Solicitation Package.pdf
PDF 6 MB Posted
- Attached to
- Hodgdon: Bathroom Renovations Federal contract opportunity
- Solicitation number
- 47PB0220R0005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AM0003 Amendment Package.pdf | ||
| AM0002 Amendment Package.pdf | ||
| AM0001 Amendment Package Includes Photos.pdf | ||
| AM0001 Amendment Package.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table of Contents
Solicitation 19
SF 1442 47PB0220R0005 51
Hodgdon Bathroom Construction Specs 54
1 00003 - TABLE OF CONTENTS 54
2 01010 - SUMMARY OF WORK 56
3 01035 - OPTIONS 60
3.1 1.2 Schedule of Options: 60
4 01040 - COORDINATION 62
5 01045 - CUTTING AND PATCHING 65
6 01541 - SECURITY REGULATIONS 69
6.1 D. Facilities and Procedures: The following security facilities and procedures will apply for work under this contract. 69
6.1.1 1. The contractor will be limited to one controlled entry point to the job site through which all personnel must pass and which will be staffed by the Government.
6.1.2 2. Not withstanding the fact that a Federal Protection Officer or Marshal may be on site, the Contractor hereby releases the Government from all demands, actions, claims and liability whatsoever of every name and nature in any manner related to repair...
6.1.3 15. Security Evacuation of the Building: In the event of a very high alert (Code Red) security conditions and at the extreme ends of a high alert (Code Orange) security condition, the Contracting Officer, acting in the response to the directions from...
7 02071 - SELECTIVE DEMOLITION FOR INTERIORS 78
7.1 1.4 PROJECT CONDITIONS 79
7.2 A. Government will occupy portions of the building immediately adjacent to selective demolition area. Conduct selective demolition so Government’s operations are not disrupted.
7.3 B. Notify Contracting Officer of discrepancies between existing conditions and Drawings before proceeding with selective demolition. 79
7.4 C. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to Contracting Officer.
8 15050 - BASIC MECHANICAL MATERIALS 86
8.1 PART 1 - GENERAL 86
8.1.1 1.1 RELATED DOCUMENTS 86
8.1.1.1 A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.
8.1.2 1.2 SUMMARY 86
8.1.2.1 A. This Section includes the following: 86
8.1.3 1.3 DEFINITIONS 86
8.1.3.1 A. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe and duct shafts, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawlspaces, and tunnels.
8.1.3.2 B. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied spaces and mechanical equipment rooms. 86
8.1.3.3 C. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient temperatures and weather conditions. Examples include rooftop locations.
8.1.3.4 D. Concealed, Interior Installations: Concealed from view and protected from physical contact by building occupants. Examples include above ceilings and in duct shafts.
8.1.3.5 E. Concealed, Exterior Installations: Concealed from view and protected from weather conditions and physical contact by building occupants but subject to outdoor ambient temperatures. Examples include installations within unheated shelters.
8.1.3.6 F. The following are industry abbreviations for plastic materials: 87
8.1.3.7 G. The following are industry abbreviations for rubber materials: 87
8.1.4 1.4 SUBMITTALS 87
8.1.4.1 A. Submittals shall comply with the requirements of the Construction Contract Clauses, Division 1 Section "Submittals" and the individual sections specifying the work.
8.1.4.2 B. Product Data: For the following: 87
8.1.4.3 C. Welding certificates. 87
8.1.5 1.5 QUALITY ASSURANCE 87
8.1.5.1 A. Steel Support Welding: Qualify processes and operators according to AWS D1.1, "Structural Welding Code--Steel." 87
8.1.5.2 B. Steel Pipe Welding: Qualify processes and operators according to ASME Boiler and Pressure Vessel Code: Section IX, "Welding and Brazing Qualifications."
8.1.5.3 C. Electrical Characteristics for Mechanical Equipment: Equipment of higher electrical characteristics may be furnished provided such proposed equipment is approved in writing and connecting electrical services, circuit breakers, and conduit sizes ar...
8.1.6 1.6 DELIVERY, STORAGE, AND HANDLING 88
8.1.6.1 A. Deliver pipes and tubes with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe end damage and to prevent entrance of dirt, debris, and moisture.
8.1.7 1.7 COORDINATION 88
8.1.7.1 A. Arrange for pipe spaces, chases, slots, and openings in building structure during progress of construction, to allow for mechanical installations.
8.1.7.2 B. Coordinate requirements for access panels and doors for mechanical items requiring access that are concealed behind finished surfaces.
Access panels and doors are specified in Division 8 Section "Access Doors and Frames."
8.2 PART 2 - PRODUCTS 88
8.2.1 2.1 MANUFACTURERS 88
8.2.1.1 A. In other Part 2 articles where subparagraph titles below introduce lists, the following requirements apply for product selection: 88
8.2.2 2.2 PIPE, TUBE, AND FITTINGS 88
8.2.2.1 A. Refer to individual Division 15 piping Sections for pipe, tube, and fitting materials and joining methods. 88
8.2.2.2 B. Pipe Threads: ASME B1.20.1 for factory-threaded pipe and pipe fittings. 88
8.2.2.3 C. Plastic Piping Prohibition: No plastic piping shall be used. 88
8.2.3 2.3 JOINING MATERIALS 88
8.2.3.1 A. Refer to individual Division 15 piping Sections for special joining materials not listed below. 88
8.2.3.2 B. Pipe-Flange Gasket Materials: Suitable for chemical and thermal conditions of piping system contents. 89
8.2.3.3 C. Flange Bolts and Nuts: ASME B18.2.1, carbon steel, unless otherwise indicated. 89
8.2.3.4 D. Solder Filler Metals: ASTM B 32, lead-free alloys. Include water-flushable flux according to ASTM B 813. 89
8.2.3.5 E. Brazing Filler Metals: AWS A5.8, BCuP Series, copper-phosphorus alloys for general-duty brazing, unless otherwise indicated; and AWS A5.8, BAg1, silver alloy for refrigerant piping, unless otherwise indicated.
8.2.3.6 F. Welding Filler Metals: Comply with AWS D10.12 for welding materials appropriate for wall thickness and chemical analysis of steel pipe being welded.
8.2.4 2.4 TRANSITION FITTINGS 89
8.2.4.1 A. AWWA Transition Couplings: Same size as, and with pressure rating at least equal to and with ends compatible with, piping to be joined. 89
8.2.5 2.5 DIELECTRIC FITTINGS 89
8.2.5.1 A. Description: Combination fitting of copper alloy and ferrous materials with threaded, solder-joint, plain, or weld-neck end connections that match piping system materials.
8.2.5.2 B. Insulating Material: Suitable for system fluid, pressure, and temperature. 89
8.2.5.3 C. Dielectric Unions: Factory-fabricated, union assembly, for 250-psig (1725-kPa) minimum working pressure at 180 deg F (82 deg C). 90
8.2.5.4 D. Dielectric Flanges: Factory-fabricated, companion-flange assembly, for 150- or 300-psig (1035- or 2070-kPa) minimum working pressure as required to suit system pressures.
8.2.5.5 E. Dielectric Couplings: Galvanized-steel coupling with inert and noncorrosive, thermoplastic lining; threaded ends; and 300-psig (2070-kPa) minimum working pressure at 225 deg F (107 deg C).
8.2.5.6 F. Dielectric Nipples: Electroplated steel nipple with inert and noncorrosive, thermoplastic lining; plain, threaded, or grooved ends; and 300-psig (2070-kPa) minimum working pressure at 225 deg F (107 deg C).
8.2.6 2.6 MECHANICAL SLEEVE SEALS 91
8.2.6.1 A. Description: Modular sealing element unit, designed for field assembly, to fill annular space between pipe and sleeve. 91
8.2.7 2.7 SLEEVES 91
8.2.7.1 A. Galvanized-Steel Sheet: 0.0239-inch (0.6-mm) minimum thickness;
round tube closed with welded longitudinal joint. 91
8.2.7.2 B. Steel Pipe: ASTM A 53, Type E, Grade B, Schedule 40, galvanized, plain ends. 91
8.2.7.3 C. Cast Iron: Cast or fabricated "wall pipe" equivalent to ductile-iron pressure pipe, with plain ends and integral waterstop, unless otherwise indicated.
8.2.7.4 D. Stack Sleeve Fittings: Manufactured, cast-iron sleeve with integral clamping flange. Include clamping ring and bolts and nuts for membrane flashing.
8.2.8 2.8 ESCUTCHEONS 91
8.2.8.1 A. Description: Manufactured wall and ceiling escutcheons and floor plates, with an ID to closely fit around pipe, tube, and insulation of insulated piping and an OD that completely covers opening.
8.2.8.2 B. One-Piece, Deep-Pattern Type: Deep-drawn, box-shaped brass with polished chrome-plated finish. 91
8.2.8.3 C. One-Piece, Cast-Brass Type: With set screw. 91
8.2.8.4 D. Split-Casting, Cast-Brass Type: With concealed hinge and set screw. 92
8.2.8.5 E. One-Piece, Stamped-Steel Type: With set screw or spring clips and chrome-plated finish. 92
8.2.8.6 F. Split-Plate, Stamped-Steel Type: With concealed hinge, set screw or spring clips, and chrome-plated finish. 92
8.2.8.7 G. One-Piece, Floor-Plate Type: Cast-iron floor plate. 92
8.2.8.8 H. Split-Casting, Floor-Plate Type: Cast brass with concealed hinge and set screw. 92
8.2.9 2.9 GROUT 92
8.2.9.1 A. Description: ASTM C 1107, Grade B, nonshrink and nonmetallic, dry hydraulic-cement grout. 92
8.3 PART 3 - EXECUTION 92
8.3.1 3.1 MECHANICAL DEMOLITION 92
8.3.1.1 A. Refer to Division 1 Sections "Cutting and Patching" and "Selective Demolition" for general demolition requirements and procedures. 92
8.3.1.2 B. Disconnect, demolish, and remove mechanical systems, equipment, and components indicated to be removed. 92
8.3.1.3 C. If pipe, insulation, or equipment to remain is damaged in appearance or is unserviceable, remove damaged or unserviceable portions and replace with new products of equal capacity and quality.
8.3.2 3.2 PIPING SYSTEMS - COMMON REQUIREMENTS 93
8.3.2.1 A. Install piping according to the following requirements and Division 15 Sections specifying piping systems. 93
8.3.2.2 B. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems. Indicated locations and arrangements were used to size pipe and calculate friction loss, expansion, pump sizing, and other design considerations
8.3.2.3 C. Install piping in concealed locations, unless otherwise indicated and except in equipment rooms and service areas. 93
8.3.2.4 D. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.
8.3.2.5 E. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal. 93
8.3.2.6 F. Install piping to permit valve servicing. 93
8.3.2.7 G. Install piping at indicated slopes. 93
8.3.2.8 H. Install piping free of sags and bends. 93
8.3.2.9 I. Install fittings for changes in direction and branch connections. 93
8.3.2.10 J. Install piping to allow application of insulation. 93
8.3.2.11 K. Select system components with pressure rating equal to or greater than system operating pressure. 93
8.3.2.12 L. Install escutcheons for penetrations of walls, ceilings, and floors.
Select appropriate style and size for finished, symmetrical appearance.
Where existing piping remains and is visible, provide escutcheons.
8.3.2.13 M. Sleeves are not required for core-drilled holes. 93
8.3.2.14 N. Install sleeves for pipes passing through concrete and masonry walls and concrete floor and roof slabs. 94
8.3.2.15 O. Install sleeves for pipes passing through concrete and masonry walls, gypsum-board partitions, and concrete floor and roof slabs. 94
8.3.2.16 P. Aboveground, Exterior-Wall Pipe Penetrations: Seal penetrations using sleeves and mechanical sleeve seals. Select sleeve size to allow for 1-inch (25-mm) annular clear space between pipe and sleeve for installing mechanical sleeve seals.
8.3.2.17 Q. Fire-Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with firestop materials. Refer to Division 7 Section " Through-Penetration Firestop Systems" for mat...
8.3.2.18 R. Verify final equipment locations for roughing-in. 94
8.3.2.19 S. Refer to equipment specifications in other Sections of these Specifications for roughing-in requirements. 94
8.3.3 3.3 PIPING JOINT CONSTRUCTION 95
8.3.3.1 A. Join pipe and fittings according to the following requirements and Division 15 Sections specifying piping systems. 95
8.3.3.2 B. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe. 95
8.3.3.3 C. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly. 95
8.3.3.4 D. Soldered Joints: Apply ASTM B 813, water-flushable flux, unless otherwise indicated, to tube end. Construct joints according to ASTM B 828 or CDA's "Copper Tube Handbook," using lead-free solder alloy complying with ASTM B 32.
8.3.3.5 E. Brazed Joints: Construct joints according to AWS's "Brazing Handbook," "Pipe and Tube" Chapter, using copper-phosphorus brazing filler metal complying with AWS A5.8.
8.3.3.6 F. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:
8.3.3.7 G. Welded Joints: Construct joints according to AWS D10.12, using qualified processes and welding operators according to Part 1 "Quality Assurance" Article.
8.3.3.8 H. Flanged Joints: Select appropriate gasket material, size, type, and thickness for service application. Install gasket concentrically positioned.
Use suitable lubricants on bolt threads.
8.3.4 3.4 PIPING CONNECTIONS 95
8.3.4.1 A. Make connections according to the following, unless otherwise indicated: 95
8.3.5 3.5 EQUIPMENT INSTALLATION - COMMON REQUIREMENTS 96
8.3.5.1 A. Install equipment to allow maximum possible headroom unless specific mounting heights are not indicated. 96
8.3.5.2 B. Install equipment level and plumb, parallel and perpendicular to other building systems and components in exposed interior spaces, unless otherwise indicated.
8.3.5.3 C. Install mechanical equipment to facilitate service, maintenance, and repair or replacement of components. Connect equipment for ease of disconnecting, with minimum interference to other installations. Extend grease fittings to accessible locations.
8.3.5.4 D. Install equipment to allow right of way for piping installed at required slope. 96
8.3.6 3.6 PAINTING 96
8.3.6.1 A. Painting of mechanical systems, equipment, and components is specified in Division 9 Section "Painting (Consumer Line Products)." 96
8.3.6.2 B. Damage and Touchup: Repair marred and damaged factory-painted finishes with materials and procedures to match original factory finish. 96
8.3.7 3.7 CONCRETE BASES 96
8.3.7.1 A. Concrete Bases: Anchor equipment to concrete base according to equipment manufacturer's written instructions and according to seismic codes at Project.
8.3.8 3.8 ERECTION OF METAL SUPPORTS AND ANCHORAGES 96
8.3.8.1 A. Refer to Division 5 Section "Metal Fabrications" for structural steel. 97
8.3.8.2 B. Cut, fit, and place miscellaneous metal supports accurately in location, alignment, and elevation to support and anchor mechanical materials and equipment.
8.3.8.3 C. Field Welding: Comply with AWS D1.1. 97
8.3.9 3.9 GROUTING 97
8.3.9.1 A. Mix and install grout for mechanical equipment base bearing surfaces, pump and other equipment base plates, and anchors. 97
8.3.9.2 B. Clean surfaces that will come into contact with grout. 97
8.3.9.3 C. Provide forms as required for placement of grout. 97
8.3.9.4 D. Avoid air entrapment during placement of grout. 97
8.3.9.5 E. Place grout, completely filling equipment bases. 97
8.3.9.6 F. Place grout on concrete bases and provide smooth bearing surface for equipment. 97
8.3.9.7 G. Place grout around anchors. 97
8.3.9.8 H. Cure placed grout. 97
9 16010 - BASIC ELECTRICAL REQUIREMENTS 98
10 16050 - BASIC ELECTRICAL MATERIALS AND METHODS 106
11 220523 General-Duty Valves for HVAC Piping 116
11.1 PART 1 - GENERAL 116
11.1.1 1.1 RELATED DOCUMENTS 116
11.1.1.1 A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
11.1.2 1.2 SUMMARY 116
11.1.2.1 A. Section Includes: 116
11.1.2.2 B. Related Sections: 116
11.1.3 1.3 DEFINITIONS 116
11.1.3.1 A. CWP: Cold working pressure. 116
11.1.3.2 B. EPDM: Ethylene propylene copolymer rubber. 116
11.1.4 1.4 DELIVERY, STORAGE, AND HANDLING 116
11.1.4.1 A. Prepare valves for shipping as follows: 116
11.1.4.2 B. Use the following precautions during storage: 116
11.2 PART 2 - PRODUCTS 117
11.2.1 2.1 GENERAL REQUIREMENTS FOR VALVES 117
11.2.1.1 A. Valve Pressure and Temperature Ratings: Not less than indicated and as required for system pressures and temperatures. 117
11.2.1.2 B. Valve Sizes: Same as upstream piping unless otherwise indicated. 117
11.2.1.3 C. Valves in Insulated Piping: With 50-mm (2-inch) stem extensions and the following features: 117
11.2.1.4 D. Valve-End Connections: 117
11.2.2 2.2 BRONZE BALL VALVES 117
11.2.2.1 A. Two-Piece, Full-Port, Bronze Ball Valves with Bronze Trim: 117
11.3 PART 3 - EXECUTION 118
11.3.1 3.1 EXAMINATION 118
11.3.1.1 A. Examine valve interior for cleanliness, freedom from foreign matter, and corrosion. 118
11.3.1.2 B. Operate valves in positions from fully open to fully closed. Examine guides and seats made accessible by such operations. 118
11.3.1.3 C. Examine threads on valve and mating pipe for form and cleanliness. 118
11.3.1.4 D. Do not attempt to repair defective valves; replace with new valves. 118
11.3.2 3.2 VALVE INSTALLATION 118
11.3.2.1 A. Install valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.
11.3.2.2 B. Locate valves for easy access and provide separate support where necessary. 118
11.3.2.3 C. Install valves in horizontal piping with stem at or above center of pipe. 118
11.3.2.4 D. Install valves in position to allow full stem movement. 118
11.3.3 3.3 ADJUSTING 118
11.3.3.1 A. Adjust or replace valve packing after piping systems have been tested and put into service but before final adjusting and balancing.
Replace valves if persistent leaking occurs.
12 220719 Plumbing Piping Insulation 119
12.1 PART 1 - GENERAL 119
12.1.1 1.1 RELATED DOCUMENTS 119
12.1.1.1 A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
12.1.2 1.2 SUMMARY 119
12.1.2.1 A. Section includes insulating the following plumbing piping services: 119
12.1.3 1.3 SUBMITTALS 119
12.1.3.1 A. Submittals shall comply with the requirements of the Construction Contract Clauses, Division 01 Section "Submittals" and the individual sections specifying the work.
12.1.3.2 B. Product Data: For each type of product indicated. On data submittal sheets where more than one product is described, clearly annotate which product(s) is to be supplied. Include thermal conductivity, water-vapor permeance thickness, and jackets (b...
12.1.3.3 C. Insulation Schedule: Identify type of material, thickness, and vapor barrier provision for each piping application. 119
12.1.4 1.4 QUALITY ASSURANCE 119
12.1.4.1 A. Surface-Burning Characteristics: For insulation and related materials, as determined by testing identical products according to ASTM E 84 by a testing agency acceptable to authorities having jurisdiction. Factory label insulation and jacket mater...
12.1.5 1.5 DELIVERY, STORAGE, AND HANDLING 120
12.1.5.1 A. Packaging: Insulation material containers shall be marked by manufacturer with appropriate ASTM standard designation, type and grade, and maximum use temperature.
12.1.6 1.6 COORDINATION 120
12.1.6.1 A. Coordinate sizes and locations of supports, hangers, and insulation shields specified in Division 22 Section "Hangers and Supports for Plumbing Piping and Equipment."
12.1.6.2 B. Coordinate clearance requirements with piping Installer for piping insulation application. 120
12.2 PART 2 - PRODUCTS 120
12.2.1 2.1 INSULATION MATERIALS 120
12.2.1.1 A. Comply with requirements in "Piping Insulation Schedule, General," " Indoor Piping Insulation Schedule," and "Outdoor, Aboveground Piping Insulation Schedule," articles for where insulating materials shall be applied.
12.2.1.2 B. Products shall not contain asbestos, lead, mercury, or mercury compounds. 120
12.2.1.3 C. Foam insulation materials shall not use CFC or HCFC blowing agents in the manufacturing process. 120
12.2.1.4 D. Flexible Elastomeric Insulation: Closed-cell, sponge- or expanded-rubber materials. Comply with ASTM C 534, Type I for tubular materials.
12.2.1.5 E. Mineral-Fiber, Preformed Pipe Insulation: 120
12.2.2 2.2 INSULATING CEMENTS 121
12.2.2.1 A. Mineral-Fiber Insulating Cement: Comply with ASTM C 195. 121
12.2.2.2 B. Expanded or Exfoliated Vermiculite Insulating Cement: Comply with
ASTM C 196. 121
12.2.3 2.3 ADHESIVES 121
12.2.3.1 A. Materials shall be compatible with insulation materials, jackets, and substrates and for bonding insulation to itself and to surfaces to be insulated, unless otherwise indicated.
12.2.3.2 B. Flexible Elastomeric Adhesive: Comply with MIL-A-24179A, Type II, Class I. 121
12.2.3.3 C. Mineral-Fiber Adhesive: Comply with MIL-A-3316C, Class 2, Grade A. 121
12.2.3.4 D. ASJ Adhesive: Comply with MIL-A-3316C, Class 2, Grade A for bonding insulation jacket lap seams and joints. 122
12.2.3.5 E. PVC Jacket Adhesive: Compatible with PVC jacket. 122
12.2.4 2.4 MASTICS 123
12.2.4.1 A. Materials shall be compatible with insulation materials, jackets, and substrates; comply with MIL-PRF-19565C, Type II. 123
12.2.4.2 B. Vapor-Barrier Mastic: Water based; suitable for indoor use on below-ambient services. 123
12.2.4.3 C. Breather Mastic: Water based; suitable for indoor and outdoor use on above-ambient services. 123
12.2.5 2.5 LAGGING ADHESIVES 123
12.2.5.1 A. Description: Comply with MIL-A-3316C, Class I, Grade A, and shall be compatible with insulation materials, jackets, and substrates. 123
12.2.6 2.6 SEALANTS 124
12.2.6.1 A. ASJ Flashing Sealants, and PVC Jacket Flashing Sealants: 124
12.2.7 2.7 FACTORY-APPLIED JACKETS 124
12.2.7.1 A. Insulation system schedules indicate factory-applied jackets on various applications. When factory-applied jackets are indicated, comply with the following:
12.2.8 2.8 FIELD-APPLIED JACKETS 124
12.2.8.1 A. Field-applied jackets shall comply with ASTM C 921, Type I, unless otherwise indicated. 124
12.2.8.2 B. PVC Jacket: High-impact-resistant, UV-resistant PVC complying with ASTM D 1784, Class 16354-C; thickness as scheduled; roll stock ready for shop or field cutting and forming. Thickness is indicated in field-applied jacket schedules.
12.2.9 2.9 TAPES 125
12.2.9.1 A. ASJ Tape: White vapor-retarder tape matching factory-applied jacket with acrylic adhesive, complying with ASTM C 1136. 125
12.2.9.2 B. PVC Tape: White vapor-retarder tape matching field-applied PVC jacket with acrylic adhesive; suitable for indoor and outdoor applications.
12.2.10 2.10 SECUREMENTS 126
12.2.10.1 A. Bands: 126
12.2.10.2 B. Staples: Outward-clinching insulation staples, nominal 19-mm- (3/4-inch-) wide, stainless steel or Monel. 126
12.2.10.3 C. Wire: 2.0-mm (0.080-inch) nickel-copper alloy, 1.6-mm (0.062-inch) soft-annealed, stainless steel or 1.6-mm (0.062-inch) soft-annealed, galvanized steel.
12.3 PART 3 - EXECUTION 126
12.3.1 3.1 EXAMINATION 126
12.3.1.1 A. Examine substrates and conditions for compliance with requirements for installation tolerances and other conditions affecting performance of insulation application.
12.3.1.2 B. Proceed with installation only after unsatisfactory conditions have been corrected. 126
12.3.2 3.2 PREPARATION 127
12.3.2.1 A. Surface Preparation: Clean and dry surfaces to receive insulation.
Remove materials that will adversely affect insulation application. 127
12.3.2.2 B. Mix insulating cements with clean potable water. 127
12.3.3 3.3 GENERAL INSTALLATION REQUIREMENTS 127
12.3.3.1 A. Install insulation materials, accessories, and finishes with smooth, straight, and even surfaces; free of voids throughout the length of piping including fittings, valves, and specialties.
12.3.3.2 B. Install insulation materials, forms, vapor barriers or retarders, jackets, and thicknesses required for each item of pipe system as specified in insulation system schedules.
12.3.3.3 C. Install accessories compatible with insulation materials and suitable for the service. Install accessories that do not corrode, soften, or otherwise attack insulation or jacket in either wet or dry state.
12.3.3.4 D. Install insulation with longitudinal seams at top and bottom of horizontal runs. 127
12.3.3.5 E. Install multiple layers of insulation with longitudinal and end seams staggered. 127
12.3.3.6 F. Do not weld brackets, clips, or other attachment devices to piping, fittings, and specialties. 127
12.3.3.7 G. Keep insulation materials dry during application and finishing. 127
12.3.3.8 H. Install insulation with tight longitudinal seams and end joints. Bond seams and joints with adhesive recommended by insulation material manufacturer.
12.3.3.9 I. Install insulation with least number of joints practical. 127
12.3.3.10 J. Where vapor barrier is indicated, seal joints, seams, and penetrations in insulation at hangers, supports, anchors, and other projections with vapor-barrier mastic.
12.3.3.11 K. Apply adhesives, mastics, and sealants at manufacturer's recommended coverage rate and wet and dry film thicknesses. 127
12.3.3.12 L. Install insulation with factory-applied jackets as follows: 128
12.3.3.13 M. Cut insulation in a manner to avoid compressing insulation more than 75 percent of its nominal thickness. 128
12.3.3.14 N. Finish installation with systems at operating conditions. Repair joint separations and cracking due to thermal movement. 128
12.3.3.15 O. Repair damaged insulation facings by applying same facing material over damaged areas. Extend patches at least 100 mm (4 inches) beyond damaged areas. Adhere, staple, and seal patches similar to butt joints.
12.3.3.16 P. For above-ambient services, do not install insulation to the following: 128
12.3.4 3.4 PENETRATIONS 128
12.3.4.1 A. Insulation Installation at Interior Wall and Partition Penetrations (That Are Not Fire Rated): Install insulation continuously through walls and partitions.
12.3.4.2 B. Insulation Installation at Floor Penetrations: 128
12.3.5 3.5 GENERAL PIPE INSULATION INSTALLATION 129
12.3.5.1 A. Requirements in this article generally apply to all insulation materials except where more specific requirements are specified in various pipe insulation material installation articles.
12.3.5.2 B. Insulation Installation on Fittings, Valves, Strainers, Flanges, and Unions: 129
12.3.6 3.6 INSTALLATION OF FLEXIBLE ELASTOMERIC INSULATION 130
12.3.6.1 A. Seal longitudinal seams and end joints with manufacturer's recommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.
12.3.6.2 B. Insulation Installation on Pipe Flanges: 130
12.3.6.3 C. Insulation Installation on Pipe Fittings and Elbows: 130
12.3.6.4 D. Insulation Installation on Valves and Pipe Specialties: 130
12.3.7 3.7 INSTALLATION OF MINERAL-FIBER INSULATION 130
12.3.7.1 A. Insulation Installation on Straight Pipes and Tubes: 130
12.3.7.2 B. Insulation Installation on Pipe Flanges: 131
12.3.7.3 C. Insulation Installation on Pipe Fittings and Elbows: 131
12.3.7.4 D. Insulation Installation on Valves and Pipe Specialties: 131
12.3.8 3.8 FIELD-APPLIED JACKET INSTALLATION 131
12.3.8.1 A. Where PVC jackets are indicated, install with 25-mm (1-inch) overlap at longitudinal seams and end joints. Seal with manufacturer's recommended adhesive.
12.3.9 3.9 FINISHES 131
12.3.9.1 A. Flexible Elastomeric Thermal Insulation: After adhesive has fully cured, apply two coats of insulation manufacturer's recommended protective coating.
12.3.10 3.10 PIPING INSULATION SCHEDULE, GENERAL 131
12.3.10.1 A. Acceptable preformed pipe and tubular insulation materials and thicknesses are identified for each piping system and pipe size range.
If more than one material is listed for a piping system, selection from materials listed is Contractor's option.
12.3.11 3.11 INDOOR PIPING INSULATION SCHEDULE 132
12.3.11.1 A. Domestic Cold Water: 132
12.3.11.2 B. Domestic Hot and Recirculated Hot Water: 132
13 221116 Domestic Water Piping 133
13.1 PART 1 - GENERAL 133
13.1.1 1.1 RELATED DOCUMENTS 133
13.1.1.1 A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
13.1.2 1.2 SUMMARY 133
13.1.2.1 A. Section Includes: 133
13.1.3 1.3 SUBMITTALS 133
13.1.3.1 A. Submittals shall comply with the requirements of the Construction Contract Clauses, Division 01 Section "Submittals" and the individual sections specifying the work.
13.1.3.2 B. Provide piping layouts, including pipe size and insulation requirements, to General Contractor for inclusion in project coordination drawings.
13.1.3.3 C. Field quality-control reports. 133
13.1.4 1.4 QUALITY ASSURANCE 133
13.1.4.1 A. Piping materials shall bear label, stamp, or other markings of specified testing agency. 133
13.1.4.2 B. Comply with NSF 61 for potable domestic water piping and components. 133
13.2 PART 2 - PRODUCTS 133
13.2.1 2.1 PIPING MATERIALS 133
13.2.1.1 A. Comply with requirements in "Piping Schedule" Article for applications of pipe, tube, fitting materials, and joining methods for specific services, service locations, and pipe sizes.
13.2.2 2.2 COPPER TUBE AND FITTINGS 134
13.2.2.1 A. Hard Copper Tube: ASTM B 88M, Type B (ASTM B 88, Type L) water tube, drawn temper. 134
13.2.3 2.3 PIPING JOINING MATERIALS 134
13.2.3.1 A. Solder Filler Metals: ASTM B 32, lead-free alloys. Include water-flushable flux according to ASTM B 813. 134
13.2.4 2.4 DIELECTRIC FITTINGS 134
13.2.4.1 A. General Requirements: Assembly of copper alloy and ferrous materials with separating nonconductive insulating material. Include end connections compatible with pipes to be joined.
13.2.4.2 B. Dielectric Nipples: 134
13.2.5 2.5 FLEXIBLE CONNECTORS 134
13.2.5.1 A. Flexible connectors shall have materials suitable for system fluid.
Include 1200 kPa (175-psig) minimum working-pressure rating and ends according to the following:
13.3 PART 3 - EXECUTION 135
13.3.1 3.1 PIPING INSTALLATION 135
13.3.1.1 A. Drawing plans, schematics, and diagrams indicate general location and arrangement of domestic water piping. Indicated locations and arrangements are used to size pipe and calculate friction loss, expansion, and other design considerations. Instal...
13.3.1.2 B. Install domestic water piping level without pitch and plumb. 135
13.3.1.3 C. Install piping concealed from view and protected from physical contact by building occupants unless otherwise indicated and except in equipment rooms and service areas.
13.3.1.4 D. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.
13.3.1.5 E. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal, and coordinate with other services occupying that space.
13.3.1.6 F. Install piping adjacent to equipment and specialties to allow service and maintenance. 135
13.3.1.7 G. Install piping to permit valve servicing. 135
13.3.1.8 H. Install nipples, unions, special fittings, and valves with pressure ratings the same as or higher than system pressure rating used in applications below unless otherwise indicated.
13.3.1.9 I. Install piping free of sags and bends. 135
13.3.1.10 J. Install fittings for changes in direction and branch connections. 135
13.3.1.11 K. Install unions in copper tubing at final connection to each piece of equipment, machine, and specialty. 135
13.3.1.12 L. Install sleeve seals for piping penetrations of concrete slabs.
Comply with requirements for sleeve seals specified in Division 22 Section "Sleeves and Sleeve Seals for Plumbing Piping."
13.3.1.13 M. Install escutcheons for piping penetrations of walls, ceilings, and floors where exposed. Comply with requirements for escutcheons specified in Division 22 Section "Escutcheons for Plumbing Piping."
13.3.2 3.2 JOINT CONSTRUCTION 135
13.3.2.1 A. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe. 135
13.3.2.2 B. Remove scale, slag, dirt, and debris from inside and outside of pipes, tubes, and fittings before assembly. 136
13.3.2.3 C. Soldered Joints: Apply ASTM B 813, water-flushable flux to end of tube. Join copper tube and fittings according to ASTM B 828 or CDA's "Copper Tube Handbook."
13.3.3 3.3 VALVE INSTALLATION 136
13.3.3.1 A. General-Duty Valves: Comply with requirements in Division 22 Section "General-Duty Valves for Plumbing Piping" for valve installations.
13.3.3.2 B. Install shutoff ball valve close to water main on each branch and riser serving plumbing fixtures or equipment, on each water supply to equipment, and on each water supply to plumbing fixtures that do not have supply stops.
13.3.4 3.4 FLEXIBLE CONNECTOR INSTALLATION 136
13.3.4.1 A. Install bronze-hose flexible connectors in copper domestic water tubing. 136
13.3.5 3.5 HANGER AND SUPPORT INSTALLATION 136
13.3.5.1 A. Comply with requirements in Division 22 Section "Hangers and Supports for Plumbing Piping and Equipment" for pipe hanger and support products and installation.
13.3.5.2 B. Support vertical piping and tubing at base and at each floor. 136
13.3.5.3 C. Rod diameter may be reduced one size for double-rod hangers, to a minimum of 10 mm (3/8 inch). 136
13.3.5.4 D. Install hangers for copper tubing with the following maximum horizontal spacing and minimum rod diameters: 136
13.3.5.5 E. Install supports for vertical copper tubing every 3 m (10 feet). 137
13.3.5.6 F. Support piping and tubing not listed in this article according to MSS SP-69 and manufacturer's written instructions. 137
13.3.6 3.6 CONNECTIONS 137
13.3.6.1 A. Drawings indicate general arrangement of piping, fittings, and specialties. 137
13.3.7 3.7 IDENTIFICATION 137
13.3.7.1 A. Identify system components. Comply with requirements in Division 22 Section "Identification for Plumbing Piping and Equipment" for identification materials and installation.
13.3.8 3.8 FIELD QUALITY CONTROL 137
13.3.8.1 A. Perform tests and inspections. 137
13.3.8.2 B. Piping Inspections: 137
13.3.8.3 C. Piping Tests: 137
13.3.8.4 D. Domestic water piping will be considered defective if it does not pass tests and inspections. 138
13.3.8.5 E. Prepare test and inspection reports. 138
13.3.9 3.9 ADJUSTING 138
13.3.9.1 A. Perform the following adjustments before operation: 138
13.3.10 3.10 CLEANING 138
13.3.10.1 A. Clean and disinfect potable domestic water piping as follows: 138
13.3.10.2 B. Prepare and submit reports of purging and disinfecting activities. 139
13.3.11 3.11 PIPING SCHEDULE 139
13.3.11.1 A. Transition and special fittings with pressure ratings at least equal to piping rating may be used in applications below unless otherwise indicated.
13.3.11.2 B. Aboveground domestic water piping shall be one of the following: 139
14 221316 Sanitary Waste and Vent Piping 140
14.1 PART 1 - GENERAL 140
14.1.1 1.1 RELATED DOCUMENTS 140
14.1.1.1 A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
14.1.2 1.2 SUMMARY 140
14.1.2.1 A. Section Includes: 140
14.1.3 1.3 PERFORMANCE REQUIREMENTS 140
14.1.3.1 A. Components and installation shall be capable of withstanding the following minimum working pressure unless otherwise indicated: 140
14.1.3.2 B. Plastic Piping shall not be used. 140
14.1.4 1.4 SUBMITTALS 140
14.1.4.1 A. Submittals shall comply with the requirements of the Construction Contract Clauses, Division 01 Section "Submittals" and the individual sections specifying the work.
14.1.4.2 B. Field quality-control reports. 140
14.1.4.3 C. Provide piping layouts, including pipe size, to General Contractor for inclusion in project coordination drawings. 140
14.1.5 1.5 QUALITY ASSURANCE 140
14.1.5.1 A. Piping materials shall bear label, stamp, or other markings of specified testing agency. 140
14.2 PART 2 - PRODUCTS 141
14.2.1 2.1 PIPING MATERIALS 141
14.2.1.1 A. Comply with requirements in "Piping Schedule" Article for applications of pipe, tube, fitting materials, and joining methods for specific services, service locations, and pipe sizes.
14.2.2 2.2 HUBLESS, CAST-IRON SOIL PIPE AND FITTINGS 141
14.2.2.1 A. Pipe and Fittings: ASTM A 888 or CISPI 301. 141
14.2.2.2 B. CISPI, Hubless-Piping Couplings: 141
14.2.3 2.3 COPPER TUBE AND FITTINGS 141
14.2.3.1 A. Copper DWV Tube: ASTM B 306, drainage tube, drawn temper. 141
14.2.3.2 B. Copper Drainage Fittings: ASME B16.23, cast copper or ASME B16.29, wrought copper, solder-joint fittings. 141
14.2.3.3 C. Solder: ASTM B 32, lead free with ASTM B 813, water-flushable flux. 141
14.2.4 2.4 SPECIALTY PIPE FITTINGS 141
14.2.4.1 A. Transition Couplings: 141
14.3 PART 3 - EXECUTION 142
14.3.1 3.1 PIPING INSTALLATION 142
14.3.1.1 A. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems. Indicated locations and arrangements were used to size pipe and calculate friction loss, expansion, pump sizing, and other design considerations
14.3.1.2 B. Install piping in concealed locations unless otherwise indicated and except in equipment rooms and service areas. 142
14.3.1.3 C. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.
14.3.1.4 D. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal. 142
14.3.1.5 E. Install piping to permit valve servicing. 142
14.3.1.6 F. Install piping at indicated slopes. 143
14.3.1.7 G. Install piping free of sags and bends. 143
14.3.1.8 H. Install fittings for changes in direction and branch connections. 143
14.3.1.9 I. Install piping to allow application of insulation where required. 143
14.3.1.10 J. Make changes in direction for soil and waste drainage and vent piping using appropriate branches, bends, and long-sweep bends.
Sanitary tees and short-sweep 1/4 bends may be used on vertical stacks if change in direction of flow is from horizontal...
14.3.1.11 K. Install soil and waste drainage and vent piping at the following minimum slopes unless otherwise indicated: 143
14.3.1.12 L. Install cast-iron soil piping according to CISPI's "Cast Iron Soil Pipe and Fittings Handbook," Chapter IV, "Installation of Cast Iron Soil Pipe and Fittings."
14.3.1.13 M. Install aboveground copper tubing according to CDA's "Copper Tube Handbook." 143
14.3.1.14 N. Do not enclose, cover, or put piping into operation until it is inspected and approved by authorities having jurisdiction. 143
14.3.1.15 O. Install escutcheons for piping penetrations of walls, ceilings, and floors where exposed. Comply with requirements for escutcheons specified in Division 22 Section "Escutcheons for Plumbing Piping."
14.3.2 3.2 JOINT CONSTRUCTION 143
14.3.2.1 A. Join hubless, cast-iron soil piping according to CISPI 310 and CISPI's "Cast Iron Soil Pipe and Fittings Handbook" for hubless-piping coupling joints.
14.3.2.2 B. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:
14.3.2.3 C. Join copper tube and fittings with soldered joints according to ASTM B 828. Use ASTM B 813, water-flushable, lead-free flux and ASTM B 32, lead-free-alloy solder.
14.3.3 3.3 SPECIALTY PIPE FITTING INSTALLATION 144
14.3.3.1 A. Transition Couplings: 144
14.3.4 3.4 HANGER AND SUPPORT INSTALLATION 144
14.3.4.1 A. Comply with requirements for pipe hanger and support devices and installation specified in Division 22 Section "Hangers and Supports for Plumbing Piping and Equipment."
14.3.4.2 B. Support horizontal piping and tubing within 300 mm (12 inches) of each fitting, valve, and coupling. 144
14.3.4.3 C. Support vertical piping and tubing at base and at each floor. 144
14.3.4.4 D. Rod diameter may be reduced one size for double-rod hangers, with 10-mm (3/8-inch) minimum rods. 144
14.3.4.5 E. Install hangers for cast-iron soil piping with the following maximum horizontal spacing and minimum rod diameters: 144
14.3.4.6 F. Install supports for vertical cast-iron soil piping every 4.5 m (15 feet). 144
14.3.4.7 G. Install hangers for copper tubing with the following maximum horizontal spacing and minimum rod diameters: 145
14.3.4.8 H. Install supports for vertical copper tubing every 3 m (10 feet). 145
14.3.4.9 I. Install hangers for piping with the following maximum horizontal spacing and minimum rod diameters: 145
14.3.4.10 J. Support piping and tubing not listed above according to MSS SP-69 and manufacturer's written instructions. 145
14.3.5 3.5 CONNECTIONS 145
14.3.5.1 A. Drawings indicate general arrangement of piping, fittings, and specialties. 145
14.3.5.2 B. Where installing piping adjacent to equipment, allow space for service and maintenance of equipment. 145
14.3.6 3.6 IDENTIFICATION 145
14.3.6.1 A. Identify exposed sanitary waste and vent piping. Comply with requirements for identification specified in Division 22 Section " Identification for Plumbing Piping and Equipment."
14.3.7 3.7 FIELD QUALITY CONTROL 145
14.3.7.1 A. During installation, notify authorities having jurisdiction at least 24 hours before inspection must be made. Perform tests specified below in presence of authorities having jurisdiction.
14.3.7.2 B. Reinspection: If authorities having jurisdiction find that piping will not pass test or inspection, make required corrections and arrange for reinspection.
14.3.7.3 C. Reports: Prepare inspection reports and have them signed by authorities having jurisdiction. 146
14.3.7.4 D. Test sanitary drainage and vent piping according to procedures of authorities having jurisdiction or, in absence of published procedures, as follows:
14.3.8 3.8 CLEANING AND PROTECTION 146
14.3.8.1 A. Clean interior of piping. Remove dirt and debris as work progresses. 146
14.3.8.2 B. Protect drains during remainder of construction period to avoid clogging with dirt and debris and to prevent damage from traffic and construction work.
14.3.8.3 C. Place plugs in ends of uncompleted piping at end of day and when work stops. 146
14.3.9 3.9 PIPING SCHEDULE 146
14.3.9.1 A. Aboveground, soil, waste and vent piping shall be any of the following: 146
14.3.9.2 B. Indirect waste piping, including mechanical equipment condensate waste piping: 147
15 221319 Sanitary Waste Piping Specialties 148
15.1 PART 1 - GENERAL 148
15.1.1 1.1 RELATED DOCUMENTS 148
15.1.1.1 A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
15.1.2 1.2 SUMMARY 148
15.1.2.1 A. This Section includes the following sanitary drainage piping specialties: 148
15.1.2.2 B. Related Sections include the following: 148
15.1.3 1.3 DEFINITIONS 148
15.1.3.1 A. HDPE: High-density polyethylene plastic. 148
15.1.3.2 B. PE: Polyethylene plastic. 148
15.1.3.3 C. PP: Polypropylene plastic. 148
15.1.3.4 D. PVC: Polyvinyl chloride plastic. 148
15.1.4 1.4 SUBMITTALS 148
15.1.4.1 A. Submittals shall comply with the requirements of the Construction Contract Clauses, Division 01 Section "Submittals" and the individual sections specifying the work.
15.1.4.2 B. Product Data: For each type of product indicated. Include rated capacities, operating characteristics, and accessories for the following: 148
15.1.5 1.5 QUALITY ASSURANCE 149
15.1.5.1 A. Drainage piping specialties shall bear label, stamp, or other markings of specified testing agency. 149
15.1.5.2 B. Comply with NSF 14, "Plastics Piping Components and Related Materials," for plastic sanitary piping specialty components. 149
15.2 PART 2 - PRODUCTS 149
15.2.1 2.1 CLEANOUTS 149
15.2.1.1 A. Exposed Metal Cleanouts (CO): 149
15.2.1.2 B. Cast-Iron Wall Cleanouts (WCO): 149
15.2.2 2.2 FLOOR DRAINS 150
15.2.2.1 A. Cast-Iron Floor Drains (FD): 150
15.2.3 2.3 MISCELLANEOUS SANITARY DRAINAGE PIPING SPECIALTIES 150
15.2.3.1 A. Floor-Drain, Trap-Seal Primer Fittings: 150
15.3 PART 3 - EXECUTION 150
15.3.1 3.1 INSTALLATION 150
15.3.1.1 A. Refer to Division 22 Section "Common Work Results for Plumbing" for piping joining materials, joint construction, and basic installation requirements.
15.3.1.2 B. For cleanouts located in concealed piping, install cleanout wall access covers, of types indicated, with frame and cover flush with finished wall.
15.3.1.3 C. Install floor drains in flooring provided under other sections. Set grates of drains flush with finished floor. 151
15.3.1.4 D. Install floor-drain, trap-seal primer fittings on inlet to floor drains. 151
15.3.1.5 E. Install air-gap fittings on draining-type backflow preventers and on indirect-waste piping discharge into sanitary drainage system. 151
15.3.1.6 F. Install wood-blocking reinforcement for wall-mounting-type specialties. 151
15.3.1.7 G. Install traps on plumbing specialty drain outlets. Omit traps on indirect wastes unless trap is indicated. 151
15.3.2 3.2 CONNECTIONS 151
15.3.2.1 A. Piping installation requirements are specified in other Division 22 Sections. Drawings indicate general arrangement of piping, fittings, and specialties.
15.3.2.2 B. Install piping adjacent to equipment to allow service and maintenance. 151
15.3.3 3.3 PROTECTION 151
15.3.3.1 A. Protect drains during remainder of construction period to avoid clogging with dirt or debris and to prevent damage from traffic or construction work.
15.3.3.2 B. Place plugs in ends of uncompleted piping at end of each day or when work stops. 151
Hodgdon Bathrooms Drawings 061220 152
1 Hodgdon 1 of 9 152
2 Hodgdon 2 of 9 153
3 Hodgdon 3 of 9 154
4 Hodgdon 4 of 9 155
5 Hodgdon 5 of 9 156
6 Hodgdon 6 of 9 157
7 Hodgdon 7 of 9 158
8 Hodgdon 8 of 9 159
9 Hodgdon 9 of 9 160
DB Wages 2020 07 17 161
Agreement 165
RepsCerts 203
CRQ 210
Evaluation Factor Checklist 212
GSA Solicitation No. 47PB0220R0005
Document: C201-SAT-LPTA/AUGUST 2019 (The Solicitation)
Simplified Acquisition construction Contract for: Hodgdon Border Patrol Sector Headquarters Bathroom Renovations and Option, US Route 1, Hodgdon, ME 04730
The Solicitation
Table of Contents
I. General Information A. The Solicitation and Contract B. List of Solicitation Documents C. Authorized Representatives D. Estimated Price Range E. FAR 52.236-27 Site Visit – Construction F. Receipt of Offers
II. Proposals
A. Proposal Contents B. Proposal Format C. Price Proposal D. Technical Proposal E. Other Information to Submit with Proposal
III. General Provisions
A. Availability of Funds B. Requests for Clarification or Interpretation C. Notice to Small Business Firms D. Information Concerning the Disclosure of Solicitation Results E. Affirmative Procurement Program F. Notice Concerning Preparation of Proposals G. Bond/Payment Protection Requirements H. Contractor Performance Information I. Safeguarding Document Designated as Sensitive But Unclassified
IV. FAR/GSAR Solicitation Provisions A. FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal
Employment Opportunity for Construction B. FAR 52.225-10 Notice of Buy American Requirement-Construction Materials C. Buy American Exceptions D. FAR 52.252-1 Solicitation Provisions Incorporated by Reference E. GSAR 552.102 Incorporating Provisions and Clauses by Reference F. Additional Provisions
(i) GSAR 552.236-74, Evaluation of Options (Mar 2019)
(ii) GSAR Clause 552.236-77, Government’s Right to Exercise Options (Mar
2019) V. Instructions to Offerors and Clauses
A. FAR 52.215-1 Instructions to Offerors – Competitive Acquisition B. FAR 52.204-25, Prohibition on Contracting for Certain Telecommunications and
Video Surveillance Services or Equipment (AUG 2019)
C. GSAR 552.204-70, Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment. (DEVIATION I) (AUG 2019)
D. FAR 52.223-21 FOAMS
E. FAR 52.222-62 Paid Sick Leave F. Security Requirements G. Additional Clauses
(i) GSAR Clause 552.211-10 Commencement, Prosecution and Completion of Work (Mar 2019)
(ii) GSAR Clause 552.211-12, Liquidated Damages –Construction (Mar 2019)
(iii) GSAR Clause 552.211-13, Time Extensions (Mar 2019)
(iv) GSAR Clause 552.211-70, Substantial Completion (Mar 2019)
(v) GSAR Clause 552.232-5, Payment Under Fixed Price Construction
Contracts (Mar 2019)
(vi) GSAR Clause 552.236-6, Superintendence by the Contractor (Mar 2019)
(vii) GSAR Clause 552.236-11, Use and Possession Prior to Completion (Mar
2019)
(viii) GSAR Clause 552.236-70, Authorities and Limitations (Mar 2019)
(ix) GSAR Clause 552.236-71, Contractor Responsibilities (Mar 2019)
(x) GSAR Clause 552.236-72, Submittals (Mar 2019)
(xi) GSAR Clause 552.236-73, Subcontracts (Apr 1984)
(xii) GSAR Clause 552.243-71, Equitable Adjustments (Mar 2019)
VI. Method Of Award A. Evaluation of Offers – Lowest Price Technically Acceptable B. Lowest Price Technically Acceptable Evaluation Process C. Price Reasonableness/Price Realism D. Unbalanced Prices
Notice to Offerors of Total Small Business Set-Aside
The General Services Administration (GSA) is setting aside the contract under the following clause found in the Agreement:
52.219-6, Notice of Total Small Business Set-Aside
I. General Information
I.A. The Solicitation and Contract
(1) This Solicitation is set-aside for Small Businesses, in accordance with FAR 19. This Solicitation sets forth requirements for proposals for a Contract to construct the Project described in the Solicitation Documents. Proposals conforming to the Solicitation requirements will be evaluated in accordance with the Method of Award set forth herein. The Government will award the Contract to the selected Offeror, subject to the conditions set forth herein.
(2) Neither the Solicitation nor any part of an Offeror's proposal shall be part of the Contract except to the extent expressly incorporated therein by…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .