18B00100001.pdf
PDF 84 KB Posted
- Attached to
- Renovatation of Office Area Federal contract opportunity
- Solicitation number
- SP330018B0010
- Issued by
- Defense Logistics Agency Distribution
About this file
Amendment 0001 Answering Questions and revising Attachment 2 SOW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Abstract_18B0010_signed.pdf | ||
| SOW_B-30_Office_Renovation_08302018_REVISED_with_14_Appendixes.pdf | ||
| Site_Visit_Roster_18B0010.pdf | ||
| Attachment_1_Construction_Wage_Determination_CA180029_Mod_15_Dated_27July2018.pdf | ||
| Attachment_2_SOW_B-30_Office_Renovation_06142018_REVISED_2_COMPOSITE_w_Appendix.pdf | ||
| ATTACHMENT_3-__SF25A_Payment_Bond_Form.pdf | ||
| SP330018B0010_as_posted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
4. REQUISITION/PURCHASE REQ. NO.
See Block 14
5. PROJECT NO. (If applicable)
P 2018 01213
6. ISSUED BY CODE SP3300 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SP330018B0010
X
2018 AUG 25
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA DISTRIBUTION
ACQUISITION OPERATIONS (J7)
430 MIFFLIN AVENUE SUITE 3102A
NEW CUMBERLAND PA 17070-5008
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
3. EFFECTIVE DATE
31AUG2018
See Attached Continuation Sheet(s).
(X)
CHECK ONE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 2 OF 3 PAGES
SP330018B0010 - 0001
CONTINUED ON NEXT PAGE
Amendment 0001 is hereby incorporated into Invitation For Bid SP3300-18-B-0010.Amendment 0001 is issued to answer vender questions and incorporate a revised Attachment 2 Statement of Work (new paragraphs 1.1 t, u, and v) with appendixes which now includes Appendix 12, 13 and 14.
Please see below for questions and answers..
Question 1. Where will the disassembled cubicles be placed for Government pick up? How far from the construction area?
Answer 1. The disassembled cubicles will be stacked on pallets in the parking lot down the stairwell on the east side of the Office area. This is within 50 feet of the work area.
Question 2. Are the cubicles on the East side of the office near the stairs, required to be disassembled and removed?
Answer 2. The cubicles on the east side will be disassembled and removed.
Question 3. Please confirm the Government will remove all furniture, electronics and personal effects within the construction areas.
Answer 3. Government personnel will remove any file cabinets and computer within the construction areas.
Question 4. Is construction phasing required? If so, where is each phased construction work area located?
Answer 4. The construction will be done in two Phases as shown in Appendix 12.
Question 5. Is there any after normal business hours, overtime or weekend work required?
Answer 5. All work will be performed during normal working hours 0700 to 1530.
Question 6. Is it acceptable for the new walls to be constructed up to and under the existing acoustic ceilings?
Answer 6. The walls will be constructed up to and under the existing acoustic ceiling.
Question 7. Provide information on the door locksets, including manufacturer, keying or core requirements.
Answer 7. Door lock information is provided in Appendix 14.
Question 8. Provide information on the paint color differences, i.e., walls, doors, trim, sills, accents Answer 8. Door information is provided in Appendix 13. The new doors will be solid wood with a wood finish. The existing doors will be painted dark gray. The window sills will be painted dark gray, and the recessed walls around the windows will also be dark gray.
Question 9. Are there any hazardous materials within the construction areas, i.e., lead paint, asbestos?
Answer 9. There are no hazardous materials in this office location such as asbestos or lead paint.
Please see the attached revised Attachment 2 Statement of Work (new paragraphs 1.1 t, u, and v) with appendixes which now includes Appendix 12, 13 and 14.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 3 OF 3 PAGES
SP330018B0010 - 0001
SECTION J - LIST OF ATTACHMENTS
List of Attachments
File Name Description ATTACH_2_Revised_State ment_of_Work_including_A ppendixes
Attachment 2 SOW B-30 Offic
File details come from the government source that posted it.