ATTACHMENT_1_REVISED_SPECIFICATIONS_-_SPMYM219Q2464__(WATERJET_MACHINE).pdf
PDF 852 KB Posted
- Attached to
- WATER JET CUTTING MACHINE Federal contract opportunity
- Solicitation number
- SPMYM219Q2464
About this file
REVISED SPECIFICATION TO SPMYM219Q2464 FOR LIFTING ATTACHMENT REQUIREMENTS.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0003_(Waterjet_Cutting_Machine).pdf | ||
| Amendment_0002_(Waterjet_Cutting_Machine).pdf | ||
| Amendment_0001_(Waterjet_Cutting_Machine).pdf | ||
| EXHIBITS.pdf | ||
| RFQ_SPMYM219Q2464_(WATERJET_CUTTING_MACHINE).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PURCHASE AND INSTALLATION OF WATERJET CUTTING SYSTEM
1.SCOPE
1.1. Scope. The purchase description set forth below describes the minimum requirements of the Government for a Water Jet Cutting System. It is the Government’s intent that a single primary contractor be awarded this contract and be responsible for the provision of equipment, and the accomplishment of all work detailed by this specification.
2. REQUIREMENTS
2.1. Design. The item offered shall be new and a current commercially available model. A current model is defined as the manufacturer’s currently produced model which, on the date this solicitation is issued, has been designed, engineered, sold or is being offered for sale through advertisements or manufacturer’s published catalogue or brochures. Products such as a prototype unit, pre-production model, or experimental unit do not qualify as meeting the requirements specified herein. The systeme shall include all components, parts, and features necessary to meet the performance requirements specified herein. All parts subject to wear, breakage or distortion shall be accessible for adjustment, replacement, and repair.
2.2. Construction. The Water Jet Cutting System shall be constructed of parts that are new, without defects, and free of repairs. The structure shall withstand all forces encountered during operation of the Water Jet Cutting System to its maximum rating and capacity without distortion.
2.2.1. Surfaces. All surfaces shall be clean and free of harmful or extraneous materials. All edges shall be either rounded or beveled unless sharpness is required to perform a necessary function. The condition and finish of all surfaces shall be in accordance with the manufacturer's commercial practice.
2.2.2. Welding, Brazing, or Soldering. Welding, brazing, or soldering shall be employed only where specified in the original design. None of these operations shall be employed as a repair measure for any defective part. All major welds shall be thermal stress relieved.
2.2.3. Corrosion Control. All system components shall be protected against corrosion and deterioration by appropriate material selection, application of coatings and sealants. The system and its parts shall be painted on all sides, prior to assembly, except mating surfaces such as mounting flanges and motor shafts. Painting shall result in a highly wear-resistant finish, which guarantees continued protection to the surfaces covered against the specified environment under all service conditions. Exposed ferrous parts such as screws, bolts, nuts, washers shall be treated to resist corrosion in a salt-laden, moist, variable temperature atmosphere. Protection such as cadmium or chrome plating, galvanizing or other
ATTACHMENT 1
electrical/chemical process, or stainless steel is acceptable. Stainless steel parts shall be passivated. Aluminum parts shall be anodized or chemically treated followed by two coats of weather-resistant exterior paint. Dissimilar metals shall not be used in direct contact with each other without suitable means for preventing electrolytic corrosion. All paint shall be lead and chromate free.
2.2.4. Castings and Forgings. All castings and forgings shall be free of defects, scale, and mismatching. No processes such as welding, peening, plugging, or filling with solder or paste shall be used for reclaiming any defective part.
2.2.5. Fastening Devices. All screws, pins, bolts, and other fasteners shall be installed to prevent unintentional loosening. Fastening devices subject to removal or adjustment shall not be permanently installed.
2.2.6. Controls. All electrical, mechanical, hydraulic, and pneumatic operating controls shall be located convenient to the operator's work station(s).
2.2.7. OSHA Compliance. The equipment installation and its component parts shall be in compliance with 29 CFR 1910, NFPA 70 and NFPA 79. Approval shall be as specified under the “Approval” and “Acceptance” criteria in the OSHA regulations Subpart “O”, Machinery and Machine Guarding paragraph 1910.212 and Subpart “S” Electrical, paragraph
1910.303 and paragraph 1910.399.
2.2.8. Safety Signs and Labels. Safety signs and labels in accordance with NEMA Z535.4 shall be securely attached to the equipment in visible locations, at the point of hazard(s), with any safety precautions to be observed by the operator or maintenance personnel permanently marked on the signs.
2.2.9. Safety Guarding. Covers, guards, or other safety devices shall be provided per ANSI B11. The safety devices shall not interfere with the operation of the Water Jet Cutting System. The safety devices shall prevent unintentional contact with the guarded part, and shall be removable to facilitate inspection, maintenance, and repair of the parts.
2.2.10. Audible Noise Level. Audible noise emitted by the equipment shall not exceed 84 decibels (dB), measured on the “A” weighted scale of a standard Type II sound level meter, at the operator's work position or any point at a distance of three (3) feet from the equipment.
Noise generated by the work piece shall be excluded in determining compliance of the equipment with the 84 dB requirements.
2.2.11. Lubrication. Means shall be provided to ensure adequate lubrication for all moving parts. Recirculating lubrication systems shall include a filter that is cleanable or replaceable.
Each lubricant reservoir shall have at least a 24-hour capacity. Means shall be provided to indicate a low oil condition. When a low oil pressure condition occurs, the machine shall enter an emergency stop condition. All oil holes, grease fittings, and filler caps shall be accessible. A lubrication plate shall be securely attached to the equipment.
