AM0003 Amendment Package.pdf
PDF 198 KB Posted
- Attached to
- Hodgdon: Bathroom Renovations Federal contract opportunity
- Solicitation number
- 47PB0220R0005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AM0002 Amendment Package.pdf | ||
| AM0001 Amendment Package Includes Photos.pdf | ||
| AM0001 Amendment Package.pdf | ||
| Solicitation Package.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table of Contents
47PB0220R0005 AM0003 2020 08 04 2
Hodgdon RFI 2 2020 08 04 4
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
1PSKM
Lyska Benitez, CS for Kevin Morris, CO
AM0003 is to include RFI 2 and responses, it also extend the proposal receipt date to Wednesday, August 12, 2020 at 2:00
PM.
1PSKM
GSA/PBS SERVICE CENTERS DIVISION
ADMIN SUPPORT CENTER MANCHESTER
275 CHESTNUT ST., SUITE 528
MANCHESTER, NH 03101
GSA/PBS SERVICE CENTERS DIVISION
ADMIN SUPPORT CENTER MANCHESTER
275 CHESTNUT ST., SUITE 528
MANCHESTER, NH 03101
EQ1PSKM-20-0042
47PB0220R0005
N0471613
1 2
8/4/2020
7/17/2020
Digitally signed by LYSKA BENITEZ-ECHEAGARAY DN: C=US, O=U.S. Government, OU=General Services Administration, OID.0.9.2342.19200300.100.1.1=47001000619696 + CN=LYSKA
BENITEZ-ECHEAGARAY
Reason: I am the author of this document Location: your signing location here Date: 2020-08-04 14:15:15 Foxit PhantomPDF Version: 10.0.0
08/04/2020
INSTRUCTIONS (Back Page):
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
RFI 2
1. QUESTION: Can you please provide more details on the storefront (note 15 on A-2)?
ANSWER: Provide standard Kawneer EnCORE® Framing System or an approved equal.
2. QUESTION: The note calls for double pane glass, is this required on an interior only installation?
Doors are typically single pane.
ANSWER: Even though these doors are interior, the double pane glass was specified to reduce sound transmission. Double pane glass is required and pricing should reflect double pane glass. Glazing is just standard glazing with no coatings, no low E or any other special requirements are required for glazing.
3. QUESTION: Also, please confirm the glazing does NOT need to meet ballistic specifications.
ANSWER: Glazing DOES NOT need to meet ballistic specifications.
4. QUESTION: Will the existing ACT need to be modified and a header need to be installed to receive the storefront at the top?
ANSWER: No modifications to the ACT are required. The storefront will be ceiling high. Installation should follow standard manufacturer’s instructions for installation.
5. QUESTION: Is there ACT on both sides of the storefront?
ANSWER: The existing ceiling remains and will remain on both sides of the storefront system.
6. QUESTION: Please confirm all notes that say 'ABA' are referencing accessibility code requirements, and please confirm this should conform to ANSI 117.1 2017?
ANSWER: Standards issued under the Americans with Disabilities Act (ADA) address access in new construction and alterations to state and local government facilities, places of public accommodation, and commercial facilities. Similar standards apply under the Architectural Barriers Act (ABA) to facilities funded by the federal government. ABA, ADA and ANSI 117.1 2017 share the mutual goal of meeting accessibility code requirements.
7. QUESTION: Shower stall: Is there a specification/basis of design for the shower?
ANSWER: The basis of design is a 62”x33” Freedom ADA Roll in Shower or an approved equal. Link below.
https://www.freedomshowers.com/ADA-Showers-for-Handicapped-Accessibility/Wheelchair- Accessible-ADA-Roll-in-Showers/APFQ6233BFF875R
8. QUESTION: Is this a pre-fab unit to be installed, or will it be constructed out of wet bed and tile?
ANSWER: Refer to response to question 7.
9. QUESTION: Is shower expected to be barrier free and comply with ANSI 117.1 2017, i.e. also incude bench, grab bars, controls, etc.?
ANSWER: Refer to answer to question 7. Shower stall should include grab bars bench and controls.
10. QUESTION: If it is barrier free and flush with the floor, the VCT finish called out for the remainder of the restroom will fail. We suggest utilizing ceramic tile finish instead. If ceramic tile finish, please provide a basis of design/specification.
ANSWER: VCT is required by the agency and has been specified as such and the proposal should be submitted with VCT flooring. After award, if coordination of materials will not allow for proper ABA compliance due to grading issues, this will be addressed once construction award has been made.
11: QUESTION: Restroom cabinet: The lav component as drawn does not meet accessibility code;
would need a slanted panel below the lav rather than a base cabinet to allow wheelchair to roll in.
ANSWER: The configuration of the lavatory meets side approach requirements and will be installed as indicated on the drawings.
12: QUESTION: The countertop height is shown as 34", but we were not able to find anything made by Hampton Bay that would create a 34" high counter (stock items are for 36" high counter).
ANSWER: The Products specified for the lavatory and for that matter, any and all products specified under this contract solicitation are basis of design references. The counter is required to be a maximum 34” height to meet ABA Compliance. Other comparable products are acceptable that meet the basis of design materials called out in the drawings and specifications.