SOW Fuel Inspection 3_21_24.docx

DOCX document 292 KB Posted

Attached to
Fuel System Inspections Neah Bay, Washington Federal contract opportunity
Solicitation number
30484PR240000008
Issued by
Department of Homeland Security US Coast Guard

About this file

This document is a Scope of Work (SOW) for an upcoming federal contract opportunity to inspect the shore, marine, and aviation fuel delivery systems at the U.S. Coast Guard Station Neah Bay in Washington.

The SOW outlines the contractor's responsibilities to provide all personnel, equipment, transportation, tools, materials, supervision, and other items necessary to safely conduct inspections and tests on the various fuel systems at the station, including diesel, gasoline, and jet fuel tanks, piping, dispensers, secondary containment, and leak detection systems. The contractor must provide a detailed, photo-documented report outlining findings and recommendations for upgrades and repairs. The work must be completed within 45 calendar days after the notice to proceed. The related federal contract opportunity, Solicitation Number 30484PR240000008, is a Request for Quotation (RFQ) set-aside for small businesses. Quotes are due by April 19, 2024 to the contracting officer.

View the file

Other files for this federal contract opportunity

Other files attached to Fuel System Inspections Neah Bay, Washington, newest first.
File Type Posted
Question and Answer Page fuel inspection.pdf PDF
Question and Answer Page fuel inspection.docx DOCX document
Question and Answer Page fuel inspection.docx DOCX document
wage rates clallam county rev 23.txt TXT text file
SF1449 Fuel testing inspection.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

U.S. COAST GUARD

STATION NEAH BAY

Inspect Shore, Marine and Aviation Fuel Delivery Systems.

SECTION 1 – GENERAL INFORMATION

1.1 BACKGROUND

Inspect existing shore, marine and aviation fuel systems for compliance with State and Federal regulations.

1.2 SCOPE

The Contractor shall provide all personnel, equipment, transportation, tools, materials, supervision, and other items and services necessary to perform inspection of existing shore, marine and aviation fuel systems for compliance with State and Federal regulations.

1.2.1 Primary Point of Contact/Technical Representative:

Name: CPO Thomas Roposa Phone: 401-644-4986 E-mail: Thomas.j.roposa@uscg.mil

1.2.2 Alternate Point of Contact

Name: MK1 Jesse Sannicolas Phone: 757-477-0024 E-mail: Jessechristopher.M.Sannicolas@uscg.mil

SECTION 2 – SPECIFIC REQUIREMENTS/TASKS

2.1 GENERAL

The Contractor shall provide all personnel, equipment, transportation, tools, materials, supervision, insurance and other items and services necessary to safely conduct inspections and tests necessary to complete a full inspection of shore, marine and aviation fuel delivery systems.

2.2 TASKS

· Inspect existing fuel tanks, piping, dispensers, secondary containment, and monitoring systems as detailed below (Tank size).

· Diesel Marine Fuel System and Housing Emergency Generator Fuel System (5,000 – Gallon tank).

· Station Main building Diesel Heating and Emergency Generator Fuel System (3,000 – Gallon tank).

· Gasoline Marine Fuel System (1,500 – Gallon Tank).

· Jet -A Aviation Fuel System (2,000 – Gallon Tank).

· VEEDER-ROOT TLS-350 Leak detection system.

· Contractor shall provide a detailed photo-documented, report outlining findings and recommendations for upgrades and repairs and provide copies to the unit.

· Contractor shall complete all work, deliverables, and outcomes within 45 calendar days after notice to proceed is given by the Government.

2.3 CONTROL AND DISPOSAL OF WASTES

All wastes and demolished materials become the Contractor’s property and shall be removed from the job site daily in accordance with all local, state, and federal environmental regulations.

2.4 SAFETY

During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 – Safety and Health Regulations for Construction and the Washington Industrial Safety and Health Administration (WISHA) regulations.

2.4.1 Unforeseen Hazardous Materials/Environmental Discharge:

If hazardous material is found during operations, stop that portion of work, and notify both parties immediately at their listed point of contact. Within 14 calendar days, the Government will determine fiscal indemnity without liability. If the material is not hazardous or poses no danger, the government will direct the cleanup and proceed without change. If the material is hazardous and handling of the material is necessary to accomplish the work, the Government will issue a contract modification.

2.5 OPERATIONS AND STORAGE FACILITITES

The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the onsite representative with the concurrence of the Contracting Officer. The Contractor shall hold and save the Government, its officers, and agents, free and harmless from liability of any nature occasioned by the Contractor’s performance.

SECTION 3 – CONTRACTOR PERSONNEL

3.1 QUALIFIED PRESONNEL

3.1.1 Contract Manager

The Contractor shall provide a Project Manager who shall be responsible for all Contractor work performed under this SOW. The Project Manager shall be a single point of contact for the Contracting Officer and the Technical representative. The name of the Project Manager, and the name(s) of any alternate(s) who shall act for the Contractor in the absence of the Project Manager, shall be provided to the Government as part of the Contractor's proposal. The Project Manager is further designated as Key by the Government. During any absence of the Project Manager, only one alternate shall have full authority to act for the Contractor on all matters relating to work performed under this contract. The Project Manager and all designated alternates shall be able to fluently read, write, speak and understand English. Additionally, the Contractor shall not replace the Project Manager without prior approval from the Contracting Officer.

3.1.2 Contractor Employees

The contractor must not employ persons for work on this contract if such employee is considered by the Contracting Officer to be a potential threat to the health, safety, and security, general well –being, or operational mission of the installation and its population. Contractor personnel must present a neat appearance and be easily recognized as contractor employees. The contractor must not employ any person who is an employee of the U.S. Government if employing that person would create a conflict of interest. Additionally, the contractor must not employ any person who is an employee of the U.S. Coast Guard unless such person seeks and receives approval according to U.S. Coast Guard regulations.

3.2 CONTINUITY OF SUPPORT

The Contractor shall ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor shall ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor shall provide e-mail notification to the Contracting Officer’s Representative (COR) prior to employee absence. Otherwise, the Contractor shall provide a fully qualified replacement.

3.3 EMPLOYEE IDENTIFICATION

Contractor employees visiting Government facilities shall wear an identification badge that, at a minimum, displays the Contractor name, the employee’s photo, and name. Visiting Contractor employees shall comply with all Government escort rules and requirements. All Contractor employees shall identify themselves as Contractors when their status is not readily apparent and display all identification and visitor badges in plain view above the waist at all times.

3.4 EMPLOYEE CONDUCT

Contractor’s employees shall comply with all applicable Government regulations, policies, and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor shall ensure Contractor employees always present a professional appearance and that their conduct shall not reflect discredit on the United States or the Department of Homeland Security. The Project Manager shall ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.

3.5 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS

The Government may, at its sole discretion (via the technical representative), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.

SECTION 4 – OTHER APPLICABLE CONDITIONS

4.1 PLACE OF PERFORMANCE

USCG Station Neah Bay 31 Coast Guard Dr.

Neah Bay, WA 98357

4.2 HOURS OF OPERATION

Contractor employees shall generally perform all work between the hours of 0800 and 1600 PST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW.

4.2.1 Special event, or adjusted work hours: If circumstances should arise wherein the contractor desires a different work schedule as required in section 4.3 above, the contractor must request same in writing. Submit written request to the government Point of Contact a minimum of 24 hours before the requested adjusted work schedule.

4.3 APPLICABLE PUBLICATIONS

Publications and forms that apply to the SOW are listed below. The publications have been designated as mandatory. The contractor must be guided by those publications to the extent necessary to accomplish requirements in this SOW.

4.3.1 Mandatory Publications

Applicable OSHA Safety and Health Standards and applicable EPA regulations.

4.4 INVOICING

Invoices will be submitted through the Invoice Processing Platform (IPP) at https://www.ipp.gov/. IPP is a secure web-based electronic invoicing system provided by the U.S. Department of the Treasury’s Bureau of the Fiscal Service in partnership with the Federal Reserve Bank of St. Louis (FRSTL). IPP is available at no cost to any commercial vendor or independent contractor doing business with a participating government agency. Action to take instructions will be provided upon award.

SECTION 5 – GOVERNMENT FURNISHED RESOURCES

The Government will provide basic facilities and utilities for the off-site Contractor to use in performing work under this contract.

SECTION 6 – CONTRACTOR FURNISHED ITEMS AND SERVICES

The Contractor shall furnish all facilities, materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in section 5.

image1.png