7._Attachment_2_-SOW.pdf
PDF 491 KB Posted
- Attached to
- W0--EQUIP MGMT SOLUTIONS, 710 Federal contract opportunity
- Solicitation number
- SP700015Q0065
- Issued by
- Defense Logistics Agency
About this file
Attachment 2 -SOW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Delivery_schedule_(71_devices)_w_o.pdf | ||
| SOW_(71_devices).pdf | ||
| BAHRAIN_SOW_(updated_11-4-15).doc | DOC document | |
| 6._Attachment_1-_Instruction_to_Quoters.pdf | ||
| 8._Attachment_3_-Delivery_Schedule.pdf | ||
| 9._SP7000-15-Q-0065.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW FY15-3
STATEMENT OF WORK (SOW)
DLA DOCUMENT SERVICES
DLA Document Services NORFOLK Office Group seeks to enter into a contract for up to 60 months of services and equipment associated with 64 Multi-Functional Devices (MFDs) and copier machines (hereafter collectively referred to as devices) including installation and removal, full service maintenance, all consumable supplies (excluding paper), key operator training, reports, relocations, network functionality, and network security.
The geographic scope of this contracting action is:
OUTSIDE THE CONTIGUOUS UNITED STATES (OCONUS) and limited to a 50 mile radius and within the same country (ies) of the delivery schedule.
US FORCES BAHRAIN NAVY ONENET
1.0 GENERAL INFORMATION.
This is a firm fixed price commercial acquisition.
1.1 The contractor is responsible to comply with all rules and regulations to obtain installation access in order to meet all response times stated in the SOW. The contractor shall comply with base access and vehicle registration requirements regarding contractor-owned and contractor employee privately owned vehicles as set forth in the base/command regulations. All vehicles, including those with passes or decals, are subject to random search at any time.
1.2 All deliveries or services provided under this contract require a Customer Acceptance Form (attached) be signed and dated by the DLA Document Services’ customer.
Upon completion of any installations, deliveries, relocations, removals, maintenance services, or any support action, the contractor will provide the receiving customer with the Customer Acceptance Form, for their signature as a means of consent by the receiving agency/command that the action was completed.
This Customer Acceptance Form will be signed to include the following: (1) Activity Name, (2) Model and Serial numbers; (3) date of removal; (4) removal locations (to include building numbers, room numbers, (5) Information Assurance Managers (IAMs) or their designated assignee’s name, phone numbers, email addresses and their validating signature confirming receipt of the devices status.
This Customer Acceptance Form must be submitted to the DLA Document Services Point of Contact within 10 calendar days of completing the install/removal.
1.3 Invoices will be submitted via Wide Area Work Flow (WAWF) and will include the Installation Report and spreadsheet with the serial numbers and locations of each device on a monthly basis. Invoices will be in United States Dollars. The first invoice will not be paid unless the installation report spreadsheet referenced in Paragraph 6.2 of the Statement of Work has been provided.
Date created/revised:
FY15 Mar 5, 2015
No Invoice will be approved without a fully completed spreadsheet and the signed Customer Acceptance Form. There will be no interest penalty incurred by the government for delay of payment due to a vendor delay in providing the Installation Report.
1.4 The final invoice must include the Removal Report referenced in Paragraph 2.5 of this Statement of Work.
Failure to provide the Removal Report will result in an invoice rejection. The government will not pay the final invoice until such time as the Removal Report has been furnished IAW Paragraph 2.5. There will be no interest penalty incurred by the government for delay of payment due to a vendor delay in providing the Removal Report.
2.0 INSTALLATION & REMOVALS. The contractor shall:
2.1 Initial installations will be IAW the timeframes outlined in the chart below. Installation of optional devices can only be authorized by a Contracting Officer and will occur between months 1-47; with no new installations required during months 48-60. Regardless of installation date, all devices will maintain a co-terminus Period of Performance (PoP) and will end at the completion of the 48th month unless an extension of the PoP is approved by the Contracting Officer.
2.2 The Government requires delivery to be made according to the following schedule:
Amount of Devices Per Contracting Action
Maximum Number of Calendar Days to Complete Installation
Up to 100 30
101 – 200 45
201 – 500 60
More than 500 90
2.3 Provide a toll free telephone number(s) to place service maintenance calls and order consumable supplies.
The contractor shall affix its toll free telephone number(s) on each device placed on this contract, as well as the DLA Document Services EMS sticker. (DLA Document Services will provide the stickers). In addition, the contractor shall ensure each device has the manufacturer’s name, model number, and machine serial number legibly stamped or affixed to the device in a readily accessible location. The contractor shall provide English speaking personnel at the toll-free number(s) it provides in this paragraph.
2.4 Remove all devices and associated supplies from Government premises within thirty (30) calendar days of contract expiration or receipt of a valid removal order. Contractor is required to submit the Customer Acceptance Form after the removal. In the case of termination, DLA Document Services shall provide the contractor with a final cancellation and removal order depicting each device’s serial number, location, and local contact phone number. Devices not removed by the contractor within thirty (30) calendar days shall be deemed abandoned and subject to such disposal as the Government may deem appropriate at the contractor’s expense.
2.4.1 Upon termination or expiration of the contract, the hard drive and/or any component containing residual data, will be removed by the vendor/contractor and turned over to DLA Document
Services (or its designated assignee) and provide written verification to the designated DLA Document Services (POC) . In all cases where the customer or DLA Document Services requests to own the hard drive at the term of the contract and at time of removals, the contractor, as part of their quoted price, shall provide a replacement hard drive to ensure equipment is fully operational.
2.4.2 Government Owned Equipment, as part of the Contractors quoted price, when requested.
It will be the Contractor’s responsibility for removal and disposal of existing Government Owned Equipment which refers to those MFDs purchased and may require the removal and disposal from Government premises. As part of the Contractors quoted price; prior to removal, DLA Document Services requires the Contractor to remove all hard drives from the controllers and print engines, turn the hard drives over to DLA Document Services, and provide documentation to the DLA Document Services (POC) signed by the Contractor and the local DLA Document Services representative attesting to the hard drive removal and receipt by DLA Document Services. All hard drives will remain the possession of DLA Document Services. It will be the Contractor’s responsibility to remove and dispose of existing equipment. Offerors will have the opportunity to list the cost of removing the equipment when pricing the contract. Removal of existing equipment will be coordinated by the location POC named in the delivery order.
2.5 Provide a Vendor Removal Report to the DLA Document Services (POC) within (10) calendar days after removal. The Removal Report must be provided in an excel spreadsheet format (version 2003 or newer) that provides the Purchase Order Number (PO#) along with the following: (1) date of installation; (2) date of removal
(3) serial numbers/ CLIN; (4) removal locations to include building numbers, room numbers, customer POC name, phone numbers, email addresses; and (5) copy of trucking company pick-up order/GBL.
3.0 TRAINING. The contractor shall:
3.1 Provide on-site training in English within three (3) business days after installation to key operators. A training schedule shall be established prior to device delivery and shall be noted on the installation report.
The training schedule shall show training dates and times. Special and remote areas shall be provided training at the new device’s location(s).
3.2 The contractor shall provide initial training upon installation of devices and any follow up training can be furnished via a quick reference desk guide in addition to a CD- ROM or web based self-guided instructions
3.2.1 Quick reference guide should be single sheet, 2 sided print, no larger than 8.5 X 11 paper size, laminated, full color and easily stowed away with the device.
4.0 MAINTENANCE (Including Operational Standards & Performance). The contractor shall:
4.1 Maintain each device at a minimum 95% monthly available rate based on the 21 standard federal work days in a month. Maintaining the devices includes, but is not limited to, preventive maintenance, service calls, repairs, troubleshooting, connectivity and maintenance as required, to correct hardware and software malfunctions within 30 days, and to mitigate high risk findings identified by customers running DOD approved network scanning tool as well as all associated labor and travel.
4.2 Provide service technician support Sunday through Thursday from 8:00 a.m. – 4:30 p.m. local time, except varying Federal or local Holidays. The contractor shall provide a service technician who speaks English.
4.3 Respond to work stoppage situations within two (2) business hours of a service call. A telephone call (unless it results in solving the problem) shall not be deemed as an acceptable service response. The service technician shall call the key operator within an hour to discuss service problem and time of arrival. It is estimated that 10% of service calls will be classified as “work stoppage” across the total device population on a yearly basis.
4.4 Respond to non-work stoppage situations within four (4) business hours of a service call. A telephone call
(unless it results in solving the problem) shall not be deemed as an acceptable service response. The service technician shall call the key operator within an hour to discuss service problem and time of arrival.
4.5 In the case of devices cleared for CLASSIFIED material, the contractor’s repair technicians CONUS shall have a Department of Defense (DOD) security clearance equal to or higher than the classification of the device and be able to provide verification when requested.
4.5.1 In the case of devices cleared for CLASSIFIED material, the contractor’s foreign-national technicians will be escorted by government personnel and will be able to produce proper identification/credentials when requested.
4.6 Inform the designated DLA Document Services (POC) within two (2) business days of the determination that device is non-repairable and provide comparable replacement device within two (2) business days from receipt of an order from the contracting officer.
5.0 CONSUMABLE SUPPLIES. The contractor shall:
5.1 Provide all consumable supplies (including staples) necessary for the operation of the devices. Paper is excluded as a consumable supply.
5.2 Deliver all required consumable supplies to the designated locations listed on the delivery schedule within two (2) business days after receipt of an order.
6.0 REPORTS. The contractor shall:
6.1 Provide to the designated DLA Document Services (POC) a quarterly usage report in electronic (Microsoft compatible) format on the total and average monthly production volumes by serial number for all devices.
Reports are due 15 business days in the months of December, March, June and September after the 3 month usage period is completed. In addition, the DLA Document Services (POC) may request adhoc usage report by serial numbers.
6.2 Submit a device installation report to the designated DLA Document Services (POC) within ten (10) calendar days after installation. Each installation report shall include an excel spreadsheet format (version 2003 or newer) that provides the Purchase Order Number (PO#) along with the following: (1) date of installation;
(2) serial numbers/ CLIN; (3) delivery locations (to include building numbers, room numbers, DLA Document Services’ customer names, phone numbers, email addresses); and (4) delivery report (packing slip or a separate spreadsheet) which clearly identifies the Contract Line Item Number(s) (CLINs) of the order.
6.3 Provide service history reports containing frequency of service calls, production volume between repairs, type of repairs, parts required, and device down time to the designated DLA D (POC) within 5 business days upon request for information.
6.4 Provide a summary of training report within 5 business days of training completion by serial number and listing personnel trained.
6.5 Maintain an accurate listing of all devices under contract (model, serial number, location) and provide to the designated DLA Document Services (POC) with the monthly invoice. The contractor shall invoice in and be paid in U.S. Dollars.
6.6 The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Defense Logistics Agency via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address:
http://www.ecmra.mil/.
Reporting input will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2014. Contractors may direct questions to the help desk at: http://www.ecmra.mil/.
7.0 EMS - MODEL SUBSTITUTIONS. The contractor shall:
After contract award and initial installation, determine if an alternative solution (1) meets or exceeds all the requirements set forth in this Statement of Work, (2) meets or exceeds all the performance qualities set forth in the contractor’s quote, AND (3) can be offered at unit prices that are equal to or less than those of the contractor’s quote or the current contract price, whichever is less.
7.1 Provide confirmation of model discontinuance due to equipment life cycles.
7.2 Verify the substitution.
7.3 Validate no-cost impact.
7.4 No model substitutions will be made without first receiving written approval by the contracting officer.
8.0 DEVICE RELOCATION. The contractor shall:
8.1 Provide relocations aggregating to an amount equal to the total number of devices under contract for each year of the contract. (For example, if there are 36 devices under contract then the contractor will provide up to 36 relocations per year. This may mean relocating the same device 36 times, relocating 36 different devices once each, or any other combination thereof each year.) Relocations shall be limited to a 50 mile radius from where the devices to be moved are located and shall not require rigging or special handling.
Devices shall not be relocated without written approval from the designated DLA Document Services (POC) and shall be completed within 30 calendar days after receipt of the approved request. Contractor is also required to submit the Customer Acceptance Form after the relocation.
Note: Device relocation shall include the following depending on the needs of the Government: breakdown and packing of equipment, shipping, uncrating, re-installation and key operator training.
9.0 DEVICES & CONFIGURATIONS. The contractor shall:
9.1 Provide devices for all Volume Bands that:
9.1.1 Is new or remanufactured as well as currently manufactured, and actively marketed. The terms “new” and “remanufactured” are defined at FAR 52.211-5.
9.1.2 Comply with Section 508 of the Rehabilitation Act of 1973 (29 U.S.C. § 794d), and the Architectural and Transportation Barriers Compliance Board Electronic and Information Technology (EIT) Accessibility Standards (36 CFR part 1194) as amended. See Enclosure (1).
9.1.3 Comply with the Health Insurance Portability and Accountability Act (HIPAA) when installed at government medical sites.
9.1.4 Upon delivery, at no additional cost above the bid price, have the following features and configurations included as standard options:
9.1.4.1 The MFDs shall, upon delivery of the device, be able to meet the capabilities and functions specified within this paragraph. All scan, all print, all fax, all copy, basic inline finishing functions. Printing is defined as digital printing or reproduction output to hardcopy from a digital-based image or electronic document file, created in various software programs, directly to a variety of media using ink, toner, inkjet, or other dye/pigment based imaging system. Printing functions means the ability to select various print settings such as single sided; double sided; enlargement/reduction; varying paper sizes and orientation; various image control and quality settings such as color, where applicable; gray scale, draft mode etc. For the purposes of this Statement of Work, Digital Printing does not include 3D printing. Faxing capability is defined as analogue fax only. Scan functions are defined as standard scanning and network scanning with full integration to standard network infrastructure destinations, which comprises Scan-to-Email, Scan-to-Folder, Scan-to- Network, Scan-to-Server and PC. Full integration does not mean scanning to proprietary back-end content or document management systems supporting customized indexing or metadata requirements. Scanned documents must be made available as a .TIF and as a .PDF file format. Copying is defined as reproduction output from hardcopy to hardcopy to a variety of media using ink, toner, inkjet, or other dye/pigment based imaging system.
Copy functions mean the ability to use an onboard automatic document feeder and provide for the selection of various document output settings such as single sided, double sided, image enlargement/reduction, varying paper sizes and orientation, various image control and quality settings such as color, where applicable, gray scale, draft mode etc.
Basic inline finishing functions are defined as document collation, document stapling, stapling, offset of finished sets, when requested, choice of more than one output tray.
9.1.4.2 Automatic Duplexing; Reversing Automatic Document Feeder with minimum 30 page document capacity.
9.1.4.3 Operate correctly and efficiently using at least 50% or greater recycled 20 lb paper;
9.1.4.4 Devices with hard drives must have an encryption or overwrite capable Security Kit;
9.1.4.5 The default setting for device operation will be, 2 sided printing, gray scale print and the default language setting shall be English.
9.1.4.6 Configure devices so the fax function is physically isolated from the network controller;
9.1.4.7 Configure devices Page Description Language (PDL) to support Adobe PS3, as well as
PCL5e or PCL6;
9.1.4.8 Provide up-to-date software and drivers to include, but not limited to: print drivers and web interface drivers.
9.1.4.9 Equipment must be capable of operating using standard U.S. office 120/220 volt 15 amp
60 Hz AC electrical current or U.S. office 120/220 volt 20 amp 60 Hz AC electrical current.
In the event the later (20 amp) is offered, the Contractor will clearly identify these models in proposals and in all price lists.
Have electrical power capability and power cable/plug as checked:
120 VAC 60Hz 220 VAC 50Hz
Identify Power Plug Part Number Required.
9.1.4.10 Preset/default to “draft” quality printing rather than “high” quality.
9.1.4.11 Desktop and server operating systems currently supported by Microsoft.
9.1.4.12 Provide up-to-date software and drivers to include, but not limited to: 32-bit and 64 architecture driver support and web interface drivers;
9.1.4.13 In the case of MFDs, will be delivered with all USB ports disabled, except the port used to connect the device to a single computer, to prohibit the use of USB flash drives/thumb drives;
9.1.4.14 If File Transfer Protocol (FTP) services capability exists, the device must have secure FTP (SFTP) functionality available;
9.1.4.15 Have changing device settings so that the device moves to “sleep mode” at the end of the working day and on weekends.
9.1.4.16 Preset/default to toner efficient fonts. Fonts such as Century Gothic, Garamond or Times New Roman reduce toner costs over Arial.
9.1.4.17 Preset/default all MFDs to automatically go into sleep mode after 20 minutes of inactivity and automatically go into hibernation after an hour of inactivity.
9.1.4.18 Equipment must also be capable of printing documents that can be securely retrieved from one of many Multifunctional devices on the customer’s network with a CAC card. It must have the capability of restricting output from the printer at a specified multifunctional printer on the network. Print documents can still be directed to print on demand at a designated multifunctional printer without further user intervention.
9.2 Provide devices for Volume Band 0 that, in addition to what is set forth at paragraph 9.1; also have these features/capabilities/configurations.
9.2.1 Maximum Measurements: Width 25” x Depth 25” x Height 23” Desktop/tabletop device shall be small enough to fit on a desk or table comfortably without dominating the desktop/tabletop surface. Floor standing models are not acceptable;
9.2.2 Copy from/to multi-sized materials up to and including 8.5 x 14 paper;
9.2.3 Feeds from at least two (2) paper sources, one of which must be a bypass tray.
9.3 Provide devices for Volume Band 1 and above that, in addition to what is set forth at paragraph 9.1, also have these features/capabilities/configurations:
9.3.1 At least 256 Megabytes of document management memory;
9.3.2 Multi-Position Stapler Finisher;
9.3.3 Floor standing with wheels (or cabinets provided as needed);
9.3.4 Copy from/to multi-sized materials up to and including 11 x 17 paper;
9.3.5 Feeds from at least three (3) paper sources one of which must be a bypass tray.
9.3.6 Preset/default output duplexing.
9.3.7 Preset/default output black and white printing on color devices.
9.4 Provide devices for Volume Band 2 and above that, in addition to what is set forth at paragraphs 9.1 and
9.3, also have these features/capabilities/configurations:
9.4.1 Feeds from at least four (4) paper sources one of which must be a bypass tray.
9.5 Provide an operator’s manual written in English with each device.
9.6 Only classified devices can be placed on the SIPRNET. Devices with hard drive shall be protected at the highest level of classified material produced.
Any one of the following conditions is acceptable for devices on Classified Networks:
9.6.1 Devices without hard drives ensure the MFD does not have an internal hard drive.
Provide devices that have No Hard Drive (See delivery instruction).
9.6.2 Removable Hard Drive (a removable hard drive is a hard drive the operator may easily remove, and reinsert into the device on a reoccurring basis).
9.6.2.1 Any Volume Band that is used for classified processing in a physical environment NOT approved for Open Secret Storage will require a removable hard drive so they can be removed and locked in an approved container/room.
Provide devices that have a Removable Hard Drive (See delivery instruction).
Any Volume Band that has a hard drive readily accessible and easily removable requires that the MFD must have a mechanism to lock and prevent access to the hard drive.
Provide devices that have a lockable cabinet door to prevent access to the Hard Drive
(See delivery instruction).
Devices with hard drives using an encryption or overwrite capable Security Kit are cleared for use with CLASSIFIED material; the contractor, working with the DLA Document Services (POC) and designated government Information Assurance (IA) and security personnel, will remove any/all non-volatile memory chips or cards, hard drives and surrender them to DLA Document Services (or its assignee).
Note: If the contracting officer has designated an assignee, the contractor’s written verification must include a validating signature from the designated assignee confirming receipt of the components.
10.0 NETWORK FUNCTIONALITY. For those devices that shall be connected to a DOD local area network, the contractor shall:
10.1 Devices shall be capable of being configured to comply with the current Defense Information Systems
Agency (DISA) Security Technical Implementation Guide titled SPAN Multi-Function Device (MFD) and Printer STIG (latest version and release), developed by DISA for the DOD.
URL for zip files of this DISA documents found at: http://iase.disa.mil/stigs/index.html.
Note: DOD policy prohibits the publishing of network configuration information, and therefore DOD installations will not fill out pre-installation site surveys. The required information will be provided at time of installation by the local IT support.
Contractor shall supply onsite support during installation. At time of installation, the end user IT department shall be present for collaboration.
10.2 Provide technical and system analysis support and appropriate digital cards/products to successfully connect devices to DLA Document Services’ customer networks.
http://iase.disa.mil/stigs/index.html
10.3 Provide, upon installation, two (2) hours of technical and analyst support to the agency network administrator onsite for each digital/multifunctional unit installed. Support may be requested for the physical and software interface of the controller/device to the DLA Document Services’ customer’s network.
Support shall be provided for network configurations based on agency hardware/software and initial Digital Site Survey provided prior to date of installation.
11.0 NETWORK SECURITY. For those devices that shall be connected to a DOD local area network, the contractor shall:
11.1 Warrant that the devices shall operate on and coexist on a network supporting any and all of the following:
Internet Protocol Version 4 (IPv4), Internet Protocol Version 6 (IPv6), A hybrid of IPv4 and IPv6.
11.2 Additional Network Security Requirements. If the box is checked, the contractor shall provide devices that:
11.2.1 NIAP: Multifuctional Devices must be ISO/IEC 15408 (Common Criteria) certified using the National Information Assurance Partnership (NIAP) approved criteria. To be technically acceptable all devices must meet the following two conditions:
11.2.1.1. NIAP Transition Period instructions
Until the hardcopy Protection Profile is approved a MFD will be acceptable if it is listed in one of the following lists.
. NIAP CCEVS Validated Products List . NIAP CCEVS Product Compliant List . Common Criteria Portal Certified Products List
When the hardcopy PP is approved MFD’s will be given 2 years to become compliant. After the 2 year grace period MFD’s are expected to be in full compliance with NIAP CCEVS Policy Letter #22 and CNSSP-11. NIAP Form T6004 can be used to obtain the CCRA evaluated registered on NIAP’s
PCL.
11.2.2 DIACAP: Are capable of obtaining accreditation through the Department of Defense Information Assurance Certification and Accreditation Process (DIACAP). As part of this, the contractor agrees to provide all requested information and work in good faith with DLA Document Services so the DLA Document Services’ customer(s) can expeditiously obtain DIACAP accreditation. The contractor further agrees that should the DLA Document Services’ customer(s), after good faith efforts, not obtain DIACAP accreditation, the contractor shall remove the device(s) at no additional expense to the government to include, but not be limited to, waiving any and all early or premature discontinuance/termination/cancellation/etc. fees.
[Information regarding DIACAP is found in DOD Department of Defense Information Assurance
Certification and Accreditation Process (DIACAP) Instruction 8510.1 dated 10 November 2007.
http://www.dtic.mil/whs/directives/corres/pdf/851001p.pdf].
http://www.dtic.mil/whs/directives/corres/pdf/851001p.pdf
11.2.3 SMARTCARD: The contractor shall supply a SMARTCARD PKI Solution, which is compliant with DOD CAC and NIST FIPS 201 (PIV) standards. The contractor shall provide card readers that are capable of reading and processing all approved CAC and PIV cards. The contractor shall maintain compliance with DOD wide SMARTCARD and DOD PKI standards, and support all approved physical cards during the full lease period.
The contractor must produce certificates of compliance if requested.
CAC authentication is required for the following capabilities:
Scanning Copying
11.2.3.1 Equipment shall be capable of digitally signing emails using the senders DOD PKI Certificate(s)
11.2.3.2 Equipment shall be capable of encrypting emails using the receivers DOD PKI Certificate(s)
11.2.3.3 Equipment shall be capable to scan to file on networked devices
NOTE: SIPRNET Devices are not compatible with the current CAC capabilities
11.2.4 Configured for installation at selected DOD or Federal Sites in accordance with the following:
The contractor shall (only applicable if checked):
NMCI
Provide networked equipment that is certified to operate on the Navy & Marine Corps Intranet (NMCI) for the "Printer, Scanner and Fax" functions. Certification is determined by being listed on the NMCI Certified Device List (CDL) at time of award.
ONENET
Provide networked equipment that is approved to operate on Outside the Continental United States (OCONUS) Navy Enterprise Network (ONE-NET) for the "Printer, Scanner and Fax" functions. This equipment must be listed on the Naval Network Warfare Command (NETWARCOM) Approved Product List (APL) at time of award. See Enclosure 2
U.S. Army Sites: Provide devices that are configured for installation at U.S. Army Sites in accordance with the following:
Office of the Secretary of the Army Memorandum, NETC-EST-IA, 1 Nov 05, Subject: Army Implementation of Two-Factor Network Authentication for User Accounts and Compliance with Homeland Security Presidential Directive-12 (HSPD-12) Army Regulation 25-2, Information Assurance, 23 March 2009, Chapter 4-5c(6) and Chapter 4-12a (http://armypubs.army.mil/epubs/pdf/r25_2.pdf) Army CIO/G6 Message, SAIS-ZA CIO/G, DTG 041939Z Feb 06, Subject: Army Accelerated Implementation of Common Access Card Cryptographic Network Logon, paragraph 2.
U.S. Air Force Sites:
Provide devices that are configured for installation at U.S. Air Force sites in accordance with the Multi-User Information Systems guidance reference AFI 33-202, Network and Computer Security and in conjunction with AFSSI 8580 Remanence Security. See Enclosure 3
11.3 Enterprise Management Tool (if checked contractor shall provide):
11.3.1 Enterprise Management Capability tool that manages devices. A commercially available management/monitoring software tool that will reside within the customers’ network in order to monitor, manage and generate usage to facilitate continued fleet optimization reports.
Configuration settings should be accomplished utilizing the .dlm format.
Enterprise Management Tool must use SNMP V3 The management tool must monitor meter reads, volume, usage, supplies consumed with notification to order more and provide device uptime performance on networked output devices.
See paragraph 13.0 for associated requirements beyond the commercially available management/ monitoring software tool.
Note: If a regulation cited in Paragraphs 10 or 11 is updated or revised, the contractor must comply with the most current version of the regulation.
12.0 CONTRACTOR PROGRAM MANAGEMENT. The contractor shall:
12.1 Assign a single point of contact to coordinate with the DLA Document Services (POC) in all aspects of this contract. Quotes shall state the assigned point of contact’s name, title, business address, phone number and email address.
13.0 ADDITIONAL EXCEPTIONAL REQUIREMENTS.
If the box is checked, as part of its quoted price, the contractor shall:
13.1 This line adds to 11.2.3 - the requirement to authenticate both US Department of Defense personnel and the ability to authenticate ALT TOKEN CAC CARD for Local national employees.
VOLUME BAND/CLIN STRUCTURE:
CLIN Volume Band Description Quantities
VB-0
Low Volume Black and White or Color Desktop/Tabletop Devices:
Minimum 15 to maximum 24 pages per minute. 600 DPI or greater. (Applies to all volume band 0 requirements). Estimated maximum of 2,000 copies per month.
0B Networked Black and White Multi-Functional Device.
With full Fax, Scan, Copy and Print Capabilities.
0D Networked Color Multi-Functional Device.
With full Fax, and Scan, Capabilities.
Volume Band0 Devices Desktop/Tabletop Devices cannot be combined with VBs 1-5 below.
VB-1
Low Volume Black and White or Color Devices:
Minimum 25 pages per minute B/W and a minimum 25 pages per minute Color. 600 DPI or greater with collating and staple finishing capabilities. (Applies to all volume band 1 requirements). Estimated maximum of 5,000 copies per month for B/W and 2,000 copies per month for color.
1A Black and White standalone device.
1A1 Black and White standalone device.
With Fax Capabilities.
1A2 Black and White standalone device.
Classified device capable of reproducing up to and including
1B Networked Black and White, Multi-Functional Device.
1B1 Networked Black and White Multi-Functional Device.
(Print Only)
1B2 Networked Black and White Multi-Functional Device.
With (Fax) Capabilities.
1B3 Networked Black and White Multi-Functional Device.
With (Scan) Capabilities.
1B4 Networked Black and White Multi-Functional SIPRNET only.
001 1B5 Networked Black and White Multi-Functional Device.
With full Fax, Scan, Copy, Print and Common Access Card (CAC) Capabilities.
1C Color standalone device.
1C1 Color standalone device.
With Fax Capabilities.
1C2 Color standalone device.
1D Networked Color, Multi-Functional Device.
1D1 Networked Color, Multi-Functional Device.
(Print Only)
1D2 Networked Color, Multi-Functional Device.
With (Fax) Capabilities.
1D3 Networked Color, Multi-Functional Device.
With (Scan) Capabilities.
1D4 Networked Color, Multi-Functional Device SIPRNET Only.
002 1D5 Networked Color Multi-Functional Device.
With full Fax, Scan, Copy, Print and Common Access Card (CAC) Capabilities.
1E Option for Short-Term Rental Devices: VB (target single VB) Not to exceed twelve (12) months per device.
VB-2
Mid Volume Black and White or Color Devices: Minimum 30 pages per minute or greater B/W and a minimum 30 pages per minute Color. 600 DPI or greater with collating and staple finishing capabilities. (Applies to all volume band 2 requirements).
Estimated maximum of 10,000 copies per month for B/W and 5,000 copies per month for color.
2A Black and White standalone device.
2A1 Black and White standalone device.
With Fax Capabilities.
2A2 Black and White standalone device.
2B Networked Black and White, Multi-Functional Device.
2B1 Networked Black and White Multi-Functional Device.
(Print Only)
2B2 Networked Black and White Multi-Functional Device.
With (Fax) Capabilities.
2B3 Networked Black and White Multi-Functional Device.
With (Scan) Capabilities.
2B4 Networked Black and White Multi-Functional SIPRNET only.
003 2B5
With full Fax, Scan, Copy, Print and Common Access Card (CAC) Capabilities.
2C Color standalone device.
2C1 Color standalone device.
With Fax Capabilities.
2C2 Color standalone device.
2D Networked Color, Multi-Functional Device.
2D1 Networked Color, Multi-Functional Device.
(Print Only)
2D2 Networked Color, Multi-Functional Device.
With (Fax) Capabilities.
2D3 Networked Color, Multi-Functional Device.
With (Scan) Capabilities.
2D4 Networked Color, Multi-Functional Device SIPRNET Only.
004 2D5
With full Fax, Scan, Copy, Print and Common Access Card (CAC) Capabilities.
2E Option for Short-Term Rental Devices: VB (target single VB) Not to exceed twelve (12) months per device.
VB-3
High Volume Black and White or Color Devices:
Minimum 40 pages per minute or greater B/W and a minimum 35 pages per minute Color. 600 DPI or greater. (Applies to all volume band 3 requirements). Estimated maximum of 20,000 copies per month for B/W and 10,000 copies per month for color.
3A Black and White standalone device.
3A1 Black and White standalone device.
With Fax Capabilities.
3A2 Black and White standalone device.
3B Networked Black and White, Multi-Functional Device.
3B1 Networked Black and White Multi-Functional Device.
(Print Only)
3B2 Networked Black and White Multi-Functional Device.
With (Fax) Capabilities.
3B3 Networked Black and White Multi-Functional Device.
With (Scan) Capabilities.
3B4 Networked Black and White Multi-Functional SIPRNET only.
3B5
With full Fax, Scan, Copy, Print and Common Access Card (CAC) Capabilities.
3C Color standalone device.
3C1 Color standalone device.
3C2 Color standalone device.
3D Networked Color, Multi-Functional Device.
3D1 Networked Color, Multi-Functional Device.
(Print Only)
3D2 Networked Color, Multi-Functional Device.
With (Fax) Capabilities.
3D3 Networked Color, Multi-Functional Device.
With (Scan) Capabilities.
005 3D4 Networked Color, Multi-Functional Device SIPRNET Only.
Classified device capable of reproducing up to and including
SECRET .
006 3D5 Networked Color Multi-Functional Device.
With full Fax, Scan, Copy, Print and Common Access Card (CAC)
VB-4
High-Volume High-Speed, Black and White or Color Devices: Minimum 50 pages per minute B/W, minimum 40 pages per minute Color. 600 DPI or greater. (Applies to all volume band 4 B/W and all volume band 4 color requirements). Estimated maximum of 35,000 copies per month for B/W and estimated maximum of 20,000 copies per month for color.
4A Black and White standalone device.
4A1 Black and White standalone device.
With Fax Capabilities.
4A2 Black and White standalone device.
4B Networked Black and White, Multi-Functional Device.
4B1 Networked Black and White Multi-Functional Device.
(Print Only)
4B2 Networked Black and White Multi-Functional Device.
With (Fax) Capabilities.
4B3 Networked Black and White Multi-Functional Device.
With (Scan) Capabilities.
4B4 Networked Black and White Multi-Functional SIPRNET only.
4B5
4C Color standalone device.
4C1 Color standalone device.
With Fax Capabilities.
4C2 Color standalone device.
4D Networked Color, Multi-Functional Device.
4D1 Networked Color, Multi-Functional Device.
(Print Only)
4D2 Networked Color, Multi-Functional Device.
With (Fax) Capabilities.
4D3 Networked Color, Multi-Functional Device.
With (Scan) Capabilities.
4D4 Networked Color, Multi-Functional Device SIPRNET Only.
007 4D5
With full Fax, Scan, Copy, Print and Common Access Card (CAC) Capabilities.
VB-5
High-Volume High-Speed, Black and White Devices: Minimum 55 pages per minute with a maximum 70 pages per minute. 600 DPI or greater. (Applies to all volume band 5 requirements). Estimated maximum of 70,000 copies per month for B/W.
5A Black and White standalone device.
5A1 Black and White standalone device.
5A2 Black and White standalone device.
5B Networked Black and White, Multi-Functional Device.
5B1 Networked Black and White Multi-Functional Device.
(Print Only)
5B2 Networked Black and White Multi-Functional Device.
With (Fax) Capabilities.
5B3 Networked Black and White Multi-Functional Device.
With (Scan) Capabilities.
5B4 Networked Black and White Multi-Functional SIPRNET only.
5B5
TOTAL 64
Estimated total for Short Term Rental Devices. 0
CUSTOMER ACCEPTANCE FORM
Activity Name: Customer Address:
Customer POC Phone Number: Customer POC Email Address:
Contract Number:
NOTE: This document is required for all installations, relocations, maintenance services, deliveries and removals.
Use back for multiple installations or removals.
Device Manufacturer: Model #:
Serial Number: Training Date: (MM/DD/YYYY)
Service Date: (MM/DD/YYYY): Service Location (Room):
Installation Relocation Maintenance
Delivery of Supplies/Parts * Removal (IAM Signatures required)
Other (Describe here or on Back):
* IAM of Receipt of Hard Drive (Print Name): * IAM of Receipt of Hard Drive (Signature):
Contractor Technician Name (Print): Technician Signature:
Customer Accepting Receipt of device (Print): Must be the EMS DLA Document Services POC.
Customer Signature:
CLIN#: Model #: Serial Number: Service Location (Room):
Customer Acceptance Form
CLIN#: Model #: Serial Number: Service Location (Room):
NOTE: This space below is for any action other than an installation, relocation, maintenance, delivery and/or removal.
Customer Acceptance Form (continued)
Enclosure 1 508 Compliance Document
Government Product Accessibility Template for Multifunction Machines
Summary
• Column one includes all the Sections of the Standard that may apply to any deliverable. The total number of provisions within each Section of the Standard is shown in parentheses.
• Column two identifies the total number of provisions that typically apply to a deliverable of this type. Some of these may not be features of the vendor’s deliverable. Conversely, others not noted may be features of the vendor’s deliverable. If the deliverable includes additional features, the accessibility of these features must also be considered.
• Column three is for general notes about the Sections of the Standard. Some apply to all deliverables and some are specific to the deliverable.
• Column four is a summary of the vendor’s response to applicable provisions and additional deliverable features from the Sections of the Standard.
• Column five is where the vendor can note explanations for any of the preceding columns, e.g. there are differences between expected applicable provisions and actual product features.
CFR 1194 Standard Sections
Total Number of Applicable Provisions
Notes
Total Number of Supported Provisions Please explain
Fully Partial Not Section 1194.21 Software Applications and Operating Systems (12 provisions) 12
This Section applies if the multifunction machine is connected to a computer and has application software.
Section 1194.22 Web-based Internet and Intranet Information and Applications (16 provisions)
Section 1194.23 Telecommunications Products (14 provisions)
These four provisions apply to input devices such as integral parts of printers (keypads, touchscreens and contact sensitive controls) as referenced in 1194.25(c), Multifunction machines generally do not include telephones that can be used for voice communication.
Additional provisions from this Section would apply if the multifunction machine does include a telephone that can be used for voice communication.
Section 1194.24 Video and Multi-media Products (5 provisions)
Section 1194.25 Self- Contained, Closed Products (13 provisions)
Section 1194.26 Desktop and Portable Computers (4 provisions) 1
Multifunction machines do not typically have computer functions, but they often link to computers.
Section 1194.31 Functional Performance Criteria (6 provisions)
Functional performance criteria always apply.
Section 1194.41 Information, Documentation and Support (3 provisions)
If information, documentation, and support are to be provided by the vendor, then this Section applies.
Subpart B -- Technical Standards Note: If there is a possibility that the provision applies, the default value is “Yes”.
• Column one is the full text of the provision from the Standard.
• Column two documents the agency’s accessibility requirement based on common characteristics of the EIT deliverable. Place a Yes or No in this column based on program need and actual characteristics of your expected deliverable (i.e., Is this provision seen as applicable to the expected deliverable?)
• Column three provides explanatory information about the provision to help both the agency in determining applicability and the vendor in providing accessibility information.
• Column four is for the vendor to check off whether the deliverable meets, partially meets or does not meet the specific provision.
• Column five is for the vendor to provide an explanation of how the deliverable meets or does not meet the specific provision. It is also an opportunity to explain why a deliverable does not have an applicable feature or why it has a feature that was not identified as applicable.
Section 1194.21 Software applications and operating systems
Provision Text Applicable Notes How does the EIT meet this requirement?
Please explain
(a) When software is designed to run on a system that has a keyboard, product functions shall be executable from a keyboard where the function itself or the result of performing a function can be discerned textually.
Yes
This applies if the multifunction machine uses a QWERTY keyboard.
Fully
Partially
No
(b) Applications shall not disrupt or disable activated features of other products that are identified as accessibility features, where those features are developed and documented according to industry standards. Applications also shall not disrupt or disable activated features of any operating system that are identified as accessibility features where the application programming interface for those accessibility features has been documented by the manufacturer of the operating system and is available to the product developer.
Yes
(c) A well-defined on-screen indication of the current focus shall be provided that moves among interactive interface elements as the input focus changes. The focus shall be programmatically exposed so that Assistive Technology can track focus and focus changes.
(d) Sufficient information about a user interface element including the identity, operation and state of the element shall be available to Assistive Technology. When an image represents a program element, the information conveyed by the image must also be available in text.
(e) When bitmap images are used to identify controls, status indicators, or other programmatic elements, the meaning assigned to those images shall be consistent throughout an application's performance.
Yes
In this requirement, the term “bitmap” refers to a broad number of image formats, such as .bmp, .gif, .jpeg, .tif and .svg.
(f) Textual information shall be provided through operating system functions for displaying text. The minimum information that shall be made available is text content, text input caret location, and text attributes.
(g) Applications shall not override user selected contrast and color selections and other individual display attributes. Yes
(h) When animation is displayed, the information shall be displayable in at least one non-animated presentation mode at the option of the user.
Yes
Self-scrolling and moving texts are considered animation.
(i) Color coding shall not be used as the only means of conveying information, indicating an action, prompting a response, or distinguishing a visual element.
Yes
This requirement is also addressed in provision 1194.25(g).
(j) When a product permits a user to adjust color and contrast settings, a variety of color selections capable of producing a range of contrast levels shall be provided.
Yes
See www.lighthouse.org/color _contrast.htm
This requirement is also
1194.25(h).
(k) Software shall not use flashing or blinking text, objects, or other elements having a flash or blink frequency greater than 2 Hz and lower than 55 Hz. Yes
Other elements include turning graphics on and off or changing between images.
This requirement is also addressed in provisions 1194.22(j) and 1194.25(i).
(l) When electronic forms are used, the form shall allow people using Assistive Technology to access the information, field elements, and functionality required for completion and submission of the form, including all directions and cues.
Yes
This requirement is also
1194.22(n).
http://www.lighthouse.org/color_contrast.htm
Section 1194.22 Web-based intranet and internet information and applications
Provision Text Applicable Notes How does the EIT meet this requirement?
Please explain
(a) A text equivalent for every non-text element shall be provided (e.g., via “alt”, “longdesc”, or in element content). No
(b) Equivalent alternatives for any multimedia presentation shall be synchronized with the presentation.
(c) Web pages shall be designed so that all information conveyed with color is also available without color, for example from context or markup.
(d) Documents shall be organized so they are readable without requiring an associated style sheet.
(e) Redundant text links shall be provided for each active region of a server-side image map.
(f) Client-side image maps shall be provided instead of server-side image maps except where the regions cannot be defined with an available geometric shape.
(g) Row and column headers shall be identified for data tables.
(h) Markup shall be used to associate data cells and header cells for data tables that have two or more logical levels of row or column headers.
(i) Frames shall be titled with text that facilitates frame identification and navigation
(j) Pages shall be designed to avoid causing the screen to flicker with a frequency greater than 2 Hz and lower than 55 Hz. No
(k) A text-only page, with equivalent information or functionality, shall be provided to make a web site comply with the provisions of this part, when compliance cannot be accomplished in any other way. The content of the text-only page shall be updated whenever the primary page changes.
(l) When pages utilize scripting languages to display content, or to create interface elements, the information provided by the script shall be identified with functional text that can be read by Assistive Technology.
(m) When a web page requires that an applet, plug-in or other application be present on the client system to interpret page content, the page must provide a link to a plug-in or applet that complies with Section1194.21(a) through (l).
(n) When electronic forms are designed to be completed on-line, the form shall allow people using Assistive Technology to access the information, field elements, and functionality required for completion and submission of the form, including all directions and cues.
(o) A method shall be provided that permits users to skip repetitive navigation links.
(p) When a timed response is required, the user shall be alerted and given sufficient time to indicate more time is required. No
Section 1194.23 Telecommunications products
How does the EIT meet this requirement?
Please explain
(a) Telecommunications products or systems which provide a function allowing voice communication and which do not themselves provide a TTY functionality shall provide a standard non-acoustic connection point for TTYs.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .