Base Miami Beach Fenders Federal contract opportunity
Solicitation number
31020PR240000141
Issued by
Department of Homeland Security US Coast Guard

About this file

This combined synopsis and solicitation requests quotes for three marine foam fill fenders to be purchased and delivered by the United States Coast Guard Base Miami Beach. The solicitation specifies black fenders that are 5 feet in diameter, 8 feet in length eye-to-eye and 4 feet in length of flat, with a performance of 136 foot-kips of energy, 101 kips of reaction, and 3.6 kips per square foot of pressure at 60% compression. Accessories including endplates, swivels, bolts and three 1-inch stainless steel shackles must be provided. Delivery is required to 100 MacArthur Causeway, Miami Beach, Florida 33139. Quotes are due by March 22, 2024 and award will be made based on best value considering specification compliance, price, warranties, delivery time and cost to the government.

View the file

Other files for this federal contract opportunity

Other files attached to Base Miami Beach Fenders, newest first.
File Type Posted
15-4543.txt TXT text file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

BASE MIAMI BEACH

SPECIFICATIONS

FOR

Fenders

GENERAL: United States Coast Guard Base Miami Beach is accepting proposals for qualified individuals or firms to procure and deliver 3 fenders to Base Miami Beach. Prior to submitting a quote, it is mandatory to examine the scope of work and it’s highly encouraged to visit the facility to take field measurements, evaluations, etc., and become familiar with existing conditions under which the work will be performed. After the award of contract, a pre-conference will be held prior to starting the work at Coast Guard Base Miami Beach.

LOCATION:

United States Coast Guard Base Miami Beach 100 MacArthur Causeway Miami, FL 33139

EXAMINATION OF SITE: It is HIGHLY ENCOURAGED that bidders carefully inspect the workplace and verify work necessary to complete the job. Prospective bidders arrange for a tour of the job site by calling the point of contact, Mr. Boris Abello at (305) 695-2385 or by e-mail at Boris.Abello@uscg.mil, at least 3 working days in advance.

I. CONTINUITY OF FACILITIES OPERATIONS: Schedule work to minimize interference with the facility’s normal operations. Normal operating hours are from 6:30am to 3:00pm Monday thru Friday except federal holidays. Any work during other hours shall be requested in writing at least 5 working days in advance and must be approved by the Contracting Officer.

II. NOTIFICATION OF START/COMPLETION: The Contractor shall notify the Coast Guard one week prior to start of work, the start and projected completion date.

III. COAST GUARD CONTRACTING OFFICER REPRESENTATIVE: The Contractor shall contact the Contracting Officer’s Representative (COR) to coordinate all construction efforts onboard Coast Guard Facilities.

Mr. Boris Abello - COR Boris.Abello@uscg.mil 305-695-2385 CWO Garrett Pearsall Garrett.W.Pearsall@uscg.mil 305-535-4547 LT Nakia D Bacon Nakia.D.Bacon@uscg.mil 305-535-4589

IV. RECYCLING AND DISPOSAL OF REFUSE: Minor refuse, excess or waste materials resulting from construction operations may be disposed of in base dumpsters. All disposals shall be done in accordance with federal, state, and local laws and regulations. All bulk waste shall be disposed of in contractor provided dumpsters.

V. SAFETY: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction. The contractor shall have a written safety plan as required in FAR 5.236-13. The plan shall unequivocally assign responsibility and authority for safety to the superintendent by name. Immediate notification to the Contracting Officer’s Representative of lost time due to accidents is required. Provide two copies of workman’s compensation accident reports by noon of the day following the accident. The Coast Guard reserves the right to bar any workers or supervisors from the premises should they be documented as violating set safety standards and regulations.

mailto:Boris.Abello@uscg.mil

VI. INSPECTION: The Contracting Officer’s Representative has the right to reject defective workmanship or materials or work not performed as per the project specifications. Only the Contracting Officer or his/her representative may accept work performed by the contractor.

VII. OPERATIONS AND STORAGE: The contractor is to take whatever steps necessary to ensure that his materials are protected. The Coast Guard has no responsibility for receipt, storage, or protection of contractor’s materials. All equipment, materials and supplies shall be addressed to the contractor. The Coast Guard will not accept shipments. The contractor is responsible for the protection of existing structures, utilities, work and vegetation. Any damage shall be repaired at the contractor’s expense.

VIII. CONTRTACTOR IDENTIFICATION: The contractor and subcontractor personnel shall always wear company identification and carry personal identification.

IX. EXISTING UTILITIES: The Contractor shall field verify all utility locations before commencing work. This shall include, but not be limited to, the use of visual, sonic, electronic or magnetic detection devices. Contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government.

X. REGULATIONS WHILE ONBOARD COAST GUARD BASE MIAMI BEACH:

1. Daily colors and the raising/lowering of the American flag will take place every morning at 0800 and every evening at sunset. All personnel on Base will face the main flagpole & maintain silence and all vehicles & equipment will halt during these brief events.

2. The construction site shall always be maintained in a clean condition. This included daily clean-ups of the construction and storage areas (FAR 52.236-12). The site shall be well lit and well barricaded/cordoned off as appropriate.

3. Contractors are welcome to eat breakfast & lunch on Base in the base galley at cost.

Breakfast is served from 0630-0730 daily & lunch will be served from 1130-1230 daily in the galley. All personnel desiring meal service shall be in clean, non-soiled clothing.

The Coast guard reserves the right to refuse service to anyone it deems not hygienically acceptable.

4. There is one smoking area on base located in the central northern parking lot covered by the tiki hut. No smoking is permitted anywhere else on base.

5. Contractors are welcome to utilize the Base’s Exchange store; however, contracted personnel are prohibited from purchasing any uniform, alcohol or tobacco products.

6. Traffic Regulations:

a) 10 mph speed limit

b) No use of cell phones is permitted while driving vehicles or operating heavy machinery.

c) All personnel shall obey all marked traffic signals including stop signs & stop lights.

7. Absolutely no firearms or weapons of any kind are allowed onboard Base Miami Beach.

8. Only American citizens and permanent resident aliens are allowed onboard Base Miami

Beach Facilities. Absolutely no foreign nationals are permitted on the premises.

9. Notice shall be given to the Coast Guard’s representative 1 week in advance of any planned power, water, sewage or lighting outages.

10. The contractor shall provide a consolidated list of all contracted personnel including their driver’s license numbers (or other valid gov’t issued ID number) who will be working on

Base Miami Beach Facilities either the day of or prior to the notice to proceed date.

11. Contractors are welcome to utilize the restrooms on the 1st decks of Buildings 3, 4, and 7 providing they are clean and do not track mud, dirt or any other debris into the restrooms.

12. Should warnings of gale force or stronger winds, or other inbound natural disasters be issued, the contractor shall take every practicable precaution to minimize the danger to persons, to the work, and the adjacent property. These precautions shall include closing all openings, removing all loose materials, tools and equipment from exposed locations, and removing or securing scaffolding, securing field trailers, and other appropriate equipment and other temporary work.

13. No personnel other than the Contracting Officer has the authority to alter the terms of any contract or to issue any change orders.

14. All contractor vehicles, equipment and gear onboard Coast Guard properties are always subject to search. Additionally, contractors are subject to orders to evacuate the property at any time.

15. Due to the compact & dense nature of operations & support functions ongoing on-board Base Miami Beach all efforts within reason to minimize the size and footprint of the contractor’s lay down area shall be taken. Contractors shall carpool as much as possible to minimize the number of vehicles needing parking on Base. At a minimum, the ratio of contractors to contractor vehicles shall be no less than 2:1.

16. All piers and waterfront bulkheads on base Miami Beach are load restricted in some form. If contractors need to bring heavy equipment (cranes, forklifts, 18 wheelers, man-lifts, construction equipment, backhoes, excavators or other equipment heavier than standard sedans) closer than 40’ to any pier or waterfront bulkhead on Base to complete their project, the contractor shall submit a request for information (RFI) to the COR at least 1 week in advance.

17. The entrance bridge to Base Miami Beach is an HS20-44 rated bridge. Contractor cannot exceed this rating. If the combined vehicle, trailer, and payload weight is over 50,000 lbs.

the contractor shall submit an RFI to the COR at least 1 week in advance.

XI. SCOPE OF WORK:

1. Contractor shall procure:

Three (3) Marine Fenders 5' x 8' Long - Grade 1.0 (STD) (Black) fenders.

2. Contractor shall deliver above referenced fenders to:

100 MacArthur Causeway Miami Beach, FL 33139

ATTENTION:

Facilities Engineering Department MK1 Scott Parkinson

3. All work must be approved by the Contracting Officer’s Representative.

XII. SUBMITTALS: Submittals shall be approved before procurement, fabrication, or delivery of items to the job site. Partial submittals will not be accepted and will be returned without review. Submittals shall include the manufacturer's name, trade name, catalog model or number, nameplate data, size, layout dimensions, capacity, project specification and paragraph reference, applicable Federal, Military, industry and technical society publication references, and other information necessary to establish contract compliance of each item the Contractor proposes to furnish. Failure to furnish required submittals can be cause for rejection of the material.

Approval of submittals shall not relieve the contractor his obligation to comply with the contract specifications and drawings.

XIII: WARRANTY: Submit three signed copies of Manufacturer’s Product Warranty for entrance system as follows:

1. Warranty Period: Three years from date of completion of the project, provided that the limited warranty begins in no event later than six months from date of shipment by manufacturer. Ensure warranty language is identical to “as approved” version of the sample warranty submitted and returned from the COR.

Berth 7

Berth 11