SOW 2041-JB01 laser cutter machine.pdf
PDF 145 KB Posted
- Attached to
- Purchase Laser Cutting System Federal contract opportunity
- Solicitation number
- 70Z03822QK0000006
About this file
This document includes a statement of work and solicitation for a laser cutting system. The United States Coast Guard Aviation Logistics Center requires a FiberCab Laser Cutting System machine to fit within a ninety inch by ninety inch footprint, capable of cutting at least half an inch of aluminum or steel. The statement of work outlines requirements for rigging, delivery, installation, training, and warranty. The solicitation seeks a firm fixed price for the laser cutting system, delivery, rigging, installation, and initial training and support, with responses due by June 16th, 2022 and anticipated award by June 30th, 2022. The document provides procurement details including point of delivery, inspection criteria, and protest procedures for the United States Coast Guard opportunity.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW 2041-JB01 laser cutter machine.pdf | ||
| Terms and Conditions FAC 2022-06 Eff 1May2022.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) for the purchase of and Installation of
FiberCab Laser System Machine FC 44
70Z03822QK0000006
1.0 General
The United States Coast Guard (USCG), Aviation Logistics Center (ALC), Industrial Operations
Division (IOD) has a requirement for a FiberCab Laser System Machine FC 44.
2.0 Requirements
The Contractor shall provide all the necessary personnel to perform removal and movement of the existing water jet machine and off-loading and movement of the identified equipment into the customer’s desired location inside of building 97, Machine Shop. The Rigging Company will be responsible for the coordination of delivery and set-up of new machine and removal of the existing water jet machine. To schedule, the Rigging Company shall contact the Contractor’s technical point of contract (POC) listed below. The FiberCab Laser System machine shall be installed at;
IOD Shop 133
Building 97
1664 Weeksville Road
Elizabeth City, NC 27909
The Rigging Company shall remove the existing water jet machine and move it to the on-site disposal location. The distance is approximately four hundred (400) yards from building 97. The Rigging
Company shall off-load the FiberCab Laser Machine FC 44, and moved it into its final location, where set-up and rough level can take place. The Rigging Company will provide all Equipment, Tooling, and
Labor to complete the task within this SOW.
The Contractor shall provide only Certified Technicians for on-site installation. The Technicians will install, test, and provide initial training of machine commands and controls. At that time, the
Contractor’s requirements will be met.
The Contractor’s representative shall travel to ALC to perform services based on a mutually agreed schedule. The Contractor’s technical POC for this effort is Mr. Darnell Chamblee. He can be reached by phone at (252) 335-6414 or by email at Aaron.D.Chamblee@uscg.mil.
2.1 Additional Requirements
The following are considered the minimum key requirements when determining the appropriate Laser
Cutting System.
Machine must fit into existing foot print size – ninety (90) inch long by ninety (90) inch wide.
Machine cutting minimum capabilities - .5 inch for aluminum (Non-Ferrous) and .5 inch for steel
(Ferrous) metal.
Machine must have the capability to be air and / or water cooled.
Software must be installed as part of the procurement package.
Machine must be able to operate with either oxygen or nitrogen.
Vendor shall provide the best warranty available.
mailto:Aaron.D.Chamblee@uscg.mil
Vendor must offer training for up to ten (10) personal and support for the next twelve (12) months as initial provision package. Training will be completed within thirty (30) calendar days after installation.
Vendor shall complete the on-site installation within thirty (30) calendar days after receipt of material.
3.0 Contractor Personnel
3.1 Qualified Personnel
The Contractor shall provide personnel qualified to perform all requirements specified in this SOW.
Qualified personnel shall have been trained and authorized by the OEM to perform these services.
3.2 Identification of Contractor Employees
The Contractor shall ensure all employees present a professional appearance appropriate for the position held. All Contractor personnel shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment so as not to present a Foreign Object Debris (FOD) hazard and clearly identify the employee as a Contractor representative.
4.0 Policies and Regulations
4.1 Access to USCG Base Elizabeth City
ALC is a tenant command of Base Elizabeth City. The Contractor shall be met at the gate by a
Government representative and shall be continually escorted by the representative for the duration of the visit. Base access requires 100% hands on ID checks. Drivers of vehicles must show a state driver license, valid vehicle registration, and current proof of insurance. All vehicles are subject to random search under Title 18 U.S.C 1382.
4.2 Compliance with Local Regulations, Instructions, Directives
Contractor personnel shall comply with all local base regulations, instructions, directives, orders, and special procedures as promulgated by the Commanding Officer, USCG Base Elizabeth City (and all tenant commands), Elizabeth City, NC. All visitors to ALC shall review the ALC Visitor/Contractor
Safety & Environmental Health Brochure information which is included after page 3 of this SOW.
4.3 Removing Employees for Misconduct or Security Reasons
The Contracting Officer may direct the Contractor to remove any Contractor employee from USCG facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the order. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.
4.4 Tobacco Policy
The USCG prohibits the use of smoking tobacco and smokeless tobacco in the workplace to protect the health of all its workers. The workplace includes any area inside or outside of a building or facility under the custody and control of the USCG where work is performed by active duty personnel, civilian employees, or personnel under contract to the USCG. The use of tobacco is prohibited in all USCG
Government vehicles (including Cushman type), in all USCG aircraft, floating unit, or any other aircraft contracted for use in the USCG. The use of tobacco products (smoking and smokeless) is permitted only in designated areas as defined in USCG ALC Instruction 6280.1 (series). Contractors may only use tobacco products in designated smoking areas and are accountable for appropriately discarding their smoking material and/or spit tobacco. Tobacco spit and residue shall be held in containers with sealing lids to prevent odor and accidental spills and disposed of in a sanitary manner that prevents public exposure. Employees caught violating the tobacco policy may be subject to immediate removal.
4.5 Environmental, Safety, And Occupational Health (ESOH)
The Contractor is solely responsible for compliance with all federal, state and local laws, including but not limited to the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standard 29 CFR 1910 and any ALC Instructions as applicable, and the protection of their employees. Note: ALC Instructions are annotated because many of the USCG/ALC standards exceed the OSHA standard criteria. If a conflict is noted, the most stringent requirement takes precedence. The USCG shall assume no liability or responsibility for the Contractor's compliance or
Non-compliance with such requirements. In addition, the Contractor is required to flow down the safety requirements/specifications to all subcontracts/subcontractors. Safety requirements listed herein that do not concern Contractor’s operations or services shall be considered self-deleting as mutually agreed by the Contracting Officer and the Contractor.
4.5.1 The Contractor shall be subject to safety inspections of its work sites by the USCG. Contractor safety records shall be available upon request by the Contracting Officer. The Contractor shall be liable for, and shall indemnify and hold harmless the USCG against, all actions or claims pertaining to the
“personal” safety requirements of employees. The Contractor shall provide all personal protective equipment (respiratory protection, hearing protection, gloves, steel-toed shoes, safety glasses, protective clothing, etc.). In addition, the USCG is not responsible for medical examinations, hearing testing, substance abuse testing, or any other type of testing for Contractor employees.
5.0 Purchase Order Information
5.1 F.O.B. Point
The F.O.B. point for this order is F.O.B. Destination. Prices in the schedule include all charges for:
travel time; on-site training hours; airfare; lodging; local transportation; and any other travel costs as well as any applicable customs, duties, and taxes. No additional charges will be allowed unless indicated by a bilateral modification to the order.
5.2 Inspection and Acceptance Criteria
Inspection and acceptance of the training shall be performed at destination by the technical POC identified on this order. Performance under this order will not be accepted by the USCG until the technical POC considers all training to be delivered in accordance with this SOW.
File details come from the government source that posted it. Updated .