SPMYM222Q0871.pdf
PDF 2 MB Posted
- Attached to
- STORAGE TENT Federal contract opportunity
- Solicitation number
- SPMYM222Q0871
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMD 0003.pdf | ||
| AMD 0002 extension.pdf | ||
| AMD 0001.pdf | ||
| 20123052-CDRL COTS Manuals and Associated Supplemental Data.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
SPMYM222Q0871 07-Feb-2022
b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME
10:00 AM 10 Feb 2022
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
SPMYM29. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
LINA A. CRUZ
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
N4523A20123052
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
DLA MARITIME PUGET SOUND
ATTN: LINA CRUZ
467 W ST
BREMERTON WA 98314
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE N4523A 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
PUGET SOUND NAVAL SHIPYARD & IMF
BRUCE EVELAND
SAN DIEGO DET, NAS CORONADO, BLDG 72
ROE STREET ACCESS
SAN DIEGO CA 92135
TEL: FAX:
360-476-4121FAX:
TEL: 360-813-9189 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
332312
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF67
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
SPMYM222Q0871
Section SF 1449 - CONTINUATION SHEET
VENDOR INFORMATION
1. The Contractor’s POC is Phone:
Fax:
E-mail:
2. Buyer POC is: LINA A. CRUZ Phone: 360-813-9189 Fax: 360-476-4121 E-mail: LINA.A.CRUZ@DLA.MIL
3. Invoice Information:
The contractor shall utilize the electronic invoicing upon delivery of supplies indicated herein. Invoice may be submitted not more than one every two weeks. Invoices must be submitted electronically using Wide Area Work Flow (WAWF) – Receipt and Acceptance. The contractor shall self-register at the web site: https://wawf.eb.mil.
Contractor training is available on the Internet at https://wawftraining.eb.mil.
Additional support can be accessed by calling the NAVY WAWF Assistance Line: 1-877-251-9293.
See clause 252.232-7006 for WAWF table.
4. Inspection Level:
QA 4 7 days inspection
5. Defense Biometric Identification System (DBIDS):
Effective 14 August 2017, NCACS credentials will no longer be accepted for base access. Any new contractor, vendor or supplier requesting base access will be required to obtain a Defense Biometric Identification System (DBIDS) credential. NCACS credentials will no longer be issued. Only DBIDS credentials will be issued to ALL contractors, vendors and suppliers seeking base access AFTER 30 June 2017. Defense Biometric Identification System (DBIDS) increases installation security and communications by receiving frequent database updates on changes to personnel/credential status, law enforcement warrants, lost/stolen cards, and force protection conditions.
The system provides continuous vetting anytime the DBIDS card is scanned at an installation entry point.
If you currently have a Navy Commercial Access Control System (NCACS) card, the following is required to get a DBIDS credential:
Present your NCACS Card and a completed copy of the SECNAV FORM 5512/1 to the base Visitor Control Center (VCC) representative.
The VCC will pull up your information in the computer, ensuring all information is current and correct.
Once your information is validated, a temporary DBIDS credential is provided.
Your temporary credential will have an expiration date, prior to which you will need to obtain your permanent DBIDS credential (~ 180 days).
For each additional U.S. Navy installation to which you need access, the first time you visit you only need to bring your DBIDS credential and statement of purpose for base access when arriving at the Visitor Control Center.
The representative will enter base access authorization and then you may proceed to work.
If you do NOT have an NCACS Card, the following is required to obtain a DBIDS credential:
Present a letter or official document from any government sponsoring organization that provides the purpose for your access.
Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
Present a completed copy of the SECNAV 5512/1 form to obtain your background check.
Upon completion of the background check, the Visitor Control Center representative will complete the
DBIDS enrollment process, which includes your photo, finger prints, base restrictions, and several other assessments; after all this is done, you will be provided with your new DBIDS credential.
All deliveries must pass through the base Truck Inspection Station. All delivery vehicles are subject to inspection.
Drivers should expect delays due to heightened security.
For access to the main, perimeter gates at any Navy Base Kitsap installation, contractors are required to be a US Citizen and have either:
(a) DBIDS badge or
(b) Request a One-day Visitor badge at Pass & ID. Be prepared to present:
-Photo ID -Original proof of citizenship (any one of the following is acceptable):
State Certified Birth Certificate (must have the raised seal) Unexpired U.S. passport/Passport Card Alien Registration Card
Enhanced state-issued driver's license only accepted from Michigan, Minnesota, New York, Vermont, and Washington. Real ID licenses are not accepted at this time.
