Attachment 4- Preventive Maintenance Task List
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Award_Notice.pdf | ||
| Amendment_0001_SP330019Q0067.pdf | ||
| Attachment_5-_Past_Performance_References.pdf | ||
| Attachment_2_-_Wage_Dtermination_No._2015-4467_Rev_11.pdf | ||
| Combined_Synopsis-Solicitation_SP330019Q0067.pdf | ||
| Attachment_1-_Statement_of_Work_(SOW).pdf | ||
| Attachment_3-_Schedule_of_Services.xlsx | XLSX spreadsheet | |
| Attachment_6-_Past_Performance_Questionnaire.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PM
Preventive Maintenance Task List
| Marine Travelift Shuttlelift rubber tired gantry crane 80 ton capacity, EJON 0g0515, Registration Key 4099-15297 | ||||||||||||
| PM Task Description | Notes | Hours | ||||||||||
| Item No | Preventive Maintenance Service | Weekly or 20 hours of operation | 100hrs of operation | 250hrs of operation | 500hrs of operation | 2000hrs of operation | 4000hrs of operation | Monthly or 50 hours of operation | Every 6 months or 250 hours of operation | Annual or 500 Hours of operation | IAW manufacturer specifications & industry standards | |
| 1 | Apply grease to lubrication fittings | x | IAW man spec & industry stds. | 130 | ||||||||
| 2 | Check hoist low rope cutout. | x | IAW man spec & industry stds. | 30 | ||||||||
| 3 | Inspect hydraulic hoses. | x | IAW man spec & industry stds | 30 | ||||||||
| 4 | Inspect wire rope. | x | IAW man spec & industry stds | 30 | ||||||||
| 5 | Inspect the wire rope sheaves. | x | IAW man spec & industry stds | 30 | ||||||||
| 6 | Check the drive chain tension. | x | IAW man spec & industry stds | 30 | ||||||||
| 7 | Check the traverse chain tension. | x | IAW man spec & industry stds | 30 | ||||||||
| 8 | Chain inspection. | x | IAW man spec & industry stds | 30 | ||||||||
| 9 | Lubricate the top beam pivot (trunnion). | x | IAW man spec & industry stds | 30 | ||||||||
| 10 | Lubricate drive and traverse chains. | x | IAW man spec & industry stds | 30 | ||||||||
| 11 | Lubricate the wire rope. | x | IAW man spec & industry stds | 30 | ||||||||
| 12 | Lubricate the steering ring gear and pinion. | x | IAW man spec & industry stds | 30 | ||||||||
| 13 | Replace filer elements. | x | IAW man spec & industry stds | 5 | ||||||||
| 14 | Check tightness of rotation bearing mounting bolts. | x | IAW man spec & industry stds | 5 | ||||||||
| 15 | Check tightness of steering gearbox mounting bolts | x | IAW man spec & industry stds | 5 | ||||||||
| 16 | Clean battery, terminals and connectors. | x | IAW man spec & industry stds | 5 | ||||||||
| 17 | Perform hydraulic oil analysis. | x | IAW man spec & industry stds | 5 | ||||||||
| 18 | Lubricate wheel bearings. | x | IAW man spec & industry stds | 5 | ||||||||
| 19 | Drain, clean and fill the hydraulic tank. | x | IAW man spec & industry stds | 2.5 | ||||||||
| 20 | Drain and fill drive gearboxes. | x | IAW man spec & industry stds | 2.5 | ||||||||
| 21 | Drain and fill hoist gearboxes. | x | IAW man spec & industry stds | 2.5 | ||||||||
| 22 | Drain and fill traverse gearboxes. | x | IAW man spec & industry stds | 2.5 | ||||||||
| 23 | Drain and fill pump drive gearbox. | x | IAW man spec & industry stds | 2.5 | ||||||||
| 24 | Drain and fill steering gearboxes. | x | IAW man spec & industry stds | 2.5 | ||||||||
| 25 | Inspect structure. | x | IAW man spec & industry stds | 2.5 | ||||||||
| 26 | Check tightness of all structural bolts. | x | IAW man spec & industry stds | 2.5 | ||||||||
| 27 | Coat hose ends and fittings with corrosion blocking material. | x | IAW man spec & industry stds | 2.5 | ||||||||
| 28 | ||||||||||||
| 29 | ||||||||||||
| 30 | ||||||||||||
| Total | ||||||||||||
| x - hours of operation or calendar frequency, whichever comes first. | 515 | |||||||||||
| With 10% Buffer | ||||||||||||
| 566.5 |
&"Arial,Bold"Attachment 2
Certification Preventive Maintenance Certification Task List
| Marine Travelift Shuttlelift rubber tired gantry crane 80 ton capacity, EJON 0g0515, Registration Key 4099-15297 | |||
| PM Task Description | Notes | Hours | |
| Certification | (A) Annual | ||
| 1. Load Test and certification | X | IAW CFR29,1910,and ASME B30.5 standards. | 2.5 |