SOW_Lift Station 5.pdf
PDF 213 KB Posted
- Attached to
- Lift Station Repairs Federal contract opportunity
- Solicitation number
- 20190PR240000014
About this file
This statement of work describes requirements for replacing a programmable logic controller input/output module for a lift station at the U.S. Coast Guard Air Station in Port Angeles, Washington. The contractor must procure, install, configure, and test a new PLC I/O module to replace an existing Unitronics V200-18-E3XB module within 45 calendar days of notice to proceed. The contractor must provide all necessary labor, equipment, materials, and technical support to complete the work in accordance with OSHA safety standards. The solicitation for this requirement was issued by the Department of Homeland Security U.S. Coast Guard under number 20190PR240000014 for lift station repairs at the Air Station located at 1 Ediz Hood Rd in Port Angeles. The contractor will invoice through the Invoice Processing Platform and perform work between 0800-1600 hours Monday through Friday except federal holidays unless otherwise approved in writing. The government will provide basic on-site facilities and utilities for contractor use.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Lift Station panel Pictures.docx | DOCX document | |
| Wage Determination-2015-5545.txt | TXT text file | |
| SF18-Lift Station 5.pdf | ||
| FAR Clauses-Service.pdf | ||
| SF-18 PG2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
U.S. COAST GUARD
AIRSTATION PORT ANGELES
Replace PLC I/O Module for Lift Station # 5
SECTION 1 – GENERAL INFORMATION
1.1 BACKGROUND
Lift Station #5 is the main source for wastewater for the Hangar and Supply warehouse located at USCG AIRSTA Port Angeles.
1.2 SCOPE
The contractor must provide all personnel, equipment, transportation, tools, materials, supervision, technical support and other items and services necessary to replace the PLC I/O module for lift station #5, to include installation, configuration, and testing of the system to ensure full operational capability, in strict accordance with this Statement of Work.
1.2.1 Technical Representative:
Name: Michael R. Carter
PH: 360-417-5920
Cell: 509-554-6129 E-mail: Michael.r.carter@uscg.mil
SECTION 2 – SPECIFIC REQUIREMENTS/TASKS
2.1 GENERAL
Provide labor and materials to replace the PLC I/O module for lift station #5, to include installation, configuration, and testing of the system to ensure full operational capability.
2.2 TASKS
• Contractor shall procure and install a new PLC I/O module for lift station #5 to replace existing.
• Product specifications for existing PLC I/O module are below:
o Unitronics PLC V200-18-E3XB o 18 isolated digital inputs o 4 isolated analog (14 Bit)/ Thermocouple/ PT100 inputs o 15 isolated relay outputs o 2 isolated transistor outputs o 4 analog outputs o 24V DC power supply
• Contractor shall configure and test the system by performing a complete functionality test to ensure full operational capability.
• Excluding product manufacturer lead times, Contractor shall complete all work, deliverables and outcomes within 45 calendar days after notice to proceed is given by the Government.
2.3. SAFETY
During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 – Safety and Health Regulations for Construction.
mailto:Michael.r.carter@uscg.mil
SECTION 3 – CONTRACTOR PERSONNEL
3.1 QUALIFIED PRESONNEL
3.1.1 Contract Manager
The Contractor shall provide a Project Manager who shall be responsible for all Contractor work performed under this SOW. The Project Manager shall be a single point of contact for the Contracting Officer and the Technical representative. The name of the Project Manager, and the name(s) of any alternate(s) who shall act for the Contractor in the absence of the Project Manager, shall be provided to the Government as part of the Contractor's proposal. The Project Manager is further designated as Key by the Government. During any absence of the Project Manager, only one alternate shall have full authority to act for the Contractor on all matters relating to work performed under this contract. The Project Manager and all designated alternates shall be able to read, write, speak and understand English.
Additionally, the Contractor shall not replace the Project Manager without prior approval from the Contracting Officer.
3.1.2 Contractor Employees
The contractor must not employ persons for work on this contract if such employee is considered by the Contracting Officer to be a potential threat to the health, safety, and security, general well –being, or operational mission of the installation and its population. Contractor personnel must present a neat appearance and be easily recognized as contractor employees. The contractor must not employ any person who is an employee of the U.S. Government if employing that person would create a conflict of interest. Additionally, the contractor must not employ any person who is an employee of the U.S. Coast Guard unless such person seeks and receives approval according to U.S. Coast Guard regulations.
3.2 CONTINUITY OF SUPPORT
The Contractor shall ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor shall ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor shall provide e-mail notification to the Contracting Officer’s Representative (COR) prior to employee absence. Otherwise, the Contractor shall provide a fully qualified replacement.
3.3 EMPLOYEE IDENTIFICATION
Contractor employees visiting Government facilities shall wear an identification badge that, at a minimum, displays the Contractor name, the employee’s photo, and name. Visiting Contractor employees shall comply with all Government escort rules and requirements. All Contractor employees shall identify themselves as Contractors when their status is not readily apparent and display all identification and visitor badges in plain view above the waist at all times.
3.4 EMPLOYEE CONDUCT
Contractor’s employees shall comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor shall ensure Contractor employees present a professional appearance at all times and that their conduct shall not reflect discredit on the United States or the Department of Homeland Security. The Project Manager shall ensure Contractor employees understand and abide by
Department of Homeland Security established rules, regulations and policies concerning safety and security.
3.5 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS
The Government may, at its sole discretion (via the Technical representative), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.
SECTION 4 – OTHER APPLICABLE CONDITIONS
4.1 PLACE OF PERFORMANCE
USCG Air Station Port Angeles 1 Ediz Hood Rd Port Angeles, WA
4.2 HOURS OF OPERATION
Contractor employees shall generally perform all work between the hours of 0800 and 1600 PST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW.
4.2.1 Special event, or adjusted work hours: If circumstances should arise wherein the contractor desires a different work schedule as required in section 4.3 above, the contractor must request same in writing.
Submit written request to the government Point of Contact a minimum of 24 hours before the requested adjusted work schedule.
4.3 APPLICABLE PUBLICATIONS
Publications and forms that apply to the SOW are listed below. The publications have been designated as mandatory. The contractor must be guided by those publications to the extent necessary to accomplish requirements in this SOW.
4.3.1 Mandatory Publications
OSHA Safety and Health Standards, 29 CFR Part 1926 – Safety and Health Regulations for Construction
4.4 INVOICING
Invoices will be submitted through the Invoice Processing Platform (IPP) at https://www.ipp.gov/. IPP is a secure web-based electronic invoicing system provided by the U.S. Department of the Treasury’s Bureau of the Fiscal Service in partnership with the Federal Reserve Bank of St. Louis (FRSTL). IPP is available at no cost to any commercial vendor or independent contractor doing business with a participating government agency. Action to take instructions will be provided upon award.
SECTION 5 – GOVERNMENT FURNISHED RESOURCES
The Government will provide basic facilities and utilities for the off-site Contractor to use in performing work under this contract.
SECTION 6 – CONTRACTOR FURNISHED ITEMS AND SERVICES
The Contractor shall furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in section 5.
File details come from the government source that posted it. Updated .