2.2.12. Interchangeability. All parts subject to replacement shall be manufactured to definite dimensions and tolerances. Replacement parts shall be interchangeable without requiring modification. Replacement parts are those that are subject to wear or failure such as gears, bearings, shafts, feed screws, drive belts, pumps, and seals. Electrical replacement parts shall include but not be limited to, motors, relays, fuses, switches, magnetics, pushbuttons, light bulbs, braking mechanisms, and solid-state devices. Tooling and accessories normally supplied as standard items shall also be considered replacement parts. Foreign-sourced replacement parts shall be interchangeable with domestically supplied components or be readily available from a domestic source.
2.2.13. Measuring and Indicating Device Graduations. All measuring and indicating devices on the Water Jet Cutting System shall be graduated in the inch/pound or both inch/pound and metric.
2.2.14. Calibration. The contractor shall provide calibration control instructions for each calibrated item.
2.3. Components. The Water Jet Cutting System shall consist of not less than the following components.
2.3.1. Cutting Table. The table shall provide material support and water level control. The system shall be capable of underwater or above water cutting. The water level shall be controllable by the control system at the operators console. The table shall have replaceable slats installed in a curved configuration.
2.3.2. Z-Axis. The system shall have a fully programmable servo motor driven Z axis. The system shall compensate for taper by adjusting the Z axis accordingly. The system shall automatically compensate the taper to produce two dimensional parts with tight tolerances at full speed. The automatic taper adjusts shall be based on material type, speed, and desired edge finish.
2.3.3. Axis Covers. All axis shall have waterproof covers. The Y-Axis and the vertical Z- Axis shall have 360° wraparound bellows. The X-Axis base shall have bellows and double shielding.
2.3.4. Abrasive Delivery System. Shall provide a continual supply of abrasive materials.
The system shall continuously monitor the abrasive level. The system shall have warning lamp and an audible warning indicator, located on the control cabinet provide visual and audio feedback of the abrasive level. The system shall have a dual stage hopper allowing continuous operation. All pressure vessels shall be ASME certified.
2.3.5. Cutting Head/s. A cutting head shall provide a high velocity abrasivejet cutting stream. The orifice shall be a diamond jewel. The system shall automatically pierce holes in brittle and composite materials without breakage or delamination. The same or an interchangble cutting head shall provide water only cutting stream.
2.3.6. Edge Finder. A guidance laser shall locate the edges to precisely position waterjet at an exact position on the work piece being cut.
2.3.7. Pump. A water pump shall be capable of generating at least 60,000 pounds per square inch. The pump shall have a control panel at pump for easy maintenance and diagnostics.
The motor starter and electrical panel shall be integrated on the pump frame. The pump shall have an intensifier with a ceramic plungers, a maintenance-free attenuator, and a two-stage filter bank that filters water of particulate matter to 0.5 micron. When the pump is powered down or the emergency stop is activated, solenoid valves shall automatically shut off both the filtered water and pump cooling water.
2.3.8. Operator Control Console. A mobile, wheeled, control console shall operate the Water Jet Cutting System. The console shall include a color touch screen monitor, keyboard, mouse, and USB port.
2.3.8.1. Pump Controls. All pump controls shall be at the Operator Control Consul. The pressure settings and pump on/off shall be displayed at the operator station. An integrated diagnostic screen displaying the status of shutdown sensors for low hydraulic oil level, high hydraulic oil temperature, low inlet water pressure, high bleed-down, and check valve temperature.
2.3.8.2. Controller Features. The machine controller shall consist of a CNC Controller.
The CNC unit shall provide programmable automatic control of machine functions, operating modes, axis movement and other part program directed functions for the Water Jet Cutting System. Movement in the X, Y, and Z axes shall be independent and shall be capable of independent positioning. Control features shall include Manual Data Input (MDI), simultaneous control of three axes (X, Y, and Z), linear and circular interpolation, programmable interface, part program and buffer edit capability, part program storage, fixed cycles, and control diagnostics to at least board level. The CNC shall direct machine functions from command data stored in memory. The data stored in memory shall be input by the USB port. The control shall initiate a halt and error signal should a fault condition occur in the control. The control shall automatically shut down when internal operating temperatures exceed safe operating limits. The system shall provide full electronic pressure control.
2.3.8.3. Controller Functions. Must have integrated computer numeric control programming with industry standard G & M code, a minimum 15” LCD monitor, keyboard, mouse, 64 gigabyte memory or better, minimum of 1 USB and 1 ethernet port, CAD drawing and editing tools, Z plane 3D drawing, icon based menu, automatic and full control of waterjet from a rolling mobile operator station with start/restart from an point on cut path, automatic time estimation, graphical programming, plate alignment compensation, part tabbing, multiple user home positions, full dimensioning and detailing, and compliant with industry standard files (DXF, DWG, IGS, CADKEY, CDL, HPL).
2.3.8.4. Hydraulic System. The hydraulic system shall conform to ISO 4413, and shall be complete, including all pumps, valves, piping, cylinders, and pressure controls including protection from over-pressurization.
2.3.9. Pneumatic System. The pneumatic system shall conform to ISO 4414, and shall be complete, including all pumps, valves, piping, cylinders, and pressure controls including protection from over-pressurization.
2.3.10. Electrical System. The machine shall conform to NFPA 79. The existing electrical power source available at the installation site is 480 Volts, 3 Phase. The machine’s electrical system shall be tolerant of voltage fluctuation of ± 10 percent. The electrical system shall be complete, including transformers required to modify the existing source voltage to the proper operating voltage of the equipment. A properly rated and fused single disconnect device, controlling all electrical power to the equipment, shall be utilized on the machine with means of lockout in the off position only.
2.3.10.1. Motors. Motors shall be rated for continuous duty and shall have ball or roller bearings of the sealed and permanently lubricated type. Alternating-current (AC) motors shall be designed to operate on 60-Hz and each motor enclosure shall meet the requirements for a drip-proof enclosure. All motors 1 HP and above shall meet the requirements of NEMA MG 1. Each motor shall have an identification plate to identify manufacturer, model identification, serial number, voltage, amperage, horsepower, phase, frequency and frame number written in the English language. Servo motors are exempt from these requirements. Motor horsepower shall be the manufacturer’s standard or standard optional horsepower as indicated on the manufacturer's design and construction drawing(s), unless otherwise specified herein.
2.3.10.2. Solid-State Components. Solid-state design shall be employed throughout for electronic components. Use of selenium and other similar aging devices shall be permitted only in the application of voltage surge protection to other solid-state components. Solid-state components shall not be adversely affected when subjected to power line transients and surges typically experienced in industrial environments. Series and parallel connections of solid-state devices without forced sharing circuitry for voltage and current, respectively, is not permitted. Solid-state devices shall be capable of handling the electrical load imposed by operation of the machine to its maximum capability.
2.3.10.3. Electrical Enclosures. Electrical components of the equipment shall be contained in enclosures of drip-proof construction and of minimum size consistent with good design practices and ventilation of components, meeting the requirements of NEMA Type 12.
2.3.10.4. Cable and Hose Carriers. All flexible power lines, cables, conduits, and hoses necessary to connect the linear sliding, powered, assemblies to stationary utilities and controls shall be contained within a flexible cable and hose carrier arrangement.
Conductors located on the cable and hose carrier shall be adequately cradled or secured at regular intervals and in an orderly manner. Cable and hose carrier design shall ensure that flexible conductors are not stretched, crimped, pinched, or scraped over the full travel of the track. A guide arrangement shall be provided to insure straight motion of the track, parallel to slide motion, without twist or binding. Each cable and hose carrier shall be located in a position that will allow access and egress to the operator and control panel without interference as well as afford the best possible protection of the conductors. All conductors shall be of sufficient length to allow full travel of connected components and shall be connected at both ends to junction boxes and manifolds in proximity to the track ends to facilitate replacement of conductors. All conductors shall be labeled at both ends.
Installation of the cable and hose carrier s in the overhead position is not allowed.
2.3.11. Energy Isolating Devices. The equipment shall be provided with energy isolation devices (e.g. power switches, safety devices, circuit breakers, valves) that protect personnel from the release of hazardous energy and are integral to the component being isolated and locked out. The devices shall be designed and manufactured such that they can be padlocked in the OFF position. This includes both mechanical and electrical devices. An energy isolation device shall be installed as the first energy control device on all major components of the system such that the component can be isolated at the component level.
2.4. Facility Electrical Connections. Electrical connections made to the facility electrical system shall conform to NFPA 70.
2.5. Hour Meter. The Water Jet Cutting System shall be equipped with an analog hour meter mounted on the main electrical panel visible from the outside. The hour meter shall be installed to display accumulated operating time of the main drive motor. The meter shall be of the non-resetting type and shall have a range of 0 to 99,999.9 hours in increments of 0.1 hours, and shall revert to zero (0) upon reaching the maximum count. The meter shall have a NEMA enclosure rating of 4X, and shall be mounted to withstand shock and vibration generated by the equipment in an accessible location.
2.6. Size and Capacity. The size of the system not including pump, controller and abrasive delivery system shall fit into a 18 foot by 11 foot area and operate under 110 inch height. The capacity of the Water Jet Cutting System shall be not less than specified in Table I.
Table I Capacity X, Y, Z Travel 10 feet x 6.5 feet x 1 foot Max. Cutting Thickness 10 inches Max. Rapid Traverse 700 in./min.
Pump Motor Power 50 hp.
Pump Operating Pressure 60,000 psi Power 480V, 3 Phase, 60 Hz Abrasive Hopper Capacity 900 lbs.
Work Table Height 39 in.
Work Table Load Capacity 500 lbs/sq. ft.
2.7. Alignment and Accuracy Tolerances. The alignment and accuracy tolerances of the Water Jet Cutting System shall be not greater than specified in Table II.
Table II Alignment and Accuracy Linear Positional Accuracy +/- 0.0015 in./3 ft Repeatability +/- 0.001in.
Ballbar Circularity +/- .0025 in.
2.8. Standard Equipment. All standard equipment required for proper operation of the Water Jet Cutting Table (such as special tools) shall be furnished.
2.9. Garnet. 2200 pounds of premium quality garnet shall be furnished.
2.10. Marking on Instruments, Control Panels, and Plates. All words on instruments, control panels, and plates shall be in the English language. Characters shall be engraved, etched, embossed, or stamped in boldface on a contrasting background. All plates shall be corrosion resistant.
2.10.1. PCB Label Plate. A label plate containing the PCB Certification information shall be permanently and securely attached in the vicinity of the manufacturer’s identification plate.
2.10.2. Lubrication Plate. A lubrication plate shall be permanently and securely attached to each machine. The plate shall contain the following information:
Points of lubricant application Servicing interval Type of lubricant Viscosity Military or Federal Specification for each lubricant (If applicable) Size and type of each lubricant filter
2.10.3. Nameplate. A nameplate shall be permanently and securely attached to each machine. The nameplate shall contain the information listed below. If the machine is a special model, the model designation shall include the model number of the basic standard machine and a suffix identified in the manufacturer's permanent records.
Nomenclature Manufacturer's name Manufacturer's model designation Manufacturer's serial number Power input (volts, total amps, phase, frequency) Contract Number or Order Number Date of manufacture
2.10.4. Identification Marking of Military Property. An Item Unique Identification Marking (IUID) shall be provided in accordance with MIL-STD-130N and all applicable documents within the standard with Machine Readable Information (MRI) for item identification marking and automatic data capture. The application of Human Readable Information (HRI) shall be used in combination with MRI and free text.
2.11. Technical Data. Three (3) hard copies and one (1) electronic copy(s) of technical data shall be provided with the machine. Technical data shall contain technical information, specifications, instructions for the operation, maintenance of the machine, recommended spare parts list, and SDS/Product Data sheets for OEM fluids. All copies of technical data shall be legible and written in the English language.
2.11.1. Operating and Maintenance (O&M) Manuals. O&M Manuals shall contain technical information, specifications, instructions for the operation, maintenance of the machine and recommended spare parts list. All copies of technical data shall be legible and written in the English language. Technical Data shall contain at a minimum:
a. Data shall enable an average journeyman mechanic to operate, program, maintain, and repair the equipment.
b. Complete instructions and information for all equipment, components, assemblies, subassemblies, attachments, and accessories.
c. Operating instructions including programming requirements, pre-operational checks, start up, shut down and emergency shutdown procedures.
d. Maintenance and service instructions, including all preventive maintenance schedules, and lubrication charts.
e. Trouble-shooting guides.
f. Parts list containing: illustrations, part numbers, part nomenclature, original manufacturer, cross reference numbers, and recommended spare parts, including quantities.
g. Energy control procedure, in accordance with 29 CFR 1910.147, to bring equipment to a zero energy state for maintenance.
h. All mechanical and electrical schematics with a table of contents showing discrete components, block diagrams, wiring diagrams with inputs and outputs identified, system electrical interface documents, and drawings for the specific model of all machine equipment/drives/controls supplied.
i. All final “as-built” contract drawings shall be provided on CD or DVD disc(s). The format of the drawing files shall be in AutoCAD version 2010 or older. Files shall have DWG or DXF extensions.
2.12. OSHA Approved Certification. The equipment specified herein shall be inspected and labeled by a Nationally Recognized Testing Laboratory (NRTL) as defined in 29 CFR 1910.7 and approved as defined in section 2.2.7 of this statement of work, OSHA Compliance. A satisfactory NRTL Field Evaluation Report shall be provided to the receiving activity after equipment delivery, and prior to destination testing.
2.13. PCB Certification. Written certification from the manufacturer that the equipment contains no detectable PCBs (less than two (2) parts-per-million) shall be provided. The certification shall be on manufacturer’s letterhead, and signed by a company official who is empowered to provide same. A PCB label plate stating the PCB compliance certification shall be supplied and attached to the equipment.
2.14. Workmanship. Workmanship of the Water Jet Cutting Table shall meet all requirements specified herein and shall be of a quality equal to that prevailing among manufacturers producing equipment of the type covered by this purchase description.
2.15. Lifting attachments. If lifting attachments are necessary for the installation or operation of the machine and the machine is supplied with them, then the lifting attachments need to meet the requirements in section 2.15. If the machine does not require lifting attachments for installation or operation and is not provided with any, then the requirements of section 2.15 do not need to be meet.
2.15.1. Bending strength. The allowable bending strength shall be 1/3 of the yield strength or 1/5 of the ultimate strength, whichever is the most conservative, of the lifting attachment material.
2.15.2. Shear strength. The shear strength shall be equal to 0.58 times the allowable design bending strength defined above.
2.15.3. Bearing strength. The bearing strength shall be equal to 0.3 times the ultimate strength of the lifting attachment material.
2.15.4. Lifting attachment size. The lifting attachments shall be sized based on actual weights plus 10% for unexpected growth in the weight of the load. The resulting value shall be further increased to reflect the loads induced by the angle the slings make to the plane the lifting attachments lie on. The attachments shall be oriented so the slings shall not pull out of the plane of the individual lifting attachment by more than 5º unless they are designed to withstand the resulting side load. The attachments shall be arranged so the load is lifted relatively level. If the equipment is intended to be stackable, provisions in the design shall be made to prevent damage to the lift points of the lower item if the upper item is not landed accurately or symmetrically. In addition, the individual loads for each point shall be calculated based on the configuration of the rigged equipment and the location of its center of gravity. These final values shall be referred to as the Working Load Limit (WLL).
2.15.5. Use of three or more lifting attachments. When installing three or more lifting attachments, only two shall be assumed to carry the load unless a spreader or strongback is used. The use of spreaders or strongbacks shall be kept to a minimum.
2.15.6. Allowable Stress Design. The structure supporting the lifting attachments shall be designed to sustain the various lateral loads imparted by the arrangement of the lifting attachments and the induced sling angle loads based on a buckling analysis per the American Institute of Steel Construction (AISC), Allowable Stress Design.
2.15.7. Lifting attachment load testing. The lifting attachments are required to withstand a load test of 200% (+5%-0%) of the Working Load Limit (WLL) for 2 minutes, if applicable per 2.15. Acceptance criteria shall be: No bending, cracking, or permanent deformation of the lifting attachments or associated structure. The contractor’s certified representative shall perform the load testing plus a pre- and post-load VT per the inspection requirements of American Welding Society (AWS) D1.1 and submit documentation of the satisfactory results of all the various tests, if applicable per paragraph 2.15. The lifting attachments shall be labeled with the WLL and the test date.
2.15.7.1. In certain cases, if applicable, the prior concurrence of the cognizant technical Code at PSNS & IMF, the load test may be waived and a magnetic particle test (MT) of the attachment weld substituted, meeting the acceptance criteria of MIL-STD-2035, Class 3 or equivalent standard as approved by the Government, provided the testing is performed by a certified third party and documentation of the satisfactory results are provided with the receipt of the equipment.
2.15.8. Calculations. All calculations required for the design of the lift points shall be performed by a Professional Engineer.
2.16. Installation. The contractor shall install the system by connecting electrical and plumbing connections. Electrical supply, air supply, water supply and drain are within 20 feet of installation location.
2.17. Commissioning. The contractor shall provide system start-up including installation review of installation to requirements, assembly, level and alignment, and initial startup of the system.
The contractor will flush the system and trouble shoot problems before handing it over to the government for full operation.
2.18. Training. The contractor shall provide minimum four (4) 8 hour days of system training for two (2) operators onsite after installation of machine at PSNS, Bremerton, Washington. In addition, the contractor will provide minimum four (4) hours of on-site system familiarization with the maintenance personnel. PSNS personnel operation hours are Monday through Friday, 7:20am to 4:30pm.
2.19. Warranty. One Year Warranty on Parts and Labor with Installation by Contractor.
Twelve (12) months from signature of Acceptance Handover Protocol.
2.19.1. Seller will at its sole and exclusive discretion, either replace or repair any machine or part defective in workmanship or material, at no charge to the Buyer.
2.19.2. Transportation charges are covered by Seller.
2.19.3. All warranty repairs must either be performed by, or authorized by Seller.
2.19.4. To obtain warranty service, Buyer has to contact Seller´s Service Department in written form and include information about serial number, date of acceptance handover and description of faults with photos or other documentation. Official Service contact information is part of machine Manual.
2.19.5. Materials or parts alleged to be defective shall be returned to Seller, at Seller’s request.
2.19.6. After the warranty repair or replacement of a defective part, Seller warranty for such part shall continue for ninety (90) days or for the remainder of the Original Limited Warranty, whichever is longer.
3. GOVERNMENT RESPONSIBILITIES
3.1. Completeness of the machine foundation, including chemical anchoring for the foundation bolts.
3.2. Confirmation of the adequacy of foundation.
3.3. Supply of power for installation of the machine according to the foundation plan.
3.4. Confirmation of delivery of the machine.
Notes:
a) Machine installation, leveling, and alignment will not begin until a minimum of 30 (thirty) days cure for the foundation.
b) Installation can be realized only in a completely finished building with proper environmental and working conditions. Nominal temperatures must be between 18-
22°C/64 -71 degrees F.
c) Storage of the machine in the Government facility will be indoors.
3.5. Government assistance is required during the entire installation process. Government will have available maintenance technicians during the installation of the machine, for auxiliary work to be performed.
3.6. Oils, greases and any other hazardous materials required for commissioning of the machine.
3.7. Provide copy to the contractor of the PSNS&IMF Lock-out/Tags Plus Program (OSH-11-
4. MISCELLANEOUS
4.1. Building site
4.1.1. Delivery address:
The "Ship/Deliver to" address on the Bill of Lading (B/L) should include the JML number as shown below.
Puget Sound Naval Shipyard & IMF Receiving Officer PSNS, N4523A Bldg. 514, JML-91143680-3682 1400 Farragut Ave.
Bremerton, WA 98314-5001
4.1.2. Conditions: The building does not have a loading dock; therefore, recommend the material delivery vehicle have an operational lift-gate. There is a freight elevator adjacent to the work site.
4.2. Admittance to the work site: Upon contract award, employees or representatives of the Contractor will require access to Naval Base Kitsap – Bremerton, refer to the security section of the issued contract to obtain access to Naval Base Kitsap – Bremerton.
NOTICE: Persons who are currently on probation or parole from a felony conviction cannot qualify for a Security Pass/ID Badge and will be denied access to the
PSNS&IMF CIA.
4.2.1. To obtain access to Naval Base Kitsap – Bremerton, refer to the security section of the issued contract.
4.2.2 Ten (10) business days prior to an on-site visit, the Contractor shall complete the visitor information portion of the PSNS&IMF “Visitor Badge Request”, PSNS form 5512/127, and if a vehicle is deemed necessary by the COR, a “Vehicle Pass Request for Access to the Controlled Industrial Area (CIA)”, PSNS&IMF Form 5530/25
4.2.3 Upon receipt of the Visitor Badge and/or Vehicle Pass requests, and at least five (5) business days before the NAVSEA CIA badges are needed, the sponsor (typically the COR or the Receiving Activity Point of Contact) will submit the request(s) to the Naval Base Kitsap – Bremerton Pass and I.D. Office.
4.2.4. Proof of Citizenship: Contractors working within the CIA are required to be United States citizens and must show proof of citizenship (see Navy Commercial Access Control System (NCACS) or solicitation/award documentation) prior to receiving a NAVSEA CIA badge.
4.2.5 Contractors will be allowed to bring company vehicles into the CIA based upon the nature of their work as determined by the Commanding Officer Representative in conjunction with the Industrial Security Officer.
4.3. Working Hours: All work is to be performed during PSNS&IMF’s regular work hours from 7:30 a.m. to 4:00 p.m., Monday through Friday except for Federal Holidays.
4.4. Restrictions
4.4.1. Restricted Colors: PSNS&IMF uses the colors magenta, yellow, red and blue to identify specially controlled materials. The Contractor is specifically prohibited from using magenta, yellow, red or blue colored plastic wrapping materials or bags, tape, or other covering materials.
4.4.2. Radio Restrictions: Operation of privately owned citizens band or amateur radio equipment (receive and transmit) within the geographic limits of PSNS&IMF is prohibited.
4.4.3. Computers and Cell phones: The use of company or privately owned personal computers and cellular telephones without photographic capability by contractor personnel at PSNS&IMF is restricted but not prohibited as outlined below.
a.) Company Owned Computer Equipment is only authorized for companies under current contract with the U.S. Government. If the KO/COR deems use of company-owned computer equipment necessary to execute the contract, the KO/COR is required to complete and submit an “AIS Security Survey for Visitor Computer Equipment” PSNS&IMF Form 5239/49 10 business days prior to use.
b.) Privately Owned Personal Computers and peripherals are prohibited at PSNS &
IMF.
c.) Cellular Telephones without photographic capability (as defined in Section 5.6.4 below) are authorized at Naval Base Kitsap and PSNS&IMF Government Activity.
Talking on a cellular phone is not permitted at any time while driving anywhere within the Government Activity.
4.4.4. Photography/Recording: Contractor personnel are prohibited from having photographic equipment (including cell phones and watches capable of taking pictures), tape recorders, zip drives, personal electronic management devices, or other recording devices in their possession while inside the government Controlled Industrial Area (CIA). The detail list of Prohibited Items is available upon request from the COR.
| 1.SCOPE |
| 1.1. Scope. The purchase description set forth below describes the minimum requirements of the Government for a Water Jet Cutting System. It is the Government’s intent that a single primary contractor be awarded this contract and be responsible for ... |
| 2. REQUIREMENTS |
| 2.1. Design. The item offered shall be new and a current commercially available model. A current model is defined as the manufacturer’s currently produced model which, on the date this solicitation is issued, has been designed, engineered, sold or i... |
| 2.2. Construction. The Water Jet Cutting System shall be constructed of parts that are new, without defects, and free of repairs. The structure shall withstand all forces encountered during operation of the Water Jet Cutting System to its maximum ra... |
| 2.2.1. Surfaces. All surfaces shall be clean and free of harmful or extraneous materials. All edges shall be either rounded or beveled unless sharpness is required to perform a necessary function. The condition and finish of all surfaces shall be i... |
| 2.2.2. Welding, Brazing, or Soldering. Welding, brazing, or soldering shall be employed only where specified in the original design. None of these operations shall be employed as a repair measure for any defective part. All major welds shall be the... |
| 2.2.3. Corrosion Control. All system components shall be protected against corrosion and deterioration by appropriate material selection, application of coatings and sealants. The system and its parts shall be painted on all sides, prior to assembly... |
| 2.2.4. Castings and Forgings. All castings and forgings shall be free of defects, scale, and mismatching. No processes such as welding, peening, plugging, or filling with solder or paste shall be used for reclaiming any defective part. |
| 2.2.5. Fastening Devices. All screws, pins, bolts, and other fasteners shall be installed to prevent unintentional loosening. Fastening devices subject to removal or adjustment shall not be permanently installed. |
| 2.2.6. Controls. All electrical, mechanical, hydraulic, and pneumatic operating controls shall be located convenient to the operator's work station(s). |
| 2.2.7. OSHA Compliance. The equipment installation and its component parts shall be in compliance with 29 CFR 1910, NFPA 70 and NFPA 79. Approval shall be as specified under the “Approval” and “Acceptance” criteria in the OSHA regulations Subpart “O... |
| 2.2.8. Safety Signs and Labels. Safety signs and labels in accordance with NEMA Z535.4 shall be securely attached to the equipment in visible locations, at the point of hazard(s), with any safety precautions to be observed by the operator or maintenan... |
| 2.2.9. Safety Guarding. Covers, guards, or other safety devices shall be provided per ANSI B11. The safety devices shall not interfere with the operation of the Water Jet Cutting System. The safety devices shall prevent unintentional contact with th... |
| 2.2.10. Audible Noise Level. Audible noise emitted by the equipment shall not exceed 84 decibels (dB), measured on the “A” weighted scale of a standard Type II sound level meter, at the operator's work position or any point at a distance of three (3)... |
| 2.2.11. Lubrication. Means shall be provided to ensure adequate lubrication for all moving parts. Recirculating lubrication systems shall include a filter that is cleanable or replaceable. Each lubricant reservoir shall have at least a 24-hour capa... |
| 2.2.12. Interchangeability. All parts subject to replacement shall be manufactured to definite dimensions and tolerances. Replacement parts shall be interchangeable without requiring modification. Replacement parts are those that are subject to wea... |
| 2.2.13. Measuring and Indicating Device Graduations. All measuring and indicating devices on the Water Jet Cutting System shall be graduated in the inch/pound or both inch/pound and metric. |
| 2.2.14. Calibration. The contractor shall provide calibration control instructions for each calibrated item. |
| 2.3. Components. The Water Jet Cutting System shall consist of not less than the following components. |
| 2.3.1. Cutting Table. The table shall provide material support and water level control. The system shall be capable of underwater or above water cutting. The water level shall be controllable by the control system at the operators console. The tab... |
| 2.3.2. Z-Axis. The system shall have a fully programmable servo motor driven Z axis. The system shall compensate for taper by adjusting the Z axis accordingly. The system shall automatically compensate the taper to produce two dimensional parts with ... |
| 2.3.3. Axis Covers. All axis shall have waterproof covers. The Y-Axis and the vertical Z-Axis shall have 360 wraparound bellows. The X-Axis base shall have bellows and double shielding. |
| 2.3.4. Abrasive Delivery System. Shall provide a continual supply of abrasive materials. The system shall continuously monitor the abrasive level. The system shall have warning lamp and an audible warning indicator, located on the control cabinet pro... |
| 2.3.5. Cutting Head/s. A cutting head shall provide a high velocity abrasivejet cutting stream. The orifice shall be a diamond jewel. The system shall automatically pierce holes in brittle and composite materials without breakage or delamination. T... |
| 2.3.6. Edge Finder. A guidance laser shall locate the edges to precisely position waterjet at an exact position on the work piece being cut. |
| 2.3.7. Pump. A water pump shall be capable of generating at least 60,000 pounds per square inch. The pump shall have a control panel at pump for easy maintenance and diagnostics. The motor starter and electrical panel shall be integrated on the pump... |
| 2.3.8. Operator Control Console. A mobile, wheeled, control console shall operate the Water Jet Cutting System. The console shall include a color touch screen monitor, keyboard, mouse, and USB port. |
| 2.3.8.1. Pump Controls. All pump controls shall be at the Operator Control Consul. The pressure settings and pump on/off shall be displayed at the operator station. An integrated diagnostic screen displaying the status of shutdown sensors for low hydr... |
| 2.3.8.2. Controller Features. The machine controller shall consist of a CNC Controller. The CNC unit shall provide programmable automatic control of machine functions, operating modes, axis movement and other part program directed functions for the ... |
| 2.3.8.3. Controller Functions. Must have integrated computer numeric control programming with industry standard G & M code, a minimum 15” LCD monitor, keyboard, mouse, 64 gigabyte memory or better, minimum of 1 USB and 1 ethernet port, CAD drawing an... |
| 2.3.8.4. Hydraulic System. The hydraulic system shall conform to ISO 4413, and shall be complete, including all pumps, valves, piping, cylinders, and pressure controls including protection from over-pressurization. |
| 2.3.9. Pneumatic System. The pneumatic system shall conform to ISO 4414, and shall be complete, including all pumps, valves, piping, cylinders, and pressure controls including protection from over-pressurization. |
| 2.3.10. Electrical System. The machine shall conform to NFPA 79. The existing electrical power source available at the installation site is 480 Volts, 3 Phase. The machine’s electrical system shall be tolerant of voltage fluctuation of ± 10 percent... |
| 2.3.10.1. Motors. Motors shall be rated for continuous duty and shall have ball or roller bearings of the sealed and permanently lubricated type. Alternating-current (AC) motors shall be designed to operate on 60-Hz and each motor enclosure shall me... |
| 2.3.10.2. Solid-State Components. Solid-state design shall be employed throughout for electronic components. Use of selenium and other similar aging devices shall be permitted only in the application of voltage surge protection to other solid-state ... |
| 2.3.10.3. Electrical Enclosures. Electrical components of the equipment shall be contained in enclosures of drip-proof construction and of minimum size consistent with good design practices and ventilation of components, meeting the requirements of N... |
| 2.3.10.4. Cable and Hose Carriers. All flexible power lines, cables, conduits, and hoses necessary to connect the linear sliding, powered, assemblies to stationary utilities and controls shall be contained within a flexible cable and hose carrier arr... |
2.3.11. Energy Isolating Devices. The equipment shall be provided with energy isolation devices (e.g. power switches, safety devices, circuit breakers, valves) that protect personnel from the release of hazardous energy and are integral to the compon...
| 2.4. Facility Electrical Connections. Electrical connections made to the facility electrical system shall conform to NFPA 70. |
| 2.5. Hour Meter. The Water Jet Cutting System shall be equipped with an analog hour meter mounted on the main electrical panel visible from the outside. The hour meter shall be installed to display accumulated operating time of the main drive motor.... |
| 2.6. Size and Capacity. The size of the system not including pump, controller and abrasive delivery system shall fit into a 18 foot by 11 foot area and operate under 110 inch height. The capacity of the Water Jet Cutting System shall be not less th... |
| 2.7. Alignment and Accuracy Tolerances. The alignment and accuracy tolerances of the Water Jet Cutting System shall be not greater than specified in Table II. |
| 2.8. Standard Equipment. All standard equipment required for proper operation of the Water Jet Cutting Table (such as special tools) shall be furnished. |
| 2.9. Garnet. 2200 pounds of premium quality garnet shall be furnished. |
| 2.10. Marking on Instruments, Control Panels, and Plates. All words on instruments, control panels, and plates shall be in the English language. Characters shall be engraved, etched, embossed, or stamped in boldface on a contrasting background. All... |
| 2.10.1. PCB Label Plate. A label plate containing the PCB Certification information shall be permanently and securely attached in the vicinity of the manufacturer’s identification plate. |
| 2.10.2. Lubrication Plate. A lubrication plate shall be permanently and securely attached to each machine. The plate shall contain the following information: |
| 2.10.3. Nameplate. A nameplate shall be permanently and securely attached to each machine. The nameplate shall contain the information listed below. If the machine is a special model, the model designation shall include the model number of the basi... |
| 2.10.4. Identification Marking of Military Property. An Item Unique Identification Marking (IUID) shall be provided in accordance with MIL-STD-130N and all applicable documents within the standard with Machine Readable Information (MRI) for item iden... |
| 2.11. Technical Data. Three (3) hard copies and one (1) electronic copy(s) of technical data shall be provided with the machine. Technical data shall contain technical information, specifications, instructions for the operation, maintenance of the m... |
| 2.11.1. Operating and Maintenance (O&M) Manuals. O&M Manuals shall contain technical information, specifications, instructions for the operation, maintenance of the machine and recommended spare parts list. All copies of technical data shall be legi... |
| a. Data shall enable an average journeyman mechanic to operate, program, maintain, and repair the equipment. |
| b. Complete instructions and information for all equipment, components, assemblies, subassemblies, attachments, and accessories. |
| c. Operating instructions including programming requirements, pre-operational checks, start up, shut down and emergency shutdown procedures. |
| d. Maintenance and service instructions, including all preventive maintenance schedules, and lubrication charts. |
| e. Trouble-shooting guides. |
| f. Parts list containing: illustrations, part numbers, part nomenclature, original manufacturer, cross reference numbers, and recommended spare parts, including quantities. |
| g. Energy control procedure, in accordance with 29 CFR 1910.147, to bring equipment to a zero energy state for maintenance. |
| h. All mechanical and electrical schematics with a table of contents showing discrete components, block diagrams, wiring diagrams with inputs and outputs identified, system electrical interface documents, and drawings for the specific model of all mac... |
| i. All final “as-built” contract drawings shall be provided on CD or DVD disc(s). The format of the drawing files shall be in AutoCAD version 2010 or older. Files shall have DWG or DXF extensions. |
| 2.12. OSHA Approved Certification. The equipment specified herein shall be inspected and labeled by a Nationally Recognized Testing Laboratory (NRTL) as defined in 29 CFR 1910.7 and approved as defined in section 2.2.7 of this statement of work, OSHA... |
| 2.13. PCB Certification. Written certification from the manufacturer that the equipment contains no detectable PCBs (less than two (2) parts-per-million) shall be provided. The certification shall be on manufacturer’s letterhead, and signed by a com... |
| 2.14. Workmanship. Workmanship of the Water Jet Cutting Table shall meet all requirements specified herein and shall be of a quality equal to that prevailing among manufacturers producing equipment of the type covered by this purchase description. |
| 2.15. Lifting attachments. If lifting attachments are necessary for the installation or operation of the machine and the machine is supplied with them, then the lifting attachments need to meet the requirements in section 2.15. If the machine does n... |
| 2.15.1. Bending strength. The allowable bending strength shall be 1/3 of the yield strength or 1/5 of the ultimate strength, whichever is the most conservative, of the lifting attachment material. |
| 2.15.2. Shear strength. The shear strength shall be equal to 0.58 times the allowable design bending strength defined above. |
| 2.15.3. Bearing strength. The bearing strength shall be equal to 0.3 times the ultimate strength of the lifting attachment material. |
| 2.15.4. Lifting attachment size. The lifting attachments shall be sized based on actual weights plus 10% for unexpected growth in the weight of the load. The resulting value shall be further increased to reflect the loads induced by the angle the sl... |
| 2.15.5. Use of three or more lifting attachments. When installing three or more lifting attachments, only two shall be assumed to carry the load unless a spreader or strongback is used. The use of spreaders or strongbacks shall be kept to a minimum. |
| 2.15.6. Allowable Stress Design. The structure supporting the lifting attachments shall be designed to sustain the various lateral loads imparted by the arrangement of the lifting attachments and the induced sling angle loads based on a buckling anal... |
| 2.15.7. Lifting attachment load testing. The lifting attachments are required to withstand a load test of 200% (+5%-0%) of the Working Load Limit (WLL) for 2 minutes, if applicable per 2.15. Acceptance criteria shall be: No bending, cracking, or per... |
| 2.15.7.1. In certain cases, if applicable, the prior concurrence of the cognizant technical Code at PSNS & IMF, the load test may be waived and a magnetic particle test (MT) of the attachment weld substituted, meeting the acceptance criteria of MIL-ST... |
2.15.8. Calculations. All calculations required for the design of the lift points shall be performed by a Professional Engineer.
| 2.16. Installation. The contractor shall install the system by connecting electrical and plumbing connections. Electrical supply, air supply, water supply and drain are within 20 feet of installation location. |
| 2.17. Commissioning. The contractor shall provide system start-up including installation review of installation to requirements, assembly, level and alignment, and initial startup of the system. The contractor will flush the system and trouble shoot... |
| 2.18. Training. The contractor shall provide minimum four (4) 8 hour days of system training for two (2) operators onsite after installation of machine at PSNS, Bremerton, Washington. In addition, the contractor will provide minimum four (4) hours of... |
| 2.19. Warranty. One Year Warranty on Parts and Labor with Installation by Contractor. Twelve (12) months from signature of Acceptance Handover Protocol. |
This is the start of the file's text. The full file is on GovTribe.