This document summarizes a federal contract award for F108 engine workload augmentation services. The contract was awarded on September 14, 2020 to two vendors through a split award: Canadian Commercial Corporation with subcontracting to Lockheed Martin Commercial Engine Solutions (SPE4AX-20-D-9004), and GE Aviation (SPE4AX-20-D-9005). Both contracts have a one-year base period and four one-year option periods. The work involves overhauling F108 engines from configuration F108-100 to F108-100A at the Oklahoma City Air Logistics Center to improve production output and enhance engine availability. Services include replacement of life limited parts and stage 1 LPT blades. Pricing is firm-fixed for various contract line items, including overhaul and replacement parts. Delivery of overhauled engines is required within 90 days of engine receipt by the contractors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPE4A219R0055_Redacted.pdf | ||
| SPE4AX-20-D-9004 - CCC_LMCES_executed 14Sep2020 no attachments_Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED
SPE4AX-20-D-9005
CONTINUED ON NEXT PAGE
SECTION A
GENERAL INFORMATION
A.1 The F108 Workload Augmentation contract herein shall supplement continued organic F108 engine production at United States Air Force (USAF) Oklahoma City Air Logistics Center (OC-ALC). As such, this contract establishes temporary augmentation to organic support with a commercial source to improve whole F108 engine overhaul output and ultimately, enhance War Readiness Engines (WRE) availability.
A.2 The F108 whole engine remanufacture results in the engine overhaul from an F108-100 to F108- 100A in accordance with the technical requirements specified in the Statement of Work (SOW).
A.3 This is a five-year, Indefinite Delivery Indefinite Quantity (IDIQ) type contract with Firm-Fixed Pricing with a single-year base period, and four, one-year option periods to be exercised at the discretion of the Government in accordance with FAR 52.217-9. Orders may be issued at any time during the five-year contract term, but the total period of performance shall not exceed five years.
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 The following CLINs apply to the subject contract, and applicable Firm-fixed prices . The contract value as stated Section 26 of the SF1449 is the maximum estimated contract value (base year only).
CLIN 0001: Firm-fixed price for the F108-100 engine overhaul and upgrade to F108-100A engine as identified in the SOW at Attachment 2.
Sub-CLINs 0001AA-0001AT: Firm-fixed price for the replacement of Life Limited Parts (LLPs) and the Stage 1 LPT Blade as required for replacement in meeting the requirements in the SOW at Attachment 2. The Contractor shall notify the Government no less than thirty (30) days prior to delivery of an overhauled engine, identifying the sub-CLINs and quantity (for sub-CLIN 0001AT) replaced during the individual engine overhaul in order for the delivery order(s) to be modified to incorporate prices for replaced LLPs and/or Stage 1 LPT Blades.
CLIN 0002: Over and Above (O&A) not priced at contract award. O&A may apply due to unanticipated maintenance costs discovered during the overhaul process of an engine. O&A includes maintenance and/or material replacements not identified within the SOW and associated technical data at time of proposal and contract award.
B.2 As set forth in the solicitation, the Government may award a maximum of 30 EA engines per year and a minimum of 9 EA engines per year for augmentation support. As of the date of contract issuance, the Government requirement for the base year is 20 EA engines.
B.2.1 A contract minimum of less than 9 EA engines per year may be negotiated in order to protect the Government or address funding constraints that may arise over the potential five year contract term.
B.3 The Government has awarded split award contracts for total augmentation support and identified a
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED
SPE4AX-20-D-9005
CONTINUED ON NEXT PAGE
Therefore, the Contractor shall receive a delivery order, or combination of delivery orders issued during the base year for a
B.3.1 The Government reserves the right to adjust the engine overhaul quantity split via contract modification prior to the beginning of each performance period, or issuance of a delivery order based on Contractor performance and/or capacity constraints, if any.
SECTION C
DESCRIPTION/SPECIFICATION/STATEMENT OF WORK
The SOW and its incorporated and/or referenced appendices included herein as Attachment 2 defines the work scope for the F108 workload augmentation requirements.
SECTION D
PACKAGING AND MARKING
D.1 In accordance with the SOW, the Contractor shall utilize its commercial packaging and marking practices in lieu of MIL-STD-2073 or any other standard referenced herein. The Contractor shall place a serviceable tag, Department of Defense (DD) Form 1574 inside the package along with the assembly.
The Contractor shall place another completed DD Form 1574 to the outside of the package.
D.2 DFARS 252.211-7006 Radio Frequency Identification (RFID) requirements shall not apply until such time as DoD ship-to locations require passive RFID tagging as listed at the Logistics & Material Readiness website, http://www.acq.osd.mil/log/sci/RFID_ship-to-locations.html; or shipments are to locations outside the contiguous United States when the shipments have been assigned Transportation Priority 1.
SECTION E
INSPECTION AND ACCEPTANCE
E.1 All Government Contract Quality Assurance (GCQA) to include quality surveillance, and inspection & acceptance of overhauled engines shall reside with the Defense Contract Management Agency (DCMA) Quality personnel administering this contract and as identified at Section G herein.
SECTION F
DELIVERIES OR PERFORMANCE
F.1 No later than fifteen (15) days after award, the Contractor shall confirm the delivery address for USAF material shipment applicable to this contract in order for the Government to establish a Department of Defense Activity Address Code (DoDAAC) and issue material.
F.1.1 Material subject to issue to the Contractor by the USAF includes: (1) the CFM Propulsion Upgrade (C-PUP) Kits the USAF will provide as Government Furnished Material (GFM) for the overhaul; and (2) all engines subject to Contractor overhaul and upgrade in accordance with the
SOW.
F.2 Delivery of an overhauled and upgraded engine is 90 days from date of Contractor receipt of an engine for induction.