This scope of work document outlines requirements for the milling and replacement of an asphalt parking lot at the Fulton County Air Traffic Control Tower in Atlanta, Georgia. The Federal Aviation Administration is seeking a contractor to remove the existing asphalt and replace it with new asphalt pavement over approximately 30,000 square feet. The work must be performed between 7:00 AM and 5:30 PM Monday through Friday and require coordination to maintain site access. The contractor will be responsible for cold milling the existing asphalt to a depth of 3 inches, installing expansion joints, and applying tack coat before placing and compacting new asphalt in multiple lifts to meet density requirements. The contractor must submit plans, schedules, safety documentation and provide warranties for two years after acceptance of work, which is to be inspected upon completion. Responses were due by May 10, 2023 for this non-competitive market survey to inform the FAA's acquisition planning.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL AVIATION ADMINISTRATION SCOPE OF WORK
Fulton County Airport
AIR TRAFFIC CONTROL TOWER
PARKING LOT REPLACEMENT/UPGRADES
FTY ATCT
Project Location: 3979 Aviation Cir NW, Atlanta, GA 30336
1. STATEMENT OF WORK
The FAA Fulton County Air Traffic Control Tower (FTY ATCT) has one (1) parking lot for the facility. The lot requires replacement. The contractor shall furnish necessary equipment, materials, labor and supervision to mill the exiting asphalt and replace with new asphalt (flexible pavement), at the FTY ATCT, a Federal Aviation Administration (FAA) navigational control facility located at 979 Aviation Cir NW, Atlanta GA 30336. Work within this area may require escort, and possibly badging requirements, which might include background checks for all on-site personnel, and must be coordinated with the FAA Contracting Officer’s Representative (COR) in advance. The General Contractor (GC) shall be expected to work Monday through Friday during the day time hours of 7:00 AM to 5:30 PM unless alternatively coordinated in advance with the Contracting Officer’s Representative (COR).
Coordination between the GC and FAA personnel shall be required at all times in order to maintain an operational facility.
Any discrepancies between the contract provisions and the actual site conditions shall be referred to the Contracting Officer (CO) for a written determination in accordance with Contract Clause entitled Order of Precedence.
1. Access and egress from the parking lot must be maintained at all times. The FTY ATCT is an operational facility, and air traffic and building occupants must be allowed to enter and exist the facility premises as necessary. Contractor must develop and submit an asphalt milling and paving plan prior to any start of work, which clearly details how work will be phased such that site access is maintained throughout completion of the project.
a. Contractor should plan for 2 week review time frame for contractor developed phasing plan
b. Attached Google Earth image may be used for planning, rerouting traffic, and submitting with schedule.
2. Mill/Remove/Replace and re-stripe existing asphalt parking lot- approximately 30,000 Sqft (3250 sq yards)
a. Minimum 3" mill depth required throughout (see attached specs for details)
b. Provide ½” x 5”Asphaltic expansion joint between new and existing paved surfaces.
c. Install expansion joint to allow top ½” to be filled with expansion joint compound. (Submittal required with SDS)
2. GENERAL
Regulatory Requirements: Comply with materials, workmanship, and other applicable requirements of Georgia Department of Transportation for asphalt paving work.
a. PROJECT CONDITIONS
1. Environmental Limitations: Do not apply asphalt materials if subgrade is wet or excessively damp, if rain is imminent or expected before time required for adequate cure, or if the following conditions are not met:
1. Tack Coat: Minimum surface temperature of 60 deg F
2. Asphalt Base Course: Minimum surface temperature of 40 deg F and rising at time of placement.
3. Asphalt Surface Course: Minimum surface temperature of 60 deg F at time of placement.
2. Pavement-Marking Paint: Proceed with pavement marking only on clean, dry surfaces and at a minimum ambient or surface temperature of 55 deg F for water-based materials, and not exceeding 95 deg F.
3. PRODUCTS
1. Aggregates
a. Coarse Aggregate: ASTM D 692, sound; angular crushed stone, crushed gravel, or cured, crushed blast-furnace slag.
b. Fine Aggregate: ASTM D 1073, sharp-edged natural sand or sand prepared from stone, gravel, cured blast-furnace slag, or combinations thereof. For hot-mix asphalt, limit natural sand to a maximum of 20 percent by weight of the total aggregate mass.
2. Mineral Filler: ASTM D 242 rock or slag dust, hydraulic cement, or other inert material.
3. Asphalt Materials
a. Asphalt Binder: AASHTO M 320.
b. Asphalt Cement: ASTM D 3381 for viscosity-graded material.
c. Prime Coat: ASTM D 2027, medium-curing cutback asphalt, MC-30 or MC-70.
d. Prime Coat: Asphalt emulsion prime coat complying with State DOT requirements.
e. Tack Coat: ASTM D 977 emulsified asphalt, or ASTM D 2397 cationic emulsified asphalt, slow setting, diluted in water, of suitable grade and consistency for application.
f. Fog Seal: ASTM D 977 emulsified asphalt, or ASTM D 2397 or AASHTO M 208 cationic emulsified asphalt, slow setting, factory diluted in water, of suitable grade and consistency for application.
4. Auxiliary Materials
a. Herbicide: Commercial chemical for weed control, registered by the EPA.
Provide in granular, liquid, or wettable powder form.
b. Pavement-Marking Paint: MPI #32 Alkyd Traffic Marking Paint.
1. Color: Yellow.
c. Pavement-Marking Paint: MPI #97 Latex Traffic Marking Paint.
1. Color: Yellow.
d. Glass Beads: AASHTO M 247, Type 1.
e. Wheel Stops: Precast, air-entrained concrete, 2500-psi minimum compressive strength, 4 inches high by 9 inches wide by 72 inches. Provide chamfered corners, drainage slots on underside, and holes for anchoring to substrate.
1. Dowels: Galvanized steel, 3/4-inch diameter, 10-inch minimum length.
f. Wheel Stops: Solid, integrally colored, 96 percent recycled HDPE or commingled postconsumer and postindustrial recycled plastic; UV stabilized; 4 inches high by 6 inches wide by 72 inches long. Provide chamfered corners, drainage slots on underside, and holes for anchoring to substrate.
1. Dowels: Galvanized steel, 3/4-inch diameter, 10-inch minimum length.
2. Adhesive: As recommended by wheel-stop manufacturer for application to asphalt pavement.
5. Mixes
a. Hot-Mix Asphalt: Dense, hot-laid, hot-mix asphalt plant mixes approved by authorities having jurisdiction designed according to procedures in AI MS-2, "Mix Design Methods for Asphalt Concrete and Other Hot-Mix Types"; and complying with the following requirements:
1. Provide mixes with a history of satisfactory performance in local area.
2. Base Course: 2 inches, 307-CW Mix.
3. Surface Course: 1 inch, similar to 411 D Mix
4. EXECUTION
1. Cold Milling
b. Clean existing pavement surface of loose and deleterious material immediately before cold milling. Remove existing asphalt pavement by cold milling to grades and cross sections indicated.
c. Mill to a depth of 3 inches.
2. Proof Rolling
d. Proof-roll subgrade below pavements with heavy pneumatic-tired equipment to identify soft pockets and areas of excess yielding. Do not proof-roll wet or saturated subgrades.
e. Excavate soft spots, unsatisfactory soils, and areas of excessive pumping or rutting, as determined by COR, and replace with compacted backfill or fill as directed.
f. Proceed with paving only after unsatisfactory conditions have been corrected.
3. Concrete Patching
a. Portland Cement Concrete Pavement: Break cracked slabs, remove material and roll subbase as required to prepare for placement of new concrete.
b. Remove disintegrated or badly cracked pavement. Excavate rectangular patches, extending into adjacent sound pavement, unless otherwise indicated. Cut excavation faces vertically. Re-compact existing unbound-aggregate base course to form new subgrade.
c. Replace Concrete with 4000 psi concrete mix with fiber.
4. Tack Coat
a. Apply uniformly to vertical surfaces abutting or projecting into new, hot-mix asphalt paving at a rate of 0.05 to 0.15 gal./sq. yd.
b. Allow tack coat to cure undisturbed before applying hot-mix asphalt paving.
c. Avoid smearing or staining adjoining surfaces, appurtenances, and surroundings.
Remove spillages and clean affected surfaces.
5. Surface Preparation
a. General: Immediately before placing asphalt materials, remove loose and deleterious material from substrate surfaces. Ensure that prepared subgrade is ready to receive paving.
b. Herbicide Treatment: Apply herbicide according to manufacturer's recommended rates and written application instructions. Apply to dry, prepared subgrade or surface of compacted-aggregate base before applying paving materials.
c. Prime Coat: Apply uniformly over surface of compacted unbound-aggregate base course at a rate of 0.15 to 0.50 gal./sq. yd.. Apply enough material to penetrate and seal but not flood surface. Allow prime coat to cure.
1. If prime coat is not entirely absorbed within 24 hours after application, spread sand over surface to blot excess asphalt. Use enough sand to prevent pickup under traffic. Remove loose sand by sweeping before pavement is placed and after volatiles have evaporated.
2. Protect primed substrate from damage until ready to receive paving.
d. Tack Coat: Apply uniformly to surfaces of existing pavement at a rate of 0.05 to
0.15 gal./sq. yd.
1. Allow tack coat to cure undisturbed before applying hot-mix asphalt paving.
2. If tack coat is not entirely absorbed within 24 hours after application, spread sand over surface to blot excess asphalt. Use enough sand to prevent pickup under traffic. Remove loose sand by sweeping before pavement is placed and after volatiles have evaporated.
3. Avoid smearing or staining adjoining surfaces, appurtenances, and surroundings. Remove spillages and clean affected surfaces.
6. Hot-Mix Asphalt Placing:
a. Machine place hot-mix asphalt on prepared surface, spread uniformly, and strike off. Place asphalt mix by hand to areas inaccessible to equipment in a manner that prevents segregation of mix. Place each course to required grade, cross section, and thickness when compacted.
1. Place hot-mix asphalt base course in number of lifts and thicknesses indicated.
2. Place hot-mix asphalt surface course in single lift.
3. Spread mix at minimum temperature of 250 deg. F.
4. Begin applying mix along centerline of crown for crowned sections and on high side of one-way slopes unless otherwise indicated.
5. Regulate paver machine speed to obtain smooth, continuous surface free of pulls and tears in asphalt-paving mat.
b. Place paving in consecutive strips not less than 10 feet wide unless infill edge strips of a lesser width are required.
1. After first strip has been placed and rolled, place succeeding strips and extend rolling to overlap previous strips. Complete a section of asphalt base course before placing asphalt surface course.
c. Promptly correct surface irregularities in paving course behind paver. Use suitable hand tools to remove excess material forming high spots. Fill depressions with hot-mix asphalt to prevent segregation of mix; use suitable hand tools to smooth surface.
7. Joints:
a. Construct joints to ensure a continuous bond between adjoining paving sections.
Construct joints free of depressions, with same texture and smoothness as other sections of hot-mix asphalt course.
1. Clean contact surfaces and apply tack coat to joints.
2. Offset longitudinal joints, in successive courses, a minimum of 6 inches.
3. Offset transverse joints, in successive courses, a minimum of 24 inches.
4. Construct transverse joints at each point where paver ends a day's work and resumes work at a subsequent time. Construct these joints using either "bulkhead" or "papered" method according to AI MS-22, for both "Ending a Lane" and "Resumption of Paving Operations."
8. Compaction:
a. General: Begin compaction as soon as placed hot-mix paving will bear roller weight without excessive displacement. Compact hot-mix paving with hot, hand tampers or with vibratory-plate compactors in areas inaccessible to rollers.
1. Complete compaction before mix temperature cools to 185 deg F.
9. Breakdown Rolling: Complete breakdown or initial rolling immediately after rolling joints and outside edge. Examine surface immediately after breakdown rolling for indicated crown, grade, and smoothness. Correct laydown and rolling operations to comply with requirements.
10. Intermediate Rolling: Begin intermediate rolling immediately after breakdown rolling while hot-mix asphalt is still hot enough to achieve specified density. Continue rolling until hot-mix asphalt course has been uniformly compacted to the following density:
a. Average Density: 96 percent of reference laboratory density according to ASTM D
6927 or AASHTO T 245, but not less than 94 percent nor greater than 100 percent.
b. Average Density: 92 percent of reference maximum theoretical density according to
ASTM D 2041, but not less than 90 percent nor greater than 96 percent.
11. Finish Rolling: Finish roll paved surfaces to remove roller marks while hot-mix asphalt is still warm.
12. Edge Shaping: While surface is being compacted and finished, trim edges of pavement to proper alignment. Bevel edges while asphalt is still hot; compact thoroughly. Remove paved areas that are defective or contaminated with foreign materials and replace with fresh, hot-mix asphalt. Compact by rolling to specified density and surface smoothness.
F. Protection: After final rolling, do not permit vehicular traffic on pavement until it has cooled and hardened.
13. Barricades: Erect barricades to protect paving from traffic until mixture has cooled enough not to become marked.
14. Pavement Markings:
a. Do not apply pavement-marking paint until layout, colors, and placement have been verified with Architect.
b. Allow paving to age for 30 days before starting pavement marking.
c. Sweep and clean surface to eliminate loose material and dust.
d. Apply paint with mechanical equipment to produce pavement markings, of dimensions indicated, (See Fig 12) with uniform, straight edges. Apply at manufacturer's recommended rates to provide a minimum wet film thickness of 15 mils.
e. Broadcast glass beads uniformly into wet pavement markings at a rate of 6 lb/gal..
15. Wheel Stops:
a. Install wheel stops in bed of adhesive as recommended by manufacturer.
b. Securely attach wheel stops to pavement with not less than two galvanized-steel dowels embedded at one-quarter to one-third points. Securely install dowels into pavement and bond to wheel stop. Recess head of dowel beneath top of wheel stop.
16. Disposal:
a. Except for material indicated to be recycled, remove excavated materials from site and legally dispose of them in an EPA-approved landfill.
5. INSTALLATION TOLERANCES
A. Pavement Thickness: Compact each course to produce the thickness indicated within the following tolerances:
1. Base Course: Plus or minus 1/2 inch.
2. Surface Course: Plus 1/4 inch, no minus.
B. Pavement Surface Smoothness: Compact each course to produce a surface smoothness within the following tolerances as determined by using a 10-foot (3-m) straightedge applied transversely or longitudinally to paved areas:
1. Base Course: 1/4 inch.
2. Surface Course: 1/8 inch.
3. Crowned Surfaces: Test with crowned template centered and at right angle to crown.
Maximum allowable variance from template is 1/4 inch.
6. FIELD QUALITY CONTROL
A. Testing Agency: Contractor shall engage a qualified testing agency to perform tests and inspections. Copies of all tests shall be provided to the COR.
B. Thickness: In-place compacted thickness of hot-mix asphalt courses will be determined according to ASTM D 3549.
C. Surface Smoothness: Finished surface of each hot-mix asphalt course will be tested for compliance with smoothness tolerances.
D. In-Place Density: Testing agency will take samples of un-compacted paving mixtures and compacted pavement according to ASTM D 979 or AASHTO T 168.
E. Reference maximum theoretical density will be determined by averaging results from four samples of hot-mix asphalt-paving mixture delivered daily to site, prepared according to ASTM D 2041, and compacted according to job-mix specifications.
F. In-place density of compacted pavement will be determined by testing core samples according to ASTM D 1188 or ASTM D 2726.
G. One core sample will be taken for every 1000 sq. yd. or less of installed pavement, with no fewer than 3 cores taken.
H. Field density of in-place compacted pavement may also be determined by nuclear method according to ASTM D 2950 and correlated with ASTM D 1188 or ASTM D 2726.
I. Replace and compact hot-mix asphalt where core tests were taken.
J. Remove and replace or install additional hot-mix asphalt where test results or measurements indicate that it does not comply with specified requirements.
7. SUBMITTALS:
1. Product Data:
A. Provide manufacturer’s catalog cuts for all items but not limited to:
a All items listed in section 3 of this SOW.
b Provide SDS for all chemicals.
c Layout drawing showing planning of shutdowns of parking areas including alternate routing for delivery and provisions for parking.
d Pavement marking drawing plan.
e Concrete mix
2. Certification of Performance Criteria:
A. Contractor shall provide certification stating their qualifications for installation of asphalt pavement.
8. SITE ACCESS/CONSTRUCTION LIMITS
a. Contractor shall maintain access to the site at all times.
b. Construction/demolition shall in no way interfere with FAA Operations. Extreme care shall be exercised so as not to cause any interference or interruption of service provided of this facility. It is mandatory that the contractor protect FAA personnel and existing communications equipment. Any damages incurred, as a result of construction activity during the performance of this contract will be repaired/replaced immediately by the contractor at no cost to the FAA.
c. Any work or activity that may impact the FAA, such as work on critical equipment or circuits, will require coordination with the COR. The COR will coordinate with the local facility personnel to address develop an activity specific “Risk Assessment” for the facility’s final approval. This process may take a full day to complete.
d. The contractor shall confine operations, activities, storage of materials and employee parking within the designated areas, as identified by the COR. If required, additional space the contractor deems necessary shall be obtained off site, at no additional cost to the Government.
e. Vehicles transporting materials shall not be loaded beyond the capacity prescribed by federal, state, or local laws. Obstruction of existing roadways, driveways, to the facility is strictly prohibited.
f. Damage to existing paving, lawns, and utilities caused by the contractor's activities shall be repaired immediately. Any damages that are a result of the contractor’s activities shall be repaired. All costs of repairs shall be paid by the contractor. After notice to proceed and prior to the commencement of construction, the contractor and COR shall conduct joint inspections of the existing areas affected by the construction. Existing damage or defects shall be noted and will be used as the basis for determination of damages caused by the contractor's operations.
g. It is strongly urged that the contractor carefully examine the premises to determine the extent of work and the conditions under which it must be done.
h. The Government reserves the right to enter the construction area at any time for work inspection and for the operation of the facility.
i. All work hours, shifts, and overtime work shall be coordinated with the COR. Before commencing construction, furnish to the COR a statement of hours per day and days per week to normally be worked and approximate number of persons on the job for a normal work shift.
j. At the end of each work day, the contractor shall secure all construction areas. The contractor is responsible for the security of the staging area, and shall provide the required measures at no additional expense to the government.
9. PERSONNEL
Contracting Officer -The term "Contracting Officer" (CO) as used herein denotes the person designated to act on behalf of the Government in the performance of this contract. Where reference is made to "Federal Aviation Administration" (FAA), "Contracting Officer's Representative" (COR), or the like, this shall mean the Contracting Officer or his/her authorized representative.
Contractor Superintendence - In accordance with Contract Clause entitled SUPERINTENDENCE BY THE CONTRACTOR, the Contractor shall at all times during performance of this contract and until the work is completed and accepted, directly superintend the work or assign and have on site a competent superintendent with the authority to act for the Contractor.
The Contractor shall submit a Project Organizational Chart with the key personnel identified and their qualifications for the Government’s review and approval.
The contractor and his employees shall be subject to all rules and regulations relative to entering and leaving the FAA facility.
Employees - The government reserves the right to restrict the employment of any contractor employee, or prospective contractor employee, who is identified as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.
The contractor shall not employ any person who is in employment of the United States Government if the employment of that person would create a conflict of interest.
10. COORDINATION
The contractor shall coordinate all work, which has any or may have any impact on any operational system through the COR. The contractor shall immediately cease any work, which is adversely impacting the operation of the FAA facility and shall be responsible for the immediate repair or restoration of any portion of the operational system that has been damaged or suffered diminished performance as a result of the contractor's activities. No repairs shall be completed without notification of the COR. In some cases, the repairs may be performed by FAA personnel at the contractor’s expense, due to the criticality of the repair.
The Contractor will be responsible for obtaining and payment of all building fees, inspection fees, utility connection charges and any other fees or charges which may be incurred in the performance of this contract. The contractor shall comply with all local city, county, and state construction codes.
All materials or workmanship or both which have been rejected by the COR by reasons of failure to conform with the requirements of the Contract Documents shall be removed and replaced with new, acceptable materials by the contractor at the contractor's own expense.
Contractor shall also pay for testing of new materials which have been installed in place of rejected materials.
11. CONSTRUCTION SCHEDULE
The work plan and schedule prepared by the contractor shall consist of a logical narrative plan.
Include construction activities, submittal and approval of materials, samples and shop drawings
(if applicable), the procurement of critical materials and equipment, fabrication of special materials and equipment along with their installation and testing.
The Contractor shall warranty material, workmanship, and equipment furnished by the various manufacturers in writing for a period of two (2) years (or not less than the industry standard for the material specified, nor the manufacturer’s standard warranty period, whichever is greater) from the date of final project acceptance by the FAA.
12. SAFETY REQUIREMENTS
Contractor Responsibility
a. General Safety Provisions - The Contractor shall bear full responsibility to provide safe working conditions for its employees and Contractors. The Contractor shall not permit any employee or Subcontractor to work in surroundings or under working conditions that are unsanitary, hazardous, or dangerous to the health and safety of the employee.
b. Accident Prevention - The Contractor shall bear the responsibility of maintaining an accident prevention program such that frequent and regular inspections of the job site, materials and equipment are made by a competent person designated by the employer.
c. Use of Equipment - The Contractor shall not permit the use of any machinery, tool, material, or equipment that is not in compliance with OSHA regulations. The employer shall permit only those employees qualified by training and/or experience to operate equipment and machinery.
i. Submittals required include, but are not necessarily limited to, the following:
Contractor Safety Plan
4. The FAA shall not be held responsible for safety inspections to ensure Contractor conformance with the OSHA safety regulations. The FAA, however, reserves the right to notify the Contractor of any deficiencies regarding worker safety.
5. The FAA will evaluate the Contractor on its safety performance, including that of its Subcontractors. The number and severity of safety and security violations will be considered in this evaluation. Contractor safety violations are cause for termination for default, may result in notification of the Contractor’s bonding company, and will affect the Contractor’s opportunity to propose on future work. Failure to correct such deficiencies may impact the Contractor’s ability to work on future FAA contracts.
OSHA Regulations
The Contractor shall comply with the latest Occupational Safety and Health Administration regulations (CFR 29 Part 1926) regarding safety in the work area.
The Contractor shall be responsible for obtaining copies of non-FAA referenced documents without additional cost to the FAA. If Contractor requests a copy of FAA directives, they may be obtained by contacting the Contracting Officer.
The Contractor is not relieved from adhering to other OSHA requirements not listed herein.
The Contractor shall consult the latest referenced OSHA documents for safety regulations.
Documents:
OSHA Documents:
CFR 29 Part 1926Safety and Health Regulations for Construction
CFR 29 Part 1910 General Industry Standards Applicable to Construction Industry
13. CLEAN-UP
The contractor shall correct or repair any damage done during any part of this contract. Scrap and debris resulting from the project shall be removed from the site after each day’s work on site. All debris and generated waste shall require disposal in a manner that is not in conflict with local sanitary regulations.
14. SUPPLIES AND EQUIPMENT
The Contractor shall furnish all supplies and equipment as specified to accomplish the contract specifications.
SHIPPING AND RECEIVING MATERIAL. FAA shall not be responsible for shipping or receiving any material relating to this contract nor shall the contractor ship or otherwise receive any materials at the expense of the FAA.
STORAGE OF MATERIALS. No storage area/space will be provided for contractor furnished equipment or supplies. Onsite storage must be coordinated with the COR so that the roadway is not blocked.
15. CONTACT/LOCATION INFORMATION
A. Location of Work:
B. FAA Point of Contact:
3979 Aviation Cir NW, Atlanta, GA 30336
James Q. Storm
678-495-5250
404-858-4239
C. Pre-Bid Site Visit: All interested contractors are Required to view the site conditions prior to bidding. A site visit must be coordinated with the FAA Point of Contact. All expenses for the recommended site visit shall be the responsibility of the contractor. The U.S.
Government shall not reimburse any expenses incurred for the purpose of soliciting bids for this contract.
16. ACCEPTANCE OF WORK
The FAA COR will conduct a Construction Acceptance Inspection at the completion of the project to ensure that all items of the contract have been fulfilled and that the site has been cleaned of debris.
PHOTOS
Figure 1: Satellite view of FTY ATCT Facility with parking lot area identified -
IN YELLOW OUTLINED AREA
Figure 2: Existing asphalt condition
Figure 3: Existing asphalt condition
Figure 4: Asphalt cracking throughout
Figure 5:Asphalt cracking throughout
Figure 6: Asphalt cracking throughout
Figure 7: Striping
| 1. STATEMENT OF WORK |
| 8. SITE ACCESS/CONSTRUCTION LIMITS |
| 9. PERSONNEL |
| 10. COORDINATION |
| 11. CONSTRUCTION SCHEDULE |
| 12. SAFETY REQUIREMENTS |
| OSHA Regulations |
| OSHA Documents: |
| 13. CLEAN-UP |
| 14. SUPPLIES AND EQUIPMENT |
| 15. CONTACT/LOCATION INFORMATION |
| 16. ACCEPTANCE OF WORK |