Installation_Data_Spreadsheet_-_A0003.xlsx
XLSX spreadsheet 951 KB Posted
- Attached to
- Electricity Procurement PJM Large 2016 Federal contract opportunity
- Solicitation number
- SPE600R160413
- Issued by
- Defense Logistics Agency Energy
About this file
Attachment III - Installation Data Sheet - A0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPE600-16-R-0413_-_A0004_.pdf | ||
| SF30_-_Amendment_0004.pdf | ||
| Attachment_III_-_Installation_Data_Spreadsheet_-_A0004.xlsx | XLSX spreadsheet | |
| SPE600-16-R-0413_-_A0003_-_Conformed_.pdf | ||
| SF30.pdf | ||
| Attachment_III_-_Installation_Data_Sheet_-_A0002.xlsx | XLSX spreadsheet | |
| A0002_Final.pdf | ||
| SPE600-16-R-0413_-_Conformed_A0002_.pdf | ||
| SF30_Amendment_0001_-_SPE600-16-R-0413.pdf | ||
| SPE600-16-R-0413_-_Amendment_0001.pdf | ||
| Attachment_I_-_Past_Performance.pdf | ||
| Attachment_III_-_Combined_Installation_Data_Sheet.xlsx | XLSX spreadsheet | |
| Attachment_IV_-_Argonne_Pricining_And_Invoice_Requirements.pdf | ||
| SPE600-16-R-0413.pdf | ||
| Attachment_II_-_Commercial_Subcontracting_Plan.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| LINE ITEM | INSTALLATION | Location | 12 MONTH CONSUMPTION (kWh) | NUMBER OF ACCOUNTS | Expiration of Last Contract | Current Provider | NOTES |
| 0001 | Marine Barracks | DC | 7,948,528 | 3 | December 2016 (SPE600-15-D-8003) | CNE | |
| 0002 | Building 6000, JB Anacostia - Bolling | DC | 55,102,059 | 1 | December 2016 (SPE600-15-D-8003) | CNE | |
| 0003 | JB Myer-Henderson Hall (McNair) | DC | 23,813,039 | 3 | December 2016 (SPE-15-D-8004) | WGE | |
| 0004 | Argonne National Laboratory - DR | IL | 315,281,509 | 1 | January 2017 (SPE600-16-D-8000) | CNE | |
| 0005 | DC Naval Research Laboartory | DC | 117,898,652 | 1 | December 2016 (SPE600-15-D-8003) | CNE | |
| 0006 | US Army Corps of Engineers | MD | 133,494,637 | 16 | December 2016 (SPE-15-D-8004) | WGE | |
| 0007 | National Agricultural Library | MD | 10,071,626 | 1 | December 2016 (SPE600-15-D-8003) | CNE | Account number updated to reflect full 22-digits |
| 0008 | Site 6910 | MD | 34,751,853 | 1 | December 2016 (SPE600-15-D-8003) | CNE | |
| 0009 | National Institutes of Health | MD | 39,215,694 | 3 | December 2016 (SPE600-15-D-8003) | CNE | Usage data for account 0550140222917001818033 displayed and account numbers for PEPCO accounts updated to reflect full 22-digits |
| 0010 | Fort Detrick - Forest Glen | MD | 1,289,420 | 3 | December 2016 (SPE600-15-D-8003) | CNE | Account numbers updated to reflect full 22-digits |
| 0011 | Fort Detrick - DR | MD | 176,800,978 | 3 | December 2016 (SPE600-15-D-8003) | CNE | |
| 0012 | Fort Meade | MD | 85,208,014 | 294 | December 2016 (SPE600-15-D-8003) | CNE | 6 Accounts removed, 1 CID Number changed |
| 0013 | VA MD Healthcare | MD | 23,038,727 | 1 | December 2016 (SPE-15-D-8004) | WGE | |
| 0014 | Loch Raven | MD | 2,941,893 | 5 | December 2016 (SPE600-15-D-8003) | CNE | |
| 0015 | MD Naval Research Laboratory | MD | 9,649,065 | 1 | December 2016 (SPE-15-D-8004) | WGE | |
| 0016 | Maryland Procurement Office - DR | MD | 462,016,107 | 3 | December 2016 (SPE600-15-D-8003) | CNE | |
| 0017 | Johns Hopkins Applied Physics Laboratory | MD | 5,714,022 | 1 | December 2016 (SPE600-15-D-8003) | CNE | |
| 0018 | CSSG | MD | 11,646,093 | 1 | December 2016 (SPE-15-D-8004) | WGE | |
| 0019 | DLA Installation Support Columbus | OH | 59,517,148 | 1 | December 2016 (SPE600-15-D-8003) | CNE | 17-digit Service Delivery Identifier added |
| 0020 | Carlisle Barracks - DR | PA | 26,547,000 | 2 | December 2016 (SPE600-15-D-8003) | CNE | |
| 0021 | DLA Distribution Susquehanna | PA | 42,933,347 | 3 | December 2016 (SPE600-15-D-8003) | CNE | |
| 0022 | Bettis Atomic Power Laboratory | PA | 37,094,948 | 2 | December 2016 (SPE600-15-D-8003) | CNE | Usage data has been updated, account numbers have been modified, and Supplier Agreement IDs have been added. |
| 0023 | Tobyhanna Army Depot - DR | PA | 63,724,000 | 1 | December 2016 (SPE600-15-D-8003) | CNE | |
| 0024 | Department of Defense | MD | 4,067,075 | 1 | December 2016 (SPE600-15-D-8003) | CNE | |
| 0025 | Catocin Mountain Complex - DR | MD | 10,825,849 | 1 | December 2016 (SPE600-15-D-8003) | CNE | |
| 0026 | Joint Base Anacostia-Bolling - DR | DC | 175,846,586 | 2 | December 2016 (SPE-16-D-8001) | Talen | |
| USNO Wash | DC | 955,230 | 1 | December 2016 (SPE-16-D-8001) | Talen | ||
| Washington Navy Yard -DR | DC | 19,449,536 | 1 | December 2016 (SPE-16-D-8001) | Talen | ||
| 0027 | Naval Academy | MD | 100,328,936 | 1 | December 2016 (SPE-16-D-8005) | WGL | Usage data for account updated |
| 0028 | Naval Maritime Intelligence Center -DR | MD | 7,450,711 | 1 | December 2016 (SPE-16-D-8005) | WGL | |
| Navy Carderock - DR | MD | 271,885,020 | 1 | December 2016 (SPE-16-D-8005) | WGL | ||
| Navy Medical Center Bethesda | MD | 41,621,865 | 2 | December 2016 (SPE-16-D-8005) | WGL | ||
| 0029 | NSA Philadelphia | PA | 32,861,932 | 1 | December 2016 (SPE-16-D-8001) | Talen | |
| 0030 | Philadelphia Depot Mechanicsburg -DR | PA | 65,234 | 1 | December 2016 (SPE-16-D-8005) | WGL | Data displayed is from 2014 |
| 0031 | Naval Station Great Lakes | IL | 114,574,208 | 1 | Not under Contract | ||
| 0032 | Earle Naval Weapons Station | NJ | 13,366,913 | 3 | December 2016 (SPE-16-D-8002) | SPG | |
| TOTAL: | 2,538,997,454 | 368 | |||||
| 5,077,994,908.75 | |||||||
| Note: This sheet is a summary of the historical usage of all installation accounts under this solicitation. | |||||||
| Account specific information can be found under each installation's respective tab. |
Note: Number in cell D39 represents 12 months of data. To reach totals for procurement, multiply each CLIN by 2 and subtract 1 month of data from CLIN 0004
TOTAL SOLICITATION ESTIMATE 5050972436
Marine Barracks Solicitation Item Number 0001
| Marine Barracks | ||||||||
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) |
| 1100r | 0550 1925 9690 7001 8015 28 | PEPCO | 9/23/15 | 133,800 | 33,600 | 31,200 | 69,000 | |
| 10/23/15 | 92,400 | 24,600 | 24,000 | 44,400 | ||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 11/20/15 | 73,200 | 18,600 | 18,000 | 36,600 | ||
| Rate Code: DMGT3 | 12/25/15 | 102,000 | 24,600 | 24,600 | 52,800 | |||
| 1/24/16 | 99,600 | 24,000 | 23,400 | 51,600 | ||||
| Capacity PLC: | 324.87 | 2/23/16 | 100,800 | 25,200 | 25,800 | 50,400 | ||
| Tramission PLC: | 327.42 | 3/22/16 | 94,200 | 24,600 | 24,000 | 45,600 | ||
| 4/25/16 | 100,800 | 25,200 | 25,800 | 49,200 | ||||
| 5/24/16 | 100,200 | 28,200 | 27,000 | 45,000 | ||||
| 6/26/16 | 141,000 | 34,200 | 33,000 | 73,200 | ||||
| 7/26/16 | 157,200 | 42,600 | 40,200 | 75,000 | ||||
| 8/25/16 | 161,400 | 44,400 | 40,800 | 76,200 | ||||
| Total | 1,356,600 | 349,800 | 337,800 | 669,000 |
| Marine Barracks | |||||||||
| Delivery Period: meter read in December 2016 through meter read in December 2018 | |||||||||
| Line Item | Account | new | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) |
| 1100s | 0550 1949 2010 7001 8141 26 | PEPCO | 9/22/15 | 478,039 | 107,653 | 104,938 | 265,448 | ||
