ATTACHMENT 2 SOW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF_30_AMENDMENT.pdf | ||
| SP30_AMENDMENT_0001_PG2.pdf | ||
| site_visit_roster.pdf | ||
| SP330017Q0087_SOLICITATION.pdf | ||
| ATTACHMENT_8_-_SITE_MAP.pdf | ||
| ATTACHMENT_6_-_Davis_Bacon.pdf | ||
| ATTACHMENT_5_-_Env_Checklist.pdf | ||
| ATTACHMENT__1_-_Standard_Form_18.pdf | ||
| ATTACHMENT_4_-_DRAWING.pdf | ||
| ATTACHMENT_3_CUT_SHEETS.pdf | ||
| ATTACHMENT_7-__SF25A_(Payment_Bond).pdf | ||
| synopsis.pdf | ||
| APPENDIX_1_-_Env_Checklist_B-29_Breakroom_Expansion.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Title: Building 29 Breakroom Expansion Location: Building 29, Section 1, Tracy Site, Tracy Ca.
Date: 5/22/2017
STATEMENT OF WORK
Enclosure (1): B-29 Breakroom Expansion Drawing
(2): Modular Office Structure (3): VCT Floor Specification.
(4): Cabinets and Countertop.
(5): Power Requirement.
1.0 GENERAL REQUIREMENTS
Provide construction services to include all labor, management, supervision, tools, materials, equipment, and transportation to install the breakroom expansion.
1.1 General Description
The scope of work includes but is not limited to the following:
a. Construct modular office structure (20’x 20’x 8’6”High) connected to the existing breakroom located in Building 29, Section 1. This will require three new walls that will tie into the existing breakroom area. Two panels in the existing breakroom wall will be removed to create a walkway between the breakroom areas.
b. The new breakroom structure will include a wall HVAC unit.
c. The new breakroom structure will include an electrical distribution panel with six circuits to power the HVAC unit, the lights, and the outlets.
d. The new breakroom panel will require a new power connection to main Panel A.
e. Install VCT floor tiles in the new breakroom expansion.
f. Install new fire sprinklers in the breakroom expansion to be connected to the existing fire sprinkler system.
g. Install a new smoke detector in the breakroom expansion.
h. Install new floor cabinets with countertop (2’x 10’x 34.5”H).
i. Relocate existing guardrail with seven electrical outlets used to charge the portable computer stations.
j. Power Requirements for the new Breakroom Expansion Area:
1. Remove existing three 75 KVA (set of three 25 KVA) 12KV/208V transformer located on pole W/36. Remove all the hardware supporting existing transformer on the pole. Remove existing primary fuse.
2. Remove existing #2 AWG wires (about 200 ft.) connecting transformer and 400
A disconnect switch.
ATTACHMENT 2
3. Remove existing conduits from existing weatherhead and 400 A disconnect switch.
4. Remove existing 400 A disconnect switch.
5. Supply and install new 150 KVA (set of three 50KVA oil filled)
12KV/208/120V 3PH 4W transformer, Eaton or approved equal, on the same location on pole # W/36.
6. Supply and install new hardware to support new transformer on the pole.
7. Supply and install new 10A 12KV fuse.
8. Replace existing weather head with new weather head at the location shown in the drawing on west wall of building 29 section 1. Weather head shall be rated for 4- 250 KCMIL service.
9. Supply and install 600 A panel board with 600A main breaker, NEMA 12 enclosure with one 3PH 225A, two 3PH 100A and 10- 1PH 20A circuit breakers. Label this panel as PANEL 5A. Install updated typed panel directory.
Install government supplied Arc Flash label.
10. Supply and install new 4-250 KCMIL THHN 600V, Okonite or equal, and appropriate stainless steel reinforcement wire from new transformer to weather head building 29 section 1. Ground transformer and overhead service as per applicable code.
11. Install 3” EMT and 4-250 KCMIL THHN 600V from weather head to 600A
3PH 4W panel board.
12. Intercept cable/conduit from existing disconnect switch to Panel 5 and connect them to 225A circuit breaker in new 600A panel board.
13. Supply and install 1- 1.5”C EMT 3#1 THHN 600V from new panel to existing 1PH, 100A panel located in new office module. Label this panel as 5B. Install government supplied Arc Flash label.
14. Supply rental generator (i) Two 60 KW 480V,3PH 4W (ii) one 150KW 480V
3PH4W. Install one 60 KW generator at CDC building, one 60KW at Service truck control facility and one 150KW near building 30 prior to any power outage. Rental generators can use existing generator ATS. Rental generators must be wired so that they turn ON with loss of primary power. All rental generators must comply with all regulations mandated by federal, local air pollution control districts and defense depot environmental section.
General
1. All material supplied shall be made in USA and UL listed.
2. Only one power outage will be allowed on Sunday to complete transformer installation.
3. Minimum two weeks written notice is required for any power outage.
4. All electrical work shall be done asper NEC, NFPA and other applicable codes.
5. Transport removed transformer, primary fuse, primary fuse links, and 400A disconnect switch to government maintenance yard inside the depot.
1.2 Submittals
Submittals are required for all material to be utilized and/or installed and shall be in compliance with the Unified Facilities Guide Specifications (UFGS), and the basic contract. All submittals shall be approved prior to commencement of work.
Submittals shall include but not limited to the following:
a. Task specific: Quality Control Plan, Hazard Analysis, and Safety/Health Plan.
b. Construction schedule and Phasing Plan.
c. Manufacturer’s data for suspended ceiling system, vinyl floor tiles, cove base, doors and hardware, diffusers, registers, grilles, and cable.
d. As-built drawings.
1.3 Project Schedule and Time Constraints
Schedule and Completion of Work The contractor is required to prosecute the work diligently and complete the entire work, ready for use no later than 180 calendar days after the award/NTP of the task order. The time stated for completion shall include final clean-up of the premises. (Section 00700, FAR 52.211-10)
Liquidated Damages The liquidated damages for this task order are $ 0.00 per calendar day.
Preconstruction Meeting Prior to the initiation of work, a meeting will be held with the contractor, Depot
PM/PE and COR/Inspector to discuss matters of mutual interest concerning the task order. General conditions, work schedule, phasing, and coordination, security, safety, permits, and other matters pertinent to work accomplishments will be discussed in this meeting.
1.4 Point of Contact (POC)
DEPOT: Norm Dalsis Project Engineer
Doug Betz COR/Inspector
2 WAGE DETERMINATION
Refer to contract section 00700, page 32, FAR52.222-13, Davis-Bacon and Related Acts.
General Decision No. CA030029, dated 11/10/2006, and referenced decision modifications, are herby applicable to work performed under this task order. Certified Payrolls are required to be submitted with each pay request.
3 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
Refer to contract section 0700, page 86, FAR 52.249-10, Default (Fixed-Priced Construction). The monthly anticipated adverse weather delay work days for this task order have been provided on the contract page 01505-5.
4 AUTHORITIES
No person other than the DDC Contracting Officer has the authority to make any changes to this contract action that impact cost or schedule. Authority from the DDC Contracting Officer to the contractor to make changes that impact cost or schedule will be in the form of an official, signed modification.
END OF RFQ DESCRIPTION