About this file
Solicitation SP3300-16-Q-0170
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_1_SP330016Q0170.pdf | ||
| Attachment_2-Schedule_of_Supplies-SP330016Q0170.xlsx | XLSX spreadsheet | |
| Attachment_1_SPI_AM13028723_dated_150527.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SP3300-16-Q-0170
NOTICE TO OFFERORS
1. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6 – Streamlines Procedures for Evaluation and Solicitation for Commercial Items in conjunction with the Federal Acquisition Regulations (FAR) Subpart 13.5 Simplified Procedures for Certain Commercial Items. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. This is a Request for Quote (RFQ) and the RFQ number is SP3300-16-Q-0170.
2. This notice incorporates provisions and clauses in effect through Federal Acquisition Circular (FAC) 2005-87effective 07 Mar 2016 and Defense Federal Acquisition Regulation Supplement (DFARS) DCN 20150226 edition and Defense Logistics Acquisition Directive (DLAD) Current to Revision 5 and PROCLTR 2016-02. The complete text of any of the clauses and provisions may be accessed in full text at http://farsite.hill.af.mil.
3. This acquisition is 100% small business set-aside. The North American Industry Classification System (NAICS) code for this project is 322211 and the size standard 1,250 employees.
4. Limitations on Subcontracting: the Limitations on Subcontracting FAR clause 52.219.14 referenced in this solicitation requires any small business manufacturer of these products to perform at least 50% of the cost of manufacturing the items, not including the cost of materials.
5. This Request for Quotation (RFQ) is being issued to establish a firm-fixed price contract for 3,000 box kits to pack the M2A1 Machine Gun with an option to increase quantity up to 100%. Component specifications are detailed in Attachment 1 - Special Packaging Instruction (SPI) AM13028723 dated 150527 and Attachment 2 – Schedule of Supplies and Services. Any award resulting from this RFQ will be issued on a Standard Form (SF) 1449.
All dimensions are "inner dimensions" in inches. The bag dimensions are between inner seal edges.
6. Delivery: First shipment of 1,000 box kits to be delivered within 60 days After Date of Contract (ADC), Second shipment of 1,000 box kits to be delivered within 150 days ADC. Third shipment of 1,000 box kits to be delivered within 240 days ADC (Note: the total quantity is for 3,000 box kits). In the event that the Government receives additional requirements after the award has been issued, the Government may add additional quantity, up to the percentage cited. It is requested that pricing be submitted on the option quantity, which is shown on the Schedule of Supplies and Services page as a separate item. Evaluation for award of the proposed requirement will be based upon the lowest aggregate total price submitted for the total quantity, inclusive of the option quantity. Each box kit consists of the components listed on the Schedule of Supplies/Services. Specific delivery dates will be established at the time of the award.
7. COMPLETE SETS MUST BE SHIPPED FOR GOVERNMENT ACCEPTANCE WITH EACH SHIPMENT.
8. PACKING AND SHIPPING REQUIREMENTS:
All deliveries shall be packed and packaged in accordance with best commercial practices to insure safe delivery to destination. The contractor shall adequately seal packages containing VCI Wrap or VCI bags to prevent loss of VCI quantities.
Pallets must meet the requirements of International Standards for Phytosanitary Measures (ISPM) 15.
The contractor shall palletize 15 containers (Part Number 906571) and contents (Part Numbers 10-25008-00, 906570, and 905178) Fifteen sets shall be shipped on an ISPM approved pallet as prescribed under the Palletization paragraph on page 4 of attached SPI AM 13028723.
Part Number on SPI AM 13028723: 906571 Box shall be assembled.
Part Number on SPI AM 13028723: 10-25008-00 Box shall be assembled and placed inside P/N 906571 for shipment.
Part Number on SPI AM 13028723: 906570 Foam insert set shall be placed inside P/N 10-25008-00 for shipment.
Part Number on SPI AM 13028723: 905178 One each bag shall be packed inside P/N 10-25008-00.
Part Number on SPI AM 13028723: 906016 Boxes shall be shipped knocked-down. Boxes shall be bundled together and clearly marked with the SPI P/N on either a pallet with wrap and/or banded to pallet.
Part Number on SPI AM 13028723: 902524 Bags shall be packaged and sealed to prevent the loss of the corrosion inhibitors within the material. Bags may be shipped as total quantities of like items and palletized.
Part Number on SPI AM 13028723: 914534 Tubes shall be consolidated together and packed inside a container with the SPI P/N clearly marked on the outside of the container.
Part Number on SPI AM 13028723: 902504 Items shall be packaged and sealed to prevent the loss of the corrosion inhibitors within the material. Items may be shipped as total quantities of like items and palletized.
Part Number on SPI AM 13028723: 905204 Bags may be shipped as total quantities of like items and palletized.
Part Number on SPI AM 13028723: 905202 Bags may be shipped as total quantities of like items and palletized.
Part Number on SPI AM 13028723: 905515 Items shall be packaged and sealed to prevent the loss of the corrosion inhibitors within the material. Wraps may be shipped as total quantities of like items and palletized.
9. PACKING AND MARKING REQUIREMENTS: All products shall be packaged best commercial practice in accordance with ASTM 3951. All shipments must contain proper shipping documentation. Contractor shall attach, in a water resistant envelope, to the exterior shipping container a commercial packing list. All documents must include at a minimum, contract number and document number for the item, stock number, quantity, and unit of issue. Omission of any data on the shipping documentation could cause a delay in receipt of goods and significantly delay payment.
10. Delivery point is FOB Destination. SHIPPING ADDRESS WILL BE AS FOLLOWS:
| DODAAC | ADDRESS | |
| SB3540 | DLA Distribution Anniston, Alabama | |
| 7 Frankford Avenue | ||
| Bldg 362 Central Receiving | ||
| Anniston, AL 36201 |
11. Contractor shall type company name, address, and CAGE code exactly as it appears in the DoD System for Award Management (SAM) Database.
Company Name: _________________________________ Company Address: _________________________________ CAGE Code: _________________________________ Point of Contact _________________________________ Telephone: _________________________________
EMAIL __________________________________
12. SYSTEM FOR AWARD MANAGEMENT – A prospective awardee shall be registered in the System for Award Management (SAM) database prior to award, during performance and through final payment of any contract resulting from this solicitation. Offerors may obtain information on registration and annual confirmation requirements via the Internet at http://www.sam.gov.
13. INVOICING AND PAYMENT – Invoicing and Payment will be made via Wide Are WorkFlow (WAWF). See DFAR Clause 252.232-7003 and 252.232-7006 found on pages 3, 5, and 6 of the RFQ.
14. MARK CONTRACT NUMBER ON ALL CORRESPONDENCE
Contractor must mark the contract or purchase order number on all paperwork and shipments. The order number must appear on the exterior of the shipment. Failure to follow these instructions will hold up payment to you and could result in the return of merchandise at your expense.
15. Questions shall be submitted in writing via e-mail to:
Email: Catherine.doyne@dla.mil The Government is not soliciting for the “same old way” of doing business. The Government encourages proposals that will achieve savings through innovative processes. Furthermore, DLA Distribution personal are working to eliminate unnecessary requirements and negotiating for a reduction in supplies/material prices. Therefore, your assistance is requested in reducing prices and improving our buying processes.
Attachments:
Attachment 1 – Special Packaging Instruction (SPI) AM13028723 dated 150527 Attachment 2 – Schedule of Supplies and Services
SCHEDULE OF SUPPLIES/SERVICES
(SEE ATTACHMENT 2)
Addenda to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (MAY 2015) Additional applicable clauses incorporated by reference:
FAR 52.203-3 -- GRATUITIES (APR 1984)
FAR 52.209-10 – PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS
(DEC 2014)
FAR 52.227-1 -- AUTHORIZATION AND CONSENT (DEC 2007)
FAR 52.222-29 – NOTIFICATION OF VISA DENIAL (APR 2015)
FAR 52.232-17 – INTEREST (MAY 2014)
FAR 52.232-23 – ASSIGNMENT OF CLAIMS (MAY 2014)
FAR 52.232-40 – PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS (DEC 2013)
FAR 52.247-34 – FOB DESTINATION (NOV 1991)
DFARS 252.203-7000 – REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD
OFFICIALS (SEP 2011)
DFARS 252.203-7003 – AGENCY OFFICE OF THE INSPECTOR GENERAL (DEC 2012)
DFARS 252.203-7005 – REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD
OFFICIALS (NOV 2011)
DFARS 252.203-7997 – PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE
CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS (DEVIATION 2016-
O0003) (OCT 2015)
DFARS 252.204-7009 -- LIMITATIONS ON THE USE OR DISCLOSURE OF THIRD-PARTY
CONTRACTOR REPORTED CYBER INCIDENT INFORMATION (DEC 2015)
DFARS 252.204-7012 – SAFEGUARDING COVERED DEFENSE INFO & CYBER INCIDENT
REPORTING (DEVIATION 2016-O0001) (OCT 2015)
DFARS 252.204-7014 – LIMITATIONS ON USE/DISCLOSURE OF INFO BY LITIGATION SUPPORT
CONTRACTORS (FEB 2014)
DFARS 252.204-7015 – DISCLOSURE OF INFORMAITON TO LITIGATION SUPPORT
CONTRACTORS (FEB 2014)
DFARS 252.205-7000 – PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS
(DEC 1991)
DFARS 252.211-7006 – PASSIVE RADIO FREQUENCY IDENTIFICATION (SEP 2011)
DFARS 252.223-7008 -- PROHIBITION OF HEXAVALENT CHROMIUM (JUN 2013)
DFARS 252.225-7001 – BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM (NOV 2014)
DFARS 252.225-7012 – PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (FEB 2013)
DFARS 252.225-7015 – RESTRICTION ON ACQUISITION OF HAND OR MEASURING TOOLS (JUN
2005)
DFARS 252.226-7001 – UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC
ENTERPRISES AND NATIVE HAWAIIAN SMALL BUSINESS CONCERTNS
(SEP 2004)
DFARS 252.232-7003 – ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING
REPORTS (JUN 2012)
DFARS 252.232-7010 – LEVIES ON CONTRACT PAYMENTS (DEC 2006)
DFARS 252.243-7002 – REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)
DFARS 252.247-7003 – PASS-THROUGH OF MOTOR CARRIER FUEL SURCHARGE ADJUSTMENT
TO THE COST BEARER (JUN 2013)
DFARS 252.247-7023 – TRANSPORTATION OF SUPPLIES BY SEA (APR 2014)
DFARS 252.247-7024 – NOTIFICATION OF TRANSPORTATION OF SUPPLIES BY SEA (MAR 2000)
DLAD 52.211-9014 – CONTRACTOR RETENTION OF TRACEABILITY DOCUMENTATION (AUG
2012)
DLAD 52.232-9010 – ACCELERATED PAY TO SMALL BUSINESS (APR 2014)
Clauses incorporated by full text:
FAR 52.211-17 – DELIVERY OF EXCESS QUANTITIES (SEP 1989)
The Contractor is responsible for the delivery of each item quantity within allowable variations, if any. If the Contractor delivers and the Government receives quantities of any item in excess of the quantity called for (after considering any allowable variation in quantity), such excess quantities will be treated as being delivered for the convenience of the Contractor. The Government may retain such excess quantities up to $250 in value without compensating the Contractor therefor, and the Contractor waives all right, title, or interests therein. Quantities in excess of $250 will, at the option of the Government, either be returned at the Contractor’s expense or retained and paid for by the Government at the contract unit price.
(End of Clause) FAR 52.217-7 – OPTION FOR INCREASED QUANTITY –SEPARATELY PRICED LINE ITEM (MAR 1989) The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 210 days after date of contract. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
(End of Clause)
FAR 52.252-2 – CLAUSE INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.arnet.gov/far http://farsite.hill.af.mil (End of Clause)
DFARS 252.232-7006 -- WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause— “Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
____________Invoice (stand alone)___________________________ _______ (Contracting Officer: Insert applicable document type(s).
Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
__________________N/A__________________________________________ (Contracting Officer: Insert inspection and acceptance locations or “Not applicable.”)
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
| Field Name in WAWF |
| Data to be entered in WAWF |
| Pay Official DoDAAC |
| SL4701 |
| Issue By DoDAAC |
| SP3300 |
| Admin DoDAAC |
| SP3300 |
| Inspect By DoDAAC |
| N/A |
| Ship To Code |
| SB3540 |
| Ship From Code |
| N/A |
| Mark For Code |
| N/A |
| Service Approver (DoDAAC) |
| N/A |
| Service Acceptor (DoDAAC) |
| N/A |
| Accept at Other DoDAAC |
| N/A |
| LPO DoDAAC |
| N/A |
| DCAA Auditor DoDAAC |
| N/A |
| Other DoDAAC(s) |
| N/A |
(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
______catherine.doyne@dla.mil ______________________ (Contracting Officer: Insert applicable email addresses or “Not applicable.”)
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
__________________________catherine.doyne@dla.mil_____________________________ (Contracting Officer: Insert applicable information or “Not applicable.”)
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(End of clause) DLAD 52.247-9012 REQUIREMENTS FOR TREATMENT OF WOOD PACKAGING MATERIAL (WPM) (Feb 2007)
(a) THIS CLAUSE ONLY APPLIES WHEN WOOD PACKAGING MATERIAL (WPM) WILL BE USED TO MAKE SHIPMENTS UNDER THIS CONTRACT. AND/OR WHEN WPM IS BEING ACQUIRED UNDER THIS CONTRACT.”
(b) Definition.
Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).
(c) All Wood Packaging Material(WPM) used to make shipments under DOD contracts and/or acquired by DOD must meet requirements of International Standards for Phytosanitary Measures (ISPM) 15, “Guidelines for Regulating Wood Packaging Materials in International Trade.” DOD shipments inside and outside of the United States must meet ISPM 15 whenever WPM is used to ship DOD cargo.
(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) in accordance with American Lumber Standard Committee, Incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement Regulations (see http://www.alsc.org/).
(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Markings shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ASLC approved DUNNAGE stamp.
(d) Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government."
(End of clause) FAR 52.212-5 -- CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS – COMMERCIAL ITEM (MAR 2016)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)
(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77, 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the contracting officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
__X_ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
__X_ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
_X__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub L. 111-5) (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009).
__X_ (4) 52.204-10, Reporting Executive compensation and First-Tier Subcontract Awards (Oct 2015) (Pub. L. 109-282) (31 U.S.C. 6101 note).
___ (5) [Reserved] ___ (6) 52.204-14, Service Contract Reporting Requirements (Jan 2014) (Pub. L. 111-117, section 743 of Div. C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Jan 2014) (Pub. L. 111-117, section 743 of Div. C).
_X__ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015) (31 U.S.C. 6101 note).
_X__ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013) (41 U.S.C. 2313).
___ (10) [Reserved] ___ (11) (i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C. 657a).
___ (ii) Alternate I (Nov 2011) of 52.219-3.
___ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer)(15 U.S.C. 657a).
___ (ii) Alternate I (Jan 2011) of 52.219-4.
___ (13) [Reserved] ___ (14) (i) 52.219-6, Notice of Total Small Business Aside (Nov 2011) (15 U.S.C. 644).
___ (ii) Alternate I (Nov 2011).
___ (iii) Alternate II (Nov 2011).
_X__ (15) (i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
___ (ii) Alternate I (Oct 1995) of 52.219-7.
___ (iii) Alternate II (Mar 2004) of 52.219-7.
_X__ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2014) (15 U.S.C. 637(d)(2) and (3)).
___ (17) (i) 52.219-9, Small Business Subcontracting Plan (Oct 2015) (15 U.S.C. 637 (d)(4)).
___ (ii) Alternate I (Oct 2001) of 52.219-9.
___ (iii) Alternate II (Oct 2001) of 52.219-9.
___ (iv) Alternate III (Oct 2015) of 52.219-9.
___ (18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011) (15 U.S.C. 644(r)).
_X__ (19) 52.219-14, Limitations on Subcontracting (Nov 2011) (15 U.S.C. 637(a)(14)).
___ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
___ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011) (15 U.S.C. 657f).
_X__ (22) 52.219-28, Post Award Small Business Program Rerepresentation (Jul 2013) (15 U.S.C. 632(a)(2)).
___ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).
___ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).
_X__ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
_X__ (26) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Feb 2016) (E.O. 13126).
_X__ (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
_X__ (28) 52.222-26, Equal Opportunity (Apr 2015) (E.O. 11246).
_X__ (29) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
_X__ (30) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
___ (31) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).
_X__ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
_X__ (33) (i) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O. 13627).
___ (ii) Alternate I (Mar 2015) of 52.222-50, (22 U.S.C. chapter 78 and E.O. 13627).
___ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
___ (35) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
___ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
___ (36) (i) 52.223-13, Acquisition of EPEAT® -Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514 ___ (ii) Alternate I (Oct 2015) of 52.223-13.
___ (37) (i) 52.223-14, Acquisition of EPEAT® -Registered Television (Jun 2014) (E.O.s 13423 and 13514).
___ (ii) Alternate I (Jun 2014) of 52.223-14.
___ (38) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).
___ (39) (i) 52.223-16, Acquisition of EPEAT® -Registered Personal Computer Products (Oct 2015) (E.O.s 13423 and 13514).
___ (ii) Alternate I (Jun 2014) of 52.223-16.
_X__ (40) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging while Driving (Aug 2011) (E.O. 13513).
___ (41) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).
___ (42) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43).
___ (ii) Alternate I (May 2014) of 52.225-3.
___ (iii) Alternate II (May 2014) of 52.225-3.
___ (iv) Alternate III (May 2014) of 52.225-3.
___ (43) 52.225-5, Trade Agreements (Feb 2016) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
_X__ (44) 52.225-13, Restrictions on Certain Foreign Purchases (Jun 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
___ (45) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
___ (46) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).
___ (47) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).
___ (48) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505), 10 U.S.C. 2307(f)).
___ (49) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
_X__ (50) 52.232-33, Payment by Electronic Funds Transfer— System for Award Management (Jul 2013) (31 U.S.C. 3332).
___ (51) 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management (Jul 2013) (31 U.S.C. 3332).
___ (52) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).
___ (53) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
___ (54) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631).
___ (ii) Alternate I (Apr 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or executive orders applicable to acquisitions of commercial items:
___ (1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495) ___ (2) 52.222-41, Service Contract Labor Standards (May 2014) (41 U.S.C. chapter 67.).
___ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
___ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (Multiple Year and Option Contracts) (May 2014) (29 U.S.C.206 and 41 U.S.C. chapter 67).
___ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
___ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67).
___ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67).
___ (8) 52.222-55, Minimum Wages Under Executive Order 13658 (Mar 2016) (E.O. 13658).
___ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C. 1792).
___ (10) 52.237-11, Accepting and Dispensing of $1 Coin (Sep 2008) (31 U.S.C. 5112(p)(1)).
(d) Comptroller General Examination of Record The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records -- Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e)
(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c) and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
(ii) 52.219-8, Utilization of Small Business Concerns (Oct 2014) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(iii) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495). Flow down required in accordance with paragraph (1) of FAR clause 52.222-17.
(iv) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(v) 52.222-26, Equal Opportunity (Apr 2015) (E.O. 11246).
(vi) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
(vii) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
(viii) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).
(ix) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(x) 52.222-41, Service Contract Labor Standards (May 2014), (41 U.S.C. chapter 67).
(xi) ____ (A) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O. 13627).
___ (B) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 E.O. 13627).
(xii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)
(xiii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67)
(xiv) 52.222-54, Employment Eligibility Verification (Oct 2015) (E. O. 12989).
(xv) 52.222-55, Minimum Wages Under Executive Order 13658 (Mar 2016).
(xvi) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(xvii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xviii) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the Contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
(End of Clause) Additional applicable provisions incorporated by reference:
DFARS 252.203-7005 – REPRESENTATION RELATING TO COMPENSATION OF ORMER DoD
OFFICIALS (NOV 2011)
DFARS 252.203-7996 – PROHIBIITONS ON CONTRACTING WITH ENTITIES THAT REQUIRE
CERTAIN INTERNALLY CONFIDENTIALITY AGREEMENTS—
REPRESENTATION (DEVIATION 2016-O0003) (OCT 2015)
DFARS 252-204-7008 – COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION
CONTROLS (DEVIATION 2016-O0001) (OCT 2015)
DFARS 252.204-7011 – ALTERNATIVE LINE ITEM STRUCTURE (SEP 2011)
DFARS 252.204-7013 – LIMITATIONS ON USE/DISCLOSURE OF INFORMATION BY LITIGATION
SUPPORT (FEB 2014)
DFARS 252.209-7991 – REPRESENTATION BY CORPORATIONS REGARDING UNPAID
DELINQUENT TAXES LIABILITY OR FELONY CONVICTION UNDER ANY
FEDERAL LAW - FISCAL YEAR 2016 APPROPRIATIONS (DEVIATION 2016-
O0002) (OCT 2015)
DFARS 252.222-7007 – REPRESENTATION REGARDING COMBATING TRAFFICTING IN PERSONS
(JAN 2015)
DFARS 252.225-7000 – BUY AMERICAN—BALANCE OF PAYMENTS PROGRAM CERTIFICATE-
BASIC (NOV 2014)
DFARS 252.247-7022 – TRANSPORTATION BY SEA (AUG 1992)
The following provisions are hereby added in full text:
ADDENDA TO FAR 52.212-1 INSTRUCTION TO OFFERORS – COMMERCIAL ITEMS (APR 2014):
Reference paragraph (c) under referenced provision FAR 52.212-1. This paragraph is tailored to read as follows:
(c) Period of acceptance of offers. The offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers.
The following three (3) paragraphs under referenced provision 52.212-1 are hereby deleted:
(d) Product samples
(e) Multiple offers
(h) Multiple awards
OFFER SUBMISSION INSTRUCTIONS:
Quotations may be submitted in contractor format and shall include: (1) Company name, address, telephone number, e-mail address, and FAX number; (2) Solicitation number; (3) Unit Price and extended prices for all CLINS; (4) Contractor DUNS Number and Commercial and Government Entity (CAGE) Code, (5) Signed acknowledgements of amendments (applicable only if any amendments are issued against this solicitation), (6) Completed certifications and representations located at FAR 52.212-3 starting page 15.
QUOTE MUST HAVE THIS STATEMENT IN THE FOOTER OR HEADER OF EACH PAGE: SOURCE SELECTION INFORMATION SEE FAR 2.101 AND 3.104.
Questions shall be submitted by electronic mail to the Acquisition Specialist, Catherine Doyne via email at Catherine.doyne@dla.mil appropriate subject: SP3300-16-Q-0170 Solicitation Question. Question(s) must be received by 3:00 p.m. Eastern local time on March 21, 2016. Answers to questions will be posted to the FEDBIZOPPS website via an amendment to the solicitation.
QUOTES MUST BE RECEIVED BY March 30, 2016 at 11:00 am EST to be considered for award. Offerors shall email their quotes to Catherine Doyne at catherine.doyne@dla.mil (End of Provision) Addenda to FAR 52.212-2 EVALUATION – COMMERCIAL ITEMS (OCT 2014) Contractors are reminded that a Request For Quotation is not a request for proposal and that a quote is not an offer that the Government accepts or awards. This competition is not being conducted using FAR Part 15 procedures. The award decision process is being conducted under FAR Part 12 and FAR Part 13, wherein the Contracting Officer is permitted to have substantive communications with individual contractors about their quotes without being subject to the policies and procedures of FAR Part 15, and without engaging in "discussions" or "negotiations" under FAR Part 15.
The Government reserves the right to evaluate quotes and may seek to make an award without asking for revised quotes or entering substantive discussions. Accordingly, contractors are encouraged to provide their most realistic and competitive terms with their initial quotes.
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. Award will be made on an all or none basis. The following factors shall be used to evaluate offers:
(i) Lowest aggregate price for all CLINs, inclusive of the option for increased quantity CLINs. The Government will evaluate offers for award purposes by adding the total price for all CLINs together (including option for increased quantity CLINs). The Government may determine that an offer is unacceptable if the option for increased quantity CLINs prices is significantly unbalanced. Evaluation of option for increased quantity CLINs shall not obligate the Government to exercise those items (additional quantities).
(b) A written notice of award or acceptance of an offer mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of Provision)
FAR 52.216-1 – TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a firm-fixed price contract resulting from this solicitation.
(End of Provision)
FAR 52.233-2 – SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from DLA Distribution, Acquisition Operations (J7-AB), 5404 J Avenue, Building 404, New Cumberland, PA 17070-5059, Attn: Donna A. Kautz, Contracting Officer
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of Provision)
FAR 52.252-1 -- SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://www.arnet.gov/far http://farsite.hill.af.mil (End of Provision)
DLAD 52.233-9000 AGENCY PROTESTS (NOV 2011)
(a) Companies protesting this procurement may file a protest
(1) with the Contracting Officer,
(2) with the Government Accountability Office (GAO), or
(3) pursuant to Executive Order Number 12979, with the Agency for a decision by the Activity’s Chief of the Contracting Office.
(b) Protests filed with the agency should clearly state that they are an "Agency Level Protest under Executive Order Number 12979."
(c) Defense Logistics Agency (DLA) procedures for Agency Level Protests filed under Executive Order Number 12979 allow for a higher level decision on the initial protest than would occur with a protest to the Contracting Officer; this process is not an appellate review of a Contracting Officer's decision on a protest previously filed with the Contracting Officer. Absent a clear indication of the intent to file an agency level protest, protests will be presumed to be protests to the Contracting Officer.
(End of Provision)
DLAD 52.233-9001 DISPUTES - AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (NOV 2011)
(a) The parties agree to negotiate with each other to try to resolve any disputes that may arise. If unassisted negotiations are unsuccessful, the parties will use alternative dispute resolution (ADR) techniques to try to resolve the dispute. Litigation will only be considered as a last resort when ADR is unsuccessful or has been documented by the party rejecting ADR to be inappropriate for resolving the dispute.
(b) Before either party determines ADR inappropriate, that party must discuss the use of ADR with the other party. The documentation rejecting ADR must be signed by an official authorized to bind the Contractor (see Federal Acquisition Regulation (FAR) clause 52.233-1), or, for the Agency, by the Contracting Officer, and approved at a level above the Contracting Officer after consultation with the ADR Specialist and with legal. Contractor personnel are also encouraged to include the ADR Specialist in their discussions with the Contracting Officer before determining ADR to be inappropriate.
(c) The offeror should check here to opt out of this clause:
[ ] Alternate wording may be negotiated with the Contracting Officer.
( End of provision )
FAR 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS – COMMERCIAL ITEMS (MAR 2016) The offeror shall complete only paragraphs (b) of this provision if the Offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) Web site accessed through http://www.acquisition.gov . If the Offeror has not completed the annual representations and certifications electronically, the Offeror shall complete only paragraphs (c) through (q) of this provision.
(a) Definitions. As used in this provision-- “Economically disadvantaged women-owned small business (EDWOSB) concern” means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business eligible under the WOSB Program.
“Forced or indentured child labor” means all work or service—
(1) Exacted from any person under the age of 18 under the menace of any penalty for its nonperformance and for which the worker does not offer himself voluntarily; or
(2) Performed by any person under the age of 18 pursuant to a contract the enforcement of which can be accomplished by process or penalties.
“Highest-level owner” means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.
“Immediate owner” means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.
“Inverted domestic corporation,” means a foreign incorporated entity that meets the definition of an inverted domestic corporation under 6 U.S.C. 395(b), applied in accordance with the rules and definitions of 6 U.S.C. 395(c).
“Manufactured end product” means any end product in product and service codes (PSCs) 1000-9999, except—
(1) PSC 5510, Lumber and Related Basic Wood Materials;
(2) Product or Service Group (PSG) 87, Agricultural Supplies;
(3) PSG 88, Live Animals;
(4) PSG 89, Subsistence;
(5) PSC 9410, Crude Grades of Plant Materials;
(6) PSC 9430, Miscellaneous Crude Animal Products, Inedible;
(7) PSC 9440, Miscellaneous Crude Agricultural and Forestry Products;
(8) PSC 9610, Ores;
(9) PSC 9620, Minerals, Natural and Synthetic; and
(10) PSC 9630, Additive Metal Materials.
“Place of manufacture” means the place where an end product is assembled out of components, or otherwise made or processed from raw materials into the finished product that is to be provided to the Government. If a product is disassembled and reassembled, the place of reassembly is not the place of manufacture.
“Restricted business operations” means business operations in Sudan that include power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, as those terms are defined in the Sudan Accountability and Divestment Act of 2007 (Pub. L. 110-174). Restricted business operations do not include business operations that the person (as that term is defined in Section 2 of the Sudan Accountability and Divestment Act of 2007) conducting the business can demonstrate—
(1) Are conducted under contract directly and exclusively with the regional government of southern Sudan;
(2) Are conducted pursuant to specific authorization from the Office of Foreign Assets Control in the Department of the Treasury, or are expressly exempted under Federal law from the requirement to be conducted under such authorization;
(3) Consist of providing goods or services to marginalized populations of Sudan;
(4) Consist of providing goods or services to an internationally recognized peacekeeping force or humanitarian organization;
(5) Consist of providing goods or services that are used only to promote health or education; or
(6) Have been voluntarily suspended.
Sensitive technology—
(1) Means hardware, software, telecommunications equipment, or any other technology that is to be used specifically—
(i) To restrict the free flow of unbiased information in Iran; or
(ii) To disrupt, monitor, or otherwise restrict speech of the people of Iran; and
(2) Does not include information or informational materials the export of which the President does not have the authority to regulate or prohibit pursuant to section 203(b)(3) of the International Emergency Economic Powers Act (50 U.S.C. 1702(b)(3)).
“Service-disabled veteran-owned small business concern”—
(1) Means a small business concern—
(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and
(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran.
(2) Service-disabled veteran means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).
“Small business concern” means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR Part 121 and size standards in this solicitation.
“Small disadvantaged business concern, consistent with 13 CFR 124.1002,” means a small business concern under the size standard applicable to the acquisition, that--
(1) Is at least 51 percent unconditionally and directly owned (as defined at 13 CFR 124.105) by--
(i) One or more socially disadvantaged (as defined at 13 CFR 124.103) and economically disadvantaged (as defined at 13 CFR 124.104) individuals who are citizens of the United States; and
(ii) Each individual claiming economic disadvantage has a net worth not exceeding $750,000 after taking into account the applicable exclusions set forth at 13 CFR 124.104(c)(2); and
(2) The management and daily business operations of which are controlled (as defined at 13.CFR 124.106) by individuals, who meet the criteria in paragraphs (1)(i) and (ii) of this definition.
“Subsidiary” means an entity in which more than 50 percent of the entity is owned—
(1) Directly by a parent corporation; or
(2) Through another subsidiary of a parent corporation.
“Veteran-owned small business concern” means a small business concern—
(1) Not less than 51 percent of which is owned by one or more veterans(as defined at 38 U.S.C. 101(2)) or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more veterans; and
(2) The management and daily business operations of which are controlled by one or more veterans.
“Women-owned business concern” means a concern which is at least 51 percent owned by one or more women; or in the case of any publicly owned business, at least 51 percent of the its stock is owned by one or more women; and whose management and daily business operations are controlled by one or more women.
“Women-owned small business concern” means a small business concern --
(1) That is at least 51 percent owned by one or more women or, in the case of any publicly owned business, at least 51 percent of the stock of which is owned by one or more women;…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .