This statement of work outlines technical requirements for a universal testing machine. The Department of Agriculture Agricultural Research Service Midwest Area seeks delivery of a universal testing machine capable of withstanding 20 kilonewtons of force and handling load cells from 50 newtons to 10 kilonewtons. The machine must include a computer system and software compatible with the agency's existing Bluehill software and Instron fixtures. It should allow for cyclic testing, compression testing, and three-point bend testing. Installation and training are required at the agency's facility in Peoria, Illinois within eight weeks of award. The related solicitation is for the purchase of this universal testing machine to replace an aging unit and support ongoing research at the agency.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
(PRODUCT)
GENERAL INFORMATION.
1.0 SCOPE OF WORK.
Features, Components, Accessories, Modules, Software and/or Services to be included:
2.0 BACKGROUND.
CONTRACTOR REQUIREMENTS.
3.0 TECHNICAL REQUIREMENTS/TASKS. Technical Specifications/Salient Characteristics:
4.0 GOVERNMENT FURNISHED.
5.0 DELIVERABLES/SCHEDULE.
KEY DELIVERABLES:
Item No. Deliverable Objective Due
6.0 TRAVEL.
7.0 CONTRACTOR’S KEY PERSONNEL.
8.0 SECURITY REQUIREMENTS.
9.0 DATA RIGHTS.
10.0 SECTION 508 – ELECTRONIC AND INFORMATION TECHNOLOGY STANDARDS.
11.0 SECTION 889 OF THE NATIONAL DEFENSE AUTHORIZATION ACT CERTIFICATION
| Text1: Universal testing machine (UTM) |
| Text2: Vendor is to deliver a universal testing machine (UTM) for solid samples having a frame that can withstand 20 kilonewtons of force and with the capability to handle load cells ranging from 50 newtons to 10 kilonewtons. |
| Text13: We currently have a universal testing machine that needs to be replaced because it is approximately 20 years old nearing the End of (useful) Life (EOL) with circuit boards that are irreplaceable due to their age. This has led to downtime with essential CRIS research. An updated UTM with software that is compatible with our past data on Bluehill software is essential for continuation of CRIS research. My CRIS research revolves around using biochar as a substitute for carbon black filler in rubber composites, and the universal testing machine is essential in providing mechanical properties of the composite samples we create and study to achieve our research goals. It is necessary that equipment is from the same manufacturer as current equipment. Our current operator has extensive experience in the use and maintenance of Instron equipment and software. Besides myself, Dr. Gordon Selling and Dr. Atanu Biswas, both of Plant Polymer Research, and Dr. Kevin Liu, of Bio-oils Research, also utilize the universal testing machine in the study of various thin films that they create. |
| Text4: 1) Frame capable to withstand 20 kN of force with warranty |
| Text5: 2) System includes a complete computer system with software |
| Text6: 3)Software that is compatible with our past data on Bluehill software |
| Text7: 4) On-site installation and training. |
| Text8: 5) |
| Text9: 6) |
| Text10: 7) |
| Text11: 8) |
| Text14: 1) Frame capable to withstand 20 kN of force. |
| Text15: 2) Capable of handling load cells ranging from 50N to 10 kN. |
| Text16: 3) Capability for an extensometer for large-strain samples |
| Text17: 4) Ability to do cyclic testing |
| Text18: 5) Ability to do compression testing |
| Text19: 6) Ability to carry out a 3-point bend test |
| Text20: 7) Compatible with existing UTM "Instron" fixtures we have onsite |
| Text21: 8) Option available to add laser extensionmeter |
| Text22: 9) Runs on 120V AC power source |
| Text23: 10) Software compatible with older PPL UTM "Instron" software. |
| Text24: 11) Installation and training provided |
| Text25: 12) |
| Text27: Lab space and electric power. |
Government will be present during delivery and will install equipment. If needed, the government will supply a standard loading dock to accept delivery of the unit. The government will supply a location with ample space and a 120V, 60Hz electrical outlet to operate the instrument. Equipment will be delivered to 1815 North University Street, Peoria, Illinois. Attempts will be made to ensure that safety is met for all parties and the equipment delivered in a timely manner.
| Text29: 2 |
| Text30: 3 |
| Text31: 4 |
| Text32: 5 |
| Text33: 6 |
| Text34: 7 |
| Text35: 8 |
| Text65: Not applicable. |
| Text67: A copy of an official government photo ID (State-issued driver’s license or ID card, passport, green card, etc.) must be provided no later than one week before arrival of contract service technician(s) except in the case of emergency service, were only the name of the technician provided via email or telephone will be necessary. Security access to the NCAUR facility will be provided based on this identification requirement. |
| Text68: N/A |
| Text66: Not applicable. |
| Text69: N/A |
| Text70: Offeror will represent that: |
(1) It will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation.
(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that It does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services.
| Text29a: Introduction (or on-site training dependent on model selected) |
| Text30a: |
| Text31a: |
| Text32a: |
| Text33a: |
| Text34a: |
| Text35a: |
| Text28a: Delivery & Installation of New universal testing machine |
| Text28b: N/A |
| Text30b: |
| Text31b: |
| Text32b: |
| Text33b: |
| Text34b: |
| Text29b: |
| Text35b: |
| Text28: 1 |
| Text29c: At install, or scheduled for a later date. |
| Text30c: |
| Text31c: |
| Text32c: |
| Text33c: |
| Text34c: |
| Text28c: No later than 8 weeks after purchase order is provided to the vendor |
| Text35c: |