CSC-15725_-_Bid_Form.pdf
PDF 474 KB Posted
- Attached to
- M&R TO HEATING SYSTEM, BUILDING 11 Federal contract opportunity
- Solicitation number
- SP4702-15-R-0027
About this file
Bid Sheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 15725_-_DRAWING_SET(2).pdf | ||
| SP4702-15-R-0027.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO. DATE:
PROJECT TITLE:
PRELIMINARY DESIGN OTHER
NO. OF
UNITS
UNIT OF
MEASURE
PER UNIT TOTAL
UNIT
MANHOUR
TOTAL
MANHOURS
RATE PER
HOUR
TOTAL UNIT RATE TOTAL
Scissors Lift MO Dumpster wk Asbestos Removal LF Poly Sheeting sf Steel Channel LF
Unit Heater Demo ea Pipe Demo LF Pipe Hanger Demo LF Insulation Demo LF
Unit Heater 175 MBH ea Unit Heater 33 MBH ea
Inverted Bucket Trap ea F&T Trap ea Check Valves ea Unions ea
4" Gate Valve ea 2-1/2" Gate Valve ea 1-1/2" Gate Valve ea 3/4 Ball Valve ea
ESTIMATOR:
CSC-15725
CONSTRUCTION COST ESTIMATE
ITEM TOTAL
COST
DRAWING NO.
M&R TO HEATING SYSTEM, BLDG 11
ARCHITECT/ENGINEER:
QUANTITY MATERIAL LABOR
4-562
FINAL DESIGN
EQUIP COST
SP4702-15-R-0027
ATTACHMENT 3
4" Pipe, Sch 40 LF 3" Pipe, Sch 40 LF 2-1/2" Pipe, Sch 40 LF 2" Pipe, Sch 40 LF 1-1/2" Pipe, Sch 40 LF 1 " Pipe, Sch 40 LF
2" Pipe, Sch 80 LF 1-1/2" Pipe, Sch 80 LF 1-1/4" Pipe, Sch 80 LF 1" Pipe, Sch 80 LF 3/4" Pipe, Sch 80 LF
4" pipe insulation LF 3" pipe insluation LF 2-1/2" pipe insulation LF 2" pipe insulation LF 1-1/2" pipe insulation LF 1-1/4" pipe insulation LF 1" pipe insulation LF 3/4" pipe insulation LF
DDC Software ea DDC System Start Up LS DDC Controller ea DDC Field Panel ea Subcontractor Fees LS
Electric Circuits LS
SUBTOTAL
OH
profit bond
TOTAL