This Request for Proposal solicits offers for the construction of a Fire Station Support Facility project. The solicitation will close on 13 March 2023 at 2:00 PM CST and is open only to small businesses. The magnitude of construction costs is estimated between $10 million to $25 million.

Offerors must be registered in the System for Award Management to be eligible. Solicitation documents are available on SAM.gov and include bidder inquiry procedures through ProjNet. Questions must be submitted by the stated deadline via the bidder inquiry system. The agency is the Department of the Army Corps of Engineers Omaha District. The project involves construction of a new fire station and associated site work at Fort Carson, Colorado.

View the file

Other files for this federal contract opportunity

Other files attached to Fire Station Support Building, newest first.
File Type Posted
Am 0006 - 13 Apr 23.pdf PDF
Am 0005 - 16 Mar 23 .pdf PDF
W9128F-23-R-0016_am_0005_Attachments.pdf PDF
Am_0004_Spec.pdf PDF
Am 0004 - 10 Mar 23.pdf PDF
Am 0004 - FCDR.PDF PDF
Am 0003 - 07 Mar 2023.pdf PDF
Am 0002 - 23 Feb 23.pdf PDF
Am 0001 - Fire Station.pdf PDF
W9128F23R0016_SPECS.pdf PDF
FCDR - ADVERTISEMENT.PDF PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fire Station Support Facility Fort Carson, Colorado

This solicitation is for Small Business Only

MICHELE A RENKEMA 402-995-2929

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

10-Feb-2023

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________548 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, X negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________13 Mar 2023 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST

CONTRACTING OFFICE

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

W9128F

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W9128F23R0016 87

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Job Construct Fire Station Support Facility

FFP

Entire work complete to construct Fire Station Support Facility excluding other items listed separately below FOB: Destination

PSC CD: Y1AZ

NET AMT

0002 Job Construction Sitework

FFP

Entire work complete to construct sitework to the limits shown on the plans.

Includes pavements, utilities, site improvements, and passive barriers.

0003 Job OPTION Procure and Install FF&E

FFP

Entire work complete to procure and install FF&E (O&M funded)

0004 Job OPTION Procure & Install ESS

FFP

Entire work complete to procure and install ESS (O&M funded)

0005 Job OPTION Construct Underground Power

FFP

Additional cost to construct underground power from tie-in to project site in lieu of aboveground power (MILCON funded)

0006 Job OPTION Construct Onsite Storage Building

FFP

Entire work complete to construct onsite storage building. (MILCON funded)

0007 Job OPTION Upgrade Aggregate roads

FFP

Additional cost to upgrade all Aggregate roads within ‘BASIC ITEMS’ to concrete roads. (MILCON funded)

0008 Job OPTION Install Aggregate Turn-Around Drive

FFP

Entire work complete to install Aggregate Turn-Around Drive.

(MILCON funded)

NOTES:

1. See 00 21 00, INSTRUCTIONS TO OFFERORS (RFP) for evaluation of options. The Government reserves the right to exercise Option Item No. 0003 & 0004 within 365 calendar days and Option Items No. 0005, 0006, 0007 & 0008 within 90 calendar days after issuance of Notice to Proceed. Abbreviations: Operations & Maintenance (O&M), Military Construction (MILCON).

2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. In case of variation between the Job (lump sum) prices and the total amount, the lump sum prices will be considered the price submitted.

3. A modification to a proposal which provides for a single adjustment to the total amounts, should state the application of the adjustment to each respective lump sum price and unit price affected.

4. The Offeror shall propose a total integrated contract duration in number of calendar days after the Notice to Proceed (NTP) is received by the Contractor. The total number of proposed calendar days for construction through completion, ready for turnover should not exceed the benchmark duration of 548 calendar days. The proposed duration shall become the required contract duration. The Government may issue the NTP via e-mail or Facsimile (FAX) or by other means. Day number 1 is the day after the date of receipt of the NTP. See Section 00 73 00, paragraph 1.1: COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK.

5. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.

Section 00 21 00 - Instructions

00 21 00

INSTRUCTIONS TO OFFERORS (RFP)

1. SOLICITATION RESTRICTIONS

1.1. GENERAL CONTRACTOR

This solicitation is Restricted Small Businesses Only.

1.2. ESTIMATED CONSTRUCTION COST

The estimated construction cost of this project is between $10,000,000 and $25,000,000.

1.3. SUBMISSION DEADLINE

Contractors shall submit their proposals via email to the instructions in Section 00 22 00 no later than the date and time established in Block 13 of the Standard Form (SF) 1442, or Block 14 of the most recently issued SF 30 as applicable.

Offerors shall use the following example for file descriptions:

Volume 1, Technical and Past Performance Information. Proposal, shall be submitted as the following separate files:

W9128F23R0016_FIRMNAME_REQD_DOCS

W9128F23R0016_FIRMNAME_FACTORS1_thru_3

Volume II, Price Proposal, Price Information, and Representations, Certifications, and Other Statements of Offerors shall be submitted as the following separate files:

1. W9128F23R0016_FIRMNAME_REQD_DOCS

W9128F23R0016_FIRMNAME_PRICE

(Note: Company name may be abbreviated)

Proposal Format: Reference Section 00 22 00 EVALUATION CRITERIA for page limitations and format.

Proposals received after the date and time stated within Block 13 of the SF1442, or Block 14 of the most recently issued SF 30 as applicable, will be considered late and will not be considered for award. To avoid rejection of a proposal, the offeror must make every effort to ensure its electronic submission is virus-free.

Do not assume submission will be instantaneous. File size and number of files submitted shall be considered. Contractor/Teammate/Subcontractors should allow adequate time for submission completion because the entire proposal (i.e., Contractor's submission and all teammate/subcontractor(s) independent submissions) must be received by the due date and time specified in Block 13 of SF 1442, or SF 30 as applicable.

2. COPIES OF SOLICITATION DOCUMENT AND AMENDMENTS

Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the U.S. General Services Administration website at: https://sam.gov/.

It shall be the Contractor's responsibility to check the website for any amendments. The offeror shall submit in the proposal all requested information specified in this solicitation.

There will be no public opening of the proposals received as a result of this solicitation. A list of interested vendors (potential offerors and subcontractors) is available on the sam.gov website listed above (registration required).

3. OFFEROR’S QUESTIONS AND COMMENTS

Questions and/or comments relative to these documents should be submitted via Bidder Inquiry as indicated below. Question and/or comments relative to these bidding (proposal) documents that is proprietary in nature or if Bidder Inquiry system (See Below) is out of service should be submitted to the Contract Specialist:

Contract Specialist – Primary POC:

Michele Renkema, michele.a.renkema@usace.army.mil

3.1. BIDDER INQUIRY

Technical inquiries and questions relating to technical requirements, proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at:

https://www.projnet.org/ no later than ten (10) calendar days before due date of proposals, in order that they may be given consideration or actions taken prior to receipt of offers. The Bidder Inquiry system is to be used to ask and receive answer to all non-proprietary questions.

To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team.

All timely questions and approved answers will be made available through ProjNet.

The Solicitation Number is: W9128F23R0016 The Bidder Inquiry Key is: E2TX8F-NQ6NJQ

a. Registration for ProjNet Bidder Inquiry Access

If you are already registered, go to Entering Bidder Inquiries in ProjNet Bidder Inquiry System below.

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret

Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

b. Entering Bidder Inquiries in ProjNet Bidder Inquiry System

1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

8. Follow online screen instructions to enter specific bidder inquiries for the project.

c. Offerors are requested to review the specification in its entirety, review the Bidder

Inquiry System for answers to questions prior to submission of a new inquiry.

d. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

e. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

4. PLAN HOLDER’S LIST

W9128F23R0016

For viewing a list of interested vendors (i.e. Plan Holders List) and receiving notifications or email of changes regarding a solicitation, U.S. General Services Administration has these features available (https://sam.gov/). For this solicitation, go to https://sam.gov/ and register as a vendor or enter username and password to login. If you wish for General Contractors, Subcontractors, Suppliers, Plan Rooms or Print Shops to have the ability to contact you, click on "Add me to Interested Vendors" for the solicitation.

5. GENERAL DESCRIPTION OF WORK

Scope of project includes all work required to Construct a Fire Station Support Facility at Fort Carson, CO. Work shall be in accordance with Request for Proposal documents issued with this solicitation.

6. EVALUATION AND CONTRACT AWARD

See Section 00 22 00 Evaluation Criteria

7. SOURCE SELECTION BOARD

The Contracting Officer has established a Source Selection Evaluation Board (SSEB) to conduct an evaluation of each proposal received in response to this solicitation. The evaluation will be based exclusively on the merits and content of the proposal and any subsequent discussion required. The identities of the SSEB personnel are confidential, and any attempt by the proposers to contact these individuals is prohibited.

8. FEDERAL, STATE, AND LOCAL TAXES

It is the Contractor's responsibility to investigate applicable federal, state, and local taxes as well as any specific exemptions that may exist. This includes any applicable Value- Added Taxes (VAT), sales, use, and excise taxes. See General Conditions (Contract Clause) 52.229-3 FEDERAL, STATE, AND LOCAL TAXES.

9. COLORADO SALES AND USE TAX

Specific exemption from the Colorado Sales and Use Taxes will be granted by the Colorado Tax authorities with respect to all materials used by a prime Contractor or subcontractor and which are built into structures furnished under contract to a government agency. The Colorado Sales and Use Taxes shall be excluded from the proposal prices. Exemption certificates are available to both Contractors and subcontractors provided personal application is made therefore to the Colorado Department of Revenue (www.taxcolorado.com). The Contractor or subcontractor will be required to submit required information (i.e., the date of the contract, the amount of the contract, and the proposed date for completion of the contract). Telephone: (303) 238- 7378 (General Information).

CLAUSES INCORPORATED BY REFERENCE

52.204-6 Unique Entity Identifier OCT 2016 52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.207-1 Notice Of Standard Competition MAY 2006 52.215-1 Instructions to Offerors--Competitive Acquisition NOV 2021 52.215-16 Facilities Capital Cost of Money JUN 2003 52.215-20 Requirements for Certified Cost or Pricing Data and Data

Other Than Certified Cost or Pricing Data

NOV 2021

52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications

NOV 2021

52.219-6 Notice Of Total Small Business Set-Aside NOV 2020 52.222-5 Construction Wage Rate Requirements--Secondary Site of the

Work

MAY 2014

52.222-24 Preaward On-Site Equal Opportunity Compliance Evaluation FEB 1999 52.222-56 Certification Regarding Trafficking in Persons Compliance

Plan.

OCT 2020

52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements

MAY 2014

52.233-3 Protest After Award AUG 1996 52.236-7 Permits and Responsibilities NOV 1991 52.236-13 Accident Prevention NOV 1991 252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements MAR 2022 252.215-7008 Only One Offer JUL 2019 252.215-7010 Requirements for Certified Cost or Pricing Data and Data

Other Than Certified Cost or Pricing Data

JUL 2019

252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors.

JAN 2018

252.236-7001 Contract Drawings, and Specifications AUG 2000

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Priced (FFP) contract resulting from this solicitation.

(End of provision)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

Amanda E. Eaton US Army Corps of Engineers Contracting Division 1616 Capitol Ave.

Omaha, NE 68102

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

Name: Fort Carson Resident Office North, Building 1219 Address: 1626 Evans St, Fort Carson, Colorado Telephone:

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/ http://www.acq.osd.mil/dpap/

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Per future Amendment(s) which will be documented on an SF 30 - AMENDMENT OF

SOLICITATION/MODIFICATION OF CONTRACT

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any DFAR (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

252.211-7002 AVAILABILITY FOR EXAMINATION OF SPECIFICATIONS, STANDARDS, PLANS,

DRAWINGS, DATA ITEM DESCRIPTIONS, AND OTHER PERTINENT DOCUMENTS (DEC. 1991)

The specifications, standards, plans, drawings, data item descriptions, and other pertinent documents cited in this solicitation are not available for distribution but may be examined at the following location:

www.SAM.gov under Contract Opportunity

252.215-7012 REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)

The Offeror shall submit the cost portion of the proposal via the following electronic media: Electronic Mail

Section 00 22 00 - Supplementary Instructions

SECTION 00 22 00

SECTION 00 22 00

Basis of Award, Instruction to Offeror, and Evaluation Criteria

GENERAL SCOPE OF WORK

This subjective tradeoff solicitation for the construction of the Fire Station Support Facility at Fort Carson, Colorado. The selected contractor will deliver this project using a One Step Design-Bid-Build (DBB) project delivery method. This requires the contractor to provide the government with a complete facility and warranty based on the solicitation requirements and subsequent contract award documents.

The estimated construction cost of this project is between $10,000,000 and $25,000,000.

Competition for this contract will be Restricted to Small Business Only.

The North American Industry Classification System (NAICS) code is 236220 (Commercial and Institutional Building Construction), with a corresponding small business size standard of $45M.

THE OFFEROR SHOULD BE REGISTERED IN SYSTEM FOR AWARD MANAGEMENT WEBSITE

(SAM.GOV) FOR NAICS CODE 236220 PRIOR TO THE DATE PROPOSALS ARE DUE.

BASIS OF AWARD

The award will be made based on the best overall (i.e., best value) proposal that is determined to be the most beneficial to the Government, with appropriate consideration given to the three (3) evaluation factors: The Government will evaluate proposals in accordance with the criteria described within the solicitation and intends award a firm-fixed-price contract to the responsible Offeror whose proposal is determined to represent the best value to the Government as described in FAR 15.101-1.

The Government intends to evaluate proposals and award contracts without conducting discussions with Offerors. However, in the event the Procuring Contracting Officer (PCO) concludes conducting discussions is in the best interest of the Government, the PCO will document the rationale for the competitive range determination, in which the Source Selection Authority (SSA) will review and approve the PCO’s determination. If the PCO determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the PCO may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. Therefore, the Offeror’s initial proposal should contain the Offeror’s best terms from a price and technical standpoint.

DEBRIEFING OFFERORS

Offerors may request a debriefing in accordance with FAR 15.505 Pre-award Debriefing of offerors or FAR 15.506 Post-award Debriefing of Offerors.

SUBMISSION REQUIREMENTS

VOL 1, TAB A: PAST PERFORMANCE AND EXPERIENCE

Submission Requirements: Page limitations: no more than a one (1) page narrative per project; no more than one (1) page per project to present photographs or images (no text other than an image title shall be included on that page); and no page limitations on official past performance records such as PPQs and/or CPARS; and no more than a one (1) page narrative to describe any past teaming experience between current team members as it relates to any or all submitted projects.

CONSTRUCTION PROJECT EXAMPLES: The Offeror should submit three (3) projects similar in project size, scope, and complexity to this project that were performed by the Prime Offeror. All project examples shall demonstrate experience on similar building and site improvement projects of $10M or greater value.

Projects whose contract award was less than $10M shall not be considered for evaluation. In addition to the three (3) project examples, the Offeror may submit a one (1) page narrative to describe any past teaming experience between current team members as it relates to any or all submitted project examples. Any information presented beyond any of the page limits will not be evaluated.

Additionally, at least one (1) project submitted shall demonstrate experience constructing a new facility of at least 10,000 square feet.

Each project example submitted shall meet the following criteria:

1. The project shall have been awarded to the Offeror (either singly or one of the participants in a JV named on the SF1442 for this solicitation). The company shall have been the Prime Contractor for the past project, either singly or as a member of the Joint Venture to which it was awarded. A small business contractor may use a past performance rating for work performed as a member of a joint venture or for work performed as a first-tier subcontractor, consistent with the Small Business Administration Rule 3245-AH71.

2. The project shall be complete within seven (7) years from the date the offers are due.

The table below provides example scenarios based on the requirements above:

Scenario Examples Project Examples Qualify for Evaluation for Factor 1 (if all other requirements are met)

1 Past project was awarded to Company X only. Company X is proposing as a Prime Contractor for W9128F23R0016 and has signed the SF 1442 for W9128F23R0016.

Yes

2 Company Y has formed a JV with Company Z (forming Company “YZ”). Past project was awarded to Company Y only. Company YZ is proposing as a Prime Contractor for W9128F23R0016 and has signed the SF 1442 for W9128F23R0016.

Yes

3 Company Y has formed a JV with Company Z (forming Company “YZ”). Past project was awarded to JV Company YZ. Company YZ is proposing as a Prime Contractor for W9128F23R0016 and has signed the SF 1442 for W9128F23R0016.

Yes

4 Past Project was awarded to Company “AY,” a JV composed of Company A (not Prime Offeror for RFP W9128F23R0016) and Company Y. Company Y has formed a JV with Company Z (forming Company “YZ”). JV Company YZ is proposing as a Prime Contractor and has signed the SF 1442 for W9128F23R0016.

Yes

5 Company Y has formed a JV with Company Z (forming Company “YZ”). Company YZ is proposing as a Prime Contractor for W9128F23R0016 and has signed the SF 1442 for W9128F23R0016. Company Y performed work on the past project but was not the Prime Contractor for the past project (either singly or as a member of a JV).

No

6 Company X is proposing as a Prime Contractor for W9128F23R0016 and has signed the SF 1442 for W9128F23R0016. Company X will use Company R as a teaming member/sub-contractor but Company R is not part of a JV with Company X for W9128F23R0016. The past project was awarded to Company R as a Prime Contractor (singly or as a member of a JV), but not Company X (singly or as a member of a JV).

7 Company Y has formed a JV with Company Z (forming Company “YZ”). Company YZ is proposing as a Prime Contractor for W9128F23R0016 and has signed the SF 1442 for W9128F23R0016. Company YZ will use Company R as a teaming member/sub-contractor but Company R is not part of the JV. The past project was awarded to Company R as a Prime Contractor (singly or as a member of a JV), but not to Companies Y or Z (singly or as a member of a JV).

Project information per project example should CLEARLY include:

Summaries for each project submitted to include the name, address, telephone and email of a representative of the owner (as well as one alternate individual not affiliated with your firm) familiar with your firm’s experience on the project that can verify the experience cited;

a. Original contract award amount and final construction cost;

b. Location of project;

c. Original contract completion date and actual completion date (Month/Year);

d. Identify if the project was a construction project or a design-build project;

e. Percentage (%) performed by the Prime Offeror; and

f. Percentage (%) and type of work subcontracted out.

g. CPARS record or a complete PPQ shall be submitted for each project submitted under this factor.

Do not include extraneous information that is not requested.

The Government reserves the right to contact any persons who may be knowledgeable about the project or projects (this is not limited to contracts identified by the Offeror) submitted in an Offeror’s proposal. In addition, the Government may review and take into consideration other sources of information pertinent to the evaluation of the Offeror’s Past Performance, including both the previous experience projects and other similar projects performed by the Offeror. Other sources may include, but are not limited to, Past Performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS), using all Commercial and Government Entity (CAGE)/DUNS numbers of team members (partnership, Joint Venture, teaming arrangement, or parent firm/subsidiary/affiliate) identified in the Offeror's proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), Supplier Performance Risk System (SPRS), and any other known sources not provided by the Offeror.

If subcontractor experience is submitted for consideration as part of the proposal, the offeror should include a commitment signed by offeror and subcontractor certifying that if a contract is awarded resulting from the proposal, the parties commit to joint performance as proposed. If the signed commitment is not fully executed by both parties and provided with the Past Performance Proposal, subcontractor references will not be evaluated or considered.

While the Government may elect to consider data from other sources, the burden of ensuring detailed, current, accurate, and complete Past Performance and Experience information rests with the Offeror. The past performance information required in this solicitation shall be provided by the Offeror. Proposals that do not contain the information requested risk rejection or less favorable performance rating by the Government.

VOL I, TAB B: PROJECT MANAGEMENT PLAN, TECHNICAL APPROACH, AND SUMMARY

SCHEDULE

Submission Requirements: The page limit for this factor is fifteen (15) pages total including organizational approach, technical approach, proposed duration, and schedule.

Project Management Plan. Provide a narrative that describes the Offeror’s Project Management approach to executing the contract pursuant to the following requirements. Clearly and concisely describe the organizational, technical, and risk management approaches to project management and execution, proposed contract duration, and summary schedule.

Organizational Approach. List and describe key subcontractors, their roles and responsibilities, how they will be utilized, and any contractual arrangements that have been established to this point. Clearly describe any teaming or joint venture arrangements, including a clear description of each entities’ roles and responsibilities on the project. Identify the work (including %) which will be self-performed by the Prime Contractor. The Offeror shall document unequivocal teaming arrangements with its lead entity(ies) and key subcontractors. Describe the proposed management structure for the team, describing how the construction process and the authorities and the delegations of authority within the team will be managed.

Include an Organizational Chart, including the proposed quality control group(s). Include key personnel in the organization chart. Clearly illustrate key positions, names of the personnel, their firm affiliations, job locations and their job/position title within the organization (see specification 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS and 01 45 00.00 10 QUALITY CONTROL).

Technical Approach for Construction. Describe the technical approach to construction of the facility.

Include any considerations to the project which will increase efficiencies in the schedule or increased quality. This approach should also include site security and access management procedures.

Risk Assessment. In spreadsheet format, submit a list of risks specific to this project. Identify the degree of risk, impact of the risk (schedule, cost, safety, etc.), whether it’s within or outside the Offeror’s control, and a brief statement on how to mitigate the risk(s).

Summary Schedule. Provide a schedule on your plan to complete all work based on an arbitrary estimated, non-binding, Notice to Proceed date of 21 June 2023. Provide a summary schedule or diagrams separately in an appendix to the TAB. Clearly label the summary schedule under the TAB. This summary schedule will, after contract award, be replaced with a project schedule as required by Section 01 32 01.00 10: Project Schedule. The schedules shall be task oriented, indicating the number of calendar days, after notice to proceed, by which milestones are to be achieved. Schedules shall be graphically represented. The proposed project schedule shall reflect the proposed contract duration. Give attention to the following features:

1. Show the overall construction phase for the facility, the sitework and the utilities. Include any long lead items and any fast-tracking starts. It isn’t necessary to show the detailed breakdown construction by trades.

2. Show schedule line items for environmental permits, notifications, and utility connection permits.

3. Show turnover of facility. The duration to complete the facility and turnover to the Government must consider the requirement for the Contractor’s CQC completion inspection and the subsequent joint Contractor-Government turnover inspection.

4. Show as-built submissions (See section 01 78 39.00 24 AS-BUILT DRAWINGS).

5. Constraints: Offeror must demonstrate the capability and flexibility to plan and schedule the complete project to meet the proposed contract completion period. Clearly identify any constraints on the schedules presented (e.g., labor or material availability, permits, or weather). Indicate the anticipated overall critical path on the schedule.

VOL I, TAB C: KEY PERSONNEL

Submission Requirements: The page limit for this factor is two (2) pages per resume for a total of no more than six (6) pages.

Submit resumes for the following key personnel. If more than two (2) pages are submitted per resume, only the first two (2) pages will be evaluated. Each resume should demonstrate experience and expertise on similar projects in the same roles as proposed for this solicitation.

Project Manager responsible for the overall project: The project manager should have five (5) or more years of experience as a project manager, managing similar projects to this solicitation.

Contractor Quality Control (CQC) System Manager(s): CQC System Manager should have five (5) years of experience as a Quality Control Manager on similar projects to this solicitation.

CQC System Manager shall comply with personnel requirements listed in Section 01 45 00.00 10.

General Superintendent: The superintendent should have five (5) years’ experience as superintendent managing multiple trades and subcontractors.

Each resume should include the following information:

Proposed role/title for this solicitation Recent relevant projects: information should include the project name, role on project, prime contractor, owner, dollar amount, date of start and completion of role referenced, and brief scope of each project listed.

RELATIVE INPORTANCE OF EVALUATION FACTORS

Relative Importance Factors- All evaluation factors other than cost or price, when combined, are significantly more important than cost or price. The individual factors’ relative importance is Factor 1 is the most important factor, Factor 2 is the second most important factor, and Factor 3 is the third most important factor.

Basis for Award –The requirements specified in the solicitation are considered minimum requirements.

A more favorable evaluation rating may be given for exceeding the minimum requirements. See table below for relative importance (in descending order) of selection factors.

Table 1: Evaluation Factors

Location Description Descending Order of Importance

Vol I, Tab A

Factor 1 –- Past Performance and Experience

1st Most Important Factor

Vol I, Tab B Factor 2 –- Project Management Plan, Technical Approach, and Summary Schedule 2nd Most Important Factor

Vol I, Tab C Factor 3 –- Key Personnel 3rd Most Important Factor

Table 2: Volume II Required Submittal Item

Location Description Descending Order of Importance

Vol. II TAB A

SF1442 and Acknowledgement of Amendments Not Rated

Vol. II TAB B

Representations & Certifications Not Rated

Vol. II TAB C

Joint Venture or Teaming Arrangement (if applicable).

Not Rated

Vol. II

TAB D

Factor 4– Pricing Schedule

All evaluation factors other than cost or price, when combined, are approximately equal to cost or price.

Vol. II TAB E

Evidence of Bondability Not Rated

FACTOR 1 – VOL I, TAB A - PAST PERFORMANCE AND EXPERIENCE EVALUATION

The Past Performance and Experience evaluation results in an assessment of the Offeror’s probability of meeting the solicitation requirements. The past performance evaluations result in one overall confidence rating, considering the three elements of past performance: recency, relevancy, and quality.

The past performance evaluation considers each offeror’s demonstrated recent and relevant record of performance in construction activities that are needed to meet the contract’s requirements. The Past Performance factor submission requirements and the method that the Government will use to evaluate the Offeror’s past performance is detailed in Factor 1 -Past Performance description below.

There are three (3) aspects to the past performance evaluation: recency, relevancy (including context of data), and quality (including general trends in contractor performance and source of information). While relevancy is also evaluated individually, all past performance aspects will be used to develop an overall confidence assessment rating for the Past Performance factor.

The Government’s overall confidence level for this factor will be based on the Offeror’s Past Performance to include recency, relevancy, and the quality of performance. Past Performance on projects will examine how well an Offeror has performed on relevant projects considering such criteria as: cost growth and adherence to budget; time growth, timeliness, and adherence to schedule; quality and quality control measures; management of personnel and subcontractors; compliance with safety standards/safety plan; overall customer satisfaction; responsiveness to customer concerns.

The Government may, at its discretion, contact individuals other than those identified by the Offeror as references to verify the information contained therein. The Government reserves the right to consider all aspects of an Offeror's performance history but may attribute more importance to work that is similar to the scope contemplated for this project.

In the case of offerors for which there is no information on past contract performance or where past contract performance information is not available, the offeror may not be evaluated favorably or unfavorably on the factor of past contract performance (see FAR 15.305(a)(2)(iv).) In this case, the offeror’s past performance is unknown and assigned a performance confidence rating of “neutral.”

Although the SSEB may not rate an offeror that lacks recent, relevant past performance favorably or unfavorably regarding past performance, the SSEB may recommend and the SSA may determine, that a “Substantial Confidence” or “Satisfactory Confidence” past performance rating is worth more than a “Neutral Confidence” past performance rating in a best value tradeoff as long as the determination is consistent with stated solicitation criteria.

Recency - The first aspect is to evaluate the recency of the Offeror’s past performance. With respect to recency, more recent past performance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment than less recently completed projects.

Recency criteria related to this solicitation is outlined in the Past Performance Submission Requirements section. The Government will consider projects that are complete within six (6) years from the date the offers are due.

Relevance - The second aspect of the Past Performance evaluation is to determine how relevant previous experience accomplished by the Offeror is to the anticipated work to be accomplished under this project scope. With respect to relevancy, more relevant Past Performance will typically be a stronger predictor of future success and have more influence on the Past Performance confidence assessment. Relevancy is not a separate proposal rating but is used to develop an overall Past Performance Confidence Assessment. The four levels of relevancy definitions are:

Table 3: Specialize Experience Adjectival Rating

Adjectival Rating Description

Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant

Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

Contractor Performance. The third aspect of the past performance evaluation is to establish the overall quality of the offeror’s past performance The Past Performance evaluation performed in support of a current source selection does not establish, create, or change the existing record and history of the Offeror’s Past Performance on past contracts; rather, the Past Performance evaluation process gathers information from stakeholders on how well the Offeror performed those past contracts. The Source Selection Evaluation Board will review this Past Performance information and determine the quality and usefulness as it applies to performance confidence assessment.

The Government will review all past performance information submitted. The past performance information required in this solicitation shall be provided by the Offeror. Past performance information may also be obtained from questionnaires. At the Government’s discretion, past performance information shall be obtained from any other sources available to the Government, to include, but not limited to, the Contractors Performance Assessment Reporting System (CPARS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), Supplier Performance Risk System (SPRS), or other databases; interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency for recency, relevance and quality.

Table 4: Past Performance Adjectival Rating

Adjectival Rating Description

Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence

Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Performance Confidence Assessment. The Government will assign a final Performance Confidence Assessment for this factor based on the evaluation of recent and relevant past performance information and the quality of past performance on prior contract efforts. The Government will review all past performance information collected and determine the quality of the offeror’s performance, general trends, and usefulness of the information and incorporate these into the performance confidence assessment. In conducting a performance confidence assessment, each offeror shall be assigned one of the ratings using the terms below:

The Government will evaluate the relative merits of each Offeror’s past performance by following the recency, relevancy, and confidence assessment procedures. The evaluation of past performance will examine how well Offerors have performed on recent and relevant projects considering such criteria as but not limited to: comparison of past experience to requirements contemplated under this scope;

frequency of performance of similar projects; length of work history; performance metrics and trends;

customer satisfaction; performance evaluation ratings; cost growth and adherence to budget; time growth, timeliness, adherence to schedule; quality, quality control, management of personnel and subcontractors, compliance with safety standards/safety plan, regulatory compliance, overall customer satisfaction, and responsiveness to customer concerns.

Projects submitted without qualifying past performance data to support them may be considered for relevancy; however, the lack of qualifying performance data may have a significant negative impact on the confidence assessment.

If an Offeror submits no past performance evaluations and the Government is unable to locate evaluations in CPARS or other performance rating systems, a Neutral Confidence rating will be given.

The Government will consider the experience provided in the example projects when determining the relevancy of past performance data and use those submissions as a part of the confidence assessment. A lack of, or degraded, recency and relevancy may impact the confidence assessment that the Government provides.

FACTORS 2 & 3 -TECHNICAL RATINGS DEFINED

The evaluation ratings for the technical factors will be on an adjectival basis in conjunction with a narrative composed of the discussion of the significant strengths, strengths, significant weaknesses, weaknesses, and deficiencies of the proposal. The Source Selection Evaluation Board will use a combined technical/risk rating system that includes consideration of risk in conjunction with the significant strengths, strengths, significant weaknesses, weaknesses, and deficiencies in determining technical ratings. The combined technical/risk ratings, presented in Table 1, will be used to evaluate Factor 2, Project Management Plan, Technical Approach, and Summary Schedule, and Factor 3, Key Personnel.

Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.

Unknown Confidence (Neutral)

No recent/relevant performance record is available, or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. Per Federal Acquisition Regulation (FAR) 15.305(a) (2) (iv), “In the case of an Offeror without a record of relevant Past Performance or for whom information on Past Performance is not available, the Offeror may not be evaluated either favorably or unfavorably on Past Performance.

Table 5: Combined Technical/Risk Ratings – Factors 2 & 3 Color Rating Description Blue Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths and/or at least one significant strength, and risk of unsuccessful performance is low.

Purple Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength or significant strength, and risk of unsuccessful performance is low to moderate.

Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Red Unacceptable Proposal does not meet requirements of the solicitation and, thus, contains one or more deficiencies and is unawardable, and/or risk of performance is unacceptably high.

Rating Definitions:

Strength – is an aspect of an offeror’s proposal with merit or will exceed specified performance or capability requirements to the advantage of the Government during contract performance.

Significant Strength - is an aspect of an Offeror’s proposal with appreciable merit or will exceed specified performance or capability requirements to the considerable advantage of the Government during contract performance.

Weakness - a flaw in the proposal that increases the risk of unsuccessful contract performance.

Significant Weakness - a flaw in the proposal that appreciably increases the risk of unsuccessful contract performance.

Deficiency – a material failure of a proposal to meet a Government requirement or a…