STATEMENT OF WORK
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 8205-3000_REVISED_SPECIFICATION.pdf | ||
| 18-Q-3634_AMENDMENT_4.docx | DOCX document | |
| 18-Q-3634.docx | DOCX document | |
| 8205-3000_SPECIFICATION.pdf | ||
| 8205-3000_STATEMENT_OF_WORK.pdf | ||
| 8205-3000_CDRLS.pdf | ||
| 18-Q-3634_AMENDMENT_3.docx | DOCX document | |
| 18-Q-3634_AMENDMENT_2.docx | DOCX document | |
| 18-Q-3634_AMENDMENT.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
JML 8205-3001
1. BACKGROUND: This unit is being purchased and installed to expand our 3D additive manufacturing abilities here at PSNS & IMF in support of waterfront prototyping and training.
2. SCOPE OF WORK: (Describe what is being installed and what specific training is required, where the installation and training will be completed etc.) The printer installed, Materials Management System (MMS), and print server will be installed and training will occur at the 1400 Farragut location unless otherwise determined. The training will include:
1. Going from crate to printing test parts*
2. Going over printer functionality
3. Printer calibration
4. Slicer training
5. Q & A
3. CONTRACTOR FURNISHED MATERIAL FOR INSTALLATION AND TRAINING: All furnished materials will be available through the contractor knowledgebase of which PSNS&IMF will have online access. Contractor installation personnel will have an appropriate toolkit for installation.
4. SECURITY/BASE ACCESS REQUIREMENTS: Contractor will need CIA access for building 107for training and install.
6. QUALITY ASSURANCE REQUIREMENTS: PSNS&IMF -or- X Contractor is responsible for quality assurance. contractor will assume quality assurance as it relates to everything they are providing. It is expected that PSNS&IMF will provide adequate power to run the printer.
7. SECURITY REQUIREMENTS. 2-day entry by vender's installation technicians and up to 4 days for training personnel. All visitors must be U.S citizens with either a passport or certified birth certificate
8. TRAVEL REQUIREMENTS: unit is being installed on PSNS and travel will be a part of the install and setup quote. Is COD (carrier onboard delivery, i.e., when the contractor will be transported to a vessel underway) required? NO
9. GOVERNMENT SURVEILLANCE OFFICER: C/1010 Combined Trades Supervisor/ Cell manager (360)340-4229 or mitch.vanepps@navy.mil
10. OTHER CONSIDERATIONS:
10.1 Estimated Work Hours: approximately two eight hours back to back days to coincide with PSNS&IMF working hours
10.2 All technical clarifications will be coordinated through the Government Surveillance Officer. C/1010 Combined Trades Supervisor/ Cell manager (360)340-4229 or mitch.vanepps@navy.mil
10.3 Environmental and Safety Concerns: Evaluation form and report complete through 106 tooling evaluation
10.4 Laydown and Utilities Requirements: 220V, 15A, single phase circuit.
contractor will bring up the power cable but the wall unit/plug in must be provided by PSNS&IMF as contractor may not have info for the 220V female outlet configuration.