EXHIBITS_-_REQ_SPMYM219Q0907.pdf
PDF 810 KB Posted
- Attached to
- HORIZONTAL BORING MACHINE W INSTALLATION Federal contract opportunity
- Solicitation number
- SPMYM219Q0907
About this file
EXHIBITS - CDRLS (CONTRACT DELIVERABLES)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0002_RFQ_SPMYM219Q0907_(Boring_Machine).pdf | ||
| Updated_RFQ_SPMYM219Q0907_(_Horizontal_Boring_Machine).pdf | ||
| Amendment_0001_to_RFQ_SPMYM219Q0907.pdf | ||
| RFQ_SPMYM219Q0907_(BORING_MACHINE).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-2, AUG 96 PREVIOUS EDITION MAY BE USED. Page _1_ of _1_ Pages
CONTRACT DATA REQUIREMENTS LIST
(2 Data Items)
Form Approved OMB No. 0704-0188
The public reporting burden for this collect ion of information is est imated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any o ther aspect o f th i s co l lec t ion o f in fo rmat ion , in c lud ing suggest ions f o r reducin g the burden, to the Department o f Defense, Execut ive Se rv ices Di rec tora te (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collect ion of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM _______ OTHER SESS/MISC________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS
3. SUBTITLE
Electrical diagram
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81000E
5. CONTRACT REFERENCE
PER CONTRACT
6. REQUIRING OFFICE
PURCHASING ACTIVITY
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16* 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A*
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft Final
Reg Repro
16. REMARKS N4523A 0 1 0
15. TOTAL 0 1 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
CERTIFICATION/DATA REPORT
3. SUBTITLE
ENGINEERING DRAWINGS
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80678
5. CONTRACT REFERENCE
PER CONTRACT
6. REQUIRING OFFICE
PURCHASING ACTIVITY
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16 14. DISTRIBUTION
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
a. ADDRESSEE Final
Draft Reg Repro
16. REMARKS
Block 9 - Distribution Statement D. Distribution authorized to DoD and DoD contractors only.
Administration and operations only, effective 2/1/2019. Other U.S. requests shall be referred to COMNAVSEASYSCOM.
Block 4 - Tailored to allow vendor to provide only 10.2.4.
Block 10 - Proof of prior acceptance by a NAVSEA Activity shall be submitted in lieu of Personnel Qualifications Report prior to performance of any test.
Block 12 - Allow 45 Days from date of entry in WAWF for certification acceptance prior to material shipment.
Block 14 - Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite.
Upon submission in WAWF send email notifications to:
PSNS.WAWFQACertifications.FCM@navy.mil. Acceptance/Rejection of Certification/Data Report documentation will be accomplished with the corresponding material and will not be accomplished prior to shipment of material.
Document no.:
N4523A 0 1 0
15. TOTAL
0 1 0
G. PREPARED BY
/S/ F GILGER DOC 9015-3680
H. DATE
2/1/2019
I. APPROVED BY
/S/ P MEYERS
J. DATE
2/1/2019
17. PRICE GROUP
19. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
19. ESTIMATED
TOTAL PRICE
Block 9: Distribution Statement D. Distribution authorized to DoD and DoD contractors only. Administration and operations only, effective 2/1/2019. Other U.S. requests shall be referred to COMNAVSEASYSCOM.
Block 10 – Submit Electrical Diagram unless proof of prior acceptance by NAVSEA Activity.
Block 12 - Allow 45 Days from date of entry in WAWF for certification acceptance prior to material shipment
Block 14 - Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite.
Upon submission in WAWF send email notifications to:
PSNS.WAWFQACertifications.FCM@navy.mil. Acceptance/Rejection of Certification/Data Report documentation will be accomplished with the corresponding material and will not be accomplished prior to shipment of material.
0003AA A
A001
EXHIBITS
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.
Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
CERTIFICATION/DATA REPORT
3. SUBTITLE
GEOMETRIC MEASURING TEST REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80678
5. CONTRACT REFERENCE
PER CONTRACT
6. REQUIRING OFFICE
PURCHASING ACTIVITY
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D*
10. FREQUENCY
ONE/R
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16*
14. DISTRIBUTION
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
A. ADDRESSEE Final
N/A Draft Reg Repr o 16. REMARKS
Block 4: Tailored to allow the vendor to only provide: 10.1, 10.2, 10.2.1, 10.3, 10.3.1-Provide actual values IAW procurement specification. Ensure certs provided are traceable to material via unique markings, 10.5.
Block 9: Distribution Statement D. Distribution authorized to DoD and DoD contractors only. Administration and operations only, effective 2/1/2019. Other U.S. requests shall be referred to COMNAVSEASYSCOM.
Block 12 - Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite.
Upon submission in WAWF send email notifications to:
PSNS.WAWFQACertifications.FCM@navy.mil. Acceptance/Rejection of Certification/Data Report documentation will be accomplished with the corresponding material and will not be accomplished prior to shipment of material.
N4523A 0 1 0
TOTAL 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/s/ F GILGER 2/1/2019 /s/ P MEYERS 2/1/2019
Document no.: 9015-3680
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
0003AB B
B001
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.
Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER TMSS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
EQUIPMENT TECHNICAL MANUAL (SANITIZED)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-TMSS-81675
5. CONTRACT REFERENCE
PER CONTRACT
6. REQUIRING OFFICE
PURCHASING ACTIVITY
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D*
10. FREQUENCY
ONE/R
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16*
14. DISTRIBUTION
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
A. ADDRESSEE Final
N/A Draft Reg Repr o 16. REMARKS
Block 9: Distribution Statement D. Distribution authorized to DoD and DoD contractors only. Administration and operations only, effective 2/1/2019. Other U.S. requests shall be referred to COMNAVSEASYSCOM.
Block 12 - Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite.
Upon submission in WAWF send email notifications to:
PSNS.WAWFQACertifications.FCM@navy.mil. Acceptance/Rejection of Certification/Data Report documentation will be accomplished with the corresponding material and will not be accomplished prior to shipment of material.
N4523A 0 1 0
TOTAL 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/s/ F GILGER 2/1/2019 /s/ P MEYERS 2/1/2019
DD Form 1423-1, FEB 2001 Previous edition may be used. Page 1 of 1 Pages
DOCUMENT NO.: 9015-3680
17. PRICE
GROUP
18.
ESTIMATED
TOTAL
PRICE
0003AD
C
C001
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.
Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
CERTIFICATION/DATA REPORT
3. SUBTITLE
NATIONAL RECOGNIZED TESTING
LABORATORY (NRTL) CERTIFICATION
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80678 (DD)
5. CONTRACT REFERENCE
PER CONTRACT
6. REQUIRING OFFICE
PURCHASING ACTIVITY
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D*
10. FREQUENCY
ONE/R
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16*
14. DISTRIBUTION
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
A. ADDRESSEE Final
N/A Draft Reg Repr o 16. REMARKS
Block 4: Tailored to allow the vendor to only provide: 10.1, 10.2, 10.2.4, 10.3, 10.3.1-Provide actual values IAW procurement specification. Ensure certs provided are traceable to material via unique markings, 10.5.
Block 9: Distribution Statement D. Distribution authorized to DoD and DoD contractors only. Administration and operations only, effective 2/1/2019. Other U.S. requests shall be referred to COMNAVSEASYSCOM.
Block 12 - Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite.
Upon submission in WAWF send email notifications to:
PSNS.WAWFQACertifications.FCM@navy.mil. Acceptance/Rejection of Certification/Data Report documentation will be accomplished with the corresponding material and will not be accomplished prior to shipment of material.
N4523A 0 1 0
TOTAL 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/s/ F GILGER 2/1/2019 /s/ P MEYERS 2/1/2019
DOCUMENT NO.: 9015-3680
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
0003AD D
D001
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.
Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
CERTIFICATION/DATA REPORT
3. SUBTITLE
OSHA CERTIFICATION REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80678
5. CONTRACT REFERENCE
PER CONTRACT
6. REQUIRING OFFICE
PURCHASING ACTIVITY
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D*
10. FREQUENCY
ONE/R
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16*
14. DISTRIBUTION
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
A. ADDRESSEE Final
N/A Draft Reg Repr o 16. REMARKS
Block 4: Tailored to allow the vendor to only provide: 10.1, 10.2, 10.2.4, 10.3, 10.3.1-Provide actual values IAW procurement specification. Ensure certs provided are traceable to material via unique markings, 10.5.
Block 9: Distribution Statement D. Distribution authorized to DoD and DoD contractors only. Administration and operations only, effective 2/1/2019. Other U.S. requests shall be referred to COMNAVSEASYSCOM.
Block 12 - Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite.
Upon submission in WAWF send email notifications to:
PSNS.WAWFQACertifications.FCM@navy.mil. Acceptance/Rejection of Certification/Data Report documentation will be accomplished with the corresponding material and will not be accomplished prior to shipment of material.
N4523A 0 1 0
TOTAL 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/s/ F GILGER 2/1/2019 /s/ P MEYERS 2/1/2019
DOCUMENT NO.: 9015-3680
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
0003AE E
E001
| EXHIBIT A - ELECTRICAL DIAGRAM |
| EXHIBIT B - GEOMETRIC MEASURING TEST REPORT |
| EXHIBIT C - EQUIPMENT MANUALS |
| EXHIBIT D - NRTL CERTIFICATION |
| EXHIBIT E - OSHA APPROVED CERTIFICATION |
File details come from the government source that posted it.