JAA_BOA_Solicitation_SP0600-13-R-0706.pdf
PDF 621 KB Posted
- Attached to
- Basic Ordering Agreement (BOA) for Commercial Jet Fuel (JAA) in CONUS Federal contract opportunity
- Solicitation number
- SP0600-13-R-0706
- Issued by
- Defense Logistics Agency Energy
About this file
BOA Solicitation SP0600-13-R-0706
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INFORMATION TO OFFERORS
DLA ENERGY – FEBAC
To all potential Basic Ordering Agreement (BOA) offerors:
DLA Energy – Bulk Fuels intends to establish Basic Ordering Agreements (BOAs) with contractors, to supply and deliver bulk commercial jet fuel (JAA) to various locations in the Continental United States (CONUS) in support of the CONUS Jet A conversions expected to occur from FY 2014 – 2017. In order to meet these uncertain and constantly changing requirements a BOA will be issued to expedite the procurement time. A Basic Ordering Agreement is a written instrument of understanding, which contains the terms and agreements under which future requirements will be solicited, evaluated, awarded and performed. A BOA is not a contract.
The parties enter into a binding contract only via the issuance of a delivery order against the BOA based upon the acceptance of the agreement holder’s proposal for a specific requirement. Each delivery order will be considered a unique and separate contract. The purpose of this BOA is to negotiate in advance, any exceptions your company may have to the non-price related terms and conditions contained in this solicitation. Once negotiated, these terms and conditions will be incorporated into any supply contract awarded under the BOA.
Companies with BOAs will be able to respond to future solicitations for fuel requirements to support the changing priorities of the Department. This Solicitation will be open continuously for a period of five (5) years from the date of issuance. The BOA(s) will be reviewed annually to determine if any updates are necessary.
BOAs can be terminated by either party with 30 days’ written notice. This BOA does not authorize access or grant permission to use military installations and/or berth at ports/refuel at sea.
To be eligible for award of a BOA, offerors must submit the following:
1) Signed SF 1449
2) Certifications and Representations (See Section K under Offeror Submission Package (OSP)
3) A list of any exceptions to the terms and conditions of this solicitation
This solicitation will remain open continuously for 5 years. Please access the Federal Business Opportunities website “FedBizOpps”: https://www.fbo.gov for access to this Solicitation and for future notices.
https://www.fbo.gov/
Continuation of SF 1449, Block 8:
This Basic Ordering Agreement (BOA) Solicitation is open continuously for a period of five (5) years from date of issuance. Initial closing date for receipt of offers is October 25, 2013 at 3:00 p.m., EST; however, offers will be accepted continuously thereafter. When responding please provide the following:
1) Signed SF 1449
2) Certifications and Representations (See Section K of OSP)
3) A list of any exceptions to the terms and conditions of this solicitation
NOTES:
1. Offerors are advised to complete and submit, as your offer, all forms contained in the accompanying Offer
Submission Package. Copies of all documents submitted must be the same as the original. An authorized negotiator must sign the offer Standard Form 1449. [See K-0005 K33.01 AUTHORIZED NEGOTIATORS (DLA ENERGY APR 2007) in the OSP].
a. For offers submitted by fax, in accordance with L-0003 L2.11-3 FACSIMILE PROPOSALS –
COMMERCIAL ITEMS (DLA ENERGY NOV 1999) the DLA Energy Bid Custodian facsimile number is (703) 767-0488. Call (703) 767-8408 or 9260 for confirmation of offer receipt.
b. For offers submitted by e-mail in accordance with L-0004 L2.11-4 E-MAIL PROPOSALS (DLA
ENERGY OCT 2010). The e-mail address is BulkFuelsBidCustodian@dla.mil.
2. OFFERS FOR FUEL/FUEL EXCHANGES ARE NOT BEING SOLICITED AT THIS TIME.
OFFERS FOR FUEL/FUEL EXCHANGES WILL BE REQUESTED BY AMENDMENT TO THIS
SOLICITATION.
3. ORDERS ISSUED VIA AMENDMENTS TO THIS SOLICITATION WILL INCLUDE
ADDITIONAL APPLICABLE SCHEDULE, PRICE, INSPECTION AND ACCEPTANCE,
DELIVERY TERMS AND CONDITIONS, PAYMENT, AND EVALUATION PROVISIONS
AND/OR CLAUSES.
INDEX OF CLAUSES AND PROVISIONS
CLAUSE/ CLAUSE/PROVISION TITLE PAGE
PROVISION NUMBER
SECTION C
C-0001 C1 SPECIFICATIONS (DLA ENERGY JAN 2012) 8
C-0002 C1.02 ASSIST DATABASE OF SPECIFICATIONS (DLA ENERGY MAR 2011) 8
C-0003 C16.08-1 TURBINE FUEL, AVIATION (JET A) (BULK) (DLA ENERGY APR 2013) 8
SECTION E
52.246-2 INSPECTION OF SUPPLIES – FIXED PRICE (AUG 1996) 9
252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008) 10
52.246-9070 COMMERCIAL BILLS OF LADING (BULK) (DLA ENERGY) (NOV 2011) 10
E-0001 E1 CONTRACTOR INSPECTION RESPONSIBILITIES (DLA ENERGY JAN 2013) 11
E-0002 E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS (DLA ENERGY JUL 2013) 20
E-0003 E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY DEC 2011) 22
E-0004 E40.05 MATERIAL INSPECTION AND RECEIVING REPORT (DLA ENERGY MAR 2000) 23
SECTION F
52.211-16 VARIATION IN QUANTITY (APR 1984) 24
52.247-29 F.O.B. ORIGIN (FEB 2006) 24
52.247-34 F.O.B. DESTINATION (NOV 1991) 25
52.247-58 LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS (APR 1984) 26
52.211-9073 DETERMINATION OF QUANTITY – DLA ENERGY (NOV 2011) 26
F-0001 F1 DELIVERY CONDITIONS FOR TANK CARS, BOXCARS, TRUCKS, TRANSPORT TRUCKS, TRUCKS AND
TRAILERS, TANK WAGONS, PIPELINE, AND LIGHTERS (DLA ENERGY JAN 2012) 29
F-0002 F14 SHIPMENT AND ROUTING (DLA ENERGY MAR 2003) 31
F-0003 F15 BARGE AND/OR T1 CLASS TANKER DEMURRAGE AND LOADING CONDITIONS (DLA ENERGY JAN 2012) 32
F-0004 F16.01 BARGE DEMURRAGE AND UNLOADING CONDITIONS (BULK) (DLA ENERGY JAN 2012) 33
F-0005 F52.01 TANKER STANDARDS AND REQUIREMENTS (DLA ENERGY SEP 1995) 34
F-0006 F54 TANKER UNLOADING CONDITIONS (DLA ENERGY AUG 2007) 34
F-0007 F105.01 DEADFREIGHT (DLA ENERGY JAN 2012) 35
F-0008 F109 IN-LINE BLENDING OF NONAVIATION PETROLEUM PRODUCTS (DLA ENERGY JAN 2012) 35
SECTION G
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR WARD MANAGEMENT (JUL 2013) 37
52.232-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER – OTHER THAN CENTRAL CONTRACTOR REGISTRATION
(MAY1999) 38
52.232-38 SUBMISSION OF ELECTRONIC FUNDS TRANSFER INFORMATION (MAY 1999) 40
52.232-9010 ACCELERATED PAYMENTS TO SMALL BUSINESS (JUN 2012) 40
G-0001 G3 INVOICE NUMBERING REQUIREMENTS (DLA ENERGY AUG 1998) 40
G-0002 G6 INVOICE DISCREPANCIES (BULK) (DLA ENERGY JAN 2012) 40
G-0003 G12 SUPPLEMENTAL INVOICING INFORMATION (BULK) (DLA ENERGY SEP 2002) 40
G-0004 G150.05 SUBMISSION OF INVOICES FOR PAYMENT – COMMERCIAL ITEMS (BULK) (DLA ENERGY JAN 2011) 41
SECTION H
H-0001 H19.02 REPORTING REQUIREMENTS FOR SHIPMENTS (DLA ENERGY JAN 2012) 43
SECTION I
52.202-1 DEFINITIONS (JAN 2012) 44
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010) 44
52.204-7/ 252.204-7004 SYSTEM FOR AWARD MANAGEMENT (JUL 2013) (ALTERNATE A) (MAY 2013) 47
52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (BULK) (TAILORED) (DLA ENERGY) (FEB 2012) 48
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS –
COMMERCIAL ITEMS (SEPT 2013) 51
52.216-18 ORDERING (OCT 1995) 56
52.216-21 REQUIREMENTS (OCT 1995) 56
52.216-22 INDEFINITE QUANTITY (OCT 1995) 56
52.219-7 NOTICE OF PARTIAL SMALL BUSINESS SET-ASIDE (DEVIATION) (AUGUST 2011) (DEVIATION NUMBER 2011- D0001) 57
SECTION I
52.219-16 LIQUIDATED DAMAGES – SUBCONTRACTING PLAN (JAN 1999) 57
52.232-17 INTEREST (OCT 2010) 58
52.243-1 CHANGES – FIXED PRICE (AUG 1987) 58
252.225-7002 QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS (DEC 2012) 59
252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (JUN 2012) 59
252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006) 60
52.215-9023 REVERSE AUCTION (NOV 2012) 60
52.233-9001 DISPUTES - AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (NOV 2011) 61
I-0001 I11.01-2 ADMINISTRATIVE COST OF TERMINATION FOR CAUSE – COMMERCIAL ITEMS (DLA ENERGY FEB 1996) 61
I-0002 I28.01 FEDERAL, STATE, AND LOCAL TAXES (DLA ENERGY NOV 2011) (DEVIATION) 62
I-0003 I28.02-1 FEDERAL AND STATE TAXES/FEES (DLA ENERGY JUL 2006) 63
I-0004 I28.03-1 TAX EXEMPTION CERTIFICATES (DLA ENERGY AUG 2003) 63
I-0005 I28.24 U.S. IMPORT TAX ON PETROLEUM (BULK) (DLA ENERGY NOV 2011) 63
I-0006 I186 PROTECTION OF GOVERNMENT PROPERTY AND SPILL PREVENTION (DLA ENERGY FEB 2009) 64
I-0007 I190.04 MATERIAL SAFETY DATA SHEETS -- COMMERCIAL ITEMS (BULK) (DLA ENERGY JAN 2012) 64
I-0008 I209.09 EXTENSION PROVISIONS (DLA ENERGY JAN 2012) 64
I-0009 I211.02 ORDERING (CONT’D) (DLA ENERGY JAN 1991) 65
SECTION J
SEE OFFEROR SUBMISSION PACKAGE 66
EQUAL VALUE EXCHANGE (EVE) AGREEMENT 66
STANDARDIZED FORMAT FOR USE IN THE PREPARATION OF PRODUCT 66
DLA ENERGY FORM 19.3 SMALL BUSINESS SUBCONTRACTING PLAN 66
SECTION K
52.204-6 DATA UNIVERSAL NUMBERING SYSTEM (DUNS) NUMBER (JUL 2013) 67
52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013) 67
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013) 68
52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS – COMMERCIAL ITEMS (AUG 2013) 68
252.209-7001 DISCLOSURE OF OWNERSHIP OR CONTROL BY THE GOVERNMENT OF A TERRORIST COUNTRY (JAN 2009) 68
252.212-7000 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (JUN 2005) 69
K-0001 K1.01-7 OFFEROR REPRESENTATIONS AND CERTIFICATIONS – COMMERCIAL ITEMS (DLA ENERGY FEB 2009) 69
K-0002 K1.01-12 SMALL BUSINESS PROGRAM NOTICE (DLA ENERGY JAN 2012) 69
K-0003 K5 USE OF ELECTRONIC DATA INTERCHANGE (DLA ENERGY MAR 2009) 69
K-0004 K15.01 RELEASE OF UNIT PRICES (BULK) (DLA ENERGY NOV 2002) 70
K-0005 K33.01 AUTHORIZED NEGOTIATORS (DLA ENERGY APR 2007) 70
K-0006 K45.01 FACSIMILE OR ELECTRONIC INVOICING (DLA ENERGY JAN 2012) 70
K-0007 K150 WIDE AREA WORKFLOW (DLA ENERGY AUG 2012) 70
SECTION L
52.216-1 TYPE OF CONTRACT (APR 1984) 71
52.247-45 F.O.B. ORIGIN AND/OR F.O.B. DESTINATION EVALUATION (APR 1984) 71
52.233-9000 AGENCY PROTESTS (NOV 2011) – DLAD 71
L-0001 L2.07 EVIDENCE OF RESPONSIBILITY (DLA ENERGY JAN 1998) 71
L-0002 L2.09 EVIDENCE OF RESPONSIBILITY (OPERATING CRITERIA) (DLA ENERGY JAN 2012) 71
L-0003 L2.11-3 FACSIMILE PROPOSALS – COMMERCIAL ITEMS (DLA ENERGY NOV 1999) 71
L-0004 L2.11-4 E-MAIL PROPOSALS (DLA ENERGY OCT 2010) 73
SECTION M
52.212-2 EVALUATION – COMMERCIAL ITEMS 74
M-0001 M4.01 RIGHT TO APPLY F.O.B. ORIGIN OFFER (DLA ENERGY JAN 1976) 74
M-0002 M19.05 EVALUATION OF OFFERS SUBJECT TO ECONOMIC PRICE ADJUSTMENT (DOMESTIC BULK) (DLA
ENERGYJAN 2012) 74
M-0003 M27 EVALUATION OF OFFERS (DOMESTIC BULK) (DLA ENERGY JAN 2012) 75
M-0004 M33 QUANTITIES TO BE EVALUATED FOR TANKER AND BARGE OFFERS (DLA ENERGY AUG 2003) 75
M-0005 M41.04 EVALUATION OF OFFERS INVOLVING OTHER THAN F.O.B. TANKER (BULK) (DLA ENERGY JUL 2010) 75
M-0006 M72 EVALUATION OF OFFERS (EXCEPTIONS/DEVIATIONS) (DLA ENERGY APR 1997) 76
M-0007 M74 USE OF DESP BY COMMERCIAL SUPPLIER OFFERING PRODUCT UNDER DLA ENERGY SOLICITATIONS
(DLA ENERGY AUG 1983) 76
SECTION C
C-0001 C1 SPECIFICATIONS (DLA ENERGY JAN 2012)
Product to be supplied shall fully meet the requirements of the applicable specification(s) as indicated in the Supply Schedule, except as modified elsewhere in this contract. Unless otherwise indicated by the Contractor, prior to award and in accordance with the EVALUATION OF OFFERS contract provision, the product offered will be assumed to fully meet the applicable specification(s).
C-0002 C1.02 ASSIST DATABASE OF SPECIFICATIONS (DLA ENERGY MAR 2011)
Unless otherwise specified, current versions of defense or federal specifications and standards, military handbooks, commercial item descriptions, qualified product lists, and other related technical documents cited in this solicitation/contract can be accessed from the Department of Defense (DoD) Acquisition Streamlining and Standardization Information System (ASSIST) database at https://assist.daps.dla.mil/ or http://dodssp.daps.dla.mil/ under ASSIST-Quick Search. ASSIST is the official source for all Defense Standardization Program documents and contains the most current information on documents prepared by DoD, as well as information on how to acquire referenced non-Government standards that have been adopted for DoD use. Those who register for an ASSIST account may establish profiles to receive automatic E-mail alerts when changes are planned or made to documents of interest by selecting criteria on the [Alert Portal Profile Maintenance] screens accessed from the [User Profile] menu. Users may also view or download a bi-monthly summary of changes to the ASSIST database from the DoD Single Stock Point website (http://dodssp.daps.dla.mil/) under the [ASSIST Update] menu.
C-0003 C16.08-1 TURBINE FUEL, AVIATION (JET A) (BULK) (DLA ENERGY APR 2013)
Jet A shall conform to the requirements of ASTM D 1655, Standard Specification for Aviation Turbine Fuels, except as modified below.
(a) ADDITIVES.
(1) FUEL SYSTEM ICING INHIBITOR (FSII). When required by contract line item-
(i) FSII shall be added to the fuel and shall be Diethylene Glycol Monomethyl Ether (DIEGME) conforming to the latest revision of
ASTM D 4171, Standard Specification for FSIIs, Type III or MIL-DTL-85470B, Inhibitor, Icing, Fuel System, High Flash, NATO Code Number S-1745.
(1) FSII shall be added at a concentration of 0.07 - 0.10 volume percent.
(2) CORROSION INHIBITOR/LUBRICITY IMPROVER (CI/LI). When required by contract line item-
(i) The additive must conform to the latest revision of MIL-PRF-25017, Inhibitor, Corrosion/Lubricity Improver, Fuel Soluble (NATO S-1747), found in ASSIST and shall be listed in the electronic Qualified Products List (QPL)-25017, located in the Qualified Products Database (QPD) found at http://assistdocs.com.
(3) STATIC DISSIPATER ADDITIVE (SDA). When required by contract line item-
(i) SDA shall be added to the fuel and the conductivity limits of 50 to 600 picosiemens per meter (pS/m) at ambient temperature or 29.4oC
(85oF), whichever is lower, unless directed by the procuring activity, shall apply at the custody transfer point.
(ii) The following electrical conductivity additive is approved: Stadis® 450 marketed by Innospec Fuel Specialties (formerly Octel
Starreon LLC), Newark DE 19702."
(4) METAL DEACTIVATOR (MDA). MDA shall not be used unless the supplier has obtained PRIOR written consent from the procuring activity.
(b) REPORTS. Refer to the MATERIAL INSPECTION AND RECEIVING REPORT contract provision (52.246-9FG1) for additional reporting requirements.
https://assist.daps.dla.mil/ http://dodssp.daps.dla.mil/ http://dodssp.daps.dla.mil/ http://assistdocs.com/
SECTION E
52.246-2 INSPECTION OF SUPPLIES – FIXED PRICE (AUG 1996)
(a) Definition. “Supplies,” as used in this clause, includes but is not limited to raw materials, components, intermediate assemblies, end products, and lots of supplies.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering supplies under this contract and shall tender to the Government for acceptance only supplies that have been inspected in accordance with the inspection system and have been found by the Contractor to be in conformity with contract requirements. As part of the system, the Contractor shall prepare records evidencing all inspections made under the system and the outcome. These records shall be kept complete and made available to the Government during contract performance and for as long afterwards as the contract requires. The Government may perform reviews and evaluations as reasonably necessary to ascertain compliance with this paragraph. These reviews and evaluations shall be conducted in a manner that will not unduly delay the contract work. The right of review, whether exercised or not, does not relieve the Contractor of the obligations under the contract.
(c) The Government has the right to inspect and test all supplies called for by the contract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before acceptance. The Government shall perform inspections and tests in a manner that will not unduly delay the work. The Government assumes no contractual obligation to perform any inspection and test for the benefit of the Contractor unless specifically set forth elsewhere in this contract.
(d) If the Government performs inspection or test on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties. Except as otherwise provided in the contract, the Government shall bear the expense of Government inspections or tests made at other than the Contractor’s or subcontractor’s premises; provided, that in case of rejection, the Government shall not be liable for any reduction in the value of inspection or test samples.
(e)
(1) When supplies are not ready at the time specified by the Contractor for inspection or test, the Contracting Officer may charge to the Contractor the additional cost of inspection or test.
(2) The Contracting Officer may also charge the Contractor for any additional cost of inspection or test when prior rejection makes reinspection or retest necessary.
(f) The Government has the right either to reject or to require correction of nonconforming supplies. Supplies are nonconforming when they are defective in material or workmanship or are otherwise not in conformity with contract requirements. The Government may reject nonconforming supplies with or without disposition instructions.
(g) The Contractor shall remove supplies rejected or required to be corrected. However, the Contracting Officer may require or permit correction in place, promptly after notice, by and at the expense of the Contractor. The Contractor shall not tender for acceptance corrected or rejected supplies without disclosing the former rejection or requirement for correction, and, when required, shall disclose the corrective action taken.
(h) If the Contractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to be replaced or corrected, the Government may either
(1) by contract or otherwise, remove, replace, or correct the supplies and charge the cost to the Contractor or
(2) terminate the contract for default.
Unless the Contractor corrects or replaces the supplies within the delivery schedule, the Contracting Officer may require their delivery and make an equitable price reduction. Failure to agree to a price reduction shall be a dispute.
(i)
(1) If this contract provides for the performance of Government quality assurance at source, and if requested by the Government, the Contractor shall furnish advance notification of the time --
(i) When Contractor inspection or tests will be performed in accordance with the terms and conditions of the contract; and
(ii) When the supplies will be ready for Government inspection.
(2) The Government’s request shall specify the period and method of the advance notification and the Government representative to whom it shall be furnished. Requests shall not require more than 2 workdays of advance notification if the Government representative is in residence in the Contractor’s plant, nor more than 7 workdays in other instances.
(j) The Government shall accept or reject supplies as promptly as practicable after delivery, unless otherwise provided in the contract. Government failure to inspect and accept or reject the supplies shall not relieve the Contractor from responsibility, nor impose liability on the Government, for nonconforming supplies.
(k) Inspections and tests by the Government do not relieve the Contractor of responsibility for defects or other failures to meet contract requirements discovered before acceptance. Acceptance shall be conclusive, except for latent defects, fraud, gross mistakes amounting to fraud, or as otherwise provided in the contract.
(l) If acceptance is not conclusive for any of the reasons in paragraph (k) hereof, the Government, in addition to any other rights and remedies provided by law, or under other provisions of this contract, shall have the right to require the Contractor
(1) at no increase in contract price, to correct or replace the defective or nonconforming supplies at the original point of delivery or at the Contractor’s plant at the Contracting Officer’s election, and in accordance with a reasonable delivery schedule as may be agreed upon between the Contractor and the Contracting Officer; provided, that the Contracting Officer may require a reduction in contract price if the Contractor fails to meet such delivery schedule, or
(2) within a reasonable time after receipt by the Contractor of notice of defects or nonconformance, to repay such portion of the contract as is equitable under the circumstances if the Contracting Officer elects not to require correction or replacement. When supplies are returned to the Contractor, the Contractor shall bear the transportation cost from the original point of delivery to the Contractor’s plant and return to the original point when that point is not the Contractor’s plant. If the Contractor fails to perform or act as required in (1) or (2) above and does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure, the Government shall have the right by contract or otherwise to replace or correct such supplies and charge to the Contractor the cost occasioned the Government thereby.
252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)
(a) At the time of each delivery of supplies or services under this contract, the Contractor shall prepare and furnish to the Government a material inspection and receiving report in the manner and to the extent required by Appendix F, Material Inspection and Receiving Report, of the Defense FAR Supplement.
(b) Contractor submission of the material inspection and receiving information required by Appendix F of the Defense FAR Supplement by using the Wide Area WorkFlow (WAWF) electronic form (see paragraph (b) of the clause at 252.232-7003) fulfills the requirement for a material inspection and receiving report (DD Form 250). Two copies of the receiving report (paper copies of either the DD Form 250 or the WAWF report) shall be distributed with the shipment, in accordance with Appendix F, Part 4, F-401, Table 1, of the Defense FAR Supplement.
52.246-9070 COMMERCIAL BILLS OF LADING (BULK) (DLA ENERGY) (NOV 2011)
(a) Commercial bills of lading should not be used in the performance of this contract. The official record for the cargo lifts under bulk fuels contracts is the Department of Defense (DD) Form 250-1, Tanker/Barge Material Inspection and Receiving Report.
(b) If a fuel Contractor requires the use of a commercial bill of lading for record purposes, the bill of lading must clearly state, on the original and all copies, the following:
“Nonnegotiable instrument – DD form 250-1 is the official document for this Government cargo.”
E-0001 E1 CONTRACTOR INSPECTION RESPONSIBILITIES (DLA ENERGY JAN 2013)
(a) This contract provision applies to:
(1) All aviation fuel, lubricating oil, and additive shipments.
(2) All Bulk and Posts, Camps, and Stations non-aviation fuel shipments via pipeline or waterborne transport.
(b) QUALITY CONTROL PLAN.
(1) The Contractor is required to provide and maintain an inspection system, and a written description (Quality Control Plan
(QCP)) of that system, acceptable to the Government. The Contractor has the option to provide and maintain an inspection system that, as a minimum, incorporates the requirements of ISO9001, Quality Management Systems. If the Contractor chooses to comply with the ISO9001 quality system requirements and format, all the specific Quality Assurance Provisions of this contract must be included in the resulting ISO9001 document that will serve as the QCP. A copy of the QCP, in English, shall be presented to the Government Quality Assurance Representative (QAR) for their review and acceptance prior to commencement of production or services. An acceptable QCP is required prior to Government inspection and acceptance of supplies or services. The QCP shall be reviewed and updated when deemed necessary by the Contractor or the Government, to include changes necessary to prevent the recurrence of quality problems. The Contractor must sign and date the original QCP, as well as each subsequent revision. Revisions shall also be presented to the QAR for review and acceptance prior to implementation. When acceptable to the Government, the original QCP, and any revisions, shall be signed and dated by the QAR.
(2) The Contractor shall require subcontractors to provide and maintain inspection systems adhere to all the requirements in this contract provision.
(3) The QCP shall include the identification of key operational positions, a schematic diagram of plant facilities pertinent to the inspection system, indicating all inspection points, and a description of the following operations related to the supplies or services to be furnished under the contract:
(i) RECEIVING, BLENDING AND COMPOUNDING. Procedures used to ensure the quality of additives blended into product supplied under this contract. Procedures to identify and ensure the quality of component base stocks used to produce finished product.
Procedures to be used for adding, prior to batching, all required additives at all locations. When procedures for in-line blending of non-aviation products in accordance with the IN-LINE BLENDING OF NON-AVIATION PETROLEUM PRODUCTS contract provision are used, the QCP will provide for establishing blend ratios, and identify the responsible personnel within the Contractor's organization authorized to establish the blend ratios. When line injection of additives is required by the contract, the QCP will provide procedures for proportionately injecting additives throughout the entire loading process to ensure the additive is homogeneously blended into the product, as well as procedures for maintaining records evidencing the homogeneous blending of all line injected additives. In addition to the testing in (iii) below, a laboratory hand blend of jet fuel with all additives required by the contract shall be tested, prior to shipment, to verify compliance with the specification;
(ii) SAMPLING. Procedures for sampling additives, blend tanks, shipping tanks, lines, and conveyances/containers in accordance with API Manual of Petroleum Measurement Standards (MPMS), Chapter 8, Section 1, (ASTM D 4057) Manual Sampling of Petroleum and Petroleum Products, and/or Section 2, (ASTM D 4177) Automatic Sampling of Liquid Petroleum and Petroleum Products. Procedures include sample location, frequency, quantity, and retention. For all tanker, barge, and pipeline shipments, a flow-proportional sample taken in accordance with MPMS Chapter 8, Section 2, is preferred at the custody transfer point. However, manual samples taken in accordance with MPMS Chapter 8, Section 1 are acceptable provided that they are taken hourly throughout the shipment and that the quantity of the composite sample meets the requirements in Table II of this contract provision. See Table I, Minimum Sampling and Testing Requirements, and Table II, Sample Retention;
(iii) TESTING. Types of test series and individual test methods/procedures to be performed on samples taken from each location identified in (ii) above. See Table I, Minimum Sampling and Testing Requirements, and Table III, Definitions of Test Series;
(iv) CALIBRATION. Program for testing and measuring equipment in accordance with ISO 10012, Measurement Management Systems – Requirements for Measurement Processes and Measuring Equipment, or equivalent local regulation, as appropriate; and, a program for meters used to determine quantity complying with the API MPMS, Chapters 4, 5, and 6, or equivalent foreign standard. For items not covered by API, ASTM, or IP publications, the applicable manufacturer's recommended calibration method(s), outlined in the applicable industry publication, shall be used if acceptable to the Government;
(v) STORAGE AND HANDLING. Procedures for quality/quantity determination. Includes a description of storage and handling equipment, such as tanks, lines, valves, and manifolds; identification of dedicated/common product systems, including description of line segregation and controls to assure capability for proper gauging, sampling, draining of water, filtration, circulation, and drying; and identification of any other process/system used in maintaining product integrity during storage and handling;
(vi) LOADING AND SHIPPING – GENERAL. Procedures for product movement and related quality/quantity checks from shipping tank(s) to custody transfer point (CTP). Description of transfer system from shipping tank to CTP. A dedicated system, including lines, pumps, loading arms, and hoses, is preferred, but an isolated common system incorporating blind flanges, spectacle plates, or double valves between systems is acceptable. An isolated common system using single valves designed to ensure positive isolation, such as twin seal single valves, are also acceptable. Systems with single valve (other than twin seal) isolation require specific procedures be included in the QCP to ensure product integrity prior to the CTP. When single valves (other than twin seal) are present in the system, the Contractor shall provide their quality control procedures, from the first single valve to the CTP, at time of bid to the Contracting Officer for a determination of acceptability. Procedures for conditioning and testing of isolated systems that last carried a product other than that intended for movement under this contract. For in-line blending of non-aviation products, where approved in this contract, requirements must comply with the IN-LINE BLENDING OF NONAVIATION PETROLEUM PRODUCTS contract provision;
(vii) LOADING AND SHIPPING – TANK CARS, TANK TRUCKS, AND INTERMODAL CONTAINERS. For direct deliveries using Contractor-supplied tank cars and tank trucks in dedicated same grade aviation fuel service, refer to the section of API 1595 entitled “Loading of Road/Rail Cars” for loading and shipping procedures. All other tank car, tank truck, and intermodal container loadings shall be in accordance with the following procedures: Confirm all compartments have been prepared in accordance with Table IV, Conversion Chart for Tank Cars, Tank Trucks, and Intermodal Containers, below. Whenever possible, ensure the same preparation procedures used for compartments are applied to hoses, manifolds, etc. Ensure that conveyances carrying lubricating oil are dry and free from loose rust, scale, and dirt. Provide for investigation of discrepancies in either recorded quality or quantity. When required by the contract, seal conveyance and record seal numbers on the shipping document. Strainers and filters shall be located as near the loading or filling point as practicable and shall be used as outlined below for all deliveries except deliveries into tanker, barge, or pipeline.
(A) All aviation fuel shall be passed through strainers of 60 mesh or finer screen;
(B) All lubricating oil products, including preservatives, having a kinematic viscosity of 20.0 centistokes or less at 100 degrees Fahrenheit shall be passed through a 100 mesh or finer screen;
(C) All lubricating oil products, including preservatives, having a kinematic viscosity greater than 20.0 centistokes at 100 degrees Fahrenheit, but less than 22.0 centistokes at 210 degrees Fahrenheit, shall be passed through a 60 mesh or finer screen; and
(D) The Contractor shall furnish and periodically inspect strainers and filters pursuant to this paragraph to determine condition and perform maintenance as necessary, keeping a written record thereof.
(viii) LOADING AND SHIPPING – TANKERS AND BARGES.
(A) For f.o.b. destination Contractor-supplied tankers/barges. Procedures for the preparation of vessel cargo systems, in accordance with Energy Institute (EI) HM 50, Guidelines for the Cleaning of Tanks and Lines for Marine Tank Vessels Carrying Petroleum and Refined Products, that ensure the vessel is suitable to load the intended product(s).Particular attention should be given to vessels that previously carried a Fatty Acid Methyl Ester (FAME) cargo. As a minimum, f.o.b. destination Contractors must ensure that all cargo systems on the vessel intended for loading product under this contract, to include tanks, lines, manifolds, and pumps, are washed, gas freed, and inspected. In the event a solvent de-greaser is utilized in the tank preparation process, a minimum of two rinses must be performed by the vessel prior to loading Aviation Turbine Fuel. Vessels that will be carrying JP8 will be allowed to load without cleaning based upon the following criteria: the last cargo prior to loading JP-8 is Jet A/A1, and the second and third to last cargoes were clean middle distillate or lighter petroleum products (no black oils, lubricating oils, vegetable oils, palm oils, biodiesel with FAME content greater than or equal to 15 % or other similar products). The vessel will drop all lines and strip dry all cargo tanks of the previously carried Jet A/Jet A1 prior to loading JP-8. These procedures, and others deemed necessary by the Contractor, shall be included to ensure that the product meets the specification requirements at the CTP.
(B) For f.o.b. origin Government-supplied tankers/barges. Procedures for maintaining a time log of all significant events/delays including vessel notice of readiness, vessel arrival, mooring, vessel deballasting, inerting and conditioning of cargo tanks, inspections, hose connections and disconnections, starts, stops, vessel release, or any other event that affects laytime of the vessel. Procedures for assuring condition of loading line (full of tested product, all air bled, and pressure packed) and gauging shore tanks, both before and after loading. In the event an automated metering system is to be used as the means of shore quantity determination, manual gauges of all storage tanks designated for shipment shall be taken prior to commencement of loading. Procedures for preload discussion between Contractor, vessel, and QAR to include, but not be limited to, prior two cargoes, cleaning procedures, loading plan, loading rates, sampling requirements, and after loading sampling and gauging. [Prior to loading - gauge, sample, and test intransit cargoes designated for load on top. Gauge and sample (1 gallon) any other product on board, except for JPTS, and retain those samples.] All cargo quantities shall be calculated and volume corrected both before and after loading. Procedures for commencement of loading into one tank (up to 3 feet), then switching to at most two other vessel tanks while first-in sampling and testing is being accomplished (Table I). Procedures for the transportation of samples from the vessel to the testing facility. Monitoring the loading (including line blending and additive injection) from source to vessel, investigating irregularities immediately and stopping loading, if necessary. Procedures for investigating discrepancies in quality (mandated if off-specification or out of testing tolerance) and quantity (mandated if shore to ship variance is in excess of the following: 0.2% (0.002) for cargos not requiring cleaning, gas freeing, or drop/strip; 0.3% (0.003) for cargos requiring drop/strip; or 0.5% (0.005) for cargos requiring cleaning and gas freeing, or figures are suspect) on loaded conveyance.
(C) For both f.o.b. origin and destination tankers/barges. Procedures for immediately notifying the QAR when irregularities occur or are suspected, and on all occasions when loading is interrupted. Authority to release a Government-furnished vessel rests with the Government QAR after compliance and completion by the Contractor of all required operations, including the preparation of the DD Form 250-1.
(ix) RECORDS AND REPORTS. Procedures for completing and distributing required documentation both prior to and after the release of the vessel. Documentation shall include, as a minimum, test reports for all products and additives, additive blending and/or injection records, vessel notice of readiness, customs documents, bills of lading, vessel ullage reports, and the DD Form 250/DD Form 250-1 and continuation sheet(s) (or the Paperless Ordering and Receipt Transaction System [PORTS] or equivalent). Other documentation may be required on an as needed basis, such as vessel port logs, calibration records, and results of quality or quantity discrepancy investigations. These records and reports will include by whom, where, and how they were prepared, as well as retention information. The DD Form 250-1 and DD Form 250-1 continuation sheet(s) will be signed by the Contractor and the vessel representative in the appropriate blocks before presenting them to the QAR for signature. The DD Form 250 and DD Form 250-1 shall identify the type, brand name, and amount of all additive(s).
(x) CORRECTIVE ACTION. Actions to be followed to effect correction of any deficiency affecting product quality or quantity, such as handling of off-specification product (waivers, conveyance rejections, etc.). The corrective action procedures shall include notification of the QAR.
(4) The QCP shall identify one individual to serve as a point of contact for quality/quantity matters relating to the inspection system description in the plan.
(5) The Contractor is responsible for all inspection systems, QCPs, and product quality and quantity.
(c) The Contractor shall perform all inspections and acceptance tests required by the specifications of the supplies to be furnished under this contract or, shall have such tests performed, in a laboratory acceptable to the Government. For f.o.b. destination Contractor-supplied tankers/barges, the Contractor shall provide the QAR, prior to the first shipment, with the name and location of the laboratory to be used for testing at each discharge point. The Contractor shall also notify the QAR of any subsequent laboratory changes prior to the affected shipments. If any laboratory is determined to be unacceptable to the Government, the Contractor must designate another laboratory that is acceptable, before acceptance testing can take place. Acceptance tests will normally be performed at the acceptance point. However, when such tests are performed at origin on supplies to be accepted at destination, documentation that will enable verification of the original test results shall be provided to the Government prior to acceptance at destination. Regardless of the method of delivery, products furnished under this contract must meet all specification requirements at the CTP.
(d) Prior to loading, the Contractor shall inspect all shipping conveyances for suitability to load the supplies furnished under this contract, except for Government-furnished tankers and barges Authorization for the Contractor to participate in the inspection of Government-supplied tankers and barges rests with QAR. The QAR has the right to inspect any Government-supplied conveyance prior to loading and, in the event the Contractor and the QAR disagree on the suitability to load such a conveyance, the determination of the QAR shall govern. If the SHIPMENT AND ROUTING contract provision is included in the contract, Government-furnished transportation equipment that is unsatisfactory for loading shall be reported by the Contractor in accordance with the provisions contained in that contract provision. Procedures to determine suitability to load tank trucks and tank cars shall include, but not be limited to, visual inspection of interior compartments to assure cleanliness and dryness.
Manifolds and hoses must be drained and be clean and dry for the intended product. If the Contractor intends to witness operations at any point up to, and including, government acceptance, the Contractor is responsible for contacting the facilities to be visited and obtaining the required access.
(e) When requested by the U.S. Government, the Contractor shall furnish no more than five (ten in the case of jet fuel) 1-gallon samples of liquid product from any individual batch or lot of the supplies to be furnished under this contract. Such samples shall be furnished without charge to the Government and shall be packed, marked, and shipped by the Contractor, at their expense.
(f) The Contractor shall keep all quality and quantity records related to the performance of this contract complete and available to the Government during the performance of this contract and for three years after final payment under this contract. These records shall include, but not be limited to, DD Form 250-series documents, documentation of internal inspections of all conveyances, laboratory certificates for all required testing (including those for the shipping tanks for f.o.b. destination tankers/barges), and documentation of quantity determinations.
(g) When a common system is to be used for shipment in accordance with paragraph (a)(3)(vi) above, the Contractor shall provide a list of all products carried by that system during the past year to the Contracting Officer, at the time of offer, for a determination of acceptability.
(h) The inspection system and related operations provided or performed pursuant to this provision shall be subject to surveillance by the QAR.
(i) The contractor may provide transportation to/from/between contractor facilities and operations to the QAR or DLA Energy representative performing official duties relating to the administration of the contract and the contract price shall include the cost of any such transportation.
TABLE I
MINIMUM SAMPLING AND TESTING REQUIREMENTS (1) (9)
LOCATION
WHEN SAMPLED TYPE OF SAMPLE TYPE OF TEST
(SERIES OR INDIVIDUAL)
1. Refinery/Terminal (Each Shipping Tank)
Each Batch Prior to Start of Shipment
All Level or Multi-Level Composite
A (2)
2. All Modes (Shipping Line)
a. Dedicated Line
b. Common Line
Prior to Loading/Shipping
Spot
C
B
3. All Modes (except Tank Car/Tank Truck)/Intermodal Container)
(Custody Transfer Point)
Immediately After Start of Loading/Shipping
Spot C
4. a. Tanker/Barge or Pipeline (F.O.B.
Origin) (Custody Transfer Point)
b. Tanker/Barge (F.O.B Destination) (Custody Transfer Point)
During Loading or Pipeline Shipping
During Discharge
Representative Line Sample [See Paragraph E1(a)(3) (ii)]
Representative Line Sample [See Paragraph E1(a)(3) (ii)]
Retain Only
Retain Only – Discard After Shore Tests are On-Specification
5. Tanker/Barge/Pipeline (Custody Transfer Point)
Hourly During Loading/Shipping
Spot Visual (3) plus additive analysis for FSII & SDA, if line injected
6. Tanker/Barge (First-In)
After loading 3 feet or the line displacement quantity, whichever is greater
Spot C (4) - plus additive analysis for FSII & SDA, if line injected
7. Tanker/Barge (F.O.B. Origin only)
a. Each Compartment
b. Composite
After Loading
All-Level or Multi-Level Composite
Multi-Tank Volumetric Composite (6) of Each Product Loaded
Sample to be retained in case composite fails. If composite fails perform Workmanship & Density on each compartment sample.
For JP5, flash point must also be performed.
B (except gum for Aviation Turbine Fuel) (except carbon residue for Diesel/Kerosene) (plus FAME (7))
8. Tanker/Barge (F.O.B. Destination only)
a. Origin (vessel) Composite
b. Destination (vessel) Composite
c. Destination (vessel) Each Compartment
After loading
Prior to Discharge
Prior to discharge
Multi-Tank Volumetric Composite (6) of Each Product Loaded
Multi-Tank Volumetric Composite (6) of Each Product to be Discharged
All-level or Multi-level composite
A (plus FAME (7))
A
For retain in case composite fails.
If composite fails perform
(SEE NOTE 5 FOR ADDITIONAL
REQUIREMENTS)
Workmanship & Density on each compartment sample. For JP5 perform flash point also.
9. Tank Car/Tank Truck/Intermodal Container (Loading Rack)
After change of source tank.
Spot C plus additive analysis for FSII & SDA, if line injected
10. Tank Cars/Tank Truck/ Intermodal Container
After Loading/Filling All-Level or Low Point Drain/Bottom Line (10)
Workmanship (C - when loading lubes and FSII)
11. Drum After Filling Multi-drum Composite (8) C
NOTES FOR TABLE I:
(1) AT THE GOVERNMENT'S OPTION, FULL SPECIFICATION TESTING MAY BE REQUIRED AT THE CUSTODY
TRANSFER POINT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FURNISH THE GOVERNMENT WITH
SATISFACTORY EVIDENCE OF SPECIFICATION COMPLIANCE.
(2) PRIOR TO PERFORMING A-LEVEL TESTING, THE HOMOGENEITY OF EACH BATCH SHALL BE DETERMINED.
AT A MINIMUM, UPPER, MIDDLE, AND LOWER SAMPLES SHALL BE TESTED FOR DENSITY/API GRAVITY AND COMPARED TO THE SPECIFICATION REQUIREMENT FOR HOMOGENEITY. IF NO SPECIFICATION REQUIREMENT EXISTS, HOMOGENEITY SHALL BE DEFINED AS WHEN THE TEST RESULTS FOR THE UPPER, MIDDLE, AND LOWER SAMPLES ALL FALL WITHIN THE REPEATABILITY LIMIT(S) OF THE TEST METHOD USED TO DETERMINE DENSITY/API GRAVITY. IN ANY CASE, WHEN DEEMED NECESSARY BY THE GOVERNMENT, TESTS IN ADDITION TO DENSITY/API GRAVITYMAY BE
REQUIRED TO CONFIRM BATCH HOMOGENEITY.
(3) CONTINUOUS IN-LINE ANALYZERS (I.E., DENSITY AND/OR FLASH POINT) ARE ACCEPTABLE, IN LIEU OF
HOURLY EVALUATIONS, IF QUALITY IS ASSURED. WHEN CONTINUOUS IN-LINE ANALYZERS ARE PRESENT IN THE SYSTEM, THE CONTRACTOR SHALL PROVIDE ITS QUALITY CONTROL PROCEDURES AT TIME OF
OFFER TO THE CONTRACTING OFFICER FOR DETERMINATION OF ACCEPTABILITY.
(4) TESTING FOR PARTICULATE CONTAMINATION SHALL BE REQUIRED BY THE GOVERNMENT IF VISUAL
EXAMINATION OF THE SAMPLE FAILS WORKMANSHIP FOR SEDIMENT/SUSPENDED MATTER.
(5) FOR FOB DESTINATION SHIPMENTS DESTINED FOR MULTIPLE LOCATIONS IN CLOSE PROXIMITY TO ONE
ANOTHER (WITHIN 24 HOURS SAILING TIME BETWEEN LOCATIONS) THE A-TYPE TESTING REQUIRED PRIOR TO DISCHARGE SHALL ONLY BE REQUIRED AT THE INITIAL DISCHARGE POINT, WITH ONLY C-TYPE TESTING REQUIRED PRIOR TO DISCHARGE AT SUBSEQUENT DISCHARGE POINTS. HOWEVER, IF CARGO INTEGIRTY CHANGES BETWEEN DISCHARGE POINTS, SUCH AS THROUGH CARGO TRANSFERS, CONTAMINATION, ETC., THEN A-TYPE TESTING SHALL BE REQUIRED AT THE NEXT DISCHARGE POINT. A COPY OF THE FULL SPECIFICATION TEST REPORT FOR THE VESSEL, AFTER LOADING, SHALL BE PROVIDED TO THE RECEIVING ACTIVITY AT EACH DISCHARGE POINT, PRIOR TO DISCHARGE.
(6) COMPRISED OF ALL-LEVEL OR MULTI-LEVEL COMPOSITES FROM EACH COMPARTMENT.
(7) CONTRACTORS DELIVERING INTO THE GPSS,CEPS, NIPS, AND DFSP ATHENS (MOH) SHALL PERFORM FAME CONTENT TESTING IN ACCORDANCE WITH TEST METHOD IP 585 OR IP 590, AND REPORT THE RESULTS TO THE
DESTINATION CONSIGNEE PRIOR TO VESSEL ARRIVAL.
(8) A ONE LITER COMPOSITE SAMPLE OF EACH LOT OF PRODUCT SHALL BE TAKEN FROM A PREDETERMINED NUMBER OF RANDOMLY SELECTED DRUMS. THE TOTAL NUMBER OF DRUMS SAMPLED PER LOT SHALL, AT A MINIMUM, BE THAT CITED IN TABLE III OF API MPMS CHAPTER 8.1 (ASTM D 4057), BUT MAY BE INCREASED AT THE GOVERNMENT’S
OPTION.
(9) THE SIZE OF ALL THE SAMPLES REQUIRED IN THIS TABLE, EXCEPT FOR THOSE DESIGNATED “RETAIN ONLY”, SHALL BE DETERMINED BY THE CONTRACTOR AND SHALL BE OF SUFFICIENT QUANTITY TO PERFORM ALL THE TESTS REQUIRED BY THIS TABLE. THE SIZE REQUIREMENTS FOR RETAIN SAMPLES CAN BE FOUND IN TABLE II, SAMPLE
RETENTION.
(10) THE LOW POINT DRAIN/ BOTTOM LINE OPTION ONLY APPLIES TO TANK CAR AND TANK TRUCK SHIPMENTS
OF FUEL – SHIPMENTS OF LUBRICATING OILS AND ADDITIVES MUST UTILIZE ALL-LEVEL SAMPLING PROCEDURES. IF INITIAL FUEL SAMPLES USING THE LOW POINT DRAIN/BOTTOM LINE OPTION ARE NOT CLEAR AND BRIGHT, ADDITIONAL
SAMPLES SHALL BE TAKEN UNTIL A CLEAR AND BRIGHT SAMPLE IS OBTAINED.
TABLE II
SAMPLE RETENTION (1)
LOCATION
MINIMUM QUANTITY RETENTION PERIOD(1)
1. Bulk Tank Cars/Tank Trucks/Intermodal Containers
Additives
Fuels and Lubricating Oils
2 Liters (2)
1 Liter (2)
Until Receipt and Quality Verification of Each Lot/Batch
15 Days – 45 Days for Lubricating Oils
2. Drums
Avgas
1 Liter – multi-drum composite (3)
45 Days
3. Shipping Tank(s) 20 Liters - for Aviation Turbine Fuels
10 Liters - for all other Fuels, Lubricating
Oils, and Additives
45 Days
4. Tanker/Barge/Pipeline (Composite Line at Custody Transfer Point)
20 Liters - for Aviation Turbine Fuels
10 Liters - for all other Fuels
5. Tanker/Barge (Composite)
F.O.B. Origin
F.O.B. Destination
20 Liters - for Aviation Turbine Fuels
10 Liters - for all other Fuels
20 Liters
Until Shore Tests On-Specification
6. Tanker/Barge (Each Compartment)
F.O.B. Origin
F.O.B. Destination
0.5 Liter
1 Liter
45 days
Until Shore Tests On-Specification
NOTES FOR TABLE II:
(1) UNLESS OTHERWISE NOTED, THE RETENTION PERIOD SHALL BE FOR THE STATED NUMBER OF DAYS AFTER
THE SAMPLE HAS BEEN TAKEN FROM THE LOCATION INDICATED.
(2) IF THE CONVEYANCE IS COMPARTMENTALIZED, A PROPORTIONAL SAMPLE SHALL BE TAKEN FROM EACH
COMPARTMENT SUCH THAT A TOTAL OF ONE LITER IS COLLECTED FROM THE CONVEYANCE.
(3) A ONE LITER COMPOSITE SAMPLE OF EACH LOT OF PRODUCT SHALL BE TAKEN FROM A PREDETERMINED NUMBER OF RANDOMLY SELECTED DRUMS IN ACCORDANCE WITH TABLE III OF API MPMS CHAPTER 8.1 (ASTM D 4057).
TABLE III
DEFINITIONS OF TEST SERIES
I. TYPE A: Includes all specification quality conformance tests plus any additional contractual requirements.
II. TYPE B & C: As shown in the table below for each product. Properties and test methods will be in accordance with the product specification for each grade identified in the solicitation/contract.
AVGAS TURBINE
FUEL
MOGAS DIESEL/
KEROSENE
BURNER
FUEL
LUBE OIL FSII
TEST PROPERTIES B C B C B C B C B C B C C
Workmanship * * * * * * * * * * * Particulate content * * * (1) * Filtration Time * Color * * * * * * * * * * Density or API Gravity or Specific Gravity
* * * * * * * * * (2) * (2) *
Distillation * * * * Corrosion, Copper Strip * * Existent Gum * * Carbon Residue * * Lean or Rich Ratings * Reid Vapor Pressure * * (3) * Water Reaction * * Lead Content * Freeze Point * Flash Point * * * * * * * * FSII Content * Microseparometer * Conductivity * Sediment & Water * * Viscosity * * * Water Content * * * * Water Tolerance * Foam Test * *
* THE PROCEDURE TO BE USED FOR CONDUCTING THESE TESTS WILL BE AS STATED IN THE APPROPRIATE
PRODUCT SPECIFICATION AND/OR CONTRACT.
NOTES FOR TABLE III:
(1) F76 ONLY.
(2) GRADES 1, 2, AND 4 (L) ONLY.
(3) JP4 ONLY.
TABLE IV
CONVERSION CHART FOR TANK CARS, TANK TRUCKS, AND INTERMODAL CONTAINERS (1)
PRODUCT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .