This document is an Invitation for Bid (IFB-5692-25-DD) issued by the City of Grand Junction, Colorado, soliciting competitive bids for the Four Canyons Parkway Phase 2B Project. The project involves constructing the eastern half of an urban arterial parkway from 24½ Road to 25 Road, with a 160-ft right-of-way, and reconstructing 25 Road between F½ Road and Patterson Road. The scope includes roadway, intersection, utility, irrigation, landscaping, and electrical infrastructure improvements across multiple roadways such as 24¾ Road, 25 Road, F½ Road, and Foresight Circle. Bids are due on June 30, 2025, prior to 2:00 PM, with electronic submissions accepted only through the Rocky Mountain E-Purchasing System. The project has a scheduled completion time of 515 calendar days from the Notice to Proceed, with a final completion date not extending beyond December 31, 2026.
The bid schedule includes extensive line items covering water infrastructure, storm drainage, roadway construction, aggregate base courses, asphalt paving, concrete work, irrigation systems, landscaping, traffic signals, and electrical installations. Contractors must be pre-qualified in specific categories including Stream and Stormwater, Roadway and Earthwork, Asphalt Paving, and Concrete Work. The project includes provisions for utility coordination, with excavation of joint utility trenches to be performed by Xcel Energy, and each utility provider required to coordinate conduit placement. The bid includes allowances for asphalt cement cost adjustments and minor contract revisions, with preset amounts of $400,000 and $800,000 respectively. Contractors are required to have appropriate insurance, performance bonds, and must comply with Colorado labor requirements mandating 80% Colorado labor for public works projects.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Addendum No. 3 Four Canyons Parkway Phase 2B IFB-5692-25-DD.pdf | ||
| Addendum No. 2 Four Canyons Parkway Phase 2B IFB-5692-25-DD.pdf | ||
| Addendum No. 1 Four Canyons Parkway Phase 2B IFB-5692-25-DD.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchasing Division
Invitation for Bid
IFB-5692-25-DD
Four Canyons Parkway Phase 2B
Responses Due:
June 30, 2025, Prior to 2:00 PM
Accepting Electronic Responses Only Responses Only Submitted Through the Rocky Mountain E-Purchasing
System (RMEPS) www.bidnetdirect.com/colorado
(Purchasing Representative does not have access or control of the vendor side of
RMEPS. If website or other problems arise during response submission, vendor MUST contact RMEPS to resolve issue prior to the response deadline. 800-835-4603)
NOTE: All City Solicitation openings will continue to be held virtually.
Purchasing Representative:
Dolly Daniels, Senior Buyer; Acting as Purchasing Agent dollyd@gjcity.org
970-256-4048 http://www.bidnetdirect.com/colorado mailto:dollyd@gjcity.org
Invitation for Bids
Table of Contents
Section 1 Instruction to Bidders
Section 2 General Contract Conditions
Section 3 Statement of Work
Section 4 Contractor’s Bid Form
• Price Bid Schedule Form
Appendixes (Click on Links in Section 3.5)
Appendix A Project Manual
• Project Special Provisions
• Ute Water Specifications
• Landscape and Irrigation Specifications (by
GREENBOX STUDIO)
• Electrical Specifications (by ACM Consulting)
Appendix B Geotechnical Investigation Report by:
RockSol Consulting Group
Appendix C Attachments
• Civil Construction Drawings
• Landscape & Irrigation Drawings
• Site Lighting and Electrical Drawings
1. Instructions to Bidders
1.1 A.D.A Document Compliance Requirements: All work documents, and/or bid/proposal documents submitted, as a result of this Solicitation must comply with all applicable provisions of §§24-85-101, C.R.S., et seq., and the Accessibility Standards for Individuals with a Disability, as established by the Office Of Information Technology according to Section §24-85-103 (2.5), C.R.S. and 3) all State of Colorado technology standards related to technology accessibility and with Level A.A. of the most current version of the Web Content Accessibility Guidelines (WCAG), incorporated in the State of Colorado technology standards.
1.2 Required Review: The Offeror is responsible for thoroughly reviewing all solicitation documentation to gain a comprehensive understanding of the scope, specifications, project requirements, and all associated rules, regulations, laws, conditions, instructions, and procurement policies related to the solicitation process and the Project or Work outlined in this Invitation for Bids