SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 0056845949

1. REQUISITION NUMBER

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER

SPE600-15-R-0710

5. SOLICITATION NUMBER

2015 APR 29

6. SOLICITATION ISSUE

DATE

Michael Huck FBE9173

a. NAME

Phone: 703-767-9295

b. TELEPHONE NUMBER (No Collect calls)

2015 MAY 29

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY CODE SPE600

DLA ENERGY

8725 JOHN J KINGMAN RD STE 4950

FT BELVOIR VA 22060-6222

USA

10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

8 (A)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

324110NAICS:

SIZE STANDARD:

11. DELIVERYFOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

DO-C9

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

17a. CONTRACTOR/ CODE

OFFEROR

FACILITY

CODE

TELEPHONE NO.

18a. PAYMENT WILL BE MADE BY CODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

See Schedule

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

DATED . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or Print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or Print) 31c. DATE SIGNED

SEE SCHEDULE

7. FOR SOLICITATION

INFORMATION CALL:

SEE SCHEDULE

43PAGE 1 OF

01:00 PM

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE ADDENDUM

EDWOSB

32a. QUANTITY IN COLUMN 21 HAS BEEN

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:RECEIVED INSPECTED

COMPLETE PARTIAL FINAL

STANDARD FORM 1449 (REV. 2/2012) BACK

36. PAYMENT

PARTIAL FINAL

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

37. CHECK NUMBER

38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER 40. PAID BY

42a. RECEIVED BY (Print)

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42b. RECEIVED AT (Location)

CONTINUED ON NEXT PAGE

Section B

Quality Technical Provisions

TURBINE FUEL,AVIATION,JA1,1.1I.

9130-007535026

PR #: .0056845949

IAW BASIC QAP 52838 ENERGY-QAP-C16.09

REVISION NR DTD 05/19/2014

PART PIECE NUMBER:

IAW REFERENCE QAP 52838 ENERGY-QAP-E21.01

REVISION NR A DTD 05/04/2014

PART PIECE NUMBER:

IAW REFERENCE QAP 52838 ENERGY-QAP-E1.21

REVISION NR A DTD 05/05/2014

PART PIECE NUMBER:

IAW REFERENCE QAP 52838 ENERGY-QAP-E40.01

REVISION NR A DTD 09/02/2014

PART PIECE NUMBER:

IAW REFERENCE QAP 52838 ENERGY-QAP-E1

REVISION NR A DTD 09/02/2014

PART PIECE NUMBER:

IAW REFERENCE QAP 52838 ENERGY-QAP-E22

REVISION NR A DTD 09/02/2014

PART PIECE NUMBER:

IAW REFERENCE QAP 52838 ENERGY-QAP-E35

REVISION NR A DTD 09/02/2014

PART PIECE NUMBER:

TURBINE FUEL, AVIATION

Hazard Communication Standard Notice:

Effective June 1, 2015, Federal Standard No. 313-E, Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities, establishes the requirement for preparation and submission of Safety Data Sheets (SDS) in lieu of Material Safety Data Sheets (MSDS) by suppliers who provide hazardous materials to government activities.

The Occupational Safety and Health Administration (OSHA) has modified its Hazard Communication Standard (HCS) to conform to the United Nations Globally Harmonized System of Classification and Labeling of Chemicals.

As a result of this change, GSA revised Federal Standard No. 313-E requiring Safety Data Sheets for classifying chemicals and communicating the applicable information on labels.

In accordance with the revised standard after June 1, 2015:

1. Suppliers will be required to submit, to the contracting officer for review and approval prior to award, safety data sheets consistent with the requirements found at 29 C.F.R. 1910.1200 for hazardous materials delivered to the Government.

2. Suppliers will also be required to submit, to the contracting officer for review and approval prior to award, hazardous warning labels in accordance with 29 C.F.R. 1910.1200 for hazardous materials delivered to the Government.

3. Finally, suppliers must train their employees on the new safety data

PAGE 3 OF 43 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

SPE600-15-R-0710

sheets, hazardous warning labels, and requirements of 29 C.F.R.

1910.1200.

For more information on SDS, refer to OSHAs website, available at:

https://www.osha.gov/dsg/hazcom/ghs-final-rule.html.

For information on 29 C.F.R. 1910.1200, refer to the below link:

http://www.gpo.gov/fdsys/pkg/CFR-2009-title29-vol6/pdf/CFR-2009-title29-vol6-sec1910-1200.pdf.

TURBINE FUEL,AVIATION,JA1,1.1I.

9130-007535026

PR #: .0056845949

JA1 Requirement Totals are as follows:.

Total Qty Set Aside 8A Reservation Qty Non Set Aside Qty UoM

104,000,000 0 0 104,000,000 UG6

Total Estimated ( JA1 ) Quantity to be Purchased: 104,000,000

EPA Region Quantity Escalator Id Base Ref Price Base Ref Date .

AE 80,000,000 CIFNWEJET 1.829517 03/04/2015

AM 24,000,000 FOBMEDJET 1.738171 03/04/2015

AE .

Item:. 0003 Quantity: . 44,000,000 UG6 8A Quantity: . 0 SA Quantity: . 0 Unrestricted: . 44,000,000

Period of Performance: .08/17/2015-07/30/2016

NSN Product Code Delivery Identification State

9130-007535026 JA1 CEPS - DFSP CEPS

TURBINE FUEL,AVIATION

Region

AE

Delivery Address: BELGIAN CEPS DIVISION DEFAULT 99999

Delivery DODAAC Billing DODAAC Ordering Office DODAAC

PAGE 4 OF 43 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

SE6P09 SJ0601

FSII SDA CI

N N N

Mode Receipt % Max Parcel Min Parcel FOB Restriction FSII SDA CI

BULK:PIPE 100 N N N

PAGE 5 OF 43 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

Item:. 0002 Quantity: . 36,000,000 UG6 8A Quantity: . 0 SA Quantity: . 0 Unrestricted: . 36,000,000

9130-007535026 JA1 GPSSUKPL - DFSP GPSS

TURBINE FUEL,AVIATION

Region

AE

Delivery Address: DIVISION V DEFAULT 99999

Delivery DODAAC Billing DODAAC Ordering Office DODAAC

SE6P04 SJ0601

FSII SDA CI

N N N

Mode Receipt % Max Parcel Min Parcel FOB Restriction FSII SDA CI

BULK:PIPE 100 N N N

AM .

Item:. 0001 Quantity: . 24,000,000 UG6 8A Quantity: . 0 SA Quantity: . 0 Unrestricted: . 24,000,000

9130-007535026 JA1 NIPS - NORTHERN ITALIAN PIPELIN

TURBINE FUEL,AVIATION

Region Requirement SPLC

AM 931002270

Delivery Address: DEFAULT 99999

Delivery DODAAC Billing DODAAC Ordering Office DODAAC

SE6P05 SJ0601

FSII SDA CI

N Y Y

Mode Receipt % Max Parcel Min Parcel FOB Restriction FSII SDA CI

PAGE 6 OF 43 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

BULK:TANKER 100 120,000.00 N Y Y

BULK:PIPE 100 N Y Y

PAGE 7 OF 43 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS

General Notes General Notes:

Ocean Tanker offers are an FOB Origin basis unless otherwise specified in schedule B-1.

DLA-Energy reserves the right to reject any offer requiring the use of DLA Energy Facilities for delivery by tanker to requiring activity.

For FOB Destination (truck, barge, or pipeline), determination of quantity will be by tank gauging (See Clause 52.211-9073

DETERMINATION OF QUANTITY - DLA ENERGY (NOV 2011) –DLAD).

Ocean tanker deliveries into the Central European Pipeline System (CEPS) or Government Pipeline & Storage System (GPSS) require certification of performing vessel’s prior three (3) cargos as FAME (Fatty Acid Methyl Ester) free or, in instances where any of prior three (3) cargoes contained FAME, identification of which cargoes tanks, FAME concentration (i.e. 5%, 15%, etc.), as well as certification that affected tanks were prepared in accordance with the guidelines established in the Energy Institute (EI) HM50 document. Upon request, vessel must be prepared to provide previous cargo documentation and cleaning history demonstrating compliance with HM50 guidance.

For pipeline deliveries, the FOB point is the junction of the contractor and NATO pipelines at Augusta.

Under FOB Destination (truck, barge, or pipeline) delivery terms where testing is required to be performed prior to discharge, offerors may wish to have representatives (including Quality Assurance and Independent Inspectors under hire to supplier) present to perform sampling and testing. A by name list of must be submitted no later than 30-days prior to vessel arrival (other than Spanish National) / 7-days prior to vessel arrival (Spanish National), photocopy of passport (other than Spanish National) / national identity card and Spanish tax certificate (TC1). Representatives are to remain under escort for entirety of visit. Untimely submission of required documents may result in denial of access to Rota Naval Station.

Should vessel representatives (i.e. Husbanding Agent) require access, requirements detailed in paragraph seven (7) apply.

Berthing delays resultant of untimely or incomplete documentation will be to vendors account.

Many compulsory and non-compulsory port services require arrangement of advance payment. Known compulsory services requiring advance payment include, but are not limited to:

Line Handlers Opening and closing of Force Protection / security barrier to the harbor Trash services Water and phone connection

CEPS JA1

Acceptable locations, pipeline, entry into DFSP CEPS are:

France: Marseilles (Lavéra), Feyzin, Le Havre Belgium: Antwerp, Ghent Netherlands: Rotterdam (Pernis) Germany: Lingen

Lingen, Rotterdam, Antwerp, and Ghent entry points into the CEPS require the fuel to include SDA with conductivity levels between 150-250 pS/m.

Lavéra: The Government will be allowed a minimum of 1 hour laytime for every 3,800 barrels of cargo.

Lavéra, Feyzin, and Le Havre entry points do not allow the use of SDA.

PAGE 8 OF 43 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

CEPS will only accept origin pipeline deliveries. The custody transfer point is the connecting valves into the CEPS for product offered into the entry points of Ghent and Le Havre.

Offerors will need to obtain CEPS entry capacity through CEPS managing agent, independent of DOD.

Transportation capacity rights, interim storage and all other costs associated with offered locations Ghent or Lingen will be the responsibility of the supplier an should be reflected in the overall price. Any cost for interim storage will be paid by the contractor.

CHIEVRES, JA1

Truck mode restricted to destination offers.

GPSS, JA1

Acceptable tanker entry points, FOB Origin only for ingress into DFSP GPSS are:

South Killingholme Jetty Bristol Royal Portbury Dock Berth 7

Acceptable pipeline entry points, for ingress into DFSP GPSS are:

Killingholme (at entry to the W/E(E) pipeline from Radcliffe).

Backford North (also known as Mersey River, at entry to the N/S pipeline from Backford North to Berwick Wood).

Hallen/Berwick Wood (at entry to the A/T(W) pipeline from Berwick Wood to Calne) Thames B (at entry to the TH/SW pipeline from Thames B pump station to Saffron Walden).

Suppliers offering at pipeline entry must confirm with the GPSS Managing Agent that they can comply with the GPSS entry point requirements for scheduling and input flow rates/pressures, and confirm the location at which sale of product to DLA Energy will occur.

Suppliers offering at locations other than those listed above, must first have GPSS Managing Agent approval.

The proposed locations must be directly connected to the GPSS. The GPSS Managing Agent may require suppliers to obtain pipeline capacity required to transport product from the proposed entry point. Transportation, capacity rights, and all other cost associated with offered locations, other than those listed above, will be the responsibility of the supplier.

For UK locations, product must conform to Defense Standard 91-91 Issue 7 Incorporating Amendment 3, dated 2 February 2015.

B19.34

B-0002/B19.34 ECONOMIC PRICE ADJUSTMENT (OVERSEAS BULK) (DLA ENERGY JAN 2012)

(a) WARRANTIES. The Contractor warrants that--

(1) The unit prices set forth in this offer and/or contract do not include allowances for any portion of the contingency covered by this contract provision; and

(2) The prices to be invoiced hereunder for listed items shall be computed in accordance with these escalation provisions.

(b) DEFINITIONS. As used throughout this contract provision, the term--

(1) Base unit price means the unit price set forth opposite the item in the Schedule.

(2) Reference price means the market price indicator set forth in the Table in (f) below with which the base unit price is to fluctuate.

NOTE: The term market price indicator will be referred to hereafter as “reference price” in this contract provision.

(3) Date of delivery is defined as follows:

(i) FOR TANKER OR BARGE DELIVERIES.

(A) F.O.B. ORIGIN. The date and time vessel commences loading.

(B) F.O.B. DESTINATION. The date and time vessel commences discharging.

(ii) FOR PIPELINE DELIVERIES. The date and time product commences to move past the specified f.o.b. point.

(iii) FOR ALL OTHER TYPES OF DELIVERIES. The date product is received.

PAGE 9 OF 43 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

(c) ADJUSTMENTS.

(1) The Contractor shall give written notice to the Contracting Officer, Defense Logistics Agency Energy (DLA Energy), of any delivery and associated change in the reference price within 15 working days from the date thereof. Contractor failure to timely notify the Contracting Officer of any delivery and associated change in the reference price may result in late or incorrect payment of the relevant invoice.

(2) Subject to the conditions of this contract provision, the prices payable under this contract shall be the base unit price increased or decreased by the same number of cents, or fraction thereof, that the reference price shall have increased or decreased.

(3) An increase or decrease in any reference price published in a trade price service or in a commercial journal shall apply only to deliveries made on and after the effective date of the price change as stated in the publication.

(4) The Contracting Officer will issue a modification to this contract to reflect any change pursuant to this provision. However, no increase in a contract unit price shall be executed pursuant to this provision until the increase in the applicable published reference price has been verified by the Contracting Officer.

(5) FAILURE TO DELIVER. Notwithstanding any other conditions of this contract provision, no upward adjustment shall apply to product scheduled under the contract to be delivered before the effective date of the adjustment, unless the Contractor’s failure to deliver according to the delivery schedule results from causes beyond the Contractor’s control and without its fault or negligence, within the meaning of paragraphs (f), Excusable Delays, and (m), Termination for Cause, of the CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS clause of this contract, in which case the contract shall be amended to make an equitable extension of the delivery schedule.

(6) UPWARD CEILING ON ECONOMIC PRICE ADJUSTMENT. The Contractor agrees that the total increase in any contract unit price pursuant to these economic price adjustment provisions shall not exceed 330 percent of the award price, except as provided hereafter.

(i) If at any time the Contractor has reason to believe that within the near future a price adjustment under the conditions of this contract provision will be required that will exceed the current contract ceiling price for any item, the Contractor shall promptly notify the Contracting Officer in writing of the expected increase. The notification shall include a revised ceiling the Contractor believes is sufficient to permit completion of remaining contract performance, along with appropriate explanation and documentation as required by the Contracting Officer.

(ii) If an actual increase in the reference price would raise a contract unit price for an item above the current ceiling, the Contractor shall have no obligation under this contract to fill pending or future orders for such item, as of the effective date of the increase, unless the Contracting Officer issues a contract modification to raise the ceiling. If the contract ceiling will not be raised, the Contracting Officer shall so promptly notify the Contractor in writing.

(7) REVISION OF REFERENCE PRICE INDICATOR. In the event--

(i) Any applicable reference price is discontinued or its method of derivation is altered substantially; or

(ii) The Contracting Officer determines that the reference price consistently and substantially failed to reflect market conditions--the parties shall mutually agree upon an appropriate and comparable substitute for determining the price adjustments hereunder.

The contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions. If the parties fail to agree on an appropriate substitute, the matter shall be resolved in accordance with paragraph (d), Disputes, of the CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS clause of this contract.

(8) CONVERSION FACTORS. If this contract provision requires quantity conversion for economic price adjustment purposes, the conversion factors for applicable products, as specified in the CONVERSION FACTORS provision, apply unless otherwise specified in the Schedule.

(d) EXAMINATION OF RECORDS. The Contractor agrees that the Contracting Officer or designated representatives shall have the right to examine the Contractor's books, records, documents, or other data the Contracting Officer deems necessary to verify Contractor adherence to the conditions of this contract provision.

(e) FINAL INVOICE. The Contractor shall include a statement on the final invoice that the amounts invoiced hereunder have applied all decreases required by this contract provision.

(f) TABLE.

REFERENCE PRICE TABULATION

ITEM NO.

(LISTED

ITEMS)

NAME OF

PUBLICATION

HEADING WHICH

REFERENCE PRICE IS

PUBLISHED AND NAME

OF PRODUCT

LOCATION WHERE

REFERENCE PRICE

IS APPLICABLE

REFERENCE PRICE AS

OF

MARCH 4, 2015

(EXCLUDES ALL TAXES)

PAGE 10 OF 43 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

See Below Platt’s Oilgram Price Report (U.S. Edition)

Product Price Assessments (European

Bulk) See Below See Notes Below

NOTE: Buyer shall include a note or notes in the Table that will identify the specific publication(s), method(s), and time period(s) for calculating the reference price(s).

***FOR AEM***

PRODUCT REFERENCE PRODUCT

(LOCATION

REFERENCE PRICE/USG

EFFECTIVE MARCH 4, 2015

JA1

Jet Kerosene

(100% Cargoes CIF NWE Basis

ARA)

$1.829517

JA1 Jet Av Fuel (100% FOB Med Basis Italy) $1.738171

JA1 Jet Kerosene (Asia/Singapore Subheading) $1.767333

JA1 Kerosene (Arab Gulf, FOB) $1.703381

NOTES:

For Platt's Oilgram: NOTE: The Reference prices are calculated by averaging the respective low prices and averaging the respective high prices for the two days preceding the date of delivery, the date of delivery, and the two days subsequent to the date of delivery published effective days' prices. Both the low and high averages are then averaged to determine the new Reference Price. This average price is averaged to two (2) decimal places, regardless of whether the price is stated in dollars per barrel, dollars per metric ton, or cents per USG. This average will be converted to dollars per USG using the conversion factors cited in Paragraphs C and D, if applicable, and rounded to six (6) decimal places.

In order to calculate the price, first determine the date of delivery price. If the actual date of delivery falls on Saturday or Sunday, the date of delivery for pricing purposes will be Friday. If the actual date of delivery falls on a holiday, then the date of delivery for pricing purposes will become the previous business day.

If Platt’s fails to publish the price for a particular product on the date of delivery, then the date of delivery will become the previous business day in which a price is published.

Once the date of delivery price is determined, then obtain the published effective days prices for the two business days immediately preceding the date of delivery and the two business days immediately subsequent to the date of delivery.

Any product offer must specify on which escalator it is based. Offers for F76, JA1, and JP8, may use any or all of the stated escalators for that product.

The conversion factor 328.42 USG/Metric Ton will be used to calculate JP5, JA1, and JP8 escalators under Jet Av. Fuel, 100% FOB Med Basis, Italy, and Jet Kerosene, 100% Cargoes CIF NWE, Basis ARA.

Adjustment Factors. For evaluation purposes only, the following Adjustment Factors will be used when a product and the specified Base Price are identified in an offer:

PLATTS HEADING PRODUCT

(ITEM NO.)

REFERENCE

PRODUCT

(LOCATION)

ADJUSTMENT FACTORS –

EVALUATION ONLY $/USG

100% Cargoes CIF NWE Basis ARA JA1 Jet Kerosene None

100% FOB Med Basis Italy JA1 Jet Av. Fuel 0.017957 Asia/Singapore JA1 Jet Kerosene -0.025740

PAGE 11 OF 43 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

Arab Gulf, FOB JA1 Kerosene -0.023897

SECTION C - SPECIFICATIONS/SOW/SOO/ORD

C1

C-0001/C1 SPECIFICATIONS (DLA ENERGY JAN 2012)

Product to be supplied shall fully meet the requirements of the applicable specification(s) as indicated in the Supply Schedule, except as modified elsewhere in this contract. Unless otherwise indicated by the Contractor, prior to award and in accordance with the EVALUATION OF OFFERS contract provision, the product offered will be assumed to fully meet the applicable specification(s).

C1.02

C-0002/C1.02 ASSIST DATABASE OF SPECIFICATIONS (DLA ENERGY DEC 2014)

Unless otherwise specified, current versions of defense or federal specifications and standards, military handbooks, commercial item descriptions, qualified product lists, and other related technical documents cited in this solicitation/contract can be accessed from the Department of Defense (DoD) Acquisition Streamlining and Standardization Information System (ASSIST) database at https://assist.dla.mil under ASSIST-Quick Search or http://quicksearch.dla.mil. ASSIST is the official source for all Defense Standardization Program documents and contains the most current information on documents prepared by DoD, as well as information on how to acquire referenced non-Government standards that have been adopted for DoD use. Those who register for an ASSIST account may establish profiles to receive automatic E-mail alerts when changes are planned or made to documents of interest by selecting criteria on the [Alert Portal Profile Maintenance] screens accessed from the [User Profile] menu. Users may also view or download a bi-monthly summary of changes to the ASSIST database under the [ASSIST Update] menu. Signature

C16.09

C-0007/C16.09 TURBINE FUEL, AVIATION (JET A1) (DLA ENERGY APR 2015)

Aviation turbine fuel shall conform to the requirements of the most recent version of ASTM D1655: Standard Specification for Aviation Turbine Fuels with the following modifications:

NATIONAL STOCK NUMBER PRODUCT NOMENCLATURE DLA ENERGY PRODUCT CODE

9130-00-753-5026 Turbine Fuel, Aviation, Jet A-1 JA1

(a) EUROPEAN LOCATIONS ONLY. Aviation turbine fuel shall conform to the Defence Standard 91-91 Issue 7, Amendment 3, dated 02 February 2015.

(b) CANADA ONLY. Aviation turbine fuel shall conform to CAN/CGSB-3.23.

(c) ADDITIVES.

(i) Additives shall not be premixed with other additives before injection into the fuel.

(1) CONDUCTIVITY. If fuel contains electrical conductivity additive, the conductivity limits of 50 to 600 picosiemens per meter (pS/m) at ambient temperature or 85 degrees Fahrenheit (29.4ºC), whichever is lower shall apply at the custody transfer point, unless otherwise directed by the procuring activity.

(2) FUEL SYSTEM ICING INHIBITOR (FSII). When FSII is required by contract line item—

(i) The fuel shall contain 0.07 to 0.10 percent by volume FSII.

PAGE 12 OF 43 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

(ii) The FSII shall conform to the requirements outlined in either specification MIL-DTL-85470B, Inhibitor, Icing, Fuel System, High Flash, NATO Code Number S-1745; or the latest revision of ASTM D4171, Standard Specification for FSIIs, Type III.

(iii) When using the 20-ounce aerosol can to introduce FSII during over the wing refueling, determine the fuel quantity and calculate the amount of required additive. This additive shall be added gradually during filling to permit proper blending in the fuel. One can of aerosol additive will inhibit 180 gallons of fuel to 0.087 percent by volume. The use of aerosol FSII is not permitted for U.S. Navy aircraft refueling.

(3) CORROSION INHIBITOR/LUBRICITY IMPROVER (CI/LI). When CI/LI is required by contract line item the additive shall conform to the latest revision of MIL-PRF-25017H with amendment 1 dated August 4, 2011, and be listed in Qualified Products List (QPL)-25017. In order to obtain dosage data for QPL-25017 additives, log into ASSIST Online, access the Qualified Products Database (QPD), do a search for QPL number 25017, and click the MIL-PRF-25017 Category 1 link. The dosage information is located in the "source notes" for each qualified additive as minimum effective and maximum allowable concentrations in grams per cubic meter (g/m3).

(4) METAL DEACTIVATOR ADDITIVE (MDA). MDA shall not be used unless the supplier has obtained written consent from the procuring activity and user.

(d) Product shall be homogeneously mixed. Until all aviation turbine fuel tanks are coated, it is acceptable to perform stratification tests in lieu of circulating tanks to achieve homogeneity.

(5) Microseparometer (MSEP).

(ii) The following MSEP ratings apply in the presence of the additives listed below. Values apply at point of manufacture:

(Only required for E QAPs)

SECTION D - PACKAGING AND MARKING

52.247-9012 REQUIREMENTS FOR TREATMENT OF WOOD PACKAGING MATERIAL (WPM) (FEB 2007) DLAD

SECTION E - INSPECTION AND ACCEPTANCE

52.246-2 INSPECTION OF SUPPLIES FIXED PRICE (AUG 1996) FAR

252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008) DFARS

52.246-9001 MANUFACTURING PROCESS CONTROLS AND INPROCESS INSPECTIONS (NOV 2011) DLAD

52.246-9029 INSPECTION AND ACCEPTANCE POINTS (APR 2010) DLAD

Inspection and Acceptance are:

Inspection point: [ ] Destination [ X ] Origin (First Shipment Only)

Signature Prepared by:

Quality / Technical Support Office Approval:

Prior approval as contract provision

Contracting Approval: Prior approval as contract provision

Legal Approval:

Jet A-1 Additive MSEP Rating, min.

Fuel System Icing Inhibitor (FSII) 85

Corrosion Inhibitor/Lubricity Improver (CI/LI) 80 Fuel System Icing Inhibitor (FSII) and

Corrosion Inhibitor/Lubricity Improver

(CI/LI)

PAGE 13 OF 43 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

Acceptance point: [ X ] Destination [ X ] Origin (Subsequent Shipments) (End of Clause)

SECTION F - DELIVERIES OR PERFORMANCE

52.211-16 VARIATION IN QUANTITY (APR 1984) FAR

(b) The permissible variation shall be limited to:

10 Percent increase 10 Percent decrease This increase or decrease shall apply to each delivery order .

52.247-29 F.O.B. ORIGIN (FEB 2006) FAR

52.247-34 F.O.B. DESTINATION (NOV 1991) FAR

F1 F-0001/F1 DELIVERY CONDITIONS FOR TANK CARS, BOXCARS, TRUCKS, TRANSPORT TRUCKS, TRUCKS AND TRAILERS, TANK WAGONS, PIPELINE, AND LIGHTERS (DLA ENERGY JAN 2012)

(a) On items calling for delivery at Contractor's refinery, terminal, or bulk plant f.o.b. tank car, boxcar, truck, transport truck, truck and trailer, tank wagon, pipeline, or lighter--

(1) Supplies ordered hereunder shall be delivered, at Contractor's expense, into equipment specified in the Schedule.

(2) Unless otherwise specified in the Schedule, all deliveries shall be made upon the day specified in the order provided that the Contractor shall have received the order at least 48 hours prior to the day so specified, except for deliveries--

(i) By pipeline (other than into vessel, dredge, or barge for use as ships' bunkers) for which the Contractor shall be given 15 days' notice prior to the date so specified; and

(ii) Into vessel, dredge, or barge by any means of delivery including pipeline for use as ships' bunkers, for which deliveries the Contractor shall be given 24 hours' notice prior to the specific time delivery is to be made.

(3) All packaged or drummed material to be delivered f.o.b. boxcar, truck, or lighter shall be loaded (braced and blocked where necessary) by the Contractor as follows:

(i) RAIL SHIPMENTS IN CONTINENTAL UNITED STATES AND ALASKA.

(A) In accordance with the LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS contract provision.

(B) To the extent there is no conflict between the standards mentioned in paragraph (a) of the LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS contract provision, when a freight advantage to the Government would result, the Contractor will load boxcars to maximum capacity, including multiple tiering.

(ii) TRUCK SHIPMENTS IN THE UNITED STATES. In accordance with ICC Regulations and best commercial practices.

(iii) RAIL SHIPMENTS AND TRUCK SHIPMENTS - OVERSEAS, POSSESSIONS AND TERRITORIES. In accordance with best commercial practices and local regulations, or as indicated in the Schedule.

(iv) LIGHTER. In accordance with best commercial practices.

(4) Except for supplies delivered f.o.b. boxcar, truck, or lighter, title to the supplies delivered, and risk of loss thereof, shall pass from the Contractor to the Government when the supplies pass into the receiving conveyance. Title to supplies delivered f.o.b. boxcar, truck, or lighter, and risk of loss thereof, shall pass from the Contractor to the Government at the time the car, truck, or lighter is released to, and accepted by, the carrier.

(b) On items calling for delivery f.o.b. destination by means of tank car, boxcar, truck, transport truck, truck and trailer, tank wagon, pipeline, or lighter--

(1) Supplies ordered hereunder shall be delivered, all transportation charges paid, to the destination and by means of the transportation equipment specified in the Schedule or, if no specific destination is indicated in the Schedule, to the destination specified in the order.

Delivery shall be accomplished at Contractor's expense into Government storage or into the type of receiving equipment otherwise specified in the Schedule or in the order, except for--

(i) Delivery by tank car which shall be accomplished by spotting the car alongside the unloading manifold connection at the specified destination;

(ii) Delivery by boxcar which shall be accomplished at the specified destination as follows:

PAGE 14 OF 43 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

(A) If such activity has a railroad siding, by spotting the car alongside the unloading platform or elsewhere at such destination as may be designated by the receiving activity;

or

(B) If such activity does not have a railroad siding at the unloading platform of the railroad siding serving such activity, and if the freight tariff provides for free pickup and delivery service, delivery shall be made to the activity specified in the order;

(iii) Delivery by truck which shall be accomplished by spotting the truck at the unloading platform at the specified destination and by placing the drummed or packaged supplies at the tailgate of the truck; and

(iv) Delivery by lighter which shall be accomplished as indicated in the Schedule.

(2) Unless otherwise specified in the Schedule, all deliveries by tank car or boxcar shall be made within 24 hours from the time specified in the order, provided that such order shall have been received by the Contractor at least 120 hours prior to the time so specified; all other deliveries, except as hereinafter indicated, shall be made on the day specified in the delivery order and unless otherwise authorized by the receiving activity during normal working hours of such activity, provided that such order shall have been received by the Contractor at least 48 hours prior to the days so specified. Pipeline deliveries (except those into vessel, dredge, or barge) shall be made on the day specified in the delivery order, provided the order shall have been received by the Contractor at least 15 days prior to the day so specified. Delivery into vessels, dredges, or barges from a marine service station or by means of transport truck, truck and trailer, tank wagon, or pipeline shall be made at the specific time specified in the order, provided that such order shall have been received by the Contractor at least 24 hours prior to the specific time such delivery is required to be made.

(3) The Contractor shall not be required to deliver by transport truck or truck and trailer a quantity less than a full load nor into more than one storage tank, with the following exceptions:

(i) An order placed under an item of this contract calling for delivery by transport truck of motor gasoline, fuel oil, diesel fuel, or kerosene, or, if this procurement is for Central America only, jet fuel, may require delivery of a quantity as low as 5,200 gallons whenever the activity is restricted either by a tank capacity or by a directive from receiving a larger quantity; and

(ii) Where the Schedule provides for multiple drop delivery, the Contractor may be required to deliver into more than one storage tank. Where truck and trailer is the method of delivery specified, the Contractor may, at its option, make delivery by transport truck. In the case of deliveries in Alaska, where truck and trailer or transport truck is the method of delivery specified, the Contractor may, at its option, make delivery by tank wagon.

(4) The Contractor shall not be required to deliver by tank wagon a quantity of less than 575 liters (or 150 gallons) but, at the Government's option, may be required to deliver into more than one storage tank.

(5) When delivery of fuel oil or lubricating oil is made by tank car, such car shall be equipped with steam coils, if specified in the order, to facilitate the unloading of such product.

(6) When delivery is made by tank wagon, such wagon shall be equipped with pump, meter, and a minimum of 100 feet (30 meters) of hose. Where delivery is made by transport truck or truck and trailer, such delivery equipment shall be equipped with a minimum of 15 feet of hose.

(7) When delivery is made by tank wagon, transport truck, or truck and trailer to a Government facility--

(i) The Contractor shall provide properly maintained delivery equipment and properly trained delivery personnel to reasonably assure that delivery can be made without damage to vegetation and asphalt pavement adjacent to storage facilities being filled.

The Contractor's delivery personnel who have not exercised reasonable care and delivery equipment which is poorly maintained, may be refused entrance to the installation by the installation Commander.

(ii) The Contractor shall present delivery equipment and product in such condition at destination so as to permit complete off-loading within the prescribed free time.

(8) Unless otherwise provided in the Schedule, free time for unloading trucks, transport trucks, or trucks and trailers shall be unlimited.

(9) Except for supplies delivered by tank car, boxcar, truck, or lighter, title to supplies delivered, and risk of loss thereof, shall pass from the Contractor to the Government when the supplies pass into the receiving facilities. Title to supplies delivered by tank car or boxcar, and risk of loss thereof, shall pass from the Contractor to the Government at the time the car is released by the carrier for unloading. Title to supplies delivered by truck, and risk of loss thereof, shall pass from the Contractor to the Government when the drummed or packaged supplies are removed from the truck. Title to supplies delivered by lighter, and risk of loss thereof, shall pass from the Contractor to the Government at the time the receiving vessel's tackle is attached to the supplies to be unloaded.

PAGE 15 OF 43 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

F1.25

F-0002/F1.25 DELIVERY AND ORDERING PERIODS (DLA ENERGY JAN 2012)

(a) This contract provision applies to all modes of delivery, whether origin or destination.

(b) The period of this contract during which the Ordering Officer may order and the Contractor shall deliver, if ordered, shall be as follows unless the item in the Schedule specifies otherwise:

(1) Ordering Period Begins: Date of Award and Ends: June 30, 2016.

(2) Delivery Period Begins: Date of Award and Ends: 30 days after the end of the ordering period.

(c) Notwithstanding the foregoing, deliveries made prior to the delivery period at the option of the Contractor and pursuant to an order by the Government shall be deemed to have been made under this contract at the applicable contract price(s).

(d) Insofar as practicable, the Government will attempt to lift in approximately equal monthly quantities for the life of the contract. However, if the monthly pro rata for tanker lifting is less than the Contractor's maximum parcel size, the Government reserves the right to order volumes equal to the maximum parcel size per delivery.

(e) Unless otherwise specifically stated in this contract, and notwithstanding (e) above, where the total estimated quantity for any individual product or grade of product awarded under this contract is equal to or less than 30,000 barrels, the Government may order, and the Contractor shall deliver, if ordered, the entire quantity in one delivery.

(f) Nothing included in this contract provision shall restrict the Government's rights under the DELIVERY-ORDER LIMITATIONS - SCOPE OF CONTRACT provision.

F15 F-0003/F15 BARGE AND/OR T1 CLASS TANKER DEMURRAGE AND LOADING CONDITIONS (DLA ENERGY JAN 2012) On items calling for delivery f.o.b. barge and/or T1 Class tanker at origin--

(a) DELIVERY DATES.

(1) Unless otherwise specified in the Schedule, orders placed under items of the Schedule calling for delivery f.o.b. barge and/or T1 Class tanker at Contractor's refinery, terminal, or bulk plant will be furnished to the Contractor at least 15 days in advance of the date on which delivery is to be made, which date is hereafter referred to as the "scheduled delivery date." Each order will specify the quantity to be delivered, the scheduled delivery date, and the cargo number, and, if then available, the name of the barge and/or T1 Class tanker (herein referred to as "vessel") to be loaded.

(2) The scheduled delivery date may be revised by the Ordering Officer at any time and, unless the Contractor registers objections with the Ordering Officer within 72 hours of receipt of such revised scheduled delivery date, such revised date shall become the new agreed scheduled delivery date. At the time the Contractor registers any such objections, the Contractor must provide a date, subsequent to the date proposed by the Ordering Officer, which represents the earliest date the Contractor can provide a berth. The Ordering Officer must confirm or reject the alternate date provided by the Contractor within 72 hours of receipt of the Contractor's objection. If the Ordering Officer chooses to accept the alternate date provided in the Contractor's objection, such revised date shall become the new agreed scheduled delivery date. If the Ordering Officer chooses to reject the alternate date provided by the Contractor, the scheduled delivery date will return to the previously scheduled delivery date.

(3) All communications regarding the establishment and revision of the scheduled delivery date and objections thereto shall be set down in writing at such time or promptly confirmed in writing.

(b) EXPECTED TIME OF ARRIVAL.

(1) FOR WESTPAC/EUR/MED SHUTTLE OPERATIONS. The vessel designated to lift the cargo will notify the Contractor (at the telex number provided by the Contractor or cause it to be notified when the Contractor does not provide a telex number) of its name and the expected hour of arrival of the barge at least 72 hours before the expected time of arrival and update this notification at 48 and 24 hour intervals before expected arrival.

(2) FOR ALL OTHER VESSELS. The vessel designated to lift the cargo will notify the Contractor at the telex number provided by the Contractor or cause it to be notified when the Contractor does not provide a telex number of the name and the expected hour of arrival of the vessel at least 24 hours before the expected time of arrival.

(c) LAYTIME. The Contractor shall provide as soon as possible, but within 3 hours after receipt of notice of readiness to load from the vessel designated to load the cargo, a reachable berth free of cost to the Government, where the vessel can be safely moored and remain afloat at all times, for loading of the ordered supplies. Laytime shall commence, berth or no berth, either at the expiration of 3 hours after notice of readiness, or immediately when the vessel moors alongside, with or without notice of readiness, whichever first occurs; PROVIDED, however, that--

PAGE 16 OF 43 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

(1) If the vessel is tendered for loading on a date earlier than the last scheduled delivery date as determined pursuant to paragraph (a) above, the Government scheduled vessel shall be loaded as soon as possible in its proper turn with other vessels, and laytime shall not commence until the vessel moors alongside or at 3:00 a.m. local time on the last agreed schedule delivery date, whichever first occurs.

(2) If the vessel is tendered for loading later than noon on the day following the last agreed scheduled delivery date, as determined pursuant to paragraph (a) above, the vessel shall be loaded as soon as possible in its proper turn with other vessels. Laytime shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to have the vessel loaded as soon as is reasonably possible under the circumstances prevailing at the time.

(3) Laytime shall continue 24 hours a day, 7 days a week, without interruption from its commencement until loading of the vessel is completed and the vessel has been released for sailing by the Government Quality Representative.

(d) ALLOWED LAYTIME.

(1) BASIC ALLOWED LAYTIME. For cargo movements under DLA Energy bulk petroleum contracts, the Contractor shall be allowed 1 hour for each 2,000 barrels loaded.

(2) INCREASES TO BASIC LAYTIME.

(i) If, after laytime commences, the condition of the vessel to be loaded does not permit loading, such basic allowed laytime shall be increased by the duration of such delay.

(ii) If the vessel is delayed in reaching its berth and the delay is caused by the fault of the vessel, such basic allowed laytime will be increased by the duration of such delay that occurred after laytime commenced.

(iii) If regulations of the owner, operator of the vessel, Customs Officials, or Port Authority prohibit loading at any time after laytime commenced, time so lost shall be added to the basic allowed laytime.

(iv) If for any reason the Contractor is delayed in loading the barge or there is a delay in releasing the vessel for sailing because of action of the U.S. Government that arises out of causes beyond the control and without the fault or negligence of the Contractor, such basic allowed laytime shall be increased by the duration of such delay.

(v) If the vessel requests cargo tanks be cushioned or topped off during the loading process and the quantity of product cushioned or topped including the time spent cushioning/topping tanks is noted on the DD Form 250-1, Loading/Inspection Report, the basic allowed laytime shall be increased by the difference between the actual time taken to cushion/top tanks and the amount of time required to pump the same quantity of cushioned/topped product at the Contractor's actual loading rate exclusive of cushioning/topping time and cushioning/topping quantity.

(vi) Contractor will be allowed up to 4 hours of additional laytime following removal of cargo hoses until vessel is released by the inspector in order to accomplish tasks required under the CONTRACTOR INSPECTION RESPONSIBILITIES contract provision.

(vii) There will be no increases made to the basic allowed laytime (nor other reductions to any resulting demurrage time) for saved laytime arising out of other loadings.

(viii) Delays, after commencement of laytime, attributed to causes beyond the control and without the fault or negligence of the Contractor or the U.S. Government will result in increasing basic allowed laytime for one half of the delay.

(e) For all hours of laytime that elapse in excess of allowed laytime for loading provided for by paragraph (d) above, demurrage shall be paid by the Contractor as follows:

(1) TIME CHARTER VESSELS. At the demurrage rate for the vessel loaded, computed to the nearest whole hour, as published by the Military Sealift Command, and in effect on the date loading of the vessel is completed.

(2) The demurrage rate set forth in the Carrier's Tender of Freight Services and Demurrage Invoice to the Government.

(3) CONTRACT VESSELS. At the hourly rate specified in the contract.

(f) Hoses for loading a vessel shall be furnished, connected, and disconnected by the Contractor; loading arm shall be connected and disconnected by the Contractor.

(g) Title to the supplies delivered and risk of loss thereof shall pass from the Contractor to the Government when the supplies pass the vessel's permanent hose connection.

F16.01 F-0004/F16.01 BARGE DEMURRAGE AND UNLOADING CONDITIONS (BULK) (DLA ENERGY JAN 2012) On items calling for delivery f.o.b. destination by means of barge--

(a) The term barge, as used herein, shall include lake tankers and coastal tankers, e.g., T-1 tankers.

PAGE 17 OF 43 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

(b) The supplies ordered hereunder shall be delivered, all transportation charges paid, to the destination specified in the Schedule. Unless otherwise specified in the Schedule, orders placed under items of the Schedule calling for delivery f.o.b. destination by means of barge will be furnished the Contractor at least 15 days, plus the normal barge running time from point of loading to the destination in advance of the date on which delivery is to be made, which date is hereinafter referred to in this contract provision as the "scheduled delivery date." Each order will specify the quantity to be delivered and the scheduled delivery date. The scheduled delivery date may be changed by the Contractor at any time if the Ordering Officer approves.

(c) Within 3 hours after issuance of Notice of Readiness (NOR) to unload by the Master or Mate of the vessel designated to discharge, the Government will provide, free of cost, a reachable safe berth for the tug and tow or self-propelled barge to be afloat at all times at the unloading port: PROVIDED, however, that if the receiving activity does not receive a barge's NOR to unload within 24 hours before or after noon of the latest approved scheduled delivery date, the Government will be allowed 12 hours after receipt of notice within which to provide a berth.

(d) Unless otherwise provided in the Schedule, the Government shall be allowed and will complete unloading within laytime determined as follows: 1 hour for each 2,000 barrels of supplies to be unloaded, plus 1 1/2 hours; PROVIDED, however, that if the condition or facilities of the barge to be unloaded do not permit unloading within the number of hours so determined, such allowed laytime shall be increased by a number of hours sufficient to permit the unloading of the barge; PROVIDED, further, that when the barge is delayed in reaching its berth within 3 hours or 12 hours, as the case may be, from the time NOR to unload is given, and the delay is caused by the fault of the barge, such allowed laytime shall be increased by the duration of such delay; and PROVIDED, further, that if regulations of the owner or operator of the barge or Port Authorities prohibit unloading at any time, time so lost shall be added to the amount of such allowed laytime. Laytime shall commence either--

(1) At the expiration of the notice period prescribed by (c) above (the 3 hours' or the 12 hours' notice, as the case may be), berth or no berth; or

(2) Immediately upon the barge's arrival in berth (i.e., all fast), with or without NOR, whichever first occurs. Laytime shall continue 24 hours a day, 7 days a week, without interruption from its commencement, until unloading of the barge is completed and the hoses have been disconnected.

(e) For all hours of laytime that elapse in excess of the allowed laytime for unloading provided for by…