Naturalization papers Certificate/Statement of Birth Born Abroad)
-Current vehicle registration and insurance -Bill of lading that has the delivery address on it
Please note: The DBIDS badge does not give access through the second, Operational Area (OA) gate to lower base Bangor or to the Controlled Industrial Area (CIA) at Puget Sound Naval Shipyard (PSNS). To gain access to either the OA Gate or CIA area, a Navy Region Bangor or NAVSEA Badge is required.
To request a NAVY REGION NW badge, https://www.bavr.cnic.navy.mil/. Sponsor email is trina.williamson@navy.mil
To request a NAVSEA badge, call PSNS Pass & ID 360-476-4882.
FOR MORE INFORMATION VISIT: https://www.cnic.navy.mil/om/dbids.html
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS) JML 20123052 & 20253052
[STORAGE TENT – INSTALLATION]
PART 1
GENERAL INFORMATION
1. GENERAL:
This is a services contract for a one-time procurement to acquire and install a temporary storage tent to the designated site, detailed in Attachment 4. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction:
The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the setup and installation of the temporary storage tent, to manufacturer instructions and specification, as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background:
Shop 57 would like to establish a temporary storage tent to better store and preserve equipment and material in their San Diego – North Island Naval Air Station facilities. Shop 57 requires the acquisition and installation of a temporary storage tent in front of Building 73, detailed in Attachment 4.
1.3 Objectives:
The acquisition of temporary storage tent, meeting the following specifications:
o Vinyl Structure
24’ Wide X 34’ Long X 15’ Center Height X 11’ Side wall 18 OZ. Cover, Translucent White, Flame Retardant PVC Laminated fabric with polyester scrim.
Frame Members: 18” truss using heavy wall tubular steel on 8.5’ centers.
Base System Allows the Shelter to be built on a Dirt, Gravel, Asphalt, or Concrete
Foundation. You Do Not Need a Concrete Foundation or Knee Wall.
Unless otherwise stated, foundations other than concrete are assumed at 90% compaction or greater.
It is the customer’s responsibility to specify any foundation requirements prior to placing order. “ _Asphalt_ “.
Fabric will end at ground level.
All weld joints are coated for corrosion protection.
All connections are made using a male to female/slip fit junction.
o Side Panels
• Solid End Wall with personnel door
• Access end wall.
1 ea - 8’ wide x 8’ high disappearing door and 1 ea - personnel door.
Disappearing door to include all the necessary winch, trolleys, pulleys, cables, and manual winch.
Disclaimer: Disappearing doors are not a pre-engineered door system and should be considered a flap. Engineered door systems are available but require additional funds. Access panels are not engineered door systems, there is no warranty on the access end panel, the access panel is not warrantied against or designed at eh same engineering as the shelters, the access panels or panels are required to be secured down in high winds. The panel(s) vertical cables are to be clipped at the bottom to the anchoring devices and the cables are to be tightened and secured when the panel is always in the down position.
Trim Seals fabric to building base rail.
Assemble and Install the temporary storage tent, per manufacturer’s instructions, in front of Building 73 on San Diego – North Island Naval Air Station.
Pass final inspection by the COR, Bruce Eveland, or their designated proxies, to meet local, state, and federal standards.
1.4 Scope:
This Performance Work Statement (PWS) supports the service labor, equipment, and parts for the installation of temporary storage tent at the front of Building 73, in the San Diego – North Island Naval Air Station. This work is to be accomplished to manufacturer’s instructions and meet local, state, and federal standards.
1.5 Period of Performance: The period of performance shall be for one (1) Base Month of 30 days and two (2) 30-days option months. The Period of Performance reads as follows:
Base Month Option Month I Option Month II
1.6 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.
1.6.1 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. Bruce Eveland, a PSNS Shop 57 General Foreman, or their designated proxies will perform a final product inspection with a contractor representative to ensure that the temporary storage tent meets the manufacturer’s product instructions and specifications. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.7 Location:
1.7.1 Place of Performance: The work to be performed under this contract will be performed at San Diego – North Island Naval Air Station, in front of Building 73.
1.7.2 Hours of Operation: The contractor is responsible for conducting business, between the hours of 07:20 AM PST and 04:02 PM PST, Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.7.3 Recognized Holidays: The Contractor is not required to perform services on these holidays.
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day
1.8 Security Requirements: Contractor personnel performing work under this contract must have proof of United States Citizenship (Green Badge) at time of the proposal submission, and must maintain the level of security required for the life of the contract. The security requirements are in accordance with the attached DD254.
1.8.1 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.8.2 Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE:
All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated.
The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan.
Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas.
The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.
In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.
The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.
1.8.3 Lock Combinations: The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.
These procedures shall be included in the Contractor’s Quality Control Plan.
1.9 Special Qualifications: The Contractor will provide the Contracting Officer Representative with written proof of being an Authorized Manufacturer Installer of the temporary storage tent.
1.10 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.11 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract:
perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.12 Key Personnel: The follow personnel are considered key personnel by the government:
PSNS Contracting Officer Representative (COR):
(TBA)
Bruce Eveland, Deputy Site Manager San Diego – North Island Naval Air Station Bldg 72 Roe St.
San Diego, CA 92135 Cell Phone: (619) 247-8743 E-mail: bruce.eveland@navy.mil
Todd Arnold, Shop 57 Process General Foreman Puget Sound Naval Shipyard and Intermediate Maintenance Facility – Bremerton 1400 Farragut Avenue, Bremerton, WA 98314 Cell Phone: (360) 340-5386 E-mail: todd.arnold@navy.mil
Alex Glemzu, Shop 57 Production Shop Planner Puget Sound Naval Shipyard and Intermediate Maintenance Facility – Bremerton 1400 Farragut Avenue, Bremerton, WA 98314 Work Phone: (360) 476-1042 E-Mail: alex.glemzu@navy.mil
The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 08:00 AM PST and 04:00 PM PST, Monday thru Friday, except Federal holidays or when the government facility is closed for administrative reasons.
1.12.1 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor Personnel will be required to obtain and wear badges in the performance of this contract while in or on government facilities, per local Security requirements.
1.13 Contractor Travel: Contractor will be required to travel CONUS and within the NCR during the performance of this contract to attend meetings, conferences, and training. The contractor may be required to travel to off-site training locations and to ship training aids to these locations in support of this PWS. Contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. All travel requires Government approval/authorization and notification to the COR.
1.14 Other Direct Costs: This category includes travel (outlined in 1.6.13), reproduction, and shipping expenses associated with training activities and visits to contractor facilities. It could also entail the renting of suitable training venues. The contracting officer must preapprove these costs.
1.15 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be
Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.16 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.17 Phase In /Phase Out Period: To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have personnel on board, during the seven (7) day phase in/ phase out periods. During the phase in period, the Contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PSNS Puget Sound Naval Shipyard PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: The Government will provide vehicular gate access for equipment and materials to complete the contracted work.
3.1 Facilities: The Government will provide laydown work area adjacent to the final installation site, in front of Building 73, outlined in the attached reference NBC-73 TENT.pdf. The Government shall provide access to Building 73 for the use of restrooms.
3.2 Utilities: The Government will provide 110 Volt outlets on the exterior of Building 73. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2 Facility Clearance: The contractor shall possess and maintain their UNCLASSIFIED facility clearance from the Defense Security Service. The Contractor and their employees acknowledge that they are not authorized to possess or use cameras, including camera-capable devices, inside the Classified Industrial Area and are responsible to maintain this security requirement. The Contractor’s employees, performing work in support of this contract shall have been granted an UNCLASSIFIED security clearance from the Defense Industrial Security Clearance Office.
The DD 254 is provided as Attachment.
4.3. Materials: The Contractor is responsible to provide the necessary materials to complete the work in this PWS.
4.3.1. One Vinyl Temporary Storage Tent consisting of a minimum:
o Vinyl Structure 24’ Wide X 34’ Long X 15’ Center Height X 11’ Side wall 18 OZ. Cover, Translucent White, Flame Retardant PVC Laminated fabric with polyester scrim.
Frame Members: 18” truss using heavy wall tubular steel on 8.5’ centers.
Base System Allows the Shelter to be built on a Dirt, Gravel, Asphalt, or Concrete
Foundation. You Do Not Need a Concrete Foundation or Knee Wall.
Unless otherwise stated, foundations other than concrete are assumed at 90% compaction or greater.
It is the customer’s responsibility to specify any foundation requirements prior to placing order. “Asphalt”.
Fabric will end at ground level.
All weld joints are coated for corrosion protection.
All connections are made using a male to female/slip fit junction.
o Side Panels
• Solid End Wall with personnel door
• Access end wall.
1 each - 8’ wide x 8’ high disappearing door and 1 each - personnel door.
Disappearing door to include all the necessary winch, trolleys, pulleys, cables, and manual winch.
Disclaimer: Disappearing doors are not a pre-engineered door system and should be considered a flap. Engineered door systems are available but require additional funds. Access panels are not engineered door systems, there is no warranty on the access end panel, the access panel is not warrantied against or designed at eh same engineering as the shelters, the access panels or panels are required to be secured down in high winds. The panel(s) vertical cables are to be clipped at the bottom to the anchoring devices and the cables are to be tightened and secured when the panel is always in the down position.
o Trim Seals fabric to building base rail.
4.4. Equipment: The Contractor is responsible to provide all necessary equipment to complete the work designated in the PWS.
PART 5
SPECIFIC TASKS
5. SPECIFIC TASKS:
5.1. Basic Services: The contractor shall provide services to acquire and install of a temporary storage tent, detailed in Paragraph 4.3.1 in front of Building 73, at San Diego – North Island Naval Air Station, as detailed in attached reference NBC-73 TENT.pdf.
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS):
6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
7. ATTACHMENT/TECHNICAL EXHIBIT LIST:
7.1 Attachment 1/Technical Exhibit 1 – Performance Requirements Summary:
7.2. Attachment 2/Technical Exhibit 2 – Deliverables Schedule:
7.3 Attachment 3/Technical Exhibit 3 – Estimated Workload Data:
7.4 Attachment 4/Technical Exhibit 4 – NBC-73 TENT.pdf:
TECHNICAL EXHIBIT 1
Performance Requirements Summary
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective (The Service required—usually a shall statement)
Standard Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)
Method of Surveillance
PRS # 1
The contractor shall acquire a temporary storage tent.
The contractor will acquire a temporary storage tent, detailed in Paragraph 4.3.1.
Zero deviation from Standard.
100 Percent Inspection, upon completion.
PRS # 2
The contractor shall install a temporary storage tent in the designated area, described in Attachment 4, as the front of Building 73.
The contractor provided will follow manufacturer installation instructions and local, state, and federal regulations.
Zero deviation from standard without prior authorization from the Contracting Officer Representative and the Manufacturer.
100 Percent Inspection, upon completion.
PRS # 3
The contractor shall maintain area in a clean condition.
The contractor shall be required to maintain a clean designated work area.
No more than two customer complaints per report.
Validated Customer Compliant received by COR.
PRS # 4
The contractor shall maintain a safe working environment.
The contractor shall be required to meet all OSHA safety and health standards.
No more than two customer complaints per report.
Validated Customer Compliant received by COR.
TECHNICAL EXHIBIT 2
Deliverables Schedule
Deliverable Frequency # of Copies Medium/Format Submit To Deliver One Storage Tent
1 Time 2 Copies Hard Copies. Storage Tent Install, ATTN: Bruce Eveland, Deputy Site Manager San Diego – North Island Naval Air Station Bldg 72 Roe St.
San Diego, CA 92135
Manufacturer’s Install Manual
Upon completion of Installation.
2 Copies 1 Hard Copy and 1 PDF Format
Storage Tent Install, ATTN: Bruce Eveland, Deputy Site Manager San Diego – North Island Naval Air Station Bldg 72 Roe St.
San Diego, CA 92135
TECHNICAL EXHIBIT 3
Estimated Workload Data
ITEM
NAME
ESTIMATED QUANTITY
1 Labor: Setup and Install of Storage Tent. 200 Man-Hours
2 Procurement of one-time purchase of Storage Tent. 1 TENT
TECHNICAL EXHIBIT 4
NBC-73 TENT.pdf
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each
STORAGE TENT
FFP
STORAGE TENT - TO BE IN ACCORDANCE WITH THE ATTACHED
PERFORMANCE WORK STATEMENT.
BRAND NAME OR EQUAL TO:
PN: BT243515
MANUFACTURE: BIG TOP MANUFACTURING
MFR NAME:______________________________________
BRAND:__________________________________________
NO:_____________________________________________
NOTE: VENDORS QUOTING EQUALS MUST SUBMIT THEIR BID WITH
MANUFACTURER SPECIFICATIONS (PDF FORMATTED) FOR
EVALUATION. BIDS RECEIVED FOR EQUALS WITHOUT
MANUFACTURER SPECIFICATIONS WILL BE NON-RESPONSIVE AND
NOT CONSIDERED.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
NSN: 5410
BRAND NAME/SOLE SOURCE: BN
MILSTRIP: N4523A20123052
PURCHASE REQUEST NUMBER: N4523A20123052
PROJECT: 6X3
SIGNAL CODE: A
PSC CD: 5410
NET AMT
CONTRACT DATA REQUIREMENTS LISTING
FFP
SEE ATTACHED CONTRACT DATA REQUIREMENTS LISTING (CDRL)
FOR DETAILS
PURCHASE REQUEST NUMBER: N4523A20123052
PURCHASE REQUEST NUMBER: N4523A20123052
0002AA 1 Each
CONTRACT DATA REQUIREMENTS LISTING
FFP
COMMERCIAL OFF THE SHELF (COTS) MANUALS AND ASSOCIATED
SUPPLEMENTAL DATA
EXHIBIT A, SEQUENCS A001, CLIN 0001
FOB: Destination
MILSTRIP: N4523A20123052
PURCHASE REQUEST NUMBER: N4523A20123052
0003 1 Each
INSTALLATION
FFP
ONSITE INSULLATION OF STORAGE TENT (CLIN 0001)
REFERENCE PERFORMANCE WORK STATEMENT FOR INSTALLATION
INSTRUCTIONS.
FOB: Destination
MILSTRIP: N4523A20253053
PURCHASE REQUEST NUMBER: N4523A20123052
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 N/A N/A N/A N/A 0002AA Destination Government Destination Government 0003 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 18-MAR-2022 1 PUGET SOUND NAVAL SHIPYARD & IMF
BRUCE EVELAND
SAN DIEGO DET, NAS CORONADO, BLDG
ROE STREET ACCESS
SAN DIEGO CA 92135
FOB: Destination
N4523A
0002 N/A N/A N/A N/A
0002AA 18-MAR-2022 1 PUGET SOUND NAVAL SHIPYARD & IMF
BRUCE EVELAND
SAN DIEGO DET, NAS CORONADO, BLDG
ROE STREET ACCESS
SAN DIEGO CA 92135
0003 18-MAR-2022 1 (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY REFERENCE
52.203-19 Prohibition on Requiring Certain Internal Confidentiality
Agreements or Statements
JAN 2017
52.204-7 System for Award Management OCT 2018 52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-21 Basic Safeguarding of Covered Contractor Information Systems
DEC 2021
52.204-22 Alternative Line Item Proposal JAN 2017 52.204-24 Representation Regarding Certain Telecommunications and
Video Surveillance Services or Equipment
DEC 2021
52.212-4 Contract Terms and Conditions--Commercial Products and Commercial Services
DEC 2021
52.232-1 Payments APR 1984 52.232-8 Discounts For Prompt Payment FEB 2002 52.232-11 Extras APR 1984 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2021
52.233-1 Disputes MAY 2014 52.243-1 Changes--Fixed Price AUG 1987 52.247-34 F.O.B. Destination NOV 1991 52.249-1 Termination For Convenience Of The Government (Fixed
Price) (Short Form)
APR 1984
252.203-7000 Requirements Relating to Compensation of Former DoD Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information
OCT 2016
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
DEC 2019
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2021
252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2020 252.204-7020 NIST SP 800-171 DoD Assessment Requirements NOV 2020 252.211-7008 Use of Government-Assigned Serial Numbers SEP 2010 252.213-7000 Notice to Prospective Suppliers on Use of Supplier
Performance Risk System in Past Performance Evaluations
SEP 2019
252.225-7001 Buy American And Balance Of Payments Program-- Basic DEC 2017 252.225-7002 Qualifying Country Sources As Subcontractors DEC 2017 252.225-7013 Duty-Free Entry--Basic APR 2020 252.225-7048 Export-Controlled Items JUN 2013 252.225-7974 (Dev) Representation Regarding Business Operations with the
Maduro Regime (DEVIATION 2020-O0005)
FEB 2020
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports
DEC 2018
252.232-7010 Levies on Contract Payments DEC 2006 252.232-7017 Accelerating Payments to Small Business Subcontractors--
Prohibition on Fees and Consideration
APR 2020
252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Items JAN 2021 252.247-7023 Transportation of Supplies by Sea FEB 2019
CLAUSES INCORPORATED BY FULL TEXT
52.211-6 BRAND NAME OR EQUAL (AUG 1999)
(a) If an item in this solicitation is identified as “brand name or equal,” the purchase description reflects the characteristics and level of quality that will satisfy the Government's needs. The salient physical, functional, or performance characteristics that “equal” products must meet are specified in the solicitation.
(b) To be considered for award, offers of “equal” products, including “equal” products of the brand name manufacturer, must--
(1) Meet the salient physical, functional, or performance characteristic specified in this solicitation;
(2) Clearly identify the item by--
(i) Brand name, if any; and
(ii) Make or model number;
(3) Include descriptive literature such as illustrations, drawings, or a clear reference to previously furnished descriptive data or information available to the Contracting Officer; and
(4) Clearly describe any modifications the offeror plans to make in a product to make it conform to the solicitation requirements. Mark any descriptive material to clearly show the modifications.
(c) The Contracting Officer will evaluate “equal” products on the basis of information furnished by the offeror or identified in the offer and reasonably available to the Contracting Officer. The Contracting Officer is not responsible for locating or obtaining any information not identified in the offer.
(d) Unless the offeror clearly indicates in its offer that the product being offered is an “equal” product, the offeror shall provide the brand name product referenced in the solicitation.
(End of provision)
52.211-16 VARIATION IN QUANTITY (APR 1984)
(a) A variation in the quantity of any item called for by this contract will not be accepted unless the variation has been caused by conditions of loading, shipping, or packing, or allowances in manufacturing processes, and then only to the extent, if any, specified in paragraph (b) below.
(b) The permissible variation shall be limited to:
10 Percent increase 10 Percent decrease This increase or decrease shall apply to Shall apply to each item specified in the delivery schedule..
(End of clause)
52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)
The Contractor is responsible for the delivery of each item quantity within allowable variations, if any. If the Contractor delivers and the Government receives quantities of any item in excess of the quantity called for (after considering any allowable variation in quantity), such excess quantities will be treated as being delivered for the convenience of the Contractor. The Government may retain such excess quantities up to $250 in value without compensating the Contractor therefor, and the Contractor waives all right, title, or interests therein. Quantities in excess of $250 will, at the option of the Government, either be returned at the Contractor's expense or retained and paid for by the Government at the contract unit price.
52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
(NOV 2021)
(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code(s) and small business size standard(s) for this acquisition appear elsewhere in the solicitation. However, the small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees if the acquisition--
(1) Is set aside for small business and has a value above the simplified acquisition threshold;
(2) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or
(3) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.
(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show--
(1) The solicitation number;
(2) The time specified in the solicitation for receipt of offers;
(3) The name, address, and telephone number of the offeror;
(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;
(5) Terms of any express warranty;
(6) Price and any discount terms;
(7) "Remit to" address, if different than mailing address;
(8) A completed copy of the representations and certifications at Federal Acquisition Regulation (FAR) 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically);
(9) Acknowledgment of Solicitation Amendments;
(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and
(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.
(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.
(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender's request and expense, unless they are destroyed during preaward testing.
(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions, including alternative line items (provided that the alternative line items are consistent with FAR subpart 4.10), or alternative commercial products or commercial services for satisfying the requirements of this solicitation. Each offer submitted will be evaluated separately.
(f) Late submissions, modifications, revisions, and withdrawals of offers:
(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that offers or revisions are due.
(2)(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--
(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or
(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or
(C) If this solicitation is a request for proposals, it was the only proposal received.
(ii) However, a late modification of an otherwise successful offer, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(3) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the offer wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(4) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .