IRTH_RFI_Questions_and_Responses.pdf
PDF 189 KB Posted
- Attached to
- Indoor Running Track Heaters Federal contract opportunity
- Solicitation number
- Solicitation_FA2550-17-R-1020
About this file
RFI's and separate pricing.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| IRTH_RFI_Amendment_5.pdf | ||
| B122_Grading_Plan.pdf | ||
| IRTH_RFI_Amendment_4.pdf | ||
| IRTH_RFI_Amendment_3.pdf | ||
| Site_Visit_9-5-17.pdf | ||
| 1_FA2550-17-R-1020_1442.docx.pdf | ||
| 6_Install_Heaters,_B122_AF_Form_66.pdf | ||
| 2_SOW_Install_Heaters,_B122.pdf | ||
| 4_Install_Heaters,_B122_Drawing.pdf | ||
| 3_Cable_Installation_Guide_0911B.pdf | ||
| PROPOSAL_DUE_DATES.pdf | ||
| 5_ENV_SPEC_SECTION_-_V1_2_Dec_14.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA2550-17-R-1020 Indoor Running Track Heaters Amendment #2
FA2550-17-R-1020
RFI Questions and Responses
1. Section 3.9 of the SoW states “The contractor shall provide connectivity between the gas heaters controls and the Base EMCS so the ATCC can turn on the gas heaters remotely.”
Is there an existing conveyance into B122 for the EMCS?
a. Government Response: There is not a conveyance at B122. The nearest one is in
B120 (next door). This may require extensive digging/trenching to run a conveyance to B122.
b. The contractor is to separately price (1) the install of the heaters and pre-wire the heaters for EMCS and (2) the EMCS conveyance install and verification.
2. Section 3.9 of the SoW states “The contractor shall provide connectivity between the gas heaters controls and the Base EMCS so the ATCC can turn on the gas heaters remotely.”
Who is the current EMCS contractor for B122?
a. Government Response: The contact for the B120 EMCS is HSQ. They would have information on the system and be able to provide any additional costs they would charge to connect and verify the system.
3. Grading and install of the concrete pads shall be seperately priced. Proposals shall contain separate pricing for:
a. install of the heaters and pre-wire the heaters for EMCS
b. EMCS conveyance install and verification.
c. Grading and install of concrete pads.