Solicitation.pdf

PDF 128 KB Posted

Attached to
Wastewater Plant Repair Federal contract opportunity
Solicitation number
SP3300-16-B-0013
Issued by
Defense Logistics Agency Distribution

About this file

Solicitation SP3300-16-B-0013

View the file

Other files for this federal contract opportunity

Other files attached to Wastewater Plant Repair, newest first.
File Type Posted
Tab_E-17_Public_Notice_of_Award.pdf PDF
Bid_Results_-_SP330016B0013.pdf PDF
16B0013_SF30_AMENDMENT_0003.pdf PDF
16B0013AMDP0003_PG_2.pdf PDF
16B0013_SF30_AMENDMENT_0002.pdf PDF
Attachment_13_Plate_Image.pdf PDF
16B0013AMDP0002_PG_2.pdf PDF
Attachment_12_Site_Visit_Roster.pdf PDF
Amendment_0001.pdf PDF
Attachment_4_Schedule_of_Supplies.pdf PDF
Attachment_5_Submittal_Reg.pdf PDF
Attachment_6_Transmittal_of_Shop_Drawings.pdf PDF
Attachment_8_SF24_-_Bid_Bond.pdf PDF
Attachment_3_Drawing_and_Photos.pdf PDF
Attachment_9_SF25_(Performance_Bond).pdf PDF
Attachment_11_Standard_Form_1442.pdf PDF
Attachment_7_Davis_Bacon.pdf PDF
Attachment_1_SoW _Gen_Specs _and_Checklists.pdf PDF
Attachment_2_Site_Map.pdf PDF
Attachment_10_SF25A_Payment_Bond.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

Section A – SOLICITATION, OFFER AND AWARD 2 PAGES Section B – SUPPLIES OR SERVICES AND PRICES 25 PAGES Section C – DESCRIPTION/SPECIFICATIONS 1 PAGE Section D – PACKAGING AND MARKING 0 PAGE Section E – INSPECTION AND ACCEPTANCE 1 PAGE Section F – DELIVERIES O PAGE

R PERFORMANCE 2 PAGES

Section G – CONTRACT ADMINISTRATION DATA 2 PAGES Section H – SPECIAL CONTRACT REQUIREMENTS 3 PAGES Section I – CONTRACT CLAUSES 12 PAGES Section J – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS 1 PAGE Section K – REPRESENTATIONS, CERTIFICATIOS, AND OTHER STATEMENT OF BIDDERS 4 PAGES Section L – INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS 3 PAGES Section M – EVALUATION FACTORS FOR AWARD 1 PAGE

An organized site visit has been scheduled for July 25th, 2016 at 9:00 AM local time Defense Distribution Depot San Joaquin, California 25600 South Chrisman Rd Tracy, CA 95304 Please follow instruction on Page 3, Paragraph B.4 for site visit attendance.

SECTION B

SUPPLIES OR SERVICES AND PRICES

B.1 GENERAL OVERVIEW

Provide for all labor, supervision, tools, materials, equipment transportation and management necessary to repair, remove, replace, install and repaint valves, pipes and other items for the Wastewater Treatment Plant at the Defense Distribution Depot San Joaquin, Tracy Site Tracy CA 95304. Some construction and electrical work may be required. See Attachment 4 – for complete schedule of supplies and services. This acquisition is 100% set-aside for small businesses in accordance with FAR 52.219-8. The resulting contract will be a firm fixed-price contract.

B.2 ELECTRONIC SOLICITATION

This solicitation, including all attachments, and any amendments, is only available electronically at the Federal Business Opportunities website www.fbo.gov. Bidders are cautioned that it is their responsibility to access the website for any amendments that may be issued under the solicitation. There will be no advance notification of amendment issuance. Bidders are advised to consult the website frequently to check for any amendments since an amendment may be issued up until the bid opening date and time.

Failure to acknowledge amendments may render our bid non-responsive and ineligible for award.

B.3 MAGNITUDE OF CONSTRUCTION

The estimated magnitude of construction is between $250,000.00 and $500,000.00.

B.4 SITE VISIT DATE, TIME AND LOCATION

Reference Section L, FAR Provision 52.236-27 for specific date, time and location. Due to security measures currently in place on this installation, anyone planning to attend the site visit must provide the name of company, name of visitor, and driver’s license number and state of issue, vehicle registration and proof of insurance, and proof of citizenship to gain security clearance to DLA Distribution San Joaquin CA (DDJC), Tracy Site. Please send the information at least 48 hours in advance of the site visit date to the Project Engineer to allow the security office to run a background check on the visitor’s driver license. Contractors may call Joseph Orpilla at (209) 839-4522, or send the information in an email to Joseph.Orpilla@dla.mil. All visitors will check in at the Pass Office located in Building 29A. The gate entrance is located at the Valpico Road and Chrisman Road intersection. If you require a camera pass please make arrangements with Joseph Orpilla before you arrive. The military installation address is: 25600 S.

Chrisman Road, Tracy, CA 95304. We will begin the site visit by meeting in the cafeteria located in Building 100. There is a parking lot located on the east side of Building 100.

B.5 BID SUBMISSION.

BIDS MUST BE SUBMITTED IN HARD COPY ONLY. ELECTRONICALLY SUBMITTED BIDS INCLUDING FACSIMILE AND TELEGRAPH WILL NOT BE ACCEPTED. BID SHALL BE SEALED IN AN ENVELOPE CLEARLY http://www.fbo.gov/ mailto:Joseph.Orpilla@dla.mil

MARKED WITH THE BID SOLICITATION NUMBER, THE BID OPENING DATE AND TIME. ALL BIDS SHALL

BE SUBMITTED TO:

B.12 DLA Distribution Acquisition Operations Attn: Margaret K. Ross 5404 J Avenue, Building 404 New Cumberland PA 17070

ALL MAILED BIDS MUST BE RECIEVED NO LATER THAN August 12TH, 2016

B.6 BID OPENING DATE, TIME AND LOCATION

Bid Opening will be held on August 13, 2016 at 10:00 AM pacific standard time.

Bid Opening will be held at DLA Distribution, 5404 J Avenue, Building 404, New Cumberland, PA 17070.

Please take note that the contracting office, and bid submission address is in New Cumberland, Pennsylvania. Hand delivering your bid to DDJC will not be accepted.

A teleconference will available for the bid opening if any contractors want to attend.

B.7 ACCESS TO THE INSTALLATION FOR THE BID OPENING

Anyone planning on attending the bid opening must abide by the same procedures as set forth to gain access for the site visit. Failure to follow these procedures may result in you not gaining access for the bid opening. A phone number to teleconference in for a third party location will not be provided. All vendors who desire to be present at the time of the Bid Opening must be present at DLA Distribution San Joaquin, Ca. In order to attend the Bid Opening on August 13, 2016 at 1:00 PM Eastern Standard Time (10:00 AM Pacific Time) vendors are encouraged to contact Joseph Orpilla at Joseph.Orpilla@DLA.MIL or (209) 839-4522 arrangements must be made a minimum of 48 hours prior to the Bid Opening.

Information for Bid Opening Address and the documentation that will need to be provided are the same as section B.4 of the solicitation.

B.8 BIDS

Bidders must complete Blocks 14 through 20c on Attachment 11 - Standard Form (SF) 1442.

Bidders must provide all information requested in Section K Representations, Certifications, and Other Statements of Offerors as well as any signed subsequent Amendments as they apply.

B.9 BID BOND

A bid bond is required. Failure to provide a bid bond for an adequate amount shall result in rejection of bid. Required amount for bid bond is twenty percent (20%).

Reference Section L, FAR Provision 52.228-1.

B.10 PERFORMANCE AND PAYMENT BONDS

The successful bidder shall be required to furnish performance and payment bonds to the Contracting Officer as follows: (Reference Section I, FAR Clause 52.228-15)

(1) Performance Bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.

(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.

B.11 WORKING HOURS: Contractor's working hours, which do not require a power outage, will coincide with working hours of Defense Logistics Agency, DDJC, a normal five (5) day, forty (40) hour week, Monday through Friday, from 7:00 A.M. to 3:30 P.M., except Federal holidays. Federal holidays are those days officially observed by the Federal Government.

Saturday holidays are observed on the preceding Friday and Sunday holidays the following Monday. New Year's Day, Martin Luther King Day, President's Day, Memorial Day, July Fourth, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day, and any other day as may be declared by the President to be a Federal holiday.

B.12 INSURANCE

Reference FAR Clause 52.228-5 Insurance-Work on a Government Installation located in this solicitation.

The minimum amount/kind of insurance required is shown below:

Workers’ Compensation and Employer’s Liability - $100,000 (except in states with exclusive or monopolistic funds that do not permit workers’ compensation to be written by private carriers.)

General Liability- $500,000 per occurrence mailto:%20Joseph.Orpilla@DLA.MIL

Automobile Liability – Property damage $20,000 per occurrence, Bodily injury $200,000 per person and $500,000 per occurrence.

When requested by the Contracting Officer, the Contractor shall provide a copy of all subcontractors’ proofs of required insurance no later than five (5) days before each subcontractor commences work on the Government installation.

B.13 CLAUSES AND PROVISIONS

Clauses and provisions from the Federal Acquisition Regulation (FAR), the Department of Defense (DOD) FAR Supplement (DFARS), and the Defense Logistics Agency Directive (DLAD) are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.

B14 NOTICE TO ALL PROSPECTIVE BIDDERS

To receive an award resulting from this solicitation, your company must be registered in the System for Award Management (SAM) Database. Reference FAR clause 52.204-7. SAM website is https://www.sam.gov.

B.15 Davis Bacon Wage Determination Number CA160029 Modification Number 4 Dated 04/29/2016 applies.

B.16 INVOICING

The Contractor shall submit payment requests and receiving reports using Wide Area Work Flow (WAWF). Instructions are found in Section G of this solicitation under DFARS Clause 252.232-7006 Wide Area WorkFlow Payment Instructions (May 2013)

SCHEDULE OF SUPPLIES/SERVICES

Note: The following project description is for the purpose of general information and is not intended to include and describe every feature or item or to define the scope of work.

PROJECT DESCRIPTION:

Repair, remove, replace, install and repaint valves, pipes and other items for the Wastewater Treatment Plant at DLA Distribution San Joaquin CA (DDJC), Tracy Site, 25600 South Chrisman Rd, Tracy CA 95304 in accordance with the attached Attachment 1 Statement of Work and Specifications. See Attachment 4 Schedule of Supplies

SCOPE OF WORK

1. 1. Remove and replace existing secondary clarifier mechanical float level switch and butterfly valve with a similar float level and butterfly valve. New Wafer-style butterfly valves shall be Keystone Figure AR1 or Figure AR2. See specifications 151000.

2. Remove and replace existing two sludge pumps and motors identical to existing or approved equal. New pumps and motors shall be UL listed and of premium efficiency. Existing pump is Make - Continental ultra-pump. Model

no. 1CG10H-CDO, 208V three phase, Serial no. CL287, motor reducer make – David Brown Radicon, model # M06206.4 BANS1. Supply one additional complete spare sludge pump set.

3. Remove and replace existing two recirculating pumps identical to existing or approved equal. New pump shall have all new electrical cables. New pumps and motors shall be UL listed and of premium efficiency. Install new guide rails and ensure pump is properly aligned. Existing pump is Flygt 3085.190-0058- 462, 208V three phase. Supply one additional complete spare recirculating pump.

4. Paint entire exterior waste water treatment facility including but not limited to; outside concrete walls, roof tops, walkways. All bug holes shall be covered and rust completely removed before painting. See specifications 096000.

5. Paint all out door metallic structures including but not limited to metallic railings, walk ways, ladders, outdoor valves, valve operating levers and handles, pipes, conduits, manhole covers and doors. Existing hand rails paint contains lead. Peeled off paints shall be removed as per Federal OSHA https://www.sam.gov/

29 CFR 1926.62, 29 CFR 1910.1025 and California OSHA 8CCR 1532.1, and Title 17 CCR Standards. surface pitting shall be covered before painting.

See specifications 096000 and 028310

6. Replace all five digester rain gutters down spouts and spout boots with same size and dimensions. Existing spouts contain lead paint. Existing down spouts paints shall be removed as per Federal OSHA 29 CFR 1926.62, 29 CFR

1910.1025 and California OSHA 8CCR 1532.1, and Title 17 CCR Standards. See specifications 028233. Material used for new down spouts and its installation shall be galvanized steel.

General:

1. Contractor shall verify all measurements and other field information provided in SOW.

2. Submit color scheme for government approval minimum of two prior to staring paint work.

3. Provide training records for each worker that will participate in confined space entry. Confined space entry permits and any other safety clearances shall be obtained from concerned DDJC departments as per all prevalent regulations.

4. Paint and other hazardous material, their application and storage procedures shall meet SJVAPCD standards in addition to other standards mentioned in specifications.

5. All hazardous material shall be properly identified, marked, packed and labeled in preparation for hazardous waste shipment as per IAW 49 CFR in addition to standards mentioned in specifications.

6. All demolished material shall be removed and disposed from the depot as per applicable rules and regulations.

7. Provide advance copy of hazardous waste manifest 5 days prior to shipment pick up date in addition to standards mentioned in specifications.

8. All waste manifests and Bills of laden must be reviewed and certified by government environment office located in defense depot Tracy CA.

9. Provide OSHA 300 log if more than 10 employees are employed for the project in addition to standards mentioned in specifications.

10. Provide job specific injury illness prevention program (IIPP) two weeks prior to starting work.

11. Facility shall be restored to original condition if damaged during construction.

12. Waste water treatment plant shall be operational all the time. Government shall operate valves and isolate work area as per approved work plan prior to any work inside waste water treatment plant.

13. Permitted work time shall be week days 7:00 am to 3:30 pm unless written permission is obtained, two weeks prior to work, for different work schedule at no cost to the government.

Section C - SPECIFICATIONS The following document is provided as part of the solicitation package and shall be used in the execution of work under this contract:

SPECIFICATIONS

FOR

Repair, remove, replace, install and repaint valves, pipes and other items for the

Wastewater Treatment Plant Defense Distribution Depot San Joaquin-Tracy Site

LOCATED AT SECTION J OF THIS SOLICITATION ATTACHMENTS 1, 2

and 3

(END OF SECTION C)

SECTION D - PACKAGING AND MARKING

This section is not used.

(END OF SECTION D)

SECTION E - INSPECTION AND ACCEPTANCE

FAR 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

(END OF SECTION E)

SECTION F – DELIVERIES OR PERFORMANCE

FAR 52.242-14 SUSPENSION OF WORK (APR 1984)

FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) (DEVIATION) The Contractor shall be required to commence work under this contract upon receipt of the notice to proceed (NTP) and complete all work to include close out documentation within 90 days after receipt of the NTP according to the following schedule:

A preconstruction meeting will be scheduled within 10 calendar days after the Notice to Proceed is issued. The Contractor shall provide all initial submittal items indicated on the Technical Submittal Registers (Form 4288) and the following contract clause and Non-Technical Initial Submittals in accordance with the Specifications at the preconstruction meeting. Exceptions to this Submittal delivery requirement may be for materials that have a long-lead time.

1. SD-01 Project Submittal Schedule – This schedule must be provided at the preconstruction meeting for all initial submittal register items not provided at the Preconstruction meeting.

2. Contractor must provide Non-Technical submittals as outlined in Section 01330 as well as Section 01525 Accident Prevention Plan (APP).

Contractor shall provide the following submittal items within 30 calendar days after completion of project and prior to final payment:

1. Final Report (deficiencies encountered and recommended corrective action), 07180 1.2.1

2. Operation and Maintenance Manuals

3. Warranties / Guaranties

(End of Clause)

(END OF SECTION F)

Section G – CONTRACT ADMINISTRATION DATA

DFARS 252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)

(a) Definition. “Contracting officer's representative” means an individual designated in accordance with subsection 201.602-2 of the Defense Federal Acquisition Regulation Supplement and authorized in writing by the contracting officer to perform specific technical or administrative functions.

(b) If the Contracting Officer designates a contracting officer's representative (COR), the Contractor will receive a copy of the written designation. It will specify the extent of the COR's authority to act on behalf of the contracting officer. The COR is not authorized to make any commitments or changes that will affect price, quality, quantity, delivery, or any other term or condition of the contract.

(Revised January 29, 2015)

DFARS 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (JUN 2012)

(a) Definitions. As used in this clause—

(1) “Contract financing payment” and “invoice payment” have the meanings given in section 32.001 of the Federal Acquisition Regulation.

(2) “Electronic form” means any automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, e-mail, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using Wide Area WorkFlow (WAWF) or another electronic form authorized by the Contracting Officer.

(3) “Payment request” means any request for contract financing payment or invoice payment submitted by the Contractor under this contract.

(4) “Receiving report” means the data required by the clause at 252.246- 7000, Material Inspection and Receiving Report.

(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests and receiving reports using WAWF, in one of the following electronic formats that WAWF accepts: Electronic Data Interchange, Secure File Transfer Protocol, or World Wide Web input. Information regarding WAWF is available on the Internet at https://wawf.eb.mil/.

(c) The Contractor may submit a payment request and receiving report using other than WAWF only when—

(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer’s determination with each request for payment;

(2) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System);

(3) DoD makes payment for rendered health care services using the TRICARE Encounter Data System (TEDS) as the electronic format; or

(4) When the Governmentwide commercial purchase card is used as the method of payment, only submission of the receiving report in electronic form is required.

(d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in Section G of the contract.

(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.

(End of Clause)

DFARS 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

http://www.acq.osd.mil/dpap/dars/dfars/html/current/252246.htm http://www.acq.osd.mil/dpap/dars/dfars/html/current/252246.htm https://wawf.eb.mil/

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

2 in 1 invoice type

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

N/A

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC

SL4701

Issue By DoDAAC

SP3300

Admin DoDAAC

SP3300

Inspect By DoDAAC

SB3200

Ship To Code N/A

Ship From Code N/A

Mark For Code N/A

Service Approver (DoDAAC)

SB3300

http://www.acq.osd.mil/dpap/dars/dfars/html/current/252232.htm http://www.acq.osd.mil/dpap/dars/dfars/html/current/252232.htm https://www.acquisition.gov/

Service Acceptor (DoDAAC) N/A

Accept at Other DoDAAC N/A

LPO DoDAAC N/A

DCAA Auditor DoDAAC N/A

Other DoDAAC(s) N/A

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

Will be identified in the contract documents.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

N/A

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

(END OF SECTION G)

SECTION H – SPECIAL CONTRACT REQUIREMENTS

This section is not used.

(END OF SECTION H)

SECTION I – CONTRACT CLAUSES

FAR 52.202-1 DEFINITIONS (NOV 2013)

FAR 52.203-3 GRATUITIES (APR 1984)

FAR 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

FAR 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)

FAR 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)

FAR 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER

ACTIVITY (MAY 2014)

FAR 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

FAR 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT

2010)

FAR 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (OCT 2015)

FAR 52.203-14 DISPLAY OF HOTLINE POSTER(S) (OCT 2015)

FAR 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM

EMPLOYEES OF WHISTLEBLOWER RIGHTS (APR 2014)

FAR 52.204-2 ALT II SECURITY REQUIREMENTS (AUG 1996)

FAR 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (MAY 2011)

FAR 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

FAR 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (OCT 2015)

FAR 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (JUL 2013)

FAR 52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS

DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (OCT 2015)

FAR 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS

(JUL 2013)

FAR 52.214-26 AUDIT AND RECORDS—SEALED BIDDING (OCT 2010)

FAR 52.214-29 ORDER OF PRECEDENCE – SEALED BIDDING (JAN 1986)

FAR 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2014)

FAR 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011)

FAR 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)

FAR 52.222-3 CONVICT LABOR (JUN 2003)

FAR 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT – OVERTIME COMPRENSATION (MAY

2014)

FAR 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (MAY 2014)

FAR 52.222-7 WITHHOLDING OF FUNDS (MAY 2014)

FAR 52.222-8 PAYROLLS AND BASIC RECORDS (MAY 2014)

FAR 52.222-9 APPRENTICES AND TRAINEES (JUL 2005)

FAR 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)

FAR 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)

FAR 52.222-12 CONTRACT TERMINATION-DEBARMENT (MAY 2014)

FAR 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED ACT

REGULATIONS (MAY 2014)

FAR 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)

FAR 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014)

FAR 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

FAR 52.222-26 EQUAL OPPORTUNITY (APR 2015)

FAR 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (APR 2015)

FAR 52.222-35 EQUAL OPPORTUNITY FOR SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM

ERA, AND OTHER ELIGIBLE VETERANS (OCT 2015)

FAR 52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (JUL 2014)

FAR 52.222-37 EMPLOYMENT REPORTS ON SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM

ERA, AND OTHER ELIGIBLE VETERANS (FEB 2016)

FAR 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT

(DEC 2010)

FAR 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)

FAR 52.223-3 HAZARDOUS MATERIAL IDENITIFICATION AND MATERIAL SAFETY DATA (JAN 1997)

FAR 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)

FAR 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

FAR 52.223-11 OZONE-DEPLETING SUBSTANCES (Jun 2016)

FAR 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016)

FAR 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and

Construction Contracts (May 2008)

FAR 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (AUG

2011)

FAR 52.224-1 PRIVACY ACT NOTIFICATION (APR 1984)

FAR 52.224-2 PRIVACY ACT (APR 1984)

FAR 52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (May 2014)

FAR 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUNE 2008)

FAR 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)

FAR 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT

(DEC 2007)

FAR 52.227-4 PATENT INDEMNITY—CONSTRUCTION CONTRACTS (DEC 2007)

FAR 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)

FAR 52.228-5 INSURANCE – WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

FAR 52.228-11 PLEDGES OF ASSETS (JAN 2012)

FAR 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (MAY 2014)

FAR 52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)

FAR 52.228-15 PERFORMANCE AND PAYMENT BONDS – CONSTRUCTION (OCT 2010)

FAR 52.229-3 FEDERAL, STATE AND LOCAL TAXES (FEB 2013)

FAR 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)

FAR 52.232-17 INTEREST (MAY 2014)

FAR 52.232-23 Alt I ASSIGNMENT OF CLAIMS (MAY 2014) ALTERNATE I (APR 1984)

FAR 52.232.27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (MAY 2014)

FAR 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER—SYSTEM FOR AWARD MANAGEMENT (JUL

2013)

FAR 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)

FAR 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)

FAR 52.233-1 DISPUTES (MAY 2014)

FAR 52.233-3 PROTEST AFTER AWARD (AUG 1996)

FAR 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

FAR 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)

FAR 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)

FAR 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)

FAR 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)

FAR 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)

FAR 52.236-8 OTHER CONTRACTS (APR 1984)

FAR 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS (APR 1984)

FAR 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)

FAR 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)

FAR 52.236-12 CLEANING UP (APR 1984)

FAR 52.236-13 ACCIDENT PREVENTION (NOV 1991)

FAR 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)

FAR 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)

FAR 52.236-17 LAYOUT OF WORK (APR 1984)

FAR 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)

ALTERNATE I (APR 1984)

FAR 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)

FAR 52.242-13 BANKRUPTCY (JUL 1995)

FAR 52.243-4 CHANGES (JUN 2007)

FAR 52.243-6 CHANGE ORDER ACCOUNTING (APR 1984)

FAR 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (Jun 2016)

FAR 52.245-1 GOVERNMENT PROPERTY (APR 2012)

FAR 52.245-9 USE AND CHARGES (APR 2012)

FAR 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)

FAR 52.248-3 VALUE ENGINEERING – CONSTRUCTION (OCT 2015)

FAR 52.249-2 Alt I TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE)

(APR 2012) ALTERNATE I (SEP 1996)

FAR 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)

FAR 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

DFARS 252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-

CONTRACT-RELATED FELONIES (DEC 2008)

DFARS 252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS

(SEP 2013)

DFARS 252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (DEC 2012)

DFARS 252.204-7000 DISCLOSURE OF INFORMATION (AUG 2013)

DFARS 252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

DFARS 252.204-7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT (FEB 2014)

DFARS 252.204-7005 ORAL ATTESTATION OF SECURITY RESPONSIBILITIES (NOV 2001)

DFARS 252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS

(DEC 1991)

DFARS 252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE

GOVERNMENT OF A TERRORIST COUNTRY (DEC 2014)

DFARS 252.223-7004 DRUG-FREE WORK FORCE (SEP 1988)

DFARS 252.223-7006 PROHIBITION ON STORAGE AND DISPOSAL OF TOXIC AND HAZARDOUS

MATERIALS (SEP 2014)

DFARS 252.223-7008 PROHIBITION OF HEXAVALENT CHROMIUM (JUN 2013)

DFARS 252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (FEB 2013)

DFARS 252.225-7031 SECONDARY ARAB BOYCOTT OF ISRAEL (JUN 2005)

DFARS 252.227-7033 RIGHTS IN SHOP DRAWINGS (APR 1966)

DFARS 252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)

DFARS 252.236-7000 MODIFICATION PROPOSALS-PRICE BREAKDOWN (DEC 1991)

DFARS 252.236-7005 AIRFIELD SAFETY PRECAUTIONS (DEC 1991)

DFARS 252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)

DFARS 252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)

DFARS 252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA (APR 2014)

DLAD 52.249-9000 ADMINISTRATIVE COSTS OF REPROCUREMENT AFTER DEFAULT (MAY 1988)

FAR 52.219-28 POST AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)

(a) Definitions. As used in this clause--

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is “not dominant in its field of operation” when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.

(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph

(e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts—

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/services/contractingopportunities/sizestandardstopics/ .

(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.

(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the rerepresentation required by paragraph (b) of this clause by validating or updating all its representations in the Online Representations and Certifications Application and its data in the Central Contractor Registration, as necessary, to ensure they reflect the Contractor’s current status. The Contractor shall notify the contracting officer in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.

(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.

(g) If the Contractor does not have representations and certifications in ORCA, or does not have a representation in ORCA for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code 238220 assigned to contract number ______________.[Contractor to sign and date and insert authorized signer's name and title].

FAR 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Products (May 2008)

(a) Definitions. As used in this clause—

“Postconsumer material” means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered material.”

“Recovered material” means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.

(b) The Contractor, on completion of this contract, shall—

(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of postconsumer material content; and http://www.sba.gov/services/contractingopportunities/sizestandardstopics/

(2) Submit this estimate to Defense Distribution Center, Acquisition Operations, Attn: Michael Minto, J Avenue, Building 404, New Cumberland PA 17070-5001.

FAR 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least twenty five (25) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.arnet.gov/far/ http://www.acq.osd.mil/dpap/

FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.

(b) The use in this solicitation or contract of FAR clause 52.222-8 Payrolls and Basic Records with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.

DFARS 252.223-7001 HAZARD WARNING LABELS (DEC 1991)

(a) “Hazardous material,” as used in this clause, is defined in the Hazardous Material Identification and Material Safety Data clause of this contract.

(b) The Contractor shall label the item package (unit container) of any hazardous material to be delivered under this contract in accordance with the Hazard Communication Standard (29 CFR 1910.1200 et seq). The Standard requires that the hazard warning label conform to the requirements of the standard unless the material is otherwise subject to the labelling requirements of one of the following statutes:

(1) Federal Insecticide, Fungicide and Rodenticide Act;

(2) Federal Food, Drug and Cosmetics Act;

(3) Consumer Product Safety Act;

(4) Federal Hazardous Substances Act; or

(5) Federal Alcohol Administration Act.

(c) The Offeror shall list which hazardous material listed in the Hazardous Material Identification and Material Safety Data clause of this contract will be labelled in accordance with one of the Acts in paragraphs (b)(1) through (5) of this clause instead of the Hazard Communication Standard. Any hazardous material not listed will be interpreted to mean that a label is required in accordance with the Hazard Communication Standard.

http://www.arnet.gov/far/

MATERIAL (If None, Insert “None.”)

ACT

(d) The apparently successful Offeror agrees to submit, before award, a copy of the hazard warning label for all hazardous materials not listed in paragraph (c) of this clause. The Offeror shall submit the label with the Material Safety Data Sheet being furnished under the Hazardous Material Identification and Material Safety Data clause of this contract.

(e) The Contractor shall also comply with MIL-STD-129, Marking for Shipment and Storage (including revisions adopted during the term of this contract).

DFARS 252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall—

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title File

Drawing No.

52.204-9000 CONTRACTOR PERSONNEL SECURITY REQUIREMENTS (JUL 2015)

(a) Work to be performed under this contract or task order may, in full or in part, be performed at the Defense Logistics Agency (DLA) Headquarters (HQ), DLA field activity office(s), or other Federally-controlled facilities. Prior to beginning work on a contract, DLA requires all Contractor personnel working on the Federally-controlled facility to have, at a minimum, an initiated National Agency Check with Written Inquiries (NACI) or NACI equivalent and favorable completion of a Federal Bureau of Investigation (FBI) fingerprint check.

(b) Additionally, in accordance with Department of Defense (DoD) Regulation 5200.2-R, Personnel Security Programs, and DLA Issuance 4314, Personnel Security Program, all DoD Contractor personnel who have access to Federally-controlled information systems must be assigned to positions which are designated at one of three information technology (IT) levels, each requiring a certain level of investigation and clearance, as follows:

(1) IT-I for an IT position requiring a single scope background investigation (SSBI) or SSBI equivalent;

(2) IT-II for an IT position requiring a National Agency check with Law and Credit (NACLC) or NACLC equivalent; and

(3) IT-III for an IT position requiring a NACI or equivalent.

Note: IT levels will be designated according to the criteria in DoD 5200.2-R.

(c) Previously completed security investigations may be accepted by the Government in lieu of new investigations if determined by the DLA Intelligence Personnel Security Office to be essentially equivalent in scope to the contract requirements. The length of time elapsed since the previous investigation will also be considered in determining whether a new investigation is warranted. To assist the Government in making this determination, the Contractor must provide the following information to the respective DLA Intelligence Personnel Security Office immediately upon receipt of the contract. This information must be provided for each Contractor employee who will perform work on a Federally-controlled facility and/or will require access to Federally-controlled information systems:

(1) Full name, with middle name, as applicable, with social security number;

(2) Citizenship status with date and place of birth;

(3) Proof of the individual’s favorably adjudicated background investigation or NACI, consisting of identification of the type of investigation performed, date of the favorable adjudication, name of the agency that made the favorable adjudication, and name of the agency that performed the investigation;

(4) Company name, address, phone and fax numbers with email address;

(5) Location of on-site workstation or phone number if off-site (if known by the time of award); and

(6) Delivery order or contract number and expiration date; and name of the Contracting Officer.

(d) The Contracting Officer will ensure that the Contractor is notified as soon as a determination is made by the assigned or cognizant DLA Intelligence Personnel Security Office regarding acceptance of the previous investigation and clearance level.

(1) If a new investigation is deemed necessary, the Contractor and Contracting Officer will be notified by the respective DLA Personnel Security Office after appropriate checks in DoD databases have been made.

(2) If the Contractor employee requires access to classified information and currently does not have the appropriate clearance level and/or an active security clearance, the DLA Intelligence Personnel Security Office will relay this information to the Contractor and Contracting Officer for further action. Investigations for Contractor employees requiring access to classified information must be initiated by the Contractor Facility Security Officer (FSO).

(3) The Contracting Officer will ensure that the respective DLA Intelligence Personnel Security Office initiates investigations for Contractor employees not requiring access to classified information (i.e., IT or unescorted entry).

(4) It is the Contractor’s responsibility to ensure that adequate information is provided and that each Contractor employee completes the appropriate paperwork, as required either by the Contracting Officer or the DLA Intelligence Personnel Security Office, in order to begin the investigation process for the required clearance level.

(e) The Contractor is responsible for ensuring that each Contractor employee assigned to the position has the appropriate security clearance level.

(f) The Contractor shall submit each request for IT access and investigation through the Contracting Officer to the assigned or cognizant DLA Intelligence Personnel Security Office. Requests shall include the following information and/or documentation:

(1) Standard Form (SF) 85, Questionnaire for Non-Sensitive Positions, or the SF 86, Questionnaire for National Security Positions (see note below);

(2) Proof of citizenship (i.e., an original or a certified copy of a birth certificate, passport, or naturalization certificate); and

(3) Form FD-258, Fingerprint Card (however, fingerprinting can be performed by the cognizant DLA Intelligence Personnel Security Office).

(Note to (f)(1) above: An investigation request is facilitated through use of the SF 85 or the SF 86. These forms with instructions as well as the Optional Form (OF) 306, Declaration for Federal Employment, which is required with submission of the SF85 or SF 86, are available at the Office of Personnel Management’s (OPM) system called Electronic –Questionnaires for Investigations Processing (e-QIP). Hard copies of the SF85 and SF86 are available at OPM’s web-site, www.opm.gov, but hard copies of the forms are not accepted.)

(g) Required documentation, listed above in paragraphs (f) (1) through (3), must be provided by the Contractor as directed by the Contracting Officer to the cognizant DLA Intelligence Personnel Security Office at the time of fingerprinting or prior to the DLA Intelligence Personnel Security Office releasing the investigation to OPM.

(h) Upon completion of the NACI, NACLC, SSBI, or other sufficient, appropriate investigation, the results of the investigation will be forwarded by OPM to the appropriate adjudication facility for eligibility determination or the DLA Intelligence Personnel Security Office for review and determination regarding the applicant’s suitability to occupy an unescorted entry position in performance of the DLA contract.

Contractor personnel shall not commence work on this effort until the investigation has been favorably adjudicated or the Contractor employee has been waived into the position pending completion of adjudication. The DLA Intelligence Personnel Security Office will ensure that results of investigations will be sent by OPM t to the Department of Defense, Consolidated Adjudications Facility (DoD CAF) or DLA Intelligence Personnel Security Office.

(i) A waiver for IT level positions to allow assignment of an individual Contractor employee to commence work prior to completion of the investigation may be granted in emergency situations when it is determined that a delay would be harmful to national security. A request for waiver will be considered only after the Government is in receipt of the individual Contractor employee’s completed forms, the background investigation has been initiated and favorable FBI fingerprint check has been conducted. The request for a waiver must be approved by the Commander/Director or Deputy Commander/Director of the site. The cognizant DLA Intelligence Personnel Security Office reserves the right to determine whether a waiver request will be forwarded for processing. The individual Contractor employee for which the waiver is being requested may not be assigned to a position, that is, physically work at the Federally-controlled facility and/or be granted access to Federally-controlled information systems, until the waiver has been approved.

(j) The requirements of this clause apply to the prime Contractor and any subcontractors the prime Contractor may employ during the course of this contract, as well as any temporary employees that may be hired by the Contractor. The Government retains the right to request removal of Contractor personnel, regardless of prior clearance or adjudication status whose actions, while assigned to this contract, who are determined by the Contracting Officer to conflict with the interests of the Government. If such removal occurs, the Contractor shall assign qualified personnel, with the required investigation, to any vacancy.

http://www.opm.gov/

(k) All Contractor personnel who are granted access to Government and/or…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .