16 Apr 2010 - Amendment 0001 - Hill AFB.pdf
PDF 18 KB Posted
- Attached to
- Hill AFB, UT Electric Federal contract opportunity
- Solicitation number
- SP0600-10-R-0802
- Issued by
- Defense Logistics Agency Energy
About this file
Solicitation SP0600-10-C-0802 Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 20140314_SF30_Amd_00010.pdf | ||
| 20140203-SP060010R0802_Amend_0009.pdf | ||
| 20130617_SF30_Amd_0008.pdf | ||
| 20130604_SF30_Amd_0007.pdf | ||
| SP0600-10-R-0802_Amendment_0006.pdf | ||
| 2012_12_03_Amendment_0005_-_SF_30.pdf | ||
| 2012_10 _15_Amendment_0004_-_SF_30.pdf | ||
| JR3 Tech Eval Categories.pdf | ||
| JA44 Wage Determination.pdf | ||
| JE1 Subcontracting Plan.pdf | ||
| SP0600-10-R-0802 Amendment 0003 08032012.pdf | ||
| 2012 02 23 Amendment 0002 - SF 30.pdf | ||
| Hill-JA44 Wage Determination Amd 0002.pdf | ||
| JR2 Legislative Authority.pdf | ||
| JA44 Wage Determination.pdf | ||
| JR3 Tech Evaluation Categories.pdf | ||
| JA43 No Current Specialty Training Requirements.pdf | ||
| JA39 Past Performance.pdf | ||
| JA38 Federal Equivalents.pdf | ||
| JE1 Subcontracting Plan.pdf | ||
| Mar24 - RFP | — | |
| JR1 Bill of Sale.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
K
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
16 April 2010
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE
DEFENSE ENERGY SUPPORT CENTER
SP0600 7. ADMINISTERED BY (If other than Item 6)
CODE
8725 JOHN J. KINGMAN ROAD, SUITE 3830
FT. BELVOIR, VA 22060-6222 FAX (703) 767-2382
BUYER/SYMBOL: Temica Scroggins/DESC-EA
PHONE (703) 767-9554 P.P. 8.2
8. NAME AND ADDRESS OF CONTRACTOR (NO., street,city,county,State,and ZIP Code)
X
9a. AMENDMENT OF SOLICITATION NO.
SP0600-10-R-0802
9b. DATED (SEE ITEM 11)
24 MARCH 2010
10a. MODIFICATION OF ONTRACT/ORDER NO.
10b. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ X ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended [ X ] is not extended .
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning __1__ copies of the amendment;(b) By acknowledging receipt of this amendment on each copy of the offer submitted; or(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A. I2.05 CHANGES-FIXED PRICE (AUG 87)
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: FAR 43.01 OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [ ] is not, [ x ] is required to sign this document and return ____1__ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See following pages.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME OF CONTRACTING OFFICER
15B. NAME OF CONTRACTOR/OFFEROR
BY
(Signature of person authorized to sign)
15C.DATE
SIGNED
16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C.DATE SIGNED
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation SP0600-10-R-0802 Amendment 0001
Pg 2 of 2
BASIS FOR AMENDMENT: This solicitation amendment incorporates the following changes:
a. F.3 Clauses Incorporated by Reference is changed to correct referenced prescription as follows:
Change From: 52.242-17 Government Delay of Work Apr 1984 IAW 42.1305(d)
Change To: 52.242-17 Government Delay of Work Apr 1984
IAW 42.1305(c)
b. Section B.6.11 is changed to correct reference in header as follows:
Change From: B.6.1.1 Economic Price Adjustment – Price Index Utility Privatization
(DESC B.19.40 OCT 2003)
Change To: B.6.1.1 Economic Price Adjustment – Price Index Utility Privatization (DESC INT B19.40 Oct 2003)
c. Section I.6.4 is changed as follows:
Change From: I.6.4 Federal, State, and Local Taxes (DESC Aug 2003 (Deviation)
Change To: I.6.4 Federal, State, and Local Taxes (DESC INT I28.01 Aug 2003)
(Deviation)
d. Solicitation Provision M.2.1 Order of Importance for Evaluating Factors and Subfactors is hereby deleted and replaced in its entirety with the following:
Before a best-value decision can be made, Offerors must comply with the basic economic test of 10 USC § 2688. If more than one proposal meets the basic economic test, such proposals will then be evaluated using the following factors and sub-factors:
Technical Capability, Past Performance, and Risk are of equal importance.
Socioeconomic Plan is somewhat less important than Technical Capability, Past Performance and Risk. When combined, Technical Capability, Past Performance, Risk, and Socioeconomic Plan are significantly more important than Price. Technical Capability and Risk will be evaluated at the sub-factor level. Under Technical Capability, all sub-factors are of equal importance; however a less than acceptable rating for any sub-factor will result in a less than acceptable rating for the overall Technical Capability factor. Under Risk, all sub-factors are of equal importance;
however, a negative rating in any sub-factor may result in a negative rating for the overall Risk factor.
e. All other terms and conditions shall remain unchanged and in full force and effect.
File details come from the government source that posted it. Updated .