Attachment_3_-_Submittal_Register.pdf

PDF 569 KB Posted

Attached to
Building Renovation for DDJC Federal contract opportunity
Solicitation number
SP3300-15-Q-0096
Issued by
Defense Logistics Agency Distribution

About this file

Attachment 3 - Submittal Register

View the file

Other files for this federal contract opportunity

Other files attached to Building Renovation for DDJC, newest first.
File Type Posted
Amendment_0004.pdf PDF
Attachment_11_-_Standard_Form_18.pdf PDF
Amendment_00003.pdf PDF
Amendment_00002.pdf PDF
Amendment_00003.pdf PDF
Attachment_6_-_Asbestos_Report.pdf PDF
Attachment_10_-_SF25A_Payment_Bond.pdf PDF
Solicitation_(RFQ)_text.pdf PDF
Attachment_7_-_Panic_Alarm_System.pdf PDF
Attachment_2_-_Specificaitons.pdf PDF
Attachment_5_-_General_Environmental_Controls.pdf PDF
Attachment_9_-_Davis_Bacon.pdf PDF
Attachment_11_-_Standard_Form_18.pdf PDF
Attachment_1_-_Statment_of_Work _Submittal_Information_and_Specs.pdf PDF
Attachment_8_-_Transmittal_of_Shop_Drawings.pdf PDF
Attachment_4_-_Drawings.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESCRIPTION OF ITEM SUBMITTED

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2)

01 PS Project Schedule 3.4 G

01 PS Submittal Register 1.9 G

01 PS Accident Prevention Plan (APP) 1.6 G,A 01 PS Activity Hazard Analysis (AHA) 1.7 G,A

01 PS Quality Control Plan 3.2 G

01 CS Construction Waste, Pollution Prevention Spreadsheet 1.6 G

01 PS Waste Management Plan 1.6 G 01 CS Records 1.7 G

03 PD As-Built Record of Equipment and Materials 1.3.1 G 03 PD Final Approved Shop Drawings 1.3.2 G 03 PD Warranty Management Plan 1.4 G 03 PD Performance Bond 1.4.2 G 3 PD Warranty Tag 1.4.5 03 PD Spare Parts Data 1.4 11 CS Record Drawings (CAD Drawings) 1.2 G 11 CS Record Drawings (Full Size Prints) 1.2 G 11 CS Record Drawings (Full Size Red Line Drawings) 1.2 11 CS Record Drawings (Color Scan of Red Line Drawings) 1.2

01 PS Existing Conditions 1.6 G 07 C Demolition Plan 1.6 G 07 C Notifications 1.6 G 11 CS Receipts 1.6

02 42 51, Carpet Removal and Reclamation

SUBMIT

APPROVAL

NEEDED BY:

MATERIAL

NEEDED

BY:

A C T I O N

C O D E

DAT

E OF

ACTI

ON

D A T E

F O R W A R D E D

T O

R E V I E W E R

D A T E

R E C E I V E D

F R O M

R E V I E W E R

A C T I O N

C O D E

DATE OF

ACTION

D A T E

R E C E I V E D

F R O M

C O N T R A C T O R

D A T E

F O R W A R D E D

T O

A P P R O V I N G

A U T H O R I T Y

APPROVING AUTHORITY D

A T E

R E C E I V E D

F R O M

A P P R O V I N G

A U T H O R I T Y

D A T E

M A I L E D

T O

C O N T R A C T O R

PS - PRECONSTRUCTION SUBMITTALS

SD - SHOP DRAWING

PD - PRODUCT DATA

S - SAMPLES

DD - DESIGN DATA

TR - TEST REPORTS

C - CERTIFICATES

MI - MANUFACTURER'S INSTRUCTIONS

MFR - MANUFACTURER'S FIELD REPORTS

O&M - OPERATING AND MAINTENANCE

CS - CLOSE-OUT SUBMITTALS

P A R A G R A P H

N U M B E R

C L A S S I F I C A T I O N

G O V E R N M E N T

O R

A E

R E V I E W E R

CONTRACTOR

SCHEDULE DATES

CONTRA

CTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E F I C I A T I O N

S E C T I O N

S U B M I T T A L

D O C U M E

T

Y P E

S U B M I T T A L

D O C U M E

D

S C R I P T I O N

SUBMITTAL REGISTER CONTRACT NO:

TITLE: Task Order Construction Services CONTRACTOR:LOCATION: Defense Distribution Depot San Joaquin

JOB NAME: Renovate Building 101

Division 1 - General Requirements

02 41 00, Demolition and Deconstruction Division 2 - Existing Conditions

01 78 00, Close-Out Submittals

01 57 20.00 10, Environmental Protection

01 32 01.00 10, Project Schedule

01 33 00, Submittal Procedures

01 35 26, Government Safety Requirements

01 45 00.00, Quality Control

01 74 19, Construction and Demolition Waste Management

SOURCE SELECTION INFORMATION

SEE FAR 2.101AND 3.104

Attachment 3

SUBMIT

APPROVAL

NEEDED BY:

MATERIAL

NEEDED

BY:

A C T I O N

C O D E

DAT

E OF

ACTI

ON

D A T E

F O R W A R D E D

T O

R E V I E W E R

D A T E

R E C E I V E D

F R O M

R E V I E W E R

A C T I O N

C O D E

DATE OF

ACTION

D A T E

R E C E I V E D

F R O M

C O N T R A C T O R

D A T E

F O R W A R D E D

T O

A P P R O V I N G

A U T H O R I T Y

APPROVING AUTHORITY D

A T E

R E C E I V E D

F R O M

A P P R O V I N G

A U T H O R I T Y

D A T E

M A I L E D

T O

C O N T R A C T O R

PS - PRECONSTRUCTION SUBMITTALS

SD - SHOP DRAWING

PD - PRODUCT DATA

S - SAMPLES

DD - DESIGN DATA

TR - TEST REPORTS

C - CERTIFICATES

MI - MANUFACTURER'S INSTRUCTIONS

MFR - MANUFACTURER'S FIELD REPORTS

O&M - OPERATING AND MAINTENANCE

CS - CLOSE-OUT SUBMITTALS

P A R A G R A P H

N U M B E R

C L A S S I F I C A T I O N

G O V E R N M E N T

O R

A E

R E V I E W E R

CONTRACTOR

SCHEDULE DATES

CONTRA

CTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E F I C I A T I

C T I O N

S U B M I T T A L

D O C U M E

P E

S U B M I T T A L

D O C U M E

S C R I P T I O N

SUBMITTAL REGISTER CONTRACT NO:

TITLE: Task Order Construction Services CONTRACTOR:LOCATION: Defense Distribution Depot San Joaquin

JOB NAME: Renovate Building 101

01 PS Proposed Dust-Control Measures 1.3 G 01 PS Proposed Packing and Transportation Measures 1.3 G 01 PS Schedule of Carpet Reclamation Activities 1.3 G 01 PS Carpet Reclamation Agency Records 1.3 G

SOURCE SELECTION INFORMATION

SUBMIT

APPROVAL

NEEDED BY:

MATERIAL

NEEDED

BY:

A C T I O N

C O D E

DAT

E OF

ACTI

ON

D A T E

F O R W A R D E D

T O

R E V I E W E R

D A T E

R E C E I V E D

F R O M

R E V I E W E R

A C T I O N

C O D E

DATE OF

ACTION

D A T E

R E C E I V E D

F R O M

C O N T R A C T O R

D A T E

F O R W A R D E D

T O

A P P R O V I N G

A U T H O R I T Y

APPROVING AUTHORITY D

A T E

R E C E I V E D

F R O M

A P P R O V I N G

A U T H O R I T Y

D A T E

M A I L E D

T O

C O N T R A C T O R

PS - PRECONSTRUCTION SUBMITTALS

SD - SHOP DRAWING

PD - PRODUCT DATA

S - SAMPLES

DD - DESIGN DATA

TR - TEST REPORTS

C - CERTIFICATES

MI - MANUFACTURER'S INSTRUCTIONS

MFR - MANUFACTURER'S FIELD REPORTS

O&M - OPERATING AND MAINTENANCE

CS - CLOSE-OUT SUBMITTALS

P A R A G R A P H

N U M B E R

C L A S S I F I C A T I O N

G O V E R N M E N T

O R

A E

R E V I E W E R

CONTRACTOR

SCHEDULE DATES

CONTRA

CTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E F I C I A T I

C T I O N

S U B M I T T A L

D O C U M E

P E

S U B M I T T A L

D O C U M E

S C R I P T I O N

SUBMITTAL REGISTER CONTRACT NO:

TITLE: Task Order Construction Services CONTRACTOR:LOCATION: Defense Distribution Depot San Joaquin

JOB NAME: Renovate Building 101

03 PD Asbestos Management Plan 3.8.3.2 G Division 7 - Thermal and Moisture Protection

02 82 14.00 10, Asbestos Hazard Control Activities

SUBMIT

APPROVAL

NEEDED BY:

MATERIAL

NEEDED

BY:

A C T I O N

C O D E

DAT

E OF

ACTI

ON

D A T E

F O R W A R D E D

T O

R E V I E W E R

D A T E

R E C E I V E D

F R O M

R E V I E W E R

A C T I O N

C O D E

DATE OF

ACTION

D A T E

R E C E I V E D

F R O M

C O N T R A C T O R

D A T E

F O R W A R D E D

T O

A P P R O V I N G

A U T H O R I T Y

APPROVING AUTHORITY D

A T E

R E C E I V E D

F R O M

A P P R O V I N G

A U T H O R I T Y

D A T E

M A I L E D

T O

C O N T R A C T O R

PS - PRECONSTRUCTION SUBMITTALS

SD - SHOP DRAWING

PD - PRODUCT DATA

S - SAMPLES

DD - DESIGN DATA

TR - TEST REPORTS

C - CERTIFICATES

MI - MANUFACTURER'S INSTRUCTIONS

MFR - MANUFACTURER'S FIELD REPORTS

O&M - OPERATING AND MAINTENANCE

CS - CLOSE-OUT SUBMITTALS

P A R A G R A P H

N U M B E R

C L A S S I F I C A T I O N

G O V E R N M E N T

O R

A E

R E V I E W E R

CONTRACTOR

SCHEDULE DATES

CONTRA

CTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E F I C I A T I

C T I O N

S U B M I T T A L

D O C U M E

P E

S U B M I T T A L

D O C U M E

S C R I P T I O N

SUBMITTAL REGISTER CONTRACT NO:

TITLE: Task Order Construction Services CONTRACTOR:LOCATION: Defense Distribution Depot San Joaquin

JOB NAME: Renovate Building 101

03 PD Sealants 2.1 G 07 C Sealant 1.2

03 PD Acoustical Units 2.1 04 S Acoustical Units 2.1 G 07 C Acoustic Ceiling Tiles 2.1

03 PD Carpet 2.1 G 03 PD Carpet Cushion 2.3 G 03 PD Molding 2.5 G 03 PD Surface Preparation 3.1 G 03 PD Installation 3.4 G 04 S Carpet 2.1 G 04 S Molding 2.1 G 11 CS Local/Regional Materials 1.2.1 11 CS Carpet 2.1 11 CS Adhesives and Concrete Primer 2.4

03 PD Coating 1.11.6.3 G 03 PD Manufacturer's Technical Data Sheets 2.1 G 3 PD Local/Regional Materials 1.9 G 04 S Color 1.4.2 G 07 C Applicator's qualifications 1.3 G 08 MI Application instructions 3.6 08 MI Mixing 3.6.2

08 MI Manufacturer's Material Safety Data Sheets 2.1

10 O&M Coatings: 2.1 G

02 SD Marking Strips 1.5.1 G 02 SD Conduit and Fittings, equipment layout and arrangements, and accessories 1.5.1 G

DIVISION 26 - Electrical

09 51 00, Acoustical Ceilings

09 90 00, Paints and Coatings

Division 9 - Finishes

07 92 00, Joint Sealants

09 68 00, Carpet

26 00 00.00 20, Basic Electrical Materials and Methods

SUBMIT

APPROVAL

NEEDED BY:

MATERIAL

NEEDED

BY:

A C T I O N

C O D E

DAT

E OF

ACTI

ON

D A T E

F O R W A R D E D

T O

R E V I E W E R

D A T E

R E C E I V E D

F R O M

R E V I E W E R

A C T I O N

C O D E

DATE OF

ACTION

D A T E

R E C E I V E D

F R O M

C O N T R A C T O R

D A T E

F O R W A R D E D

T O

A P P R O V I N G

A U T H O R I T Y

APPROVING AUTHORITY D

A T E

R E C E I V E D

F R O M

A P P R O V I N G

A U T H O R I T Y

D A T E

M A I L E D

T O

C O N T R A C T O R

PS - PRECONSTRUCTION SUBMITTALS

SD - SHOP DRAWING

PD - PRODUCT DATA

S - SAMPLES

DD - DESIGN DATA

TR - TEST REPORTS

C - CERTIFICATES

MI - MANUFACTURER'S INSTRUCTIONS

MFR - MANUFACTURER'S FIELD REPORTS

O&M - OPERATING AND MAINTENANCE

CS - CLOSE-OUT SUBMITTALS

P A R A G R A P H

N U M B E R

C L A S S I F I C A T I O N

G O V E R N M E N T

O R

A E

R E V I E W E R

CONTRACTOR

SCHEDULE DATES

CONTRA

CTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E F I C I A T I

C T I O N

S U B M I T T A L

D O C U M E

P E

S U B M I T T A L

D O C U M E

S C R I P T I O N

SUBMITTAL REGISTER CONTRACT NO:

TITLE: Task Order Construction Services CONTRACTOR:LOCATION: Defense Distribution Depot San Joaquin

JOB NAME: Renovate Building 101

01 PS Material, Equipment, and Fixture List 1.3 G 02 PD Conduit and Fittings 2.1 G 03 PD Wires and Cables 2.2 G 03 PD Splices and Connectors, Receptacles 2.3, 2.5 G 03 PD Outlet, Outlet Boxes, and Pull Boxes 2.6 G 03 PD Lamps and Lighting Fixtures 2.9 G 08 MI Manufacturer's Instructions 1.3 G

02 SD Marking Strips 1.3 G,AE 03 SD Conduit, Fittings, and Wireway 1.3, 2.33 G,AE 03 PD Outlet Boxes and Covers 2.4 G,AE 03 PD Receptacles 2.18 G,AE

03 PD LED Lighting Fixtures 2.1 G,AE 03 PD LED Drivers 2.1.1 G,AE 03 PD LED Lamps 2.15 G,AE 03 PD Power Hook Fixture Hanger 2.6 G,AE 03 PD Local/Regional Materials 1.5 06 TR Operating Test 3.3 G

02 SD Telecommunication Drawings 1.6.1.1 G,AE 03 PD Patch Panel 2.4.2 G,AE 03 PD Telecommunication Outlet/Connector Assemblies 2.5 G,AE 03 PD Connector Blocks 2.5 G,AE 03 PD Spare Parts Data 1.5 G,AE 06 TR Telecommunication Cabling Testing 3.5.1 G,AE 07 C Telecommunication Contractor Qualificaiton 1.6.2.1 G,AE 07 C Key Personnel Qualifications 1.6.2 G,AE 07 C Manufacturer Qualifications 1.6.2.3 G,AE 11 CS Record Documentation 1.5 G,AE

27 10 00, Building Telecommunication Cabling System

26 20 00, Interior Distribution

26 51 00, Interior Lighting

26 05 00.00 40, Common Work Results for Electrical

DIVISION 27 - Communications

27 10 00, Building Telecommunication Cabling System

09 68 00, Carpet 09 90 00, Paints and Coatings 26 00 00.00 20, Basic Electrical Materials and Methods 26 05 00.00 40, Common Work Results for Electrical 26 20 00, Interior Distribution 26 51 00, Interior Lighting

09 51 00, Acoustical Ceilings

01 32 01.00 10, Project Schedule 01 33 00, Submittal Procedures 01 35 26, Government Safety Requirements 01 45 00.00, Quality Control 01 57 20.00 10, Environmental Protection 01 74 19, Construction and Demolition Waste Managemen 01 78 00, Close-Out Submittals 02 41 00, Demolition and Deconstruction 02 42 51, Carpet Removal and Reclamation 02 82 14.00 10, Asbestos Hazard Control Activities 07 92 00, Joint Sealants

Submittal Register
Sheet2

File details come from the government source that posted it. Updated .