IRTH_RFI_Questions_and_Responses.pdf

PDF 189 KB Posted

Attached to
Indoor Running Track Heaters Federal contract opportunity
Solicitation number
Solicitation_FA2550-17-R-1020
Issued by
Department of the Air Force Space Command

About this file

RFI's and separate pricing.

View the file

Other files for this federal contract opportunity

Other files attached to Indoor Running Track Heaters, newest first.
File Type Posted
IRTH_RFI_Amendment_5.pdf PDF
B122_Grading_Plan.pdf PDF
IRTH_RFI_Amendment_4.pdf PDF
IRTH_RFI_Amendment_3.pdf PDF
Site_Visit_9-5-17.pdf PDF
1_FA2550-17-R-1020_1442.docx.pdf PDF
6_Install_Heaters,_B122_AF_Form_66.pdf PDF
2_SOW_Install_Heaters,_B122.pdf PDF
4_Install_Heaters,_B122_Drawing.pdf PDF
3_Cable_Installation_Guide_0911B.pdf PDF
PROPOSAL_DUE_DATES.pdf PDF
5_ENV_SPEC_SECTION_-_V1_2_Dec_14.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA2550-17-R-1020 Indoor Running Track Heaters Amendment #2

FA2550-17-R-1020

RFI Questions and Responses

1. Section 3.9 of the SoW states “The contractor shall provide connectivity between the gas heaters controls and the Base EMCS so the ATCC can turn on the gas heaters remotely.”

Is there an existing conveyance into B122 for the EMCS?

a. Government Response: There is not a conveyance at B122. The nearest one is in

B120 (next door). This may require extensive digging/trenching to run a conveyance to B122.

b. The contractor is to separately price (1) the install of the heaters and pre-wire the heaters for EMCS and (2) the EMCS conveyance install and verification.

2. Section 3.9 of the SoW states “The contractor shall provide connectivity between the gas heaters controls and the Base EMCS so the ATCC can turn on the gas heaters remotely.”

Who is the current EMCS contractor for B122?

a. Government Response: The contact for the B120 EMCS is HSQ. They would have information on the system and be able to provide any additional costs they would charge to connect and verify the system.

3. Grading and install of the concrete pads shall be seperately priced. Proposals shall contain separate pricing for:

a. install of the heaters and pre-wire the heaters for EMCS

b. EMCS conveyance install and verification.

c. Grading and install of concrete pads.