SOW NUMBER: XXXX
Date: 13 August 2020
STATEMENT OF WORK
Procurement Bldg. 52 Generator Load Bank
1. Scope: Procurement of generator load bank to provide stable electrical load balancing for testing and protection of the building UPS and generator. NAVFACMAR CIS will perform installation. Parts only procurement.
2. Product Description:
Name: Electrical load bank
Specifications: Procure electrical load bank.
Priority Item/Description (details) Manufacturer Part Number
Qty
1 Generator Load Bank Simplex Mars-100-
Notes:
1. Item 1 meets technical requirements derived from NAVFACMAR Critical Infrastructure Support Department.
2. Refurbished are NOT acceptable.
3. Please include shipping/freight cost for FOB destination delivery.
3. Delivery Date/Location:
Required Delivery Date: 31 December 2020
Place of Delivery (FOB Destination/shipping Point)(Complete Address):
DLA DISTRIBUTION SAN JOAQUIN, CA
CONSOLIDATION AND CONTAINERIZATION POINT (CCP)
WHSE 29, SECTION 1
25600 SOUTH CHRISMAND ROAD
TRACY, CA 95304
Ultimate Destination:
NRTF Barrigada
Building 52
Barrigada, GU 96921
SOW NUMBER: XXXX
Date: 13 August 2020
4. Other Pertinent Information or Special Considerations:
(Include any special considerations or unique requirements necessary to accomplish the order
[e.g., standards, classifications, or regulations that must be met] and/or any additional information that will be helpful in determining cost estimates for the Contracting Officer. As appropriate, this section may contain:)
a. Packaging, Packing and Shipping Instructions.
b. Inspection and Acceptance Criteria.
In the absence of other agreements negotiated with respect to time provided for government review, deliverables will be inspected and the contractor notified of the
Program POC's findings within 10 work days of the submission of the deliverable by the contractor. The project manager is responsible for the final inspection and acceptance of all deliverables under this delivery order.
e. Data Rights. Do you require data rights to deliverables?
f. Warranty: See warranty on quotation. Standard on-year, parts-only warranty starts on date of shipment.