Amendment_4_SP330017Q5017.pdf
PDF 2 MB Posted
- Attached to
- Vertical Lift Module Storage Systems for Bldg. 66 at DLA Distribution Richmond, VA Federal contract opportunity
- Solicitation number
- SP3300-17-Q-5017
- Issued by
- Defense Logistics Agency Distribution
About this file
Amendment 0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_4-DWG_DDRV_Bldg._66_D_VLM_Storage_Systems_Revised_19_Jul_17.dwg | DWG drawing | |
| Amendment_4_DDRV_Bldg_66_Bay_D_VLM_Storage_Systems_SOW_Revised_19_Jul_17.pdf | ||
| Amendment_3_SP330017Q5017.pdf | ||
| Amendment_2_SP330017Q5017_.pdf | ||
| Amendment_1_SP330017Q5017.pdf | ||
| Attachment_3_CDRLs_DIDs_SP330017Q5017.pdf | ||
| Attachment_2_Dwg_DDRV_Bldg_66D_VLM_Storage_Systems.pdf | ||
| RFQ_SP330017Q5017.doc | DOC document | |
| Attachment_5_-_Schedule_of_Supplies_SP330017Q5017.xlsx | XLSX spreadsheet | |
| Attachment_4_Wage_Determination_SP330017Q5017.pdf | ||
| Attachment_6_-PPQ_SP330017Q5017.docx | DOCX document | |
| Attachment_1_DDRV_Bldg_66_Bay_D_VLM_Storage_Systems_SOW.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
SP3300-17-Q-5017
Amendment 0004
A. Replace Attachment 1 – Statement of Work (SOW) with the attached revised Attachment 1 –SOW. (NOTE: paragraph 1.4.1 of the SOW is revised from 21 to 24 rack units of demo and a revised Vertical Lift Module rack demo layout drawing is attached).
B. Replace Attachment 2 – Drawing with the attached revised Attachment 2 – Drawing.
C. The following questions have been submitted from industry regarding solicitation SP3300-17-Q-5017. Each question has been redacted to ensure anonymity. The Government response is provided in the far right-hand column for each question.
Contractor Question Government Response 1 The number of sections? 24 Sections
2 How High are they? Wide Deep? Rack units are 5 ft. wide 4 ft, deep and 7 ft. high with five storage levels with a pair of beams at the top of the upright.
3 Are they bolted together? No 4 Are we to dispose of skids also or is it simply frame work, if so are the metal or wood?
There is no wood. The scope is to dispose of the metal only.
5 Give the estimated the length of the longest part so we can order the correct size drop off container and how close can we put it to the area?
7 ft. tall uprights that are 4 ft. deep.
6 Is the demo simultaneous with the install or does it have to be done prior to install?
Rack demo needs to be done before installing the VLMs to make room for staging of components for the VLMs.