att_5DSCC_Excavation_Permit.pdf
PDF 957 KB Posted
- Attached to
- CSC-16703 Security Enhancements FY16 Federal contract opportunity
- Solicitation number
- SP4702-16-R-0015
About this file
Excavation Permit
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SP470216R0015_AMENDMENT_0001.pdf | ||
| att_4_Eng_Form_4025-R.pdf | ||
| SP470216R0015.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEFENSE SUPPLY CENTER COLUMBUS EXCAVATION PERMIT
PERMIT NUMBER
In case of an emergency, dial 911 from a DSCC phone or call the DSCC Fire Department at (614) 692-2111.
PROJECT NAME DATE
PROJECT START DATE PROJECT END DATE DURATION
PRIME CONTRACTOR SUB-CONTRACTOR / EXCAVATION CONTRACTOR
CONTRACTOR REPRESENTATIVE CONTRACTOR REPRESENTATIVE PHONE NO.
DSCC FACILITIES REPRESENTATIVE DSCC FACILITIES REPRESENTATIVE PHONE NO.
DESCRIPTION OF WORK AND LOCATION
Excavation by Contractor include applicable drawings.
Excavation by Government
Excavation / Trench Depth: Less than 5 ft. Greater than 5 ft. Greater than 20 ft.
Note: If excavation depth is greater than 5 ft., a soil analysis will be required to determine the appropriate Protective System that will be utilized. A Competent Person shall be on site during trenching and/or excavating activities.
SOIL ANALYSIS CONTRACTOR COMPETENT PERSON SOIL ANALYSIS CONTRACTOR PHONE NO.
SOIL ANALYSIS METHOD UTILIZED NAME OF PROFESSIONAL ENGINEER (if excavation is greater than 20 ft.)
SOIL ANALYSIS RESULTS PROVIDED TO FACILITIES: Yes No
CONTRACTOR REVIEWED UTILITY DRAWINGS: Yes No
UNDERGROUND UTILITIES IDENTIFIED: Yes No If no, provide explanation:
INSTRUMENTS UTILIZED TO IDENTIFY UNDERGROUND UTILITIES: Passive or Active Electromagnetic RF Detector
Ground Penetrating Radar
Other (provide type):
UTILITIES CHECKED BELOW WERE IDENTIFIED, AND MARKED ACCORDINGLY AT THE WORK LOCATION
Electrical Water Sewer Compressed Gas Communications* Stormwater
IS PROTECTIVESHORING SYSTEM REQUIRED: Yes No
Shoring Shielding Benching Sloping Not Applicable
REVIEWED BY CONCURRENCES
PRINT SIGN DATE
CONTRACTOR (Required) (Company Name)
SUBMITTED BY
DSCC FACILITIES REPRESENTATIVE
PROFESSIONAL ENGINEER DATE
(if excavation is greater than 20ft.)
COMPETENT PERSON DATE
NOTES: PERMIT SHALL BE KEPT AT THE WORK LOCATION AT ALL TIMES
* If Communications utilities are present Defense Information Systems Agency (DISA) may require 30 Days Advanced Notice prior to excavation
| PERMIT NUMBER: |
| PROJECT NAME: |
| DATE: |
| PROJECT START DATE: |
| PROJECT END DATE: |
| DURATION: |
| PRIME CONTRACTOR: |
| SUB-CONTRACTOR / EXCAVATION CONTRACTOR: |
| CONTRACTOR REPRESENTATIVE: |
| CONTRACTOR REPRESENTATIVE PHONE NO.: |
| JPL FACILITIES REPRESENTATIVE: |
| JPL FACILITIES REPRESENTATIVE PHONE NO.: |
| Construction Project include applicable drawings: Off |
| Construction Project include applicable drawings: Off |
| Excavation / Trench Depth: |
| Less than 5 ft: Off |
| Greater than 5 ft: Off |
| Greater than 5 ft: Off |
| SOIL ANALYSIS CONTRACTOR: |
| SOIL ANALYSIS CONTRACTOR PHONE NO.: |
| SOIL ANALYSIS METHOD UTILIZED: |
| undefined: Off |
| undefined: Off |
| CONTRACTOR REVIEWED UTILITY DRAWINGS: Yes No: |
| undefined: Off |
| undefined: Off |
| Yes: Off |
| No If no, provide explanation: Off |
| Passive or Active Electromagnetic RF Detector: Off |
| Ground Penetrating Radar: Off |
| undefined: Off |
| Other (provide type: |
| Electrical: Off |
| Water: Off |
| Sewer: Off |
| Compressed Gas: Off |
| Communications: Off |
| Stormwater: Off |
| Yes: Off |
| No If yes, select type below: Off |
| Shoring: Off |
| Shielding: Off |
| Benching: Off |
| Sloping: Off |
| Not Applicable: Off |
| CONTRACTOR (Required) (Company Name): |
| PROTECTIVE SERVICES (as applicable) DATE: |
| SUBMITTED BY: |
| TRANSPORTATION (as applicable) DATE: |
| FACILITIES (Required): |
File details come from the government source that posted it. Updated .