| 10/22/15 | 288,822 | 71,892 | 69,083 | 147,847 | |||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 11/19/15 | 202,122 | 47,943 | 45,495 | 108,684 | |||
| Rate Code: DMGT1 | 12/24/15 | 267,856 | 61,877 | 60,107 | 145,872 | ||||
| 1/23/16 | 229,197 | 52,770 | 50,311 | 126,115 | |||||
| Capacity PLC: | 874.44 | 2/22/16 | 220,310 | 53,814 | 51,805 | 114,691 | |||
| Tramission PLC: | 886.59 | 3/21/16 | 225,925 | 57,323 | 55,531 | 113,071 | |||
| 4/24/16 | 259,789 | 64,580 | 61,432 | 133,776 | |||||
| This Account currently has 208 kW enrolled in a Demand Response Program | 5/23/16 | 310,023 | 81,128 | 75,132 | 153,763 | ||||
| 6/25/16 | 417,566 | 96,085 | 92,132 | 229,349 | |||||
| 7/25/16 | 429,703 | 108,348 | 104,575 | 216,781 | |||||
| 8/24/16 | 440,176 | 110,869 | 107,024 | 222,283 | |||||
| Total | 3,769,528 | 914,282 | 877,565 | 1,977,680 |
| Marine Barracks | ||||||||
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) |
| 1100u | 0550 1643 6135 7001 1740 57 | PEPCO | 9/23/15 | 317,400 | 78,600 | 72,600 | 166,200 | |
| 10/23/15 | 236,400 | 61,800 | 57,600 | 116,400 | ||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 11/20/15 | 189,000 | 48,600 | 43,800 | 97,200 | ||
| Rate Code: DMGT1 | 12/25/15 | 250,800 | 61,200 | 56,400 | 133,200 | |||
| 1/24/16 | 206,400 | 48,600 | 46,800 | 110,400 | ||||
| Capacity PLC: | 671.63 | 2/23/16 | 202,800 | 51,000 | 48,000 | 103,800 | ||
| Tramission PLC: | 664.17 | 3/22/16 | 186,600 | 50,400 | 46,800 | 90,000 | ||
| 4/25/16 | 211,200 | 52,800 | 52,200 | 106,800 | ||||
| 5/24/16 | 189,000 | 51,000 | 48,000 | 90,000 | ||||
| 6/26/16 | 257,400 | 61,800 | 57,600 | 136,800 | ||||
| 7/26/16 | 294,000 | 78,000 | 72,600 | 144,000 | ||||
| 8/25/16 | 281,400 | 75,000 | 69,000 | 138,000 | ||||
| Total | 2,822,400 | 718,800 | 671,400 | 1,432,800 | ||||
| 7,948,528 |
Building 6000 Solicitation Item Number 0002
| Building 6000, Bolling AFB | ||||||||
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) |
| 1105a | 0550 2000 8458 7001 8143 47 | PEPCO | 9/22/15 | 5,299,765 | 1,296,612 | 1,211,461 | 2,791,691 | |
| 10/22/15 | 4,515,500 | 1,189,335 | 1,111,670 | 2,214,495 | ||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 11/19/15 | 3,938,012 | 987,517 | 930,382 | 2,020,113 | ||
| Rate Code: DCHV | 12/24/15 | 5,058,399 | 1,211,292 | 1,155,764 | 2,691,343 | |||
| 1/23/16 | 4,105,418 | 964,806 | 932,275 | 2,208,337 | ||||
| Capacity PLC: | 10084.41 | 2/22/16 | 4,212,312 | 1,057,441 | 1,011,486 | 2,143,385 | ||
| Tramission PLC: | 10100.89 | 3/21/16 | 4,113,610 | 1,099,827 | 1,034,927 | 1,978,856 | ||
| 4/24/16 | 4,715,716 | 1,214,496 | 1,153,230 | 2,347,990 | ||||
| This Account currently has 3613 kW enrolled in a Demand Response Program | 5/23/16 | 4,229,026 | 1,125,232 | 1,070,952 | 2,032,842 | |||
| 6/25/16 | 5,066,642 | 1,229,188 | 1,166,292 | 2,671,162 | ||||
| 7/25/16 | 4,997,574 | 1,296,734 | 1,224,173 | 2,476,667 | ||||
| 8/24/16 | 4,850,085 | 1,292,541 | 1,212,954 | 2,344,590 | ||||
| Total | 55,102,059 | 13,965,021 | 13,215,566 | 27,921,471 |
JB Myer Solicitation Item Number 0003
| JB Myer - Henderson Hall | ||||||||
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) |
| 1110c | 0550 2006 9823 7001 3188 82 | Pepco | 10/1/15 | 1,025,989 | 264,204 | 247,984 | 513,800 | |
| 11/1/15 | 881,317 | 228,585 | 213,299 | 439,434 | ||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 12/1/15 | 811,483 | 204,249 | 189,647 | 417,586 | ||
| Rate Code: DCHV | 1/1/16 | 906,135 | 221,410 | 203,880 | 480,845 | |||
| 2/1/16 | 723,447 | 181,834 | 169,918 | 371,695 | ||||
| Capacity PLC: | 2239.79 | 3/1/16 | 752,555 | 197,471 | 181,183 | 373,902 | ||
| Tramission PLC: | 2248.28 | 4/1/16 | 973,649 | 251,056 | 238,652 | 483,939 | ||
| 5/1/16 | 870,770 | 232,120 | 219,093 | 419,557 | ||||
| 6/1/16 | 971,029 | 248,141 | 234,990 | 487,898 | ||||
| 7/1/16 | 1,120,519 | 280,419 | 258,676 | 581,423 | ||||
| 8/1/16 | 1,059,372 | 285,779 | 258,965 | 514,628 | ||||
| 9/1/16 | 1,150,642 | 327,487 | 286,317 | 536,838 | ||||
| Total | 11,246,907 | 2,922,755 | 2,702,604 | 5,621,545 |
| JB Myer - Henderson Hall (Fort McNair) | ||||||||
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) |
| 1110a | 0550 1951 7626 7001 8152 71 | Pepco | 9/20/15 | 949,149 | 241,273 | 215,634 | 492,242 | |
| 10/22/15 | 673,717 | 183,189 | 166,294 | 324,234 | ||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 11/22/15 | 503,996 | 132,532 | 121,952 | 249,512 | ||
| Rate Code: DCHV | 12/20/15 | 569,672 | 150,073 | 140,600 | 278,998 | |||
| 1/20/16 | 662,700 | 152,514 | 146,389 | 363,797 | ||||
| Capacity PLC: | 829.48 | 2/24/16 | 557,808 | 137,753 | 132,582 | 287,473 | ||
| Tramission PLC: | 859.67 | 3/22/16 | 561,392 | 153,090 | 143,458 | 264,845 | ||
| 4/21/16 | 607,708 | 161,204 | 150,956 | 295,546 | ||||
| 5/18/16 | 554,672 | 152,119 | 140,769 | 261,785 | ||||
| 6/17/16 | 825,702 | 209,500 | 188,446 | 427,755 | ||||
| 7/19/16 | 909,336 | 244,458 | 221,057 | 443,822 | ||||
| 8/17/16 | 1,029,995 | 278,769 | 251,844 | 499,382 | ||||
| Total | 8,405,847 | 2,196,474 | 2,019,981 | 4,189,391 |
| JB Myer - Henderson Hall (Fort McNair) | ||||||||
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) |
| 1110b | 0550 1880 2607 7001 3546 29 | Pepco | 9/15/15 | 391,572 | 98,049 | 91,992 | 201,531 | |
| 10/15/15 | 303,024 | 85,710 | 79,095 | 138,218 | ||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 11/13/15 | 311,389 | 80,454 | 76,776 | 154,159 | ||
| Rate Code: DCHV | 12/13/15 | 319,676 | 85,161 | 80,068 | 154,448 | |||
| 1/17/16 | 367,434 | 85,660 | 81,597 | 200,178 | ||||
| Capacity PLC: | 1998.63 | 2/15/16 | 293,999 | 74,635 | 70,441 | 148,923 | ||
| Tramission PLC: | 1930.96 | 3/14/16 | 334,864 | 92,179 | 86,357 | 156,327 | ||
| 4/17/16 | 369,671 | 96,243 | 92,288 | 181,139 | ||||
| 5/16/16 | 340,425 | 92,343 | 86,873 | 161,209 | ||||
| 6/18/16 | 395,556 | 96,399 | 90,239 | 208,919 | ||||
| 7/18/16 | 402,680 | 101,710 | 96,423 | 204,548 | ||||
| 8/17/16 | 329,995 | 89,695 | 82,966 | 157,333 | ||||
| Total | 4,160,285 | 1,078,238 | 1,015,115 | 2,066,932 |
23,813,039
Argonne Solicitation Item Number 0004
| Argonne National Laboratory | |||||||||
| Delivery Period: meter read date occurring in January 2017 through meter read date occurring in December 2018 | |||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Off Peak | Peak Demand (KW) | Intern Demand (KW) | Off Peak Demand (KW) |
| 1705a | 0556224009 | ComEd | 29-May-15 | 24,028,888 | 9,631,434 | 14,397,454 | 42995 | ||
| 29-Jun-15 | 30,138,491 | 11,483,672 | 18,654,819 | 49258 | |||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 29-Jul-15 | 29,674,470 | 11,495,474 | 18,178,996 | 49095 | |||
| Rate Code: R67 | 27-Aug-15 | 29,062,004 | 11,585,009 | 17,476,995 | 48256 | ||||
| 28-Sep-15 | 22,929,219 | 8,535,422 | 14,393,797 | 40179 | |||||
| Capacity PLC: | 45811.3289 | 23-Oct-15 | 22,064,654 | 9,346,358 | 12,718,296 | 43704 | |||
| Tramission PLC: | 40084.8088 | 23-Nov-15 | 27,161,282 | 10,175,849 | 16,985,433 | 40381 | |||
| 2-Dec-15 | 30,515,487 | 11,207,601 | 19,307,886 | 41547 | |||||
| 28-Jan-16 | 20,511,167 | 8,137,302 | 12,373,865 | 38629 | |||||
| 26-Feb-16 | 25,349,539 | 10,110,263 | 15,239,276 | 39601 | |||||
| 28-Apr-16 | 26,823,836 | 10,068,042 | 16,755,794 | 39186 | |||||
| 28-Apr-16 | 27,022,472 | 11,059,843 | 15,962,629 | 40538 | |||||
| Total | 315,281,509 | 122,836,269 | 192,445,240 |
Navy Research Lab Solicitation Item Number 0005
| DC Naval Research Laboratory | ||||||||
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) |
| 1120a | 0550 1953 9174 7001 8155 05 | PEPCO | 9/23/15 | 11,312,722 | 2,690,094 | 2,550,867 | 6,071,760 | |
| 10/25/16 | 9,667,977 | 2,448,387 | 2,321,303 | 4,898,286 | ||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 11/25/15 | 8,382,124 | 2,033,642 | 1,932,933 | 4,415,547 | ||
| Rate Code: DCHV | 12/22/15 | 10,476,906 | 2,449,273 | 2,354,635 | 5,672,998 | |||
| 1/27/16 | 8,342,259 | 1,924,821 | 1,873,401 | 4,544,037 | ||||
| Capacity PLC: | 2/28/16 | 8,406,595 | 2,065,797 | 1,987,098 | 4,353,700 | |||
| Tramission PLC: | 3/27/16 | 8,555,907 | 2,257,450 | 2,147,562 | 4,150,896 | |||
| 4/26/16 | 10,026,396 | 2,531,451 | 2,400,298 | 5,094,646 | ||||
| 5/29/16 | 9,008,259 | 2,345,285 | 2,241,064 | 4,421,911 | ||||
| 6/24/16 | 11,327,509 | 2,678,269 | 2,534,885 | 6,114,354 | ||||
| 7/26/16 | 11,261,983 | 2,872,185 | 2,713,433 | 5,676,365 | ||||
| 8/24/16 | 11,130,015 | 2,875,582 | 2,724,995 | 5,529,437 | ||||
| Total | 117,898,652 | 29,172,236 | 27,782,474 | 60,943,937 |
ACOE
Solicitation Item Number 0006
| Army Corps of Engineers | ||||||||||
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) | Intern Demand (KW) | Off Peak Demand (KW) |
| 7530071980 | BGE | 6/15/15 | 197,117 | 76,367 | 35,993 | 84,757 | ||||
| 7/15/15 | 446,616 | 177,378 | 83,816 | 185,422 | ||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 8/14/15 | 464,193 | 177,886 | 85,343 | 200,964 | ||||
| Rate Code: DCHV | 9/15/15 | 458,582 | 168,660 | 78,338 | 211,584 | |||||
| Capacity PLC: | 960.566569 | 10/14/15 | 164,562 | 46,511 | 38,223 | 79,828 | ||||
| Tramission PLC: | 978.344175 | 11/12/15 | 360,967 | 105,560 | 85,824 | 169,583 | ||||
| 12/12/15 | 365,531 | 106,309 | 82,336 | 176,886 | ||||||
| 1/14/16 | 395,705 | 107,832 | 80,859 | 207,014 | ||||||
| 2/12/16 | 370,570 | 111,371 | 81,484 | 177,715 | ||||||
| 3/14/16 | 397,009 | 103,428 | 79,801 | 213,780 | ||||||
| 4/14/16 | 400,163 | 112,889 | 89,765 | 197,509 | ||||||
| 5/13/16 | 371,179 | 110,704 | 88,974 | 171,501 | ||||||
| Total | 4,392,194 | 1,404,895 | 910,756 | 2,076,543 |
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) | Intern Demand (KW) | Off Peak Demand (KW) |
| 532634634 | BGE | 6/15/15 | 1,812,180 | 543,374 | 323,994 | 944,812 | ||||
| 7/15/15 | 3,847,020 | 1,191,961 | 709,191 | 1,945,868 | ||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 8/14/15 | 3,816,411 | 1,182,146 | 701,514 | 1,932,751 | ||||
| Rate Code: DCHV | 9/15/15 | 3,977,542 | 1,104,467 | 656,407 | 2,216,668 | |||||
| 10/14/15 | 1,532,826 | 356,347 | 269,629 | 906,850 | ||||||
| Capacity PLC: | 5431.818797 | 11/12/15 | 3,416,737 | 829,526 | 627,218 | 1,959,993 | ||||
| Tramission PLC: | 6073.112273 | 12/12/15 | 3,519,470 | 826,307 | 625,999 | 2,067,164 | ||||
| 1/14/16 | 3,908,048 | 834,867 | 625,451 | 2,447,730 | ||||||
| 2/12/16 | 3,441,362 | 836,025 | 625,770 | 1,979,567 | ||||||
| 3/14/16 | 3,630,336 | 784,242 | 588,474 | 2,257,620 | ||||||
| 4/14/16 | 3,598,310 | 856,883 | 649,719 | 2,091,708 | ||||||
| 5/13/16 | 3,385,996 | 823,643 | 623,100 | 1,939,253 | ||||||
| Total | 39,886,238 | 10,169,788 | 7,026,466 | 22,689,984 |
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) | Intern Demand (KW) | Off Peak Demand (KW) |
| 4176570540 | BGE | 6/15/15 | 23,896 | 9,408 | 3,998 | 10,490 | ||||
| 7/15/15 | 48,975 | 19,191 | 8,208 | 21,576 | ||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 8/14/15 | 47,297 | 19,937 | 8,259 | 19,101 | ||||
| Rate Code: DCHV | 9/15/15 | 48,908 | 19,673 | 7,943 | 21,292 | |||||
| 10/14/15 | 24,586 | 6,888 | 5,668 | 12,030 | ||||||
| Capacity PLC: | 124.082858 | 11/12/15 | 53,242 | 15,166 | 11,481 | 26,595 | ||||
| Tramission PLC: | 139.303045 | 12/12/15 | 57,451 | 14,593 | 10,167 | 32,691 | ||||
| 1/14/16 | 59,556 | 16,611 | 11,437 | 31,508 | ||||||
| 2/12/16 | 58,178 | 16,988 | 11,372 | 29,818 | ||||||
| 3/14/16 | 57,124 | 15,931 | 11,604 | 29,589 | ||||||
| 4/14/16 | 49,815 | 13,706 | 11,568 | 24,541 | ||||||
| 5/13/16 | 41,901 | 11,054 | 10,996 | 19,851 | ||||||
| Total | 570,929 | 179,146 | 112,701 | 279,082 |
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) | Intern Demand (KW) | Off Peak Demand (KW) |
| 4699218785 | BGE | 6/11/15 | 147,091 | 60,311 | 28,096 | 58,684 | ||||
| 7/13/15 | 432,138 | 144,642 | 70,540 | 216,956 | ||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 8/12/15 | 411,013 | 152,094 | 73,461 | 185,458 | ||||
| Rate Code: DCHV | 9/11/15 | 407,802 | 145,926 | 70,691 | 191,185 | |||||
| 10/12/15 | 140,419 | 34,127 | 28,853 | 77,439 | ||||||
| Capacity PLC: | 812.328296 | 11/10/15 | 362,036 | 93,894 | 79,010 | 189,132 | ||||
| Tramission PLC: | 894.765544 | 12/10/15 | 392,330 | 93,676 | 73,954 | 224,700 | ||||
| 1/12/16 | 429,532 | 93,661 | 72,445 | 263,426 | ||||||
| 2/10/16 | 392,641 | 98,201 | 72,814 | 221,626 | ||||||
| 3/10/16 | 394,283 | 102,325 | 78,590 | 213,368 | ||||||
| 4/12/16 | 428,618 | 106,003 | 86,881 | 235,734 | ||||||
| 5/11/16 | 379,640 | 99,038 | 82,462 | 198,140 | ||||||
| Total | 4,317,543 | 1,223,898 | 817,797 | 2,275,848 |
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) | Intern Demand (KW) | Off Peak Demand (KW) |
| 4977931411 | BGE | 6/15/15 | 52,423 | 16,419 | 9,348 | 26,656 | ||||
| 7/15/15 | 113,531 | 36,883 | 20,876 | 55,772 | ||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 8/14/15 | 114,285 | 36,976 | 20,944 | 56,365 | ||||
| Rate Code: DCHV | 9/15/15 | 120,600 | 35,601 | 19,745 | 65,254 | |||||
| 10/14/15 | 45,624 | 10,748 | 8,431 | 26,445 | ||||||
| Capacity PLC: | 188.952423 | 11/12/15 | 103,632 | 25,593 | 20,024 | 58,015 | ||||
| Tramission PLC: | 183.651196 | 12/12/15 | 105,830 | 25,271 | 19,413 | 61,146 | ||||
| 1/14/16 | 115,793 | 25,075 | 19,088 | 71,630 | ||||||
| 2/12/16 | 100,020 | 24,738 | 18,863 | 56,419 | ||||||
| 3/14/16 | 107,221 | 23,774 | 18,413 | 65,034 | ||||||
| 4/14/16 | 108,956 | 26,361 | 20,584 | 62,011 | ||||||
| 5/13/16 | 102,270 | 25,294 | 19,720 | 57,256 | ||||||
| Total | 1,190,185 | 312,733 | 215,449 | 662,003 |
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) | Intern Demand (KW) | Off Peak Demand (KW) |
| 6548003227 | BGE | 6/15/15 | 266,071 | 82,148 | 47,555 | 136,368 | ||||
| 7/15/15 | 577,602 | 187,003 | 107,472 | 283,127 | ||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 8/14/15 | 579,086 | 186,032 | 106,626 | 286,428 | ||||
| Rate Code: DCHV | 9/15/15 | 602,815 | 176,936 | 100,896 | 324,983 | |||||
| 10/14/15 | 222,974 | 52,378 | 41,063 | 129,533 | ||||||
| Capacity PLC: | 949.906273 | 11/12/15 | 499,018 | 121,719 | 94,973 | 282,326 | ||||
| Tramission PLC: | 1018.12918 | 12/12/15 | 518,397 | 122,205 | 92,103 | 304,089 | ||||
| 1/14/16 | 579,133 | 125,058 | 92,438 | 361,637 | ||||||
| 2/12/16 | 530,324 | 129,587 | 93,859 | 306,878 | ||||||
| 3/14/16 | 556,277 | 120,264 | 90,437 | 345,576 | ||||||
| 4/14/16 | 528,946 | 126,029 | 96,995 | 305,922 | ||||||
| 5/13/16 | 494,315 | 121,327 | 93,689 | 279,299 | ||||||
| Total | 5,954,958 | 1,550,686 | 1,058,106 | 3,346,166 |
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) | Intern Demand (KW) | Off Peak Demand (KW) |
| 7121773616 | BGE | 6/15/15 | 6,045 | 1,849 | 1,095 | 3,101 | ||||
| 7/15/15 | 12,117 | 3,692 | 2,247 | 6,178 | ||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 8/14/15 | 12,543 | 4,034 | 2,350 | 6,159 | ||||
| Rate Code: DCHV | 9/15/15 | 11,668 | 3,492 | 2,023 | 6,153 | |||||
| 10/14/15 | 4,894 | 1,198 | 802 | 2,894 | ||||||
| Capacity PLC: | 23.480387 | 11/12/15 | 10,877 | 2,847 | 1,555 | 6,475 | ||||
| Tramission PLC: | 43.623253 | 12/12/15 | 16,837 | 4,032 | 2,198 | 10,607 | ||||
| 1/14/16 | 20,857 | 4,986 | 2,938 | 12,933 | ||||||
| 2/12/16 | 27,240 | 6,592 | 3,925 | 16,723 | ||||||
| 3/14/16 | 22,615 | 5,147 | 3,002 | 14,466 | ||||||
| 4/14/16 | 15,655 | 3,472 | 2,001 | 10,182 | ||||||
| 5/13/16 | 11,003 | 2,519 | 1,671 | 6,813 | ||||||
| Total | 172,351 | 43,860 | 25,807 | 102,684 |
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) | Intern Demand (KW) | Off Peak Demand (KW) |
| 8382912038 | BGE | 5/31/15 | 156,473 | 35,808 | 30,734 | 89,931 | ||||
| 7/7/15 | 255,341 | 87,939 | 43,661 | 123,741 | ||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 8/6/15 | 227,546 | 80,370 | 41,387 | 105,789 | ||||
| Rate Code: DCHV | 9/4/15 | 210,119 | 73,911 | 37,743 | 98,465 | |||||
| 9/30/15 | 175,197 | 56,410 | 29,518 | 89,269 | ||||||
| Capacity PLC: | 418.172226 | 11/5/15 | 211,284 | 53,257 | 44,504 | 113,523 | ||||
| Tramission PLC: | 389.823378 | 12/4/15 | 167,949 | 38,738 | 31,460 | 97,751 | ||||
| 1/7/16 | 193,196 | 41,650 | 33,659 | 117,887 | ||||||
| 2/4/16 | 167,078 | 39,384 | 31,279 | 96,415 | ||||||
| 3/4/16 | 180,205 | 45,051 | 35,754 | 99,400 | ||||||
| 4/6/16 | 201,824 | 49,066 | 40,586 | 112,172 | ||||||
| 5/5/16 | 176,594 | 44,265 | 37,036 | 95,293 | ||||||
| Total | 2,322,806 | 645,849 | 437,321 | 1,239,636 |
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) | Intern Demand (KW) | Off Peak Demand (KW) |
| 8904102657 | BGE | 6/15/15 | 289,102 | 76,602 | 51,316 | 161,184 | ||||
| 7/15/15 | 266,461 | 83,543 | 48,255 | 134,663 | ||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 8/14/15 | 251,590 | 84,292 | 47,059 | 120,239 | ||||
| Rate Code: DCHV | 9/15/15 | 274,508 | 82,469 | 46,429 | 145,610 | |||||
| 10/14/15 | 246,153 | 71,971 | 46,880 | 127,302 | ||||||
| Capacity PLC: | 460.510722 | 11/12/15 | 234,792 | 35,894 | 28,501 | 170,397 | ||||
| Tramission PLC: | 531.881351 | 12/12/15 | 235,289 | 56,795 | 44,575 | 133,919 | ||||
| 1/14/16 | 267,796 | 59,269 | 43,477 | 165,050 | ||||||
| 2/12/16 | 236,047 | 59,171 | 41,508 | 135,368 | ||||||
| 3/14/16 | 252,536 | 55,643 | 41,537 | 155,356 | ||||||
| 4/14/16 | 242,808 | 60,015 | 47,357 | 135,436 | ||||||
| 5/13/16 | 225,258 | 56,438 | 45,125 | 123,695 | ||||||
| Total | 3,022,340 | 782,102 | 532,019 | 1,708,219 |
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) | Intern Demand (KW) | Off Peak Demand (KW) |
| 74805129 | BGE | 6/15/15 | 148,678 | 37,880 | 24,453 | 86,345 | ||||
| 7/15/15 | 140,944 | 41,883 | 24,777 | 74,284 | ||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 8/14/15 | 142,173 | 43,928 | 26,126 | 72,119 | ||||
| Rate Code: DCHV | 9/15/15 | 146,196 | 40,223 | 23,922 | 82,051 | |||||
| 10/14/15 | 128,444 | 35,098 | 23,907 | 69,439 | ||||||
| Capacity PLC: | 217.733389 | 11/12/15 | 127,811 | 30,988 | 23,514 | 73,309 | ||||
| Tramission PLC: | 223.081921 | 12/12/15 | 129,462 | 27,625 | 20,779 | 81,058 | ||||
| 1/14/16 | 145,358 | 30,541 | 23,360 | 91,457 | ||||||
| 2/12/16 | 126,656 | 29,191 | 22,031 | 75,434 | ||||||
| 3/14/16 | 136,704 | 30,757 | 23,423 | 82,524 | ||||||
| 4/14/16 | 133,755 | 33,369 | 25,279 | 75,107 | ||||||
| 5/13/16 | 126,568 | 30,724 | 23,277 | 72,567 | ||||||
| Total | 1,632,749 | 412,207 | 284,848 | 935,694 |
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) | Intern Demand (KW) | Off Peak Demand (KW) |
| 9487666128 | BGE | 6/15/15 | 74,294 | 24,254 | 14,548 | 35,492 | ||||
| 7/15/15 | 68,213 | 26,870 | 11,230 | 30,113 | ||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 8/14/15 | 66,276 | 27,091 | 11,242 | 27,943 | ||||
| Rate Code: DCHV | 9/15/15 | 66,349 | 25,853 | 10,717 | 29,779 | |||||
| 10/14/15 | 61,390 | 21,037 | 13,012 | 273,341 | ||||||
| Capacity PLC: | 145.985499 | 11/12/15 | 62,618 | 17,691 | 14,379 | 30,548 | ||||
| Tramission PLC: | 167.220299 | 12/12/15 | 65,905 | 16,617 | 12,629 | 36,659 | ||||
| 1/14/16 | 68,595 | 17,598 | 12,973 | 38,024 | ||||||
| 2/12/16 | 70,113 | 17,260 | 12,086 | 40,767 | ||||||
| 3/14/16 | 75,642 | 17,041 | 12,696 | 45,905 | ||||||
| 4/14/16 | 72,811 | 17,725 | 13,646 | 41,440 | ||||||
| 5/13/16 | 69,838 | 17,083 | 13,381 | 39,374 | ||||||
| Total | 822,044 | 246,120 | 152,539 | 669,385 |
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) | Intern Demand (KW) | Off Peak Demand (KW) |
| 9798166749 | BGE | 6/5/15 | 355,123 | 91,459 | 69,491 | 194,173 | ||||
| 7/7/15 | 380,861 | 123,072 | 66,527 | 191,262 | ||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 8/6/15 | 365,001 | 124,394 | 66,698 | 173,909 | ||||
| Rate Code: DCHV | 9/4/15 | 351,767 | 117,459 | 63,508 | 170,800 | |||||
| 9/30/15 | 319,007 | 98,577 | 53,610 | 166,820 | ||||||
| Capacity PLC: | 636.700232 | 11/5/15 | 391,799 | 96,958 | 78,785 | 216,056 | ||||
| Tramission PLC: | 581.753762 | 12/4/15 | 316,351 | 75,844 | 60,351 | 180,156 | ||||
| 1/7/16 | 364,206 | 82,436 | 65,342 | 216,428 | ||||||
| 2/4/16 | 287,355 | 71,018 | 55,887 | 160,450 | ||||||
| 3/4/16 | 312,907 | 75,077 | 59,598 | 178,232 | ||||||
| 4/6/16 | 366,057 | 85,277 | 69,060 | 211,720 | ||||||
| 5/5/16 | 325,020 | 82,043 | 66,573 | 176,404 | ||||||
| Total | 4,135,454 | 1,123,614 | 775,430 | 2,236,410 |
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) | Intern Demand (KW) | Off Peak Demand (KW) |
| 2831042603 | BGE | 6/15/15 | 51,738 | 17,593 | 10,960 | 23,185 | ||||
| 7/15/15 | 47,284 | 20,835 | 8,764 | 17,685 | ||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 8/14/15 | 46,932 | 21,786 | 8,713 | 16,433 | ||||
| Rate Code: DCHV | 9/15/15 | 49,159 | 21,676 | 8,478 | 19,005 | |||||
| 10/14/15 | 43,802 | 17,799 | 9,971 | 16,032 | ||||||
| Capacity PLC: | 119.793376 | 11/12/15 | 48,281 | 15,184 | 12,197 | 20,900 | ||||
| Tramission PLC: | 151.407588 | 12/12/15 | 56,366 | 16,260 | 12,162 | 27,944 | ||||
| 1/14/16 | 62,348 | 17,297 | 12,421 | 32,630 | ||||||
| 2/12/16 | 62,118 | 17,031 | 11,462 | 33,625 | ||||||
| 3/14/16 | 63,134 | 15,985 | 11,765 | 35,384 | ||||||
| 4/14/16 | 57,290 | 16,177 | 12,535 | 28,578 | ||||||
| 5/13/16 | 44,408 | 14,075 | 11,179 | 19,154 | ||||||
| Total | 632,860 | 211,698 | 130,607 | 290,555 |
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) | Intern Demand (KW) | Off Peak Demand (KW) |
| 8357573508 | BGE | 7/2/15 | 4,292,940 | 1,304,036 | 778,582 | 2,210,322 | ||||
| 8/4/15 | 4,843,492 | 1,411,246 | 846,357 | 2,585,889 | ||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 9/2/15 | 4,178,333 | 1,271,339 | 761,365 | 2,145,629 | ||||
| Rate Code: DCHV | 9/30/15 | 4,110,700 | 1,190,065 | 712,778 | 2,207,857 | |||||
| 11/3/15 | 4,613,451 | 1,075,528 | 808,574 | 2,729,349 | ||||||
| Capacity PLC: | 6115.918906 | 12/2/15 | 4,033,081 | 930,562 | 696,194 | 2,406,325 | ||||
| Tramission PLC: | 7061.733085 | 1/5/16 | 4,663,302 | 1,007,804 | 752,931 | 2,902,567 | ||||
| 2/2/16 | 3,909,817 | 936,809 | 698,228 | 2,274,780 | ||||||
| 3/2/16 | 3,958,143 | 909,988 | 679,075 | 2,369,080 | ||||||
| 4/4/16 | 4,356,394 | 971,908 | 727,544 | 2,656,942 | ||||||
| 5/3/16 | 3,980,266 | 958,945 | 718,215 | 2,303,106 | ||||||
| 5/31/16 | 3,910,321 | 902,023 | 679,596 | 2,328,702 | ||||||
| Total | 50,850,240 | 12,870,253 | 8,859,439 | 29,120,548 |
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) | Intern Demand (KW) | Off Peak Demand (KW) |
| 1650798475 | BGE | 6/25/15 | 388,515 | 125,633 | 73,923 | 188,959 | ||||
| 7/27/15 | 397,543 | 127,092 | 68,594 | 201,857 | ||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 8/26/15 | 388,867 | 130,215 | 71,022 | 187,630 | ||||
| Rate Code: DCHV | 9/25/15 | 351,199 | 109,575 | 62,589 | 179,035 | |||||
| 10/26/15 | 318,385 | 76,868 | 55,642 | 185,875 | ||||||
| Capacity PLC: | 669.79943 | 11/23/15 | 240,581 | 58,255 | 44,488 | 137,838 | ||||
| Tramission PLC: | 644.516359 | 12/23/15 | 249,653 | 59,370 | 45,804 | 144,479 | ||||
| 1/26/16 | 233,075 | 52,795 | 39,325 | 140,955 | ||||||
| 2/24/16 | 197,082 | 47,032 | 35,594 | 114,456 | ||||||
| 3/25/16 | 269,441 | 67,352 | 50,060 | 152,029 | ||||||
| 4/26/16 | 266,119 | 58,536 | 44,600 | 162,983 | ||||||
| 5/24/16 | 238,784 | 57,034 | 42,922 | 138,828 | ||||||
| Total | 3,539,244 | 969,757 | 634,563 | 1,934,924 |
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||||
| Line Item | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) | Intern Demand (KW) | Off Peak Demand (KW) |
| 2115233593 | BGE | 6/22/15 | 901,609 | 253,936 | 158,806 | 488,867 | ||||
| 7/22/15 | 825,715 | 273,498 | 155,733 | 396,484 | ||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 8/21/15 | 825,811 | 276,512 | 155,851 | 393,448 | ||||
| Rate Code: DCHV | 9/22/15 | 854,940 | 257,554 | 146,624 | 450,762 | |||||
| 10/21/15 | 755,951 | 207,774 | 146,524 | 401,653 | ||||||
| Capacity PLC: | 1309.726597 | 11/19/15 | 772,076 | 192,867 | 149,756 | 429,453 | ||||
| Tramission PLC: | 1411.72016 | 12/18/15 | 761,728 | 183,430 | 138,522 | 439,776 | ||||
| 1/21/16 | 958,652 | 220,570 | 157,346 | 580,736 | ||||||
| 2/19/16 | 877,528 | 203,660 | 142,648 | 531,220 | ||||||
| 3/22/16 | 909,646 | 212,065 | 159,683 | 537,898 | ||||||
| 4/21/16 | 834,921 | 198,985 | 153,577 | 482,359 | ||||||
| 5/19/16 | 773,925 | 187,521 | 144,656 | 441,748 | ||||||
| Total | 10,052,502 | 2,668,372 | 1,809,726 | 5,574,404 | ||||||
| 133,494,637 |
NAL
Solicitation Item Number 0007
| MD National Agricultural Library | ||||||||||
| Delivery Period: meter read in December 2016 through meter read in December 2018 | Meter Read Date | Total | On Peak | Interm Peak | Off Peak | On Peak Demand | Interm Peak Demand | Off Peak Demand | ||
| Line Item | Account | Utility | kWh | kWh | kWh | kWh | ||||
| 2404a | 0550 2450 2480 7001 5500 46 | PEPCO | 9/12/16 | 1,223,537 | 310,738 | 283,264 | 628,486 | |||
| 8/14/16 | 998,672 | 264,384 | 245,296 | 491,092 | ||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 7/11/16 | 1,045,704 | 260,074 | 241,444 | 545,237 | ||||
| Rate Code: Interval GT | 6/11/16 | 885,246 | 224,566 | 213,645 | 447,034 | |||||
| 5/12/16 | 733,934 | 199,286 | 186,827 | 348,871 | ||||||
| Capacity PLC: | 1285.37 | 4/09/16 | 776,460 | 211,920 | 193,175 | 371,366 | ||||
| Tramission PLC: | 1285.22 | 03/09/16 | 674,003 | 173,928 | 162,014 | 338,062 | ||||
| 02/11/16 | 621,741 | 152,921 | 145,548 | 323,273 | ||||||
| 1/08/16 | 795,711 | 180,018 | 172,259 | 444,485 | ||||||
| 12/08/15 | 768,910 | 186,488 | 178,015 | 405,456 | ||||||
| 11/07/15 | 806,687 | 193,310 | 184,227 | 430,200 | ||||||
| 10/08/15 | 741,021 | 200,993 | 185,106 | 354,922 | ||||||
| Total | 10,071,626 | 2,558,626 | 2,390,820 | 5,128,484 |
Solicitation Item Number 0008
| Site 6910 | |||||||||
| Delivery Period: meter read in December 2016 through meter read in December 2018 | |||||||||
| Line Item | Account | Supplier Choice ID | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) |
| 2406a | 2239630000 | 2239666434 | BG&E | 09/23/16 | 3,262,287 | 1,058,387 | 580,558 | 1,623,342 | |
| 08/21/16 | 3,550,571 | 1,130,622 | 615,174 | 1,804,775 | |||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 07/18/16 | 3,029,469 | 989,533 | 530,295 | 1,509,641 | |||
| Rate Code: Interval P 34KV | 6/18/16/ | 2,076,615 | 679,497 | 371,629 | 1,025,489 | ||||
| 05/26/16 | 1,251,384 | 273,731 | 219,900 | 757,753 | |||||
| Capacity PLC: | 5259.201041 | 6/1/14 | 05/13/16 | 2,567,658 | 647,152 | 518,311 | 1,402,195 | ||
| Tramission PLC: | 5414.610446 | 1/1/14 | 04/14/16 | 2,740,100 | 674,033 | 539,805 | 1,526,262 | ||
| 03/13/16 | 2,830,274 | 690,641 | 549,906 | 1,589,727 | |||||
| 02/10/16 | 2,544,432 | 606,759 | 469,661 | 1,468,012 | |||||
| 01/10/16 | 2,976,188 | 680,214 | 526,141 | 1,769,833 | |||||
| 12/05/16 | 2,568,066 | 623,876 | 493,897 | 1,450,293 | |||||
| 11/05/16 | 2,640,077 | 671,750 | 538,446 | 1,429,881 | |||||
| 10/05/16 | 1,817,550 | 448,341 | 359,197 | 1,010,012 | |||||
| 09/14/16 | 897,182 | 317,019 | 178,621 | 401,542 | |||||
| Total | 34,751,853 | 9,491,555 | 6,491,541 | 18,768,757 |
NIH
Solicitation Item Number 0009
| National Institute of Health | ||||||||||
| Delivery Period: meter read in December 2016 through meter read in December 2018 | Meter Read Date | Total | On Peak | Interm Peak | Off Peak | On Peak Demand | Interm Peak Demand | Off Peak Demand | ||
| Line Item | Account | Utility | kWh | kWh | kWh | kWh | ||||
| 2410q | 0550 1402 2291 7001 8180 33 | PEPCO | 09/29/16 | 2,198,730 | 617,940 | 538,054 | 1,042,139 | |||
| 08/25/16 | 1,903,508 | 563,086 | 488,143 | 852,280 | ||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 07/26/16 | 1,942,345 | 559,007 | 486,634 | 895,502 | ||||
| Rate Code: 2A6 | 06/26/16 | 1,991,797 | 548,957 | 477,789 | 965,050 | |||||
| 05/24/16 | 1,912,037 | 587,498 | 521,593 | 804,145 | ||||||
| Capacity PLC: | 742.04 | 04/25/16 | 2,077,551 | 641,327 | 568,763 | 868,060 | ||||
| Tramission PLC: | 736.05 | 03/24/16 | 1,961,162 | 613,843 | 513,193 | 966,528 | ||||
| 02/23/16 | 2,204,236 | 649,771 | 543,508 | 1,011,556 | ||||||
| 01/24/16 | 2,166,427 | 588,478 | 522,535 | 1,057,212 | ||||||
| 12/25/16 | 2,328,454 | 713,288 | 584,222 | 1,031,544 | ||||||
| 11/20/16 | 1,780,368 | 551,188 | 457,910 | 771,871 | ||||||
| 10/23/16 | 1,936,541 | 587,897 | 501,214 | 848,029 | ||||||
| Total | 24,403,156 | 7,222,280 | 6,203,558 | 11,113,916 | 0 | 0 | 0 |
| National Institute of Health | ||||||||||
| Delivery Period: meter read in December 2016 through meter read in December 2018 | Meter Read Date | Total | On Peak | Interm Peak | Off Peak | On Peak Demand | Interm Peak Demand | Off Peak Demand | ||
| Line Item | Account | Utility | kWh | kWh | kWh | kWh | ||||
| 2410w | 0550 1305 0392 7001 9125 40 | PEPCO | 8/25/16 | 383,126 | 145,284 | 102,901 | 135,541 | 1124 | 1138 | 1076 |
| 7/26/16 | 308,004 | 109,264 | 81,609 | 116,531 | 1120 | 1118 | 985 | |||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 6/26/16 | 394,902 | 139,133 | 100,632 | 155,737 | 1139 | 1198 | 1190 | |
| Rate Code: 2A6 | 5/24/16 | 358,613 | 82,901 | 70,511 | 205,201 | 1066 | 1210 | 1283 | ||
| 4/25/16 | 407,791 | 120,138 | 94,810 | 192,244 | 1105 | 1176 | 1283 | |||
| Capacity PLC: | 406.3 | 3/22/16 | 484,703 | 163,295 | 122,635 | 198,172 | 1398 | 1454 | 1447 | |
| Tramission PLC: | 406.43 | 2/23/16 | 566,492 | 176,406 | 141,492 | 248,594 | 1400 | 1506 | 1542 | |
| 1/24/16 | 554,710 | 158,207 | 130,643 | 266,460 | 1422 | 1554 | 1534 | |||
| 12/25/15 | 604,469 | 199,241 | 143,052 | 261,575 | 1474 | 1522 | 1484 | |||
| 11/20/15 | 375,762 | 122,124 | 90,169 | 163,468 | 1325 | 1244 | 1210 | |||
| 10/23/15 | 426,065 | 147,789 | 107,905 | 170,371 | 1289 | 1466 | 1459 | |||
| 9/23/2015 | 414,172 | 146,356 | 103,310 | 164,506 | 1153 | 1240 | 1226 | |||
| Total | 5,278,809 | 1,289,669 | 2,278,400 | 1,710,138 | 7,864 | 7,913 | 7,863 |
| National Institute of Health | |||||||||||
| Delivery Period: meter read in December 2016 through meter read in December 2018 | Meter Read Date | Total | On Peak | Interm Peak | Off Peak | On Peak Demand | Interm Peak Demand | Off Peak Demand | |||
| Line Item | Account | Customer Number | Utility | kWh | kWh | kWh | kWh | ||||
| 2410z | 110084629044 | 08043734745000474943 | First Energy | 8/29/16 | 988784 | 1725 | 1664 | ||||
| 7/28/16 | 920238 | 1679 | 1490 | ||||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 6/28/16 | 907970 | 1687 | 1421 | ||||||
| Rate Code: PE-PH#D | 5/27/16 | 667615 | 1450 | 1312 | |||||||
| 4/28/16 | 685408 | 1228 | 1117 | ||||||||
| Capacity PLC: | 3/30/16 | 805782 | 1271 | 1158 | |||||||
| Tramission PLC: | 2/26/16 | 764957 | 1264 | 1209 | |||||||
| 1/27/16 | 679843 | 1272 | 1220 | ||||||||
| 12/29/15 | 755976 | 1197 | 1118 | ||||||||
| 11/27/15 | 735272 | 1364 | 1231 | ||||||||
| 10/27/15 | 699094 | 1597 | 1617 | ||||||||
| 9/28/15 | 922790 | 1756 | 1524 | ||||||||
| Total | 9,533,729 | 0 | 0 | 0 | 17,491 | 0 | 16,081 |
39,215,694
Forest Glen Solicitation Item Number 0010
| Forest Glen | ||||||||||
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||||
| Line Item | Account | Utility | ||||||||
| 2425a | 0550 1327 3937 7001 9272 69 | PEPCO | Meter Read Date | Total | On Peak | Interm Peak | Off Peak | On Peak Demand | Interm Peak Demand | Off Peak Demand |
| kWh | kWh | kWh | kWh | |||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 8/12/16 | 5732 | 1499 | 1641 | 2592 | ||||
| Rate Code: 2A6 | 7/14/16 | 5627 | 1441 | 1626 | 2561 | |||||
| 6/13/16 | 4674 | 1092 | 1264 | 2318 | ||||||
| Capacity PLC: | 5/12/16 | 3830 | 1042 | 934 | 1853 | |||||
| Tramission PLC: | 4/13/16 | 5867 | 1522 | 1139 | 3205 | |||||
| 3/10/16 | 7468 | 1757 | 1478 | 4233 | ||||||
| 2/10/16 | 6981 | 1629 | 1248 | 4104 | ||||||
| 1/12/16 | 6609 | 1627 | 1233 | 3750 | ||||||
| 12/09/15 | 4871 | 1168 | 967 | 2736 | ||||||
| 11/09/15 | 3309 | 790 | 621 | 1898 | ||||||
| 10/11/15 | 3372 | 851 | 928 | 1594 | ||||||
| 09/11/15 | 5000 | 1178 | 1399 | 2424 | ||||||
| Total | 63,340 | 15,596 | 14,478 | 33,268 |
| Forest Glen | ||||||||||
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||||
| Line Item | Account | Utility | ||||||||
| 2425f | 0550 2291 5742 7001 1070 03 | PEPCO | Meter Read Date | Total | On Peak | Interm Peak | Off Peak | On Peak Demand | Interm Peak Demand | Off Peak Demand |
| kWh | kWh | kWh | kWh | |||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 7/30/16 | 20240 | 5040 | 5520 | 9680 | 42 | 41 | 38 | |
| Rate Code: 2A6 | 6/30/16 | 18720 | 4080 | 4720 | 9920 | 42 | 41 | 68 | ||
| 5/27/16 | 10480 | 2720 | 2800 | 4880 | 42 | 41 | 38 | |||
| 4/29/16 | 11600 | 2960 | 3200 | 5520 | 42 | 41 | 38 | |||
| Capacity PLC: | 3/28/16 | 12720 | 3040 | 3280 | 6240 | 42 | 41 | 38 | ||
| Tramission PLC: | 2/27/16 | 10720 | 2640 | 2800 | 5440 | 42 | 41 | 38 | ||
| 1/25/16 | 14400 | 3200 | 3200 | 7920 | 42 | 41 | 38 | |||
| 12/30/16 | 15680 | 3520 | 3760 | 8400 | 42 | 41 | 38 | |||
| 11/30/15 | 11600 | 2640 | 2960 | 6080 | 42 | 41 | 38 | |||
| 10/28/15 | 13280 | 3120 | 3520 | 6560 | 42 | 41 | 38 | |||
| 9/29/15 | 18160 | 4400 | 5280 | 8480 | 42 | 41 | 38 | |||
| 8/30/15 | 20000 | 4560 | 5280 | 10240 | 42 | 41 | 38 | |||
| Total | 177,600 | 41,920 | 46,320 | 89,360 | 504 |
| Forest Glen | ||||||||||
| Delivery Period: meter read in December 2016 through meter read in December 2018 | ||||||||||
| Line Item | Account | Utility | ||||||||
| 2425g | 0550 2098 7420 7001 8512 96 | PEPCO | Meter Read Date | Total | On Peak | Interm Peak | Off Peak | On Peak Demand | Interm Peak Demand | Off Peak Demand |
| kWh | kWh | kWh | kWh | |||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | September 2016 | 80,800 | 18,400 | 20,320 | 42,080 | ||||
| Rate Code: MMGTL | August 2016 | 66,400 | 16,000 | 17,440 | 32,800 | |||||
| July 2016 | 72,000 | 17,440 | 18,720 | 36,000 | ||||||
| June 2016 | 68,640 | 15,520 | 15,840 | 37,280 | ||||||
| Capacity PLC: | 44.1 | May 2016 | 61,600 | 14,880 | 14,080 | 32,640 | ||||
| Tramission PLC: | 43.71 | April 2016 | 87,680 | 20,000 | 18,880 | 48,960 | ||||
| March 2016 | 108,640 | 24,000 | 22,720 | 61,760 | ||||||
| February 2016 | 115,840 | 25,600 | 24,000 | 66,080 | ||||||
| January 2016 | 130,080 | 28,480 | 27,680 | 74,080 | ||||||
| December 2015 | 106,240 | 25,280 | 23,680 | 57,120 | ||||||
| November 2015 | 83,520 | 19,680 | 18,400 | 45,760 | ||||||
| October 2015 | 67,040 | 16,480 | 15,680 | 34,720 | ||||||
| Total | 1,048,480 | 241,760 | 237,440 | 569,280 |
1,289,420
Fort Detrick Solicitation Item Number 0011
| Fort Detrick | |||||||||||
| Delivery Period: meter read in December 2016 through meter read in December 2018 | |||||||||||
| Line Item | Customer Number | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) | Intern Demand (KW) | Off Peak Demand (KW) |
| 2430a | 08043871615000477431 | 110084721460 | Potomac Edison | 8/31/16 | 17,361,648 | 61,026 | 59,502 | ||||
| 8/1/16 | 18,123,576 | 31,752 | 29,622 | ||||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 6/30/16 | 14,176,584 | 29,188 | 27,014 | ||||||
| Rate Code: | 6/1/16 | 13,018,440 | 27,230 | 25,330 | |||||||
| 5/2/16 | 11,940,192 | 24,308 | 22,478 | ||||||||
| Capacity PLC: | 4/1/16 | 12,514,464 | 23,774 | 23,040 | |||||||
| Tramission PLC: | 3/1/16 | 11,822,832 | 21,414 | 21,068 | |||||||
| 2/1/16 | 13,506,600 | 21,384 | 20,808 | ||||||||
| 12/31/15 | 13,841,280 | 36,204 | 34,676 | ||||||||
| 12/1/15 | 15,434,352 | 36,116 | 23,630 | ||||||||
| 10/29/15 | 13,905,336 | 36,604 | 23,560 | ||||||||
| 9/30/15 | 17,637,696 | 34,100 | 28,598 | ||||||||
| Total | 173,283,000 | 0 | 0 | 0 | 383,100 | 0 | 339,326 |
| Fort Detrick | |||||||||||
| Delivery Period: meter read in December 2016 through meter read in December 2018 | |||||||||||
| Line Item | Customer Number | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) | Intern Demand (KW) | Off Peak Demand (KW) |
| 2430b | 08043058565000839093 | 110088645335 | Potomac Edison | 9/27/16 | 107,400 | ||||||
| 8/25/16 | 165,600 | ||||||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 7/26/16 | 158,700 | ||||||||
| Rate Code: | 6/27/16 | 166,800 | |||||||||
| 5/25/16 | 169,200 | ||||||||||
| Capacity PLC: | 4/26/16 | 206,100 | |||||||||
| Tramission PLC: | 3/28/16 | 252,600 | |||||||||
| 2/26/16 | 349,500 | ||||||||||
| 1/27/16 | 308,100 | ||||||||||
| 12/28/15 | 255,600 | ||||||||||
| 11/24/15 | 174,900 | ||||||||||
| 10/27/15 | 140,700 | ||||||||||
| Total | 2,455,200 | 0 | 0 | 0 |
| Fort Detrick | |||||||||||
| Delivery Period: meter read in December 2016 through meter read in December 2018 | |||||||||||
| Line Item | Customer Number | Account | Utility | Meter Read Date | Total kWh Usage | kWh On Peak | kWh Intern Peak | kWh Off Peak | Peak Demand (KW) | Intern Demand (KW) | Off Peak Demand (KW) |
| 2430c | 08043938165000542493 | 110084726576 | Potomac Edison | 8/31/16 | 99,844 | 193 | 186 | ||||
| 8/1/16 | 89,066 | 170 | 157 | ||||||||
| Svc Address: | Will be provided to offerors who submit a technical proposal. | 6/30/16 | 86,353 | 166 | 167 | ||||||
| Rate Code: | 6/1/16 | 83,581 | 163 | 156 | |||||||
| 5/2/16 | 83,579 | 147 | 150 | ||||||||
| Capacity PLC: | 4/1/16 | 83,243 | 166 | 142 | |||||||
| Tramission PLC: | 3/1/16 | 77,094 | 153 | 153 | |||||||
| 2/1/16 | 81,876 | 144 | 143 | ||||||||
| 12/31/15 | 76,253 | 149 | 134 | ||||||||
| 12/1/15 | 98,819 | 174 | 162 | ||||||||
| 10/29/15 | 99,872 | 179 | 177 | ||||||||
| 9/30/15 | 103,198 | 194 | 188 | ||||||||
| Total | 1,062,778 | 0 | 0 | 0 |
176,800,978
Meade
| DaysUsed | Month | Total_kWh | Peak_kWh | Inter_kWh | OffPeak_kWh | UsageFactor_Non_TOU | Peak_UsageFactor | Inter_UsageFactor | OffPeak_UsageFactor | Crossover | Del_Dem_kW_kVA | Gen_Trans_Dem_kW |
| Total | 85,208,009.00 | 22,217,079.00 | 15,012,801.00 | 39,625,597.00 | 3,579.17 | 903.87 | 923.51 | 1,025.43 | - 0 | 184,672.00 | 7,514.00 |
| September 2015 | 1,973,289.00 | 729,134.00 | 397,682.00 | 842,140.00 | 2.06 | - | - | - | - | - | 427.00 | ||||||||||||||||||||||||||
| October 2015 | 4,440,789.00 | 1,017,483.00 | 857,774.00 | 2,014,827.00 | 335.06 | - | - | - | - | 15,775.00 | 504.00 | ||||||||||||||||||||||||||
| November 2015 | 6,073,443.00 | 1,394,207.00 | 1,150,742.00 | 2,941,143.00 | 359.00 | 111.90 | 112.66 | 124.15 | - | 14,173.00 | 193.00 | ||||||||||||||||||||||||||
| December 2015 | 6,005,991.00 | 1,311,987.00 | 1,068,779.00 | 2,981,243.00 | 369.23 | 99.52 | 102.65 | 127.30 | - | 13,755.00 | 198.00 | ||||||||||||||||||||||||||
| January 2016 | 6,827,647.00 | 1,356,305.00 | 1,088,541.00 | 3,572,722.00 | 359.62 | 85.82 | 89.56 | 121.30 | - | 13,846.00 | 262.00 | ||||||||||||||||||||||||||
| February 2016 | 6,252,841.00 | 1,406,447.00 | 1,119,589.00 | 2,927,952.00 | 376.20 | 106.70 | 110.35 | 111.71 | - | 13,519.00 | 1,154.00 | ||||||||||||||||||||||||||
| March 2016 | 6,710,222.00 | 1,516,324.00 | 1,238,810.00 | 3,232,621.00 | 371.75 | 115.27 | 118.14 | 123.76 | - | 14,441.00 | 493.00 | ||||||||||||||||||||||||||
| April 2016 | 6,326,879.00 | 1,525,450.00 | 1,252,224.00 | 2,934,663.00 | 368.68 | 125.18 | 126.29 | 131.89 | - | 14,485.00 | 499.00 | ||||||||||||||||||||||||||
| May 2016 | 8,622,190.00 | 2,031,544.00 | 1,676,730.00 | 4,428,658.00 | 329.87 | 127.50 | 126.79 | 139.37 | - | 14,707.00 | 825.00 | ||||||||||||||||||||||||||
| June 2016 | 5,684,070.00 | 1,752,517.00 | 894,796.00 | 2,287,681.00 | 355.69 | 0.41 | 0.44 | 0.50 | - | 16,631.00 | 277.00 | ||||||||||||||||||||||||||
| July 2016 | 7,994,900.00 | 2,506,428.00 | 1,310,374.00 | 3,460,578.00 | 349.44 | 131.57 | 136.63 | 145.45 | - | 17,197.00 | 630.00 | ||||||||||||||||||||||||||
| August 2016 | 9,634,368.00 | 2,934,909.00 | 1,536,292.00 | 4,284,259.00 | 2.57 | - 0 | - 0 | - 0 | 18,447.00 | 1,067.00 | |||||||||||||||||||||||||||
| September 2016 | 8,661,380.00 | 2,734,344.00 | 1,420,468.00 | 3,717,110.00 | - 0 | - 0 | - 0 | - 0 | 17,696.00 | 985.00 | |||||||||||||||||||||||||||
| Filtered Total: | 85,207,999.00 | 22,217,089.00 | 15,012,801.00 | 39,625,597.00 | 3,579.78 | 903.86 | 923.52 | 1,025.42 | - 0 | 184,672.00 | 7,514.00 | ||||||||||||||||||||||||||
| TOTAL: | 85,208,014.00 | 22,217,089.00 | 15,012,801.00 | 39,625,597.00 | 3,579.79 | 903.86 | 923.52 | 1,025.42 | 0 | 184,672.00 | 7,514.00 | ||||||||||||||||||||||||||
| 85,208,014.00 | 22,217,089.00 | 15,012,801.00 | 39,625,597.00 | ||||||||||||||||||||||||||||||||||
| EH | Code | Desc | AccountName | AccountAddress | BillingAddress | AccountNumber | Segment | TariffCode | CapPLC | CapPLCEffectiveDt | CapPLCPrev | CapPLCPrevEffectiveDt | TransPLC | TransPLCEffectiveDt | TransPLCPrev | TransPLCPrevEffectiveDt | POLRType | BillGroup | SpecialBilling | MulitpleMtrs | MeterNumber | MeterType | FromDate | ToDate | DaysUsed | ReadingSource | Total_kWh | Peak_kWh | Inter_kWh | OffPeak_kWh | UsageFactor_Non_TOU | Peak_UsageFactor | Inter_UsageFactor | OffPeak_UsageFactor | Crossover | Del_Dem_kW_kVA | Gen_Trans_Dem_kW |
| EH | A0001 | Accepted | U S Dept Of The Army | S 4424 Mckay St | Ft George G Meade MD 20755 | Engr Plans & Svc 2212 Chisholm Av Imne Mea Pwf Ms 5115 | Ft George G Meade MD 20755 | 4304819791 | G | 150 | 0.00698 | 6/1/16 | 0.017203 | 6/1/15 | 0.005153 | 1/1/16 | 0.025908 | 1/1/15 | Type I | 16 | Summary | N | G159853623 | E-ELEC | 1/22/15 | 2/19/15 | 29 | A | - | - | - | - | 0 | - | - | - | N | - | - |
| EH | A0001 | Accepted | U S Dept Of The Army | S 4424 Mckay St | Ft George G Meade MD 20755 | Engr Plans & Svc 2212 Chisholm Av Imne Mea Pwf Ms 5115 | Ft George G Meade MD 20755 | 4304819791 | G | 150 | 0.00698 | 6/1/16 | 0.017203 | 6/1/15 | 0.005153 | 1/1/16 | 0.025908 | 1/1/15 | Type I | 16 | Summary | N | G159853623 | E-ELEC | 2/19/15 | 3/19/15 | 29 | A | - | - | - | - | 0 | - | - | - | N | - | - |
| EH | A0001 | Accepted | U S Dept Of The Army | S 4424 Mckay St | Ft George G Meade MD 20755 | Engr Plans & Svc 2212 Chisholm Av Imne Mea Pwf Ms 5115 | Ft George G Meade MD 20755 | 4304819791 | G | 150 | 0.00698 | 6/1/16 | 0.017203 | 6/1/15 | 0.005153 | 1/1/16 | 0.025908 | 1/1/15 | Type I | 16 | Summary | N | G159853623 | E-ELEC | 3/19/15 | 4/20/15 | 33 | A | - | - | - | - | 0.0016 | - | - | - | N | - | - |
| EH | A0001 | Accepted | U S Dept Of The Army | S 4424 Mckay St | Ft George G Meade MD 20755 | Engr Plans & Svc 2212 Chisholm Av Imne Mea Pwf Ms 5115 | Ft George G Meade MD 20755 | 4304819791 | G | 150 | 0.00698 | 6/1/16 | 0.017203 | 6/1/15 | 0.005153 | 1/1/16 | 0.025908 | 1/1/15 | Type I | 16 | Summary | N | G159853623 | E-ELEC | 4/20/15 | 5/19/15 | 30 | A | - | - | - | - | 0.0042 | - | - | - | N | - | - |
| EH | A0001 | Accepted | U S Dept Of The Army | S 4424 Mckay St | Ft George G Meade MD 20755 | Engr Plans & Svc 2212 Chisholm Av Imne Mea Pwf Ms 5115 | Ft George G Meade MD 20755 | 4304819791 | G | 150 | 0.00698 | 6/1/16 | 0.017203 | 6/1/15 | 0.005153 | 1/1/16 | 0.025908 | 1/1/15 | Type I | 16 | Summary | N | G159853623 | E-ELEC | 5/19/15 | 6/19/15 | 32 | A | - | - | - | - | 0.0029 | - | - | - | N | - | - |
| EH | A0001 | Accepted | U S Dept Of The Army | S 4424 Mckay St | Ft George G Meade MD 20755 | Engr Plans & Svc 2212 Chisholm Av Imne Mea Pwf Ms 5115 | Ft George G Meade MD 20755 | 4304819791 | G | 150 | 0.00698 | 6/1/16 | 0.017203 | 6/1/15 | 0.005153 | 1/1/16 | 0.025908 | 1/1/15 | Type I | 16 | Summary | N | G159853623 | E-ELEC | 6/19/15 | 7/21/15 | 33 | A | - | - | - | - | 0.0018 | - | - | - | N | - | - |
| EH | A0001 | Accepted | U S Dept Of The Army | S 4424 Mckay St | Ft George G Meade MD 20755 | Engr Plans & Svc 2212 Chisholm Av Imne Mea Pwf Ms 5115 | Ft George G Meade MD 20755 | 4304819791 | G | 150 | 0.00698 | 6/1/16 | 0.017203 | 6/1/15 | 0.005153 | 1/1/16 | 0.025908 | 1/1/15 | Type I | 16 | Summary | N | G159853623 | E-ELEC | 7/21/15 | 8/20/15 | 31 | A | - | - | - | - | 0.0018 | - | - | - | N | - | - |
| EH | A0001 | Accepted | U S Dept Of The Army | S 4424 Mckay St | Ft George G Meade MD 20755 | Engr Plans & Svc 2212 Chisholm Av Imne Mea Pwf Ms 5115 | Ft George G Meade MD 20755 | 4304819791 | G | 150 | 0.00698 | 6/1/16 | 0.017203 | 6/1/15 | 0.005153 | 1/1/16 | 0.025908 | 1/1/15 | Type I | 16 | Summary | N | G159853623 | E-ELEC | 8/20/15 | 9/21/15 | 33 | A | - | - | - | - | 0.0009 | - | - | - | N | - | - |
| EH | A0001 | Accepted | U S Dept Of The Army | 9831 3RD-CAVALRY RD | Ft George G Meade MD 20755 | DPW-Engr Plans & Svcs 2nd floor mailroom 4215 Roberts Avenue | FORT GEORGE G MEADE MD 20755-5115 | 5683060741 | G | 150 | 0.571333 | 6/1/16 | 0.001878 | 6/1/15 | 0.761475 | 1/1/16 | 0.002241 | 1/1/15 | Type I | 19 | Summary | N | D118274689 | E-ELEC | 8/26/15 | 9/25/15 | 31 | A | 373 | - | - | - | 0.1839 | - | - | - | N | - | - |
| EH | A0001 | Accepted | U S DEPT OF THE ARMY | S 902 REECE RD | Ft George G Meade MD 20755 | 2212 CHISHOLM AV Engr Plans and Services Mailstop 5115 | Fort George G Meade MD 20755 | 6164930946 | G | 150 | 0 | 6/1/16 | 0 | 6/1/15 | 0 | 1/1/16 | 0 | 1/1/15 | Type I | 19 | Summary | N | D116312797 | E-ELEC | 8/26/15 | 9/25/15 | 31 | A | - | - | - | - | - | - | - | - | N | - | - |
| EH | A0001 | Accepted | U S Dept Of The Army | 1957 FOX LN *UNIT WT003 | Ft George G Meade MD 20755 | DPW-Engineering Plans & Svcs 4215 Roberts Ave 2nd fl mailroom | Fort George G Meade MD 20755-5115 | 3047149415 | G | 150 | 6.112395 | 6/1/16 | 2.715003 | 6/1/15 | 6.068869 | 1/1/16 | 2.671284 | 1/1/15 | Type I | 21 | Summary | N | G157749837 | E-ELEC | 8/28/15 | 9/29/15 | 33 | A | 3960 | - | - | - | 1.8732 | - | - | - | N | - | - |
| EH | A0001 | Accepted | U S Dept Of The Army | 2480 Llewellyn Ave | Ft George G Meade MD 20755 | | | 2880758 | INTERVAL P 13KV | 189 | 1100.299702 | 6/1/16 | 1248.750231 | 6/1/15 | 1067.743498 | 1/1/16 | 1213.534134 | 1/1/15 | Hourly | 16 | Summary | Y | P097115686:P097115687 | E-ELEC;E-ELEC | 9/22/15 | 9/30/15 | 9 | A | 178749 | 64552 | 36075 | 78122 | - | - | - | - | Y | - | - |
| EH | A0001 | Accepted | U S Dept Of The Army | 9810 EMORY RD | Ft George G Meade MD 20755 | DPW - Engr Plans and Service 4215 Roberts Avenue 2nd FL mailroom | Fort George G Meade MD 20755 | 5075331 | GL | 166 | 134.700609 | 6/1/16 | 114.362943 | 6/1/15 | 130.625467 | 1/1/16 | 101.57146 | 1/1/15 | Type II | 15 | Summary | N | D118276384 | E-ELEC | 9/22/15 | 9/30/15 | 9 | A | 12963 | 5419 | 2918 | 4626 | - | - | - | - | Y | - | - |
| EH | A0001 | Accepted | U S Dept Of The Army | 2118 Annapolis Rd | Ft George G Meade MD 20755 | | | 86214316 | GL | 167 | 384.211485 | 6/1/16 | 377.707447 | 6/1/15 | 311.010808 | 1/1/16 | 371.713342 | 1/1/15 | Type II | 16 | Summary | N | G159096707 | E-ELEC | 9/22/15 | 9/30/15 | 9 | A | 47413 | 18107 | 9824 | 19482 | - | - | - | - | Y | - | - |
| EH | A0001 | Accepted | U S Dept Of The Army | 8472 Simonds St | Ft George G Meade MD 20755 | 2212 Chisholm Av Imne Mea Pwp Mailstop 5115 | Ft George G Meade MD 20755 | 143919978 | GL | 165 | 59.975273 | 6/1/16 | 62.828862 | 6/1/15 | 64.198892 | 1/1/16 | 61.663522 | 1/1/15 | Type II | 16 | Summary | N | D116378081 | E-ELEC | 9/22/15 | 9/30/15 | 9 | A | 6219 | 2509 | 1430 | 2280 | - | - | - | - | Y | - | - |
| EH | A0001 | Accepted | U S Dept Of The Army | 2788 Macarthur Rd | Ft George G Meade MD 20755 | 2212 Chisolm Ave | Ft George G Meade MD 20755 | 147106228 | GL | 165 | 136.43922 | 6/1/16 | 151.078784 | 6/1/15 | 94.341142 | 1/1/16 | 120.870321 | 1/1/15 | Type II | 16 | Summary | N | D116004718 | E-ELEC | 9/22/15 | 9/30/15 | 9 | A | 15073 | 6135 | 3398 | 5540 | - | - | - | - | Y | - | - |
| EH | A0001 | Accepted | U S Dept Of The Army | 4725 Ruffner Rd | Ft George G Meade MD 20755 | 2212 Chisholm Av-Engr Svcs IMNE-MEA-PWF MailStop 5115 | Ft George G Meade MD 20755 | 202112166 | GL | 165 | 97.069648 | 6/1/16 | 95.269279 | 6/1/15 | 94.54219 | 1/1/16 | 87.620062 | 1/1/15 | Type II | 16 | Summary | N | D116378393 | E-ELEC | 9/22/15 | 9/30/15 | 9 | A | 11066 | 4487 | 2548 | 4031 | - | - | - | - | Y | - | - |
| EH | A0001 | Accepted | U S Dept Of The Army | 830 Chisholm Rd | Ft George G Meade MD 20755 | c/o Anme-Pwp-C Mailstp 5115 2234 Huber Rd 2nd Flr | Ft. George G Meade MD 20755 | 385413621 | GL | 165 | 33.358868 | 6/1/16 | 31.494852 | 6/1/15 | 29.367674 | 1/1/16 | 28.880867 | 1/1/15 | Type II | 16 | Summary | N | D116378392 | E-ELEC | 9/22/15 | 9/30/15 | 9 | A | 2897 | 1442 | 621 | 834 | - | - | - | - | Y | - | - |
| EH | A0001 | Accepted | U S Dept Of The Army | 600 10th St | Ft George G Meade MD 20755 | 4215 Roberts Avenue Engr Plans & Svc Imne Mea Pwf Ms 5115 | Ft George G Meade MD 20755 | 593400863 | INTERVAL GL | 165 | 748.659515 | 6/1/16 | 766.886908 | 6/1/15 | 684.205634 | 1/1/16 | 699.85954 | 1/1/15 | Hourly | 16 | Summary | N | G153127586 | E-ELEC | 9/22/15 | 9/30/15 | 9 | A | 123524 | 45062 | 24674 | 53788 | - | - | - | - | Y | - | - |
| EH | A0001 | Accepted | U S Dept Of The Army | 8605 6th-Armored-Cavalry Rd | Ft George G Meade MD 20755 | 2212 Chisholm Av *Imne-Mea-Pwp Mailstop 5115 | Ft George G Meade MD 20755 | 667326130 | GL | 165 | 104.42166 | 6/1/16 | 83.203741 | 6/1/15 | 81.678948 | 1/1/16 | 67.339212 | 1/1/15 | Type II | 16 | Summary | N | D115980479 | E-ELEC | 9/22/15 | 9/30/15 | 9 | A | 10945 | 4103 | 2166 | 4676 | - | - | - | - | Y | - | - |
| EH | A0001 | Accepted | U S Dept Of The Army | 2246 Rock Ave *Bldg D | Ft George G Meade MD 20755 | 2234 Huber Rd 2fl Attn: Mailstp 5115 | Ft George G Meade MD 20755 | 729593987 | GL | 169 | 33.499974 | 6/1/16 | 37.970823 | 6/1/15 | 67.455813 | 1/1/16 | 43.438412 | 1/1/15 | Type II | 16 | Summary | N | D116415830 | E-ELEC | 9/22/15 | 9/30/15 | 9 | A | 4332 | 1979 | 1126 | 1227 | - | - | - | - | Y | - | - |
| EH | A0001 | Accepted | U S Dept Of The Army | 2257 Huber Rd | Ft George G Meade MD 20755 | | | 799035179 | GL | 165 | 367.36679 | 6/1/16 | 359.516698 | 6/1/15 | 293.137792 | 1/1/16 | 308.78918 | 1/1/15 | Type II | 16 | Summary | N | D116378274 | E-ELEC | 9/22/15 | 9/30/15 | 9 | A | 44463 | 15087 | 9014 | 20362 | - | - | - | - | Y | - | - |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .