of finished fasteners are represented by the mechanical properties of the starting bar.
e. Axial tensile (studs) and wedge tensile (screws and bolts) must be performed on full sized fasteners. Note that there is a typographical error in paragraph 4.5.2.7 and that the axial load test is a mandatory test that must be performed on studs as required in paragraph 4.5.2.7.e.
Thread rolling is a cold working process and is not considered to be a machining or grinding operation. Therefore, fasteners which have rolled threads do not satisfy the provisions of MIL-DTL-1222J paragraph 4.5.2.7.b and are not eligible for the “Alternate Mechanical Testing” provision.
Thread rolling alone is not a sufficient cold working process to qualify a fastener to be in the cold worked (CW) condition. Cold worked condition fasteners must be manufactured from cold worked bar stock or be cold headed in order to qualify. The threads may subsequently be rolled, machined or ground. Testing of the finished fasteners and/or reporting of the starting bar stock material properties is subject to the same provisions found in MIL-DTL- 1222J paragraph 4.5.2.7.
Clarification of Test Specimens Required for Yield and Wedge Tensile Testing
Where fastener specifications require a proof load test and a wedge tensile test, both tests may be performed on the same fastener. However, where fastener specifications require a yield strength test and a wedge tensile test, a separate (new, untested) fastener is required for each of the two test methods. Reuse of a yield strength tested fastener in a wedge tensile test may result in a false value for the wedge tensile test and is, therefore, not permitted.
As an example, if a fastener specification requires three specimens for a given lot size, and requires both yield strength testing and wedge tensile testing, then six specimens are required in total; three for yield strength testing and three more for wedge tensile testing.
Section I - Contract Clauses
52.204-7 System for Award Management NOV 2024 52.204-13 System for Award Management Maintenance OCT 2018 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.211-15 Defense Priority And Allocation Requirements APR 2008 52.212-1 Instructions to Offerors--Commercial Products and
Commercial Services
SEP 2023
52.212-4 Contract Terms and Conditions--Commercial Products and Commercial Services
NOV 2023
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
SEP 2022
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
JAN 2023
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2023
252.223-7008 Prohibition of Hexavalent Chromium JAN 2023 252.225-7001 Buy American and Balance of Payments Program FEB 2024 252.225-7002 Qualifying Country Sources As Subcontractors MAR 2022 252.225-7048 Export-Controlled Items JUN 2013 252.225-7060 Prohibition on Certain Procurements from the Xinjiang
Uyghur Autonomous Region
JUN 2023
252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Products or Commercial
Services
NOV 2023
252.247-7023 Transportation of Supplies by Sea OCT 2024
52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)
(a) Definitions. As used in this clause--
Backhaul means intermediate links between the core network, or backbone network, and the small subnetworks at the edge of the network (e.g., connecting cell phones/towers to the core telephone network). Backhaul can be wireless (e.g., microwave) or wired (e.g., fiber optic, coaxial cable, Ethernet).
Covered foreign country means The People's Republic of China.
Covered telecommunications equipment or services means--
(1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities);
(2) For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities);
(3) Telecommunications or video surveillance services provided by such entities or using such equipment; or
(4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.
Critical technology means--
(1) Defense articles or defense services included on the United States Munitions List set forth in the International Traffic in Arms Regulations under subchapter M of chapter I of title 22, Code of Federal Regulations;
(2) Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of the Export Administration Regulations under subchapter C of chapter VII of title 15, Code of Federal Regulations, and controlled--
(i) Pursuant to multilateral regimes, including for reasons relating to national security, chemical and biological weapons proliferation, nuclear nonproliferation, or missile technology; or
(ii) For reasons relating to regional stability or surreptitious listening;
(3) Specially designed and prepared nuclear equipment, parts and components, materials, software, and technology covered by part 810 of title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities);
(4) Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal Regulations (relating to export and import of nuclear equipment and material);
(5) Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part 121 of title 9 of such Code, or part 73 of title 42 of such Code; or
(6) Emerging and foundational technologies controlled pursuant to section 1758 of the Export Control Reform Act of 2018 (50 U.S.C. 4817).
Interconnection arrangements means arrangements governing the physical connection of two or more networks to allow the use of another's network to hand off traffic where it is ultimately delivered (e.g., connection of a customer of telephone provider A to a customer of telephone company B) or sharing data and other information resources.
Reasonable inquiry means an inquiry designed to uncover any information in the entity's possession about the identity of the producer or provider of covered telecommunications equipment or services used by the entity that excludes the need to include an internal or third-party audit.
Roaming means cellular communications services (e.g., voice, video, data) received from a visited network when unable to connect to the facilities of the home network either because signal coverage is too weak or because traffic is too high.
Substantial or essential component means any component necessary for the proper function or performance of a piece of equipment, system, or service.
(b) Prohibition.
(1) Section 889(a)(1)(A) of the John S.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .