Attachment IV - Schedule Pages WEST REGION.pdf
PDF 931 KB Posted
- Attached to
- Direct Supply Natural Gas Federal contract opportunity
- Solicitation number
- SP0600-10-R-0402
- Issued by
- Defense Logistics Agency Energy
About this file
Attachment IV - Schedule Pages - West Region (WA MT OR ID CA NV UT)
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Schedule Page
SP0600-10-R-0402
By Line Item Detail
Hill AFB: Line Item 4001-0101
Installation Address
State Zip 84056-5223
UT
Hill AFBCity
Address 5713 Lahm Lane Bldg 5935
Hill AFB
Utility Account Information Questar CorporationLDC or Pipeline:
Total Contract Volumes (Dths)
Total Winter Volumes (Dths)
Total Summer Volumes (Dths) 550,000 1,598,000 2,148,000
Alternate Fuel Type Percent Load Limits on Use
Assigned ToPipeline Capacity UOMVolumeCap Tolerence Period
PeriodUOM% AmountStorage TolerenceAssigned ToStorage
UOM Period% AmountBank TolerenceAssigned ToBalancing Type
Stand Alone
UOMMDQ TelemeteredRate ClassDelivery Point
TSCity Gate Yes9,174
No
No No
No No
Yes YesDTH
Supplier
None
%30#2 OilFirm
Meter Type
3 of 10 distributed steam boiler facilities have DF#2 back-up capabilities. These facilities operated 24/7 only during the winter months.
Notes:
Estimated Usage Information (All volumes expressed in Dths)
Burner TipLocation
Year One Summer Volumes: Winter Volumes: Year One Volumes:275,000 799,000 1,074,000
187,000 175,000 147,000 98,000 49,000 12,000 17,000 8,000 11,000 80,000 116,000 174,000
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Year Two YearTwo Volumes:Winter Volumes:Summer Volumes: 275,000 799,000 1,074,000
187,000 175,000 147,000 98,000 49,000 12,000 17,000 8,000 11,000 80,000 116,000 174,000
JAN FEB DECNOVOCTSEPAUGJULJUNMAYAPRMAR
Curtailment Days Total Curtailment Days: 0
000000000000
Notes:
JAN FEB DECNOVOCTSEPAUGJULJUNMAYAPRMAR
Attachment IV - Schedule Pages, West Region Page 1 of 118
By Line Item Detail
Hill AFB: Line Item 4001-0101
Solicitation Parameters
10/1/10 9/30/12 Inside FERC Questar Rky Mtn (3) Monthly Order Quantities. Firm
Starting Flow Date
Ending Flow Date
SIP Publication SIP Location Delivery Option Delivery Type
Adjustment Factor: Summer: Winter:
Overage & Shortage Volume Pricing
Gas Daily Price Guide Questar Rky Mtn Simple Average 16-EOM Yes
Gas Daily Price Guide Questar Rky Mtn Simple Average 16-EOM Yes
Gas Daily Price Guide Questar Rky Mtn Simple Average 16-EOM Yes
Gas Daily Price Guide Questar Rky Mtn Simple Average 16-EOM Yes
Shortage Treatment
Overage Treatment Summer Volumes:
Summer Volumes:
Winter Volumes:
Winter Volumes:
Publication Location Methodology Include Adj Factor
NoYesTied to Other Line Items Aggregated with Other Line Items
4001-0101: 4001-0102: 4002-0100
NOTE #1: Hill AFB (and Tooele Army Depot) are served by Questar Gas and the contractor is required to perform in accordance with the Questar Gas Company Tariff, Section 503, Gas Purchase Arrangements during Periods of Interruption. This tariff clause states as a condition of interruptible service on Questar Gas, the contractor, on behalf of the DESC customers, must offer to sell gas supplies to Questar for its use during periods of interruption during stated conditions. Hill AFB does not hold capacity on Questar Pipeline.
NOTE #2: 3 of 10 distributed steam boiler facilities have DF#2 back-up capabilities. These facilities operated 24/7 only during the winter months.
NOTE #3:
NOTE #4:
Attachment IV - Schedule Pages, West Region Page 2 of 118
By Line Item Detail
Hill AFB: Line Item 4001-0102
Installation Address
State Zip 84056-5223
UT
Hill AFBCity
Address 5713 Lahm Lane Bldg 5935
Hill AFB
Utility Account Information Questar CorporationLDC or Pipeline:
Total Contract Volumes (Dths)
Total Winter Volumes (Dths)
Total Summer Volumes (Dths) 30,000 220,000 250,000
Alternate Fuel Type Percent Load Limits on Use
Assigned ToPipeline Capacity UOMVolumeCap Tolerence Period
PeriodUOM% AmountStorage TolerenceAssigned ToStorage
UOM Period% AmountBank TolerenceAssigned ToBalancing Type
Stand Alone
UOMMDQ TelemeteredRate ClassDelivery Point
TSCity Gate Yes9,174
No
No No
No No
Yes YesDTH
Supplier
None
%30#2 OilInterruptible
Meter Type
3 of 10 distributed steam boiler facilities have DF#2 back-up capabilities. These facilities operated 24/7 only during the winter months.
Notes:
Estimated Usage Information (All volumes expressed in Dths)
Burner TipLocation
Year One Summer Volumes: Winter Volumes: Year One Volumes:15,000 110,000 125,000
46,000 11,000 5,000 0 0 0 0 0 9,000 6,000 16,000 32,000
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Year Two YearTwo Volumes:Winter Volumes:Summer Volumes: 15,000 110,000 125,000
46,000 11,000 5,000 0 0 0 0 0 9,000 6,000 16,000 32,000
JAN FEB DECNOVOCTSEPAUGJULJUNMAYAPRMAR
Curtailment Days Total Curtailment Days: 194
66663131303130566
Notes:
Attachment IV - Schedule Pages, West Region Page 3 of 118
By Line Item Detail
Hill AFB: Line Item 4001-0102
Solicitation Parameters
10/1/10 9/30/12 Inside FERC Questar Rky Mtn (3) Monthly Order Quantities. Limited Interruptible
Starting Flow Date
Ending Flow Date
SIP Publication SIP Location Delivery Option Delivery Type
Adjustment Factor: Summer: Winter:
Overage & Shortage Volume Pricing
Gas Daily Price Guide Questar Rky Mtn Simple Average 16-EOM Yes
Gas Daily Price Guide Questar Rky Mtn Simple Average 16-EOM Yes
Gas Daily Price Guide Questar Rky Mtn Simple Average 16-EOM Yes
Gas Daily Price Guide Questar Rky Mtn Simple Average 16-EOM Yes
Shortage Treatment
Overage Treatment Summer Volumes:
Summer Volumes:
Winter Volumes:
Winter Volumes:
Publication Location Methodology Include Adj Factor
NoYesTied to Other Line Items Aggregated with Other Line Items
4001-0101: 4001-0102: 4002-0100
NOTE #1: Hill AFB (and Tooele Army Depot) are served by Questar Gas and the contractor is required to perform in accordance with the Questar Gas Company Tariff, Section 503, Gas Purchase Arrangements during Periods of Interruption. This tariff clause states as a condition of interruptible service on Questar Gas, the contractor, on behalf of the DESC customers, must offer to sell gas supplies to Questar for its use during periods of interruption during stated conditions. Hill AFB does not hold capacity on Questar Pipeline.
NOTE #2: 3 of 10 distributed steam boiler facilities have DF#2 back-up capabilities. These facilities operated 24/7 only during the winter months.
NOTE #3:
Attachment IV - Schedule Pages, West Region Page 4 of 118
By Line Item Detail
Tooele Army Depot: Line Item 4002-0100
Installation Address
State Zip 84074-5003
UT
Tooele Army DepotCity
Address SJMTE-BON, Building 501
Tooele Army Depot
Utility Account Information Questar CorporationLDC or Pipeline:
Total Contract Volumes (Dths)
Total Winter Volumes (Dths)
Total Summer Volumes (Dths) 339,000 387,000 726,000
Alternate Fuel Type Percent Load Limits on Use
Assigned ToPipeline Capacity UOMVolumeCap Tolerence Period
PeriodUOM% AmountStorage TolerenceAssigned ToStorage
UOM Period% AmountBank TolerenceAssigned ToBalancing Type
Stand Alone
UOMMDQ TelemeteredRate ClassDelivery Point
TSCity Gate Yes1,700
No
No No
No No
No NoDTH
Supplier
None
Firm
Meter Type
Notes:
Estimated Usage Information (All volumes expressed in Dths)
Burner TipLocation
Year One Summer Volumes: Winter Volumes: Year One Volumes:179,000 205,000 384,000
47,000 45,000 41,000 36,000 25,000 25,000 21,000 21,000 21,000 30,000 32,000 40,000
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Year Two YearTwo Volumes:Winter Volumes:Summer Volumes: 160,000 182,000 342,000
40,000 40,000 35,000 30,000 20,000 20,000 20,000 20,000 20,000 30,000 32,000 35,000
JAN FEB DECNOVOCTSEPAUGJULJUNMAYAPRMAR
Curtailment Days Total Curtailment Days: 0
000000000000
Notes:
Attachment IV - Schedule Pages, West Region Page 5 of 118
By Line Item Detail
Tooele Army Depot: Line Item 4002-0100
Solicitation Parameters
10/1/10 9/30/12 Inside FERC Questar Rky Mtn (3) Monthly Order Quantities. Firm
Starting Flow Date
Ending Flow Date
SIP Publication SIP Location Delivery Option Delivery Type
Adjustment Factor: Summer: Winter:
Overage & Shortage Volume Pricing
Gas Daily Price Guide Questar Rky Mtn Simple Average 16-EOM Yes
Gas Daily Price Guide Questar Rky Mtn Simple Average 16-EOM Yes
Gas Daily Price Guide Questar Rky Mtn Simple Average 16-EOM Yes
Gas Daily Price Guide Questar Rky Mtn Simple Average 16-EOM Yes
Shortage Treatment
Overage Treatment Summer Volumes:
Summer Volumes:
Winter Volumes:
Winter Volumes:
Publication Location Methodology Include Adj Factor
NoYesTied to Other Line Items Aggregated with Other Line Items
4001-0101: 4001-0102: 4002-0100
NOTE #1: Activity on premise is planning to complete production work in 2011 or early 2012. They will continue running furnaces for clean-up through the end of 2012. A decrease in consumption is reflected in Year 2 of the line item gas requirements.
NOTE #2:
NOTE #3:
Attachment IV - Schedule Pages, West Region Page 6 of 118
By Line Item Detail
Nellis AFB: Line Item 4003-0100
Installation Address
State Zip 89191-7260
NV
Nellis AFBCity
Address 99 CES/CEOEF 6020 Beale Avenue # 119
Nellis AFB
Utility Account Information Southwest Gas Corp.LDC or Pipeline:
Total Contract Volumes (Dths)
Total Winter Volumes (Dths)
Total Summer Volumes (Dths) 104,630 233,706 338,336
Alternate Fuel Type Percent Load Limits on Use
Assigned ToPipeline Capacity UOMVolumeCap Tolerence Period
PeriodUOM% AmountStorage TolerenceAssigned ToStorage
UOM Period% AmountBank TolerenceAssigned ToBalancing Type
Stand Alone
UOMMDQ TelemeteredRate ClassDelivery Point
SG5L & SG5TECity Gate Yes1,538
No
No No
No No
Yes NoDTH
DTHSupplier Per Day
None
%0#2 OilFirm
Meter Type
Diesel
Notes:
Estimated Usage Information (All volumes expressed in Dths)
City GateLocation
Year One Summer Volumes: Winter Volumes: Year One Volumes:52,315 116,853 169,168
31,816 25,140 14,216 9,359 7,845 6,490 6,261 6,407 6,690 9,263 14,169 31,512
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Year Two YearTwo Volumes:Winter Volumes:Summer Volumes: 52,315 116,853 169,168
31,816 25,140 14,216 9,359 7,845 6,490 6,261 6,407 6,690 9,263 14,169 31,512
JAN FEB DECNOVOCTSEPAUGJULJUNMAYAPRMAR
Curtailment Days Total Curtailment Days: 0
000000000000
Notes:
Attachment IV - Schedule Pages, West Region Page 7 of 118
By Line Item Detail
Nellis AFB: Line Item 4003-0100
Solicitation Parameters
10/1/10 9/30/12 Inside FERC El Paso SanJuan (3) Monthly Order Quantities. Firm
Starting Flow Date
Ending Flow Date
SIP Publication SIP Location Delivery Option Delivery Type
Adjustment Factor: Summer: Winter:
Overage & Shortage Volume Pricing
Gas Daily Price Guide El Paso SanJuan Simple Average 16-EOM Yes
Gas Daily Price Guide El Paso SanJuan Simple Average 16-EOM Yes
Gas Daily Price Guide El Paso SanJuan Simple Average 16-EOM Yes
Gas Daily Price Guide El Paso SanJuan Simple Average 16-EOM Yes
Shortage Treatment
Overage Treatment Summer Volumes:
Summer Volumes:
Winter Volumes:
Winter Volumes:
Publication Location Methodology Include Adj Factor
NoNoTied to Other Line Items Aggregated with Other Line Items
NOTE #1: Volumes could fluctuate due to mission growth.
NOTE #2: Manch Meter #08191167 and Nellis Terrance #00851717 are not included in our firm transportation service estimates.
NOTE #3: Nellis AFB total square footage is 5,884,048. Nellis AFB has preliminary plans to add 57,500 sq ft through September 30, 2011.
NOTE #4: Nellis AFB has telemetering, however the data signal provided by the utility shall be used for informational purposes only and shall not be used for process control of any kind. If meter readings are necessary to accomplish Supply Management, the Marketer will contact the LDC to receive meter readings. The Marketer must contact the LDC or installation directly for accurate or current readings.
Attachment IV - Schedule Pages, West Region Page 8 of 118
By Line Item Detail
Malmstrom AFB: Line Item 4004-0100
Installation Address
State Zip 59402-7536
MT
Malmstrom AFBCity
Address 341 CES/CEAO 39 78th St North
Malmstrom AFB
Utility Account Information Energy West MontanaLDC or Pipeline:
Total Contract Volumes (Dths)
Total Winter Volumes (Dths)
Total Summer Volumes (Dths) 230,640 337,700 568,340
Alternate Fuel Type Percent Load Limits on Use
Assigned ToPipeline Capacity UOMVolumeCap Tolerence Period
PeriodUOM% AmountStorage TolerenceAssigned ToStorage
UOM Period% AmountBank TolerenceAssigned ToBalancing Type
Group Balancing
UOMMDQ TelemeteredRate ClassDelivery Point
MAFBCity Gate Yes
No
No No
No No
No No
Supplier
None
Firm
Meter Type
Notes:
Estimated Usage Information (All volumes expressed in Dths)
Burner TipLocation
Year One Summer Volumes: Winter Volumes: Year One Volumes:115,320 168,850 284,170
37,975 23,100 20,925 20,250 29,450 6,750 4,650 3,720 10,200 40,300 45,000 41,850
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Year Two YearTwo Volumes:Winter Volumes:Summer Volumes: 115,320 168,850 284,170
37,975 23,100 20,925 20,250 29,450 6,750 4,650 3,720 10,200 40,300 45,000 41,850
JAN FEB DECNOVOCTSEPAUGJULJUNMAYAPRMAR
Curtailment Days Total Curtailment Days: 0
000000000000
Notes:
Attachment IV - Schedule Pages, West Region Page 9 of 118
By Line Item Detail
Malmstrom AFB: Line Item 4004-0100
Solicitation Parameters
10/1/10 9/30/12 Inside FERC CIG Rocky Mtns (2) Full Requirements/Pool. Firm
Starting Flow Date
Ending Flow Date
SIP Publication SIP Location Delivery Option Delivery Type
Adjustment Factor: Summer: Winter:
Overage & Shortage Volume Pricing
No
No
No
No
Shortage Treatment
Overage Treatment Summer Volumes:
Summer Volumes:
Winter Volumes:
Winter Volumes:
Publication Location Methodology Include Adj Factor
NoNoTied to Other Line Items Aggregated with Other Line Items
NOTE #1: Direct supply natural gas is to be delivered FOB Carway Interconnect or any other acceptable receipt point on Northwestern's system between NorthWestern Energy and Nova Pipeline, or FOB Blaine County 3 Lateral Interconnect between NorthWestern Energy and NC Harve Pipeline Company via firm or firm equivalent transportation.
NOTE #2: In accordance with Malmstrom AFB's transportation agreement with Energy West Montana, natural gas will be transported via Energy West Montana's firm capacity on NorthWestern Energy Pipeline.
NOTE #3:
Attachment IV - Schedule Pages, West Region Page 10 of 118
By Line Item Detail
DLA-DDJC San Joaquin - Sharpe Facility: Line Item 4008-0102
Installation Address
State Zip 95296-0235
CA
LathropCity
Address Sharpe Site, Roth Road & A Street
DLA-DDJC San Joaquin - Sharpe Facility
Utility Account Information Pacific Gas & ElectricLDC or Pipeline:
Total Contract Volumes (Dths)
Total Winter Volumes (Dths)
Total Summer Volumes (Dths) 6,453 37,172 43,625
Alternate Fuel Type Percent Load Limits on Use
Assigned ToPipeline Capacity UOMVolumeCap Tolerence Period
PeriodUOM% AmountStorage TolerenceAssigned ToStorage
UOM Period% AmountBank TolerenceAssigned ToBalancing Type
Aggregate Balancing
UOMMDQ TelemeteredRate ClassDelivery Point
GNTCity Gate Yes300
No
No No
No No
No NoDTH
Supplier
None
Firm
Meter Type
The total firm MDQ 16,064 Dth represents the total firm requirement, but it does not include shrinkage. It does not exclude the DESC owned transportation.
Notes:
Estimated Usage Information (All volumes expressed in Dths)
Burner TipLocation
Year One Summer Volumes: Winter Volumes: Year One Volumes:3,222 18,586 21,808
5,102 3,784 2,823 1,146 326 204 188 180 156 1,022 2,246 4,631
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Year Two YearTwo Volumes:Winter Volumes:Summer Volumes: 3,231 18,586 21,817
5,102 3,784 2,823 1,146 326 204 188 189 156 1,022 2,246 4,631
JAN FEB DECNOVOCTSEPAUGJULJUNMAYAPRMAR
Curtailment Days Total Curtailment Days: 0
000000000000
Notes:
Attachment IV - Schedule Pages, West Region Page 11 of 118
By Line Item Detail
DLA-DDJC San Joaquin - Sharpe Facility: Line Item 4008-0102
Solicitation Parameters
10/1/10 9/30/12 NGI PG&E CG (2) Full Requirements/Pool. Firm
Starting Flow Date
Ending Flow Date
SIP Publication SIP Location Delivery Option Delivery Type
Adjustment Factor: Summer: Winter:
Overage & Shortage Volume Pricing
No
No
No
No
Shortage Treatment
Overage Treatment Summer Volumes:
Summer Volumes:
Winter Volumes:
Winter Volumes:
Publication Location Methodology Include Adj Factor
YesYesTied to Other Line Items Aggregated with Other Line Items
4008-0102: 4008-0103: 4008-0104: 4008-0106: 4008-0109:
4008-0110: 4008-0111: 4008-0112: 4008-0113: 4008-0114:
4008-0115: 4008-0116: 4008-0117: 4008-0119: 4008-0121;
4008-0202: 4008-0203: 4008-0204: 4008-0206: 4008-0209:
4008-0210: 4008-0211: 4008-0212: 4008-0213: 4008-0214:
4008-0215: 4008-0216: 4008-0217: 4008-0219: 4008-0221:
4008-0302: 4008-0303: 4008-0304: 4008-0306: 4008-0309:
4008-0310: 4008-0311: 4008-0312: 4008-0313: 4008-0314:
4008-0315: 4008-0316: 4008-0317: 4008-0319: 4008-0321
4008-0102: 4008-0103: 4008-0104: 4008-0106: 4008-0109:
4008-0110: 4008-0111: 4008-0112: 4008-0113: 4008-0114:
4008-0115: 4008-0116: 4008-0117: 4008-0119: 4008-0121
NOTE #1: Line item 4008-1, 4008-2, and 4008-3 are tied together for purpose of evaluation and award. Offerors must offer on all line items to be considered for award.
NOTE #2: **Delivery of natural gas is to be FOB Citygate via El Paso Natural Gas Pipeline, Kern River Transmission Company, Mojava Pipeline Company, Pacific Gas Transmission, Transwestern Natural Gas Pipeline, and/or California In-State produced natural gas.
***The Contractor shall submit one nomination to the LDC which includes all facilities behind PG&E. The contractor shall issue one invoice monthly, based on usage, with details provided for each installation. ***Any LDC Fuel loss must be included in the offeror's adjustment factor. Fuel loss will not be separately reimbursed.
NOTE #3: **Line Item 4008-01xx (Contractor-Owned Transportation): The Contractor shall be responsible for obtaining any additional capacity and/or Citygate purchases necessary to fulfill contractual delivery requirements.
**Based upon rates filed by Pacific Gas & Electric (PG&E) and subsequently approved by the California Public Utilities Commission (CPUC) for Calendar Year 2010, DESC declined renewal of its Firm Transportation Contract with PG&E for annual capacity on Redwood Path from January 1, 2010 through December 31, 2010. Therefore, customer requirements shall be delivered and priced in accordance with Line Item 4008-01xx during the aforementioned delivery period. DESC reserves the right to renew or decline subsequent annual capacity contracts with PG&E.
NOTE #4: ** When Government capacity is owned, the monthly delivery requirement will consist of quantities from 4008-02xx (Government Owned Transportation) and may also require deliveries from 4008-01xx (Contractor Owned Transportation). The actual split of the 4008-02xx and 4008-01xx quantities is unknown prior to the delivery month; therefore, the total combined PG&E quantities are shown under each line item. Any and all Government-Owned Transportation on Redwood Path must be used before Contractor-Owned Capacity is used.
** Line Item 4008-03xx: In the event that PG&E issues a capacity constraint/curtailment on the PG&E backbone transmission system, whereby the transportation owned by DESC is cut, the Contractor will be required to deliver under its own transportation agreement on the PG&E backbone transmission system any of the installation's firm requirements that exceed the DESC owned transportation authorized flow allowance. In this situation, all quantities shipped via Contractor-Owned transportation will be paid according to the contract SIP location’s Gas Daily, Daily midpoint price published for the affected flow date(s), plus the contract Adjustment Factor.
Attachment IV - Schedule Pages, West Region Page 12 of 118
By Line Item Detail
Edwards AFB: Line Item 4008-0103
Installation Address
State Zip 93523-0000
CA
EdwardsCity
Address Civil Engineering Fitzgerald Blvd 1000 W of Lancaster Blvd
Edwards AFB
Utility Account Information Pacific Gas & ElectricLDC or Pipeline:
Total Contract Volumes (Dths)
Total Winter Volumes (Dths)
Total Summer Volumes (Dths) 152,378 431,934 584,312
Alternate Fuel Type Percent Load Limits on Use
Assigned ToPipeline Capacity UOMVolumeCap Tolerence Period
PeriodUOM% AmountStorage TolerenceAssigned ToStorage
UOM Period% AmountBank TolerenceAssigned ToBalancing Type
Aggregate Balancing
UOMMDQ TelemeteredRate ClassDelivery Point
GNTCity Gate Yes2,910
No
No No
No No
No NoDTH
DTHSupplier Per Day
None
Firm
Meter Type
The total firm MDQ 16,064 Dth represents the total firm requirement, but it does not include shrinkage. It does not exclude the DESC owned transportation.
Notes:
Estimated Usage Information (All volumes expressed in Dths)
Burner TipLocation
Year One Summer Volumes: Winter Volumes: Year One Volumes:76,189 215,967 292,156
56,531 46,131 34,460 26,221 13,347 7,447 4,642 4,703 6,136 13,693 25,104 53,741
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Year Two YearTwo Volumes:Winter Volumes:Summer Volumes: 76,189 215,967 292,156
56,531 46,131 34,460 26,221 13,347 7,447 4,642 4,703 6,136 13,693 25,104 53,741
JAN FEB DECNOVOCTSEPAUGJULJUNMAYAPRMAR
Curtailment Days Total Curtailment Days: 0
000000000000
Notes:
Attachment IV - Schedule Pages, West Region Page 13 of 118
By Line Item Detail
Edwards AFB: Line Item 4008-0103
Solicitation Parameters
10/1/10 9/30/12 NGI PG&E CG (2) Full Requirements/Pool. Firm
Starting Flow Date
Ending Flow Date
SIP Publication SIP Location Delivery Option Delivery Type
Adjustment Factor: Summer: Winter:
Overage & Shortage Volume Pricing
No
No
No
No
Shortage Treatment
Overage Treatment Summer Volumes:
Summer Volumes:
Winter Volumes:
Winter Volumes:
Publication Location Methodology Include Adj Factor
YesYesTied to Other Line Items Aggregated with Other Line Items
4008-0102: 4008-0103: 4008-0104: 4008-0106: 4008-0109:
4008-0110: 4008-0111: 4008-0112: 4008-0113: 4008-0114:
4008-0115: 4008-0116: 4008-0117: 4008-0119: 4008-0121;
4008-0202: 4008-0203: 4008-0204: 4008-0206: 4008-0209:
4008-0210: 4008-0211: 4008-0212: 4008-0213: 4008-0214:
4008-0215: 4008-0216: 4008-0217: 4008-0219: 4008-0221:
4008-0302: 4008-0303: 4008-0304: 4008-0306: 4008-0309:
4008-0310: 4008-0311: 4008-0312: 4008-0313: 4008-0314:
4008-0315: 4008-0316: 4008-0317: 4008-0319: 4008-0321
4008-0102: 4008-0103: 4008-0104: 4008-0106: 4008-0109:
4008-0110: 4008-0111: 4008-0112: 4008-0113: 4008-0114:
4008-0115: 4008-0116: 4008-0117: 4008-0119: 4008-0121
NOTE #1: Line item 4008-1, 4008-2, and 4008-3 are tied together for purpose of evaluation and award. Offerors must offer on all line items to be considered for award.
NOTE #2: **Delivery of natural gas is to be FOB Citygate via El Paso Natural Gas Pipeline, Kern River Transmission Company, Mojava Pipeline Company, Pacific Gas Transmission, Transwestern Natural Gas Pipeline, and/or California In-State produced natural gas.
***The Contractor shall submit one nomination to the LDC which includes all facilities behind PG&E. The contractor shall issue one invoice monthly, based on usage, with details provided for each installation. ***Any LDC Fuel loss must be included in the offeror's adjustment factor. Fuel loss will not be separately reimbursed.
NOTE #3: **Line Item 4008-01xx (Contractor-Owned Transportation): The Contractor shall be responsible for obtaining any additional capacity and/or Citygate purchases necessary to fulfill contractual delivery requirements.
**Based upon rates filed by Pacific Gas & Electric (PG&E) and subsequently approved by the California Public Utilities Commission (CPUC) for Calendar Year 2010, DESC declined renewal of its Firm Transportation Contract with PG&E for annual capacity on Redwood Path from January 1, 2010 through December 31, 2010. Therefore, customer requirements shall be delivered and priced in accordance with Line Item 4008-01xx during the aforementioned delivery period. DESC reserves the right to renew or decline subsequent annual capacity contracts with PG&E.
NOTE #4: ** When Government capacity is owned, the monthly delivery requirement will consist of quantities from 4008-02xx (Government Owned Transportation) and may also require deliveries from 4008-01xx (Contractor Owned Transportation). The actual split of the 4008-02xx and 4008-01xx quantities is unknown prior to the delivery month; therefore, the total combined PG&E quantities are shown under each line item. Any and all Government-Owned Transportation on Redwood Path must be used before Contractor-Owned Capacity is used.
** Line Item 4008-03xx: In the event that PG&E issues a capacity constraint/curtailment on the PG&E backbone transmission system, whereby the transportation owned by DESC is cut, the Contractor will be required to deliver under its own transportation agreement on the PG&E backbone transmission system any of the installation's firm requirements that exceed the DESC owned transportation authorized flow allowance. In this situation, all quantities shipped via Contractor-Owned transportation will be paid according to the contract SIP location’s Gas Daily, Daily midpoint price published for the affected flow date(s), plus the contract
Attachment IV - Schedule Pages, West Region Page 14 of 118
By Line Item Detail
DLA-DDJC Tracy Facility: Line Item 4008-0104
Installation Address
State Zip 95376-0000
CA
TracyCity
Address 25600 S Chrisman Road
DLA-DDJC Tracy Facility
Utility Account Information Pacific Gas & ElectricLDC or Pipeline:
Total Contract Volumes (Dths)
Total Winter Volumes (Dths)
Total Summer Volumes (Dths) 11,924 99,378 111,302
Alternate Fuel Type Percent Load Limits on Use
Assigned ToPipeline Capacity UOMVolumeCap Tolerence Period
PeriodUOM% AmountStorage TolerenceAssigned ToStorage
UOM Period% AmountBank TolerenceAssigned ToBalancing Type
Aggregate Balancing
UOMMDQ TelemeteredRate ClassDelivery Point
GNTCity Gate Yes279
No
No No
No No
No NoDTH
DTHSupplier Per Day
None
Firm
Meter Type
The total firm MDQ 16,064 Dth represents the total firm requirement, but it does not include shrinkage. It does not exclude the DESC owned transportation.
Notes:
Estimated Usage Information (All volumes expressed in Dths)
Burner TipLocation
Year One Summer Volumes: Winter Volumes: Year One Volumes:5,962 49,689 55,651
14,241 10,331 5,996 2,863 719 312 225 235 332 1,276 4,363 14,758
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Year Two YearTwo Volumes:Winter Volumes:Summer Volumes: 5,962 49,689 55,651
14,241 10,331 5,996 2,863 719 312 225 235 332 1,276 4,363 14,758
JAN FEB DECNOVOCTSEPAUGJULJUNMAYAPRMAR
Curtailment Days Total Curtailment Days: 0
000000000000
Notes:
Attachment IV - Schedule Pages, West Region Page 15 of 118
By Line Item Detail
DLA-DDJC Tracy Facility: Line Item 4008-0104
Solicitation Parameters
10/1/10 9/30/12 NGI PG&E CG (2) Full Requirements/Pool. Firm
Starting Flow Date
Ending Flow Date
SIP Publication SIP Location Delivery Option Delivery Type
Adjustment Factor: Summer: Winter:
Overage & Shortage Volume Pricing
No
No
No
No
Shortage Treatment
Overage Treatment Summer Volumes:
Summer Volumes:
Winter Volumes:
Winter Volumes:
Publication Location Methodology Include Adj Factor
YesYesTied to Other Line Items Aggregated with Other Line Items
4008-0102: 4008-0103: 4008-0104: 4008-0106: 4008-0109:
4008-0110: 4008-0111: 4008-0112: 4008-0113: 4008-0114:
4008-0115: 4008-0116: 4008-0117: 4008-0119: 4008-0121;
4008-0202: 4008-0203: 4008-0204: 4008-0206: 4008-0209:
4008-0210: 4008-0211: 4008-0212: 4008-0213: 4008-0214:
4008-0215: 4008-0216: 4008-0217: 4008-0219: 4008-0221:
4008-0302: 4008-0303: 4008-0304: 4008-0306: 4008-0309:
4008-0310: 4008-0311: 4008-0312: 4008-0313: 4008-0314:
4008-0315: 4008-0316: 4008-0317: 4008-0319: 4008-0321
4008-0102: 4008-0103: 4008-0104: 4008-0106: 4008-0109:
4008-0110: 4008-0111: 4008-0112: 4008-0113: 4008-0114:
4008-0115: 4008-0116: 4008-0117: 4008-0119: 4008-0121
NOTE #1: Line item 4008-1, 4008-2, and 4008-3 are tied together for purpose of evaluation and award. Offerors must offer on all line items to be considered for award.
NOTE #2: **Delivery of natural gas is to be FOB Citygate via El Paso Natural Gas Pipeline, Kern River Transmission Company, Mojava Pipeline Company, Pacific Gas Transmission, Transwestern Natural Gas Pipeline, and/or California In-State produced natural gas.
***The Contractor shall submit one nomination to the LDC which includes all facilities behind PG&E. The contractor shall issue one invoice monthly, based on usage, with details provided for each installation. ***Any LDC Fuel loss must be included in the offeror's adjustment factor. Fuel loss will not be separately reimbursed.
NOTE #3: **Line Item 4008-01xx (Contractor-Owned Transportation): The Contractor shall be responsible for obtaining any additional capacity and/or Citygate purchases necessary to fulfill contractual delivery requirements.
**Based upon rates filed by Pacific Gas & Electric (PG&E) and subsequently approved by the California Public Utilities Commission (CPUC) for Calendar Year 2010, DESC declined renewal of its Firm Transportation Contract with PG&E for annual capacity on Redwood Path from January 1, 2010 through December 31, 2010. Therefore, customer requirements shall be delivered and priced in accordance with Line Item 4008-01xx during the aforementioned delivery period. DESC reserves the right to renew or decline subsequent annual capacity contracts with PG&E.
NOTE #4: ** When Government capacity is owned, the monthly delivery requirement will consist of quantities from 4008-02xx (Government Owned Transportation) and may also require deliveries from 4008-01xx (Contractor Owned Transportation). The actual split of the 4008-02xx and 4008-01xx quantities is unknown prior to the delivery month; therefore, the total combined PG&E quantities are shown under each line item. Any and all Government-Owned Transportation on Redwood Path must be used before Contractor-Owned Capacity is used.
** Line Item 4008-03xx: In the event that PG&E issues a capacity constraint/curtailment on the PG&E backbone transmission system, whereby the transportation owned by DESC is cut, the Contractor will be required to deliver under its own transportation agreement on the PG&E backbone transmission system any of the installation's firm requirements that exceed the DESC owned transportation authorized flow allowance. In this situation, all quantities shipped via Contractor-Owned transportation will be paid according to the contract SIP location’s Gas Daily, Daily midpoint price published for the affected flow date(s), plus the contract
Attachment IV - Schedule Pages, West Region Page 16 of 118
By Line Item Detail
Travis AFB: Line Item 4008-0106
Installation Address
State Zip 94535-2850
CA
Travis AFBCity
Address 151 Dixon Avenue Bldg 901
Travis AFB
Utility Account Information Pacific Gas & ElectricLDC or Pipeline:
Total Contract Volumes (Dths)
Total Winter Volumes (Dths)
Total Summer Volumes (Dths) 183,052 275,082 458,134
Alternate Fuel Type Percent Load Limits on Use
Assigned ToPipeline Capacity UOMVolumeCap Tolerence Period
PeriodUOM% AmountStorage TolerenceAssigned ToStorage
UOM Period% AmountBank TolerenceAssigned ToBalancing Type
Aggregate Balancing
UOMMDQ TelemeteredRate ClassDelivery Point
GNTCity Gate Yes1,710
No
No No
No No
No NoDTH
DTHSupplier Per Day
None
Firm
Meter Type
The total firm MDQ 16,064 Dth represents the total firm requirement, but it does not include shrinkage. It does not exclude the DESC owned transportation.
Notes:
Estimated Usage Information (All volumes expressed in Dths)
Burner TipLocation
Year One Summer Volumes: Winter Volumes: Year One Volumes:91,166 137,541 228,707
35,547 27,383 22,780 17,999 13,511 11,528 11,641 11,917 11,190 13,380 19,257 32,574
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Year Two YearTwo Volumes:Winter Volumes:Summer Volumes: 91,886 137,541 229,427
35,547 27,383 22,780 17,999 13,511 11,528 11,641 11,917 11,910 13,380 19,257 32,574
JAN FEB DECNOVOCTSEPAUGJULJUNMAYAPRMAR
Curtailment Days Total Curtailment Days: 0
000000000000
Notes:
Attachment IV - Schedule Pages, West Region Page 17 of 118
By Line Item Detail
Travis AFB: Line Item 4008-0106
Solicitation Parameters
10/1/10 9/30/12 NGI PG&E CG (2) Full Requirements/Pool. Firm
Starting Flow Date
Ending Flow Date
SIP Publication SIP Location Delivery Option Delivery Type
Adjustment Factor: Summer: Winter:
Overage & Shortage Volume Pricing
No
No
No
No
Shortage Treatment
Overage Treatment Summer Volumes:
Summer Volumes:
Winter Volumes:
Winter Volumes:
Publication Location Methodology Include Adj Factor
YesYesTied to Other Line Items Aggregated with Other Line Items
4008-0102: 4008-0103: 4008-0104: 4008-0106: 4008-0109:
4008-0110: 4008-0111: 4008-0112: 4008-0113: 4008-0114:
4008-0115: 4008-0116: 4008-0117: 4008-0119: 4008-0121;
4008-0202: 4008-0203: 4008-0204: 4008-0206: 4008-0209:
4008-0210: 4008-0211: 4008-0212: 4008-0213: 4008-0214:
4008-0215: 4008-0216: 4008-0217: 4008-0219: 4008-0221:
4008-0302: 4008-0303: 4008-0304: 4008-0306: 4008-0309:
4008-0310: 4008-0311: 4008-0312: 4008-0313: 4008-0314:
4008-0315: 4008-0316: 4008-0317: 4008-0319: 4008-0321
4008-0102: 4008-0103: 4008-0104: 4008-0106: 4008-0109:
4008-0110: 4008-0111: 4008-0112: 4008-0113: 4008-0114:
4008-0115: 4008-0116: 4008-0117: 4008-0119: 4008-0121
NOTE #1: Line item 4008-1, 4008-2, and 4008-3 are tied together for purpose of evaluation and award. Offerors must offer on all line items to be considered for award.
NOTE #2: **Delivery of natural gas is to be FOB Citygate via El Paso Natural Gas Pipeline, Kern River Transmission Company, Mojava Pipeline Company, Pacific Gas Transmission, Transwestern Natural Gas Pipeline, and/or California In-State produced natural gas.
***The Contractor shall submit one nomination to the LDC which includes all facilities behind PG&E. The contractor shall issue one invoice monthly, based on usage, with details provided for each installation. ***Any LDC Fuel loss must be included in the offeror's adjustment factor. Fuel loss will not be separately reimbursed.
NOTE #3: **Line Item 4008-01xx (Contractor-Owned Transportation): The Contractor shall be responsible for obtaining any additional capacity and/or Citygate purchases necessary to fulfill contractual delivery requirements.
**Based upon rates filed by Pacific Gas & Electric (PG&E) and subsequently approved by the California Public Utilities Commission (CPUC) for Calendar Year 2010, DESC declined renewal of its Firm Transportation Contract with PG&E for annual capacity on Redwood Path from January 1, 2010 through December 31, 2010. Therefore, customer requirements shall be delivered and priced in accordance with Line Item 4008-01xx during the aforementioned delivery period. DESC reserves the right to renew or decline subsequent annual capacity contracts with PG&E.
NOTE #4: ** When Government capacity is owned, the monthly delivery requirement will consist of quantities from 4008-02xx (Government Owned Transportation) and may also require deliveries from 4008-01xx (Contractor Owned Transportation). The actual split of the 4008-02xx and 4008-01xx quantities is unknown prior to the delivery month; therefore, the total combined PG&E quantities are shown under each line item. Any and all Government-Owned Transportation on Redwood Path must be used before Contractor-Owned Capacity is used.
** Line Item 4008-03xx: In the event that PG&E issues a capacity constraint/curtailment on the PG&E backbone transmission system, whereby the transportation owned by DESC is cut, the Contractor will be required to deliver under its own transportation agreement on the PG&E backbone transmission system any of the installation's firm requirements that exceed the DESC owned transportation authorized flow allowance. In this situation, all quantities shipped via Contractor-Owned transportation will be paid according to the contract SIP location’s Gas Daily, Daily midpoint price published for the affected flow date(s), plus the contract
Attachment IV - Schedule Pages, West Region Page 18 of 118
By Line Item Detail
DOE Lawrence Livermore National Lab: Line Item 4008-0109
Installation Address
State Zip 94550-0000
CA
LivermoreCity
Address 7000 East Avenue, L-273
DOE Lawrence Livermore National Lab
Utility Account Information Pacific Gas & ElectricLDC or Pipeline:
Total Contract Volumes (Dths)
Total Winter Volumes (Dths)
Total Summer Volumes (Dths) 545,048 565,704 1,110,752
Alternate Fuel Type Percent Load Limits on Use
Assigned ToPipeline Capacity UOMVolumeCap Tolerence Period
PeriodUOM% AmountStorage TolerenceAssigned ToStorage
UOM Period% AmountBank TolerenceAssigned ToBalancing Type
Aggregate Balancing
UOMMDQ TelemeteredRate ClassDelivery Point
GNTCity Gate Yes2,800
No
No No
No No
No NoDTH
DTHSupplier Per Day
None
Firm
Meter Type
The total firm MDQ 16,064 Dth represents the total firm requirement, but it does not include shrinkage. It does not exclude the DESC owned transportation.
Notes:
Estimated Usage Information (All volumes expressed in Dths)
Burner TipLocation
Year One Summer Volumes: Winter Volumes: Year One Volumes:272,524 282,852 555,376
64,057 53,417 53,748 48,095 42,319 36,575 32,686 34,046 35,017 43,786 51,169 60,461
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Year Two YearTwo Volumes:Winter Volumes:Summer Volumes: 272,524 282,852 555,376
64,057 53,417 53,748 48,095 42,319 36,575 32,686 34,046 35,017 43,786 51,169 60,461
JAN FEB DECNOVOCTSEPAUGJULJUNMAYAPRMAR
Curtailment Days Total Curtailment Days: 0
000000000000
Notes:
Attachment IV - Schedule Pages, West Region Page 19 of 118
By Line Item Detail
DOE Lawrence Livermore National Lab: Line Item 4008-0109
Solicitation Parameters
10/1/10 9/30/12 NGI PG&E CG (2) Full Requirements/Pool. Firm
Starting Flow Date
Ending Flow Date
SIP Publication SIP Location Delivery Option Delivery Type
Adjustment Factor: Summer: Winter:
Overage & Shortage Volume Pricing
No
No
No
No
Shortage Treatment
Overage Treatment Summer Volumes:
Summer Volumes:
Winter Volumes:
Winter Volumes:
Publication Location Methodology Include Adj Factor
YesYesTied to Other Line Items Aggregated with Other Line Items
4008-0102: 4008-0103: 4008-0104: 4008-0106: 4008-0109:
4008-0110: 4008-0111: 4008-0112: 4008-0113: 4008-0114:
4008-0115: 4008-0116: 4008-0117: 4008-0119: 4008-0121;
4008-0202: 4008-0203: 4008-0204: 4008-0206: 4008-0209:
4008-0210: 4008-0211: 4008-0212: 4008-0213: 4008-0214:
4008-0215: 4008-0216: 4008-0217: 4008-0219: 4008-0221:
4008-0302: 4008-0303: 4008-0304: 4008-0306: 4008-0309:
4008-0310: 4008-0311: 4008-0312: 4008-0313: 4008-0314:
4008-0315: 4008-0316: 4008-0317: 4008-0319: 4008-0321
4008-0102: 4008-0103: 4008-0104: 4008-0106: 4008-0109:
4008-0110: 4008-0111: 4008-0112: 4008-0113: 4008-0114:
4008-0115: 4008-0116: 4008-0117: 4008-0119: 4008-0121
NOTE #1: Line item 4008-1, 4008-2, and 4008-3 are tied together for purpose of evaluation and award. Offerors must offer on all line items to be considered for award.
NOTE #2: **Delivery of natural gas is to be FOB Citygate via El Paso Natural Gas Pipeline, Kern River Transmission Company, Mojava Pipeline Company, Pacific Gas Transmission, Transwestern Natural Gas Pipeline, and/or California In-State produced natural gas.
***The Contractor shall submit one nomination to the LDC which includes all facilities behind PG&E. The contractor shall issue one invoice monthly, based on usage, with details provided for each installation. ***Any LDC Fuel loss must be included in the offeror's adjustment factor. Fuel loss will not be separately reimbursed.
NOTE #3: **Line Item 4008-01xx (Contractor-Owned Transportation): The Contractor shall be responsible for obtaining any additional capacity and/or Citygate purchases necessary to fulfill contractual delivery requirements.
**Based upon rates filed by Pacific Gas & Electric (PG&E) and subsequently approved by the California Public Utilities Commission (CPUC) for Calendar Year 2010, DESC declined renewal of its Firm Transportation Contract with PG&E for annual capacity on Redwood Path from January 1, 2010 through December 31, 2010. Therefore, customer requirements shall be delivered and priced in accordance with Line Item 4008-01xx during the aforementioned delivery period. DESC reserves the right to renew or decline subsequent annual capacity contracts with PG&E.
NOTE #4: ** When Government capacity is owned, the monthly delivery requirement will consist of quantities from 4008-02xx (Government Owned Transportation) and may also require deliveries from 4008-01xx (Contractor Owned Transportation). The actual split of the 4008-02xx and 4008-01xx quantities is unknown prior to the delivery month; therefore, the total combined PG&E quantities are shown under each line item. Any and all Government-Owned Transportation on Redwood Path must be used before Contractor-Owned Capacity is used.
** Line Item 4008-03xx: In the event that PG&E issues a capacity constraint/curtailment on the PG&E backbone transmission system, whereby the transportation owned by DESC is cut, the Contractor will be required to deliver under its own transportation agreement on the PG&E backbone transmission system any of the installation's firm requirements that exceed the DESC owned transportation authorized flow allowance. In this situation, all quantities shipped via Contractor-Owned transportation will be paid according to the contract SIP location’s Gas Daily, Daily midpoint price published for the affected flow date(s), plus the contract
Attachment IV - Schedule Pages, West Region Page 20 of 118
By Line Item Detail
DOE Lawrence Berkeley National Lab: Line Item 4008-0110
Installation Address
State Zip 94720-0000
CA
BerkeleyCity
Address One Cyclotron Road, MS: 76-225
DOE Lawrence Berkeley National Lab
Utility Account Information Pacific Gas & ElectricLDC or Pipeline:
Total Contract Volumes (Dths)
Total Winter Volumes (Dths)
Total Summer Volumes (Dths) 152,214 202,829 355,043
Alternate Fuel Type Percent Load Limits on Use
Assigned ToPipeline Capacity UOMVolumeCap Tolerence Period
PeriodUOM% AmountStorage TolerenceAssigned ToStorage
UOM Period% AmountBank TolerenceAssigned ToBalancing Type
Aggregate Balancing
UOMMDQ TelemeteredRate ClassDelivery Point
GNTCity Gate Yes676
No
No No
No No
No NoDTH
DTHSupplier Per Day
None
Firm
Meter Type
The total firm MDQ 16,064 Dth represents the total firm requirement, but it does not include shrinkage. It does not exclude the DESC owned transportation.
Notes:
Estimated Usage Information (All volumes expressed in Dths)
Burner TipLocation
Year One Summer Volumes: Winter Volumes: Year One Volumes:75,870 101,529 177,399
19,760 18,415 16,986 13,720 10,525 10,459 9,611 9,053 9,906 12,596 21,985 24,383
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Year Two YearTwo Volumes:Winter Volumes:Summer Volumes: 76,344 101,300 177,644
19,538 18,282 16,821 13,811 10,580 10,508 9,666 9,119 9,979 12,681 22,083 24,576
JAN FEB DECNOVOCTSEPAUGJULJUNMAYAPRMAR
Curtailment Days Total Curtailment Days: 0
000000000000
Notes:
Attachment IV - Schedule Pages, West Region Page 21 of 118
By Line Item Detail
DOE Lawrence Berkeley National Lab: Line Item 4008-0110
Solicitation Parameters
10/1/10 9/30/12 NGI PG&E CG (2) Full Requirements/Pool. Firm
Starting Flow Date
Ending Flow Date
SIP Publication SIP Location Delivery Option Delivery Type
Adjustment Factor: Summer: Winter:
Overage & Shortage Volume Pricing
No
No
No
No
Shortage Treatment
Overage Treatment Summer Volumes:
Summer Volumes:
Winter Volumes:
Winter Volumes:
Publication Location Methodology Include Adj Factor
YesYesTied to Other Line Items Aggregated with Other Line Items
4008-0102: 4008-0103: 4008-0104: 4008-0106: 4008-0109:
4008-0110: 4008-0111: 4008-0112: 4008-0113: 4008-0114:
4008-0115: 4008-0116: 4008-0117: 4008-0119: 4008-0121;
4008-0202: 4008-0203: 4008-0204: 4008-0206: 4008-0209:
4008-0210: 4008-0211: 4008-0212: 4008-0213: 4008-0214:
4008-0215: 4008-0216: 4008-0217: 4008-0219: 4008-0221:
4008-0302: 4008-0303: 4008-0304: 4008-0306: 4008-0309:
4008-0310: 4008-0311: 4008-0312: 4008-0313: 4008-0314:
4008-0315: 4008-0316: 4008-0317: 4008-0319: 4008-0321
4008-0102: 4008-0103: 4008-0104: 4008-0106: 4008-0109:
4008-0110: 4008-0111: 4008-0112: 4008-0113: 4008-0114:
4008-0115: 4008-0116: 4008-0117: 4008-0119: 4008-0121
NOTE #1: Line item 4008-1, 4008-2, and 4008-3 are tied together for purpose of evaluation and award. Offerors must offer on all line items to be considered for award.
NOTE #2: **Delivery of natural gas is to be FOB Citygate via El Paso Natural Gas Pipeline, Kern River Transmission Company, Mojava Pipeline Company, Pacific Gas Transmission, Transwestern Natural Gas Pipeline, and/or California In-State produced natural gas.
***The Contractor shall submit one nomination to the LDC which includes all facilities behind PG&E. The contractor shall issue one invoice monthly, based on usage, with details provided for each installation. ***Any LDC Fuel loss must be included in the offeror's adjustment factor. Fuel loss will not be separately reimbursed.
NOTE #3: **Line Item 4008-01xx (Contractor-Owned Transportation): The Contractor shall be responsible for obtaining any additional capacity and/or Citygate purchases necessary to fulfill contractual delivery requirements.
**Based upon rates filed by Pacific Gas & Electric (PG&E) and subsequently approved by the California Public Utilities Commission (CPUC) for Calendar Year 2010, DESC declined renewal of its Firm Transportation Contract with PG&E for annual capacity on Redwood Path from January 1, 2010 through December 31, 2010. Therefore, customer requirements shall be delivered and priced in accordance with Line Item 4008-01xx during the aforementioned delivery period. DESC reserves the right to renew or decline subsequent annual capacity contracts with PG&E.
NOTE #4: ** When Government capacity is owned, the monthly delivery requirement will consist of quantities from 4008-02xx (Government Owned Transportation) and may also require deliveries from 4008-01xx (Contractor Owned Transportation). The actual split of the 4008-02xx and 4008-01xx quantities is unknown prior to the delivery month; therefore, the total combined PG&E quantities are shown under each line item. Any and all Government-Owned Transportation on Redwood Path must be used before Contractor-Owned Capacity is used.
** Line Item 4008-03xx: In the event that PG&E issues a capacity constraint/curtailment on the PG&E backbone transmission system, whereby the transportation owned by DESC is cut, the Contractor will be required to deliver under its own transportation agreement on the PG&E backbone transmission system any of the installation's firm requirements that exceed the DESC owned transportation authorized flow allowance. In this situation, all quantities shipped via Contractor-Owned transportation will be paid according to the contract SIP location’s Gas Daily, Daily midpoint price published for the affected flow date(s), plus the contract
Attachment IV - Schedule Pages, West Region Page 22 of 118
By Line Item Detail
Naval Post Graduate School Monterey: Line Item 4008-0111
Installation Address
State Zip 93943-0000
CA
MontereyCity
Address Public Works, 1 University Circle
Naval Post Graduate School Monterey
Utility Account Information Pacific Gas & ElectricLDC or Pipeline:
Total Contract Volumes (Dths)
Total Winter Volumes (Dths)
Total Summer Volumes (Dths) 58,152 79,102 137,254
Alternate Fuel Type Percent Load Limits on Use
Assigned ToPipeline Capacity UOMVolumeCap Tolerence Period
PeriodUOM% AmountStorage TolerenceAssigned ToStorage
UOM Period% AmountBank TolerenceAssigned ToBalancing Type
Aggregate Balancing
UOMMDQ TelemeteredRate ClassDelivery Point
GNTCity Gate Yes547
No
No No
No No
No NoDTH
DTHSupplier Per Day
None
Firm
Meter Type
The total firm MDQ 16,064 Dth represents the total firm requirement, but it does not include shrinkage. It does not exclude the DESC owned transportation.
Notes:
Estimated Usage Information (All volumes expressed in Dths)
Burner TipLocation
Year One Summer Volumes: Winter Volumes: Year One Volumes:29,076 39,551 68,627
9,386 7,791 8,176 7,395 4,424 3,845 3,669 3,217 3,091 3,435 6,522 7,676
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Year Two YearTwo Volumes:Winter Volumes:Summer Volumes: 29,076 39,551 68,627
9,386 7,791 8,176 7,395 4,424 3,845 3,669 3,217 3,091 3,435 6,522 7,676
JAN FEB DECNOVOCTSEPAUGJULJUNMAYAPRMAR
Curtailment Days Total Curtailment Days: 0
000000000000
Notes:
Attachment IV - Schedule Pages, West Region Page 23 of 118
By Line Item Detail
Naval Post Graduate School Monterey: Line Item 4008-0111
Solicitation Parameters
10/1/10 9/30/12 NGI PG&E CG (2) Full Requirements/Pool. Firm
Starting Flow Date
Ending Flow Date
SIP Publication SIP Location Delivery Option Delivery Type
Adjustment Factor: Summer: Winter:
Overage & Shortage Volume Pricing
No
No
No
No
Shortage Treatment
Overage Treatment Summer Volumes:
Summer Volumes:
Winter Volumes:
Winter Volumes:
Publication Location Methodology Include Adj Factor
YesYesTied to Other Line Items Aggregated with Other Line Items
4008-0102: 4008-0103: 4008-0104: 4008-0106: 4008-0109:
4008-0110: 4008-0111: 4008-0112: 4008-0113: 4008-0114:
4008-0115: 4008-0116: 4008-0117: 4008-0119: 4008-0121;
4008-0202: 4008-0203: 4008-0204: 4008-0206: 4008-0209:
4008-0210: 4008-0211: 4008-0212: 4008-0213: 4008-0214:
4008-0215: 4008-0216: 4008-0217: 4008-0219: 4008-0221:
4008-0302: 4008-0303: 4008-0304: 4008-0306: 4008-0309:
4008-0310: 4008-0311: 4008-0312: 4008-0313: 4008-0314:
4008-0315: 4008-0316: 4008-0317: 4008-0319: 4008-0321
4008-0102: 4008-0103: 4008-0104: 4008-0106: 4008-0109:
4008-0110: 4008-0111: 4008-0112: 4008-0113: 4008-0114:
4008-0115: 4008-0116: 4008-0117: 4008-0119: 4008-0121
NOTE #1: Line item 4008-1, 4008-2, and 4008-3 are tied together for purpose of evaluation and award. Offerors must offer on all line items to be considered for award.
NOTE #2: **Delivery of natural gas is to be FOB Citygate via El Paso Natural Gas Pipeline, Kern River Transmission Company, Mojava Pipeline Company, Pacific Gas Transmission, Transwestern Natural Gas Pipeline, and/or California In-State produced natural gas.
***The Contractor shall submit one nomination to the LDC which includes all facilities behind PG&E. The contractor shall issue one invoice monthly, based on usage, with details provided for each installation. ***Any LDC Fuel loss must be included in the offeror's adjustment factor. Fuel loss will not be separately reimbursed.
NOTE #3: **Line Item 4008-01xx (Contractor-Owned Transportation): The Contractor shall be responsible for obtaining any additional capacity and/or Citygate purchases necessary to fulfill contractual delivery requirements.
**Based upon rates filed by Pacific Gas & Electric (PG&E) and subsequently approved by the California Public Utilities Commission (CPUC) for Calendar Year 2010, DESC declined renewal of its Firm Transportation Contract with PG&E for annual capacity on Redwood Path from January 1, 2010 through December 31, 2010. Therefore, customer requirements shall be delivered and priced in accordance with Line Item 4008-01xx during the aforementioned delivery period. DESC reserves the right to renew or decline subsequent annual capacity contracts with PG&E.
NOTE #4: **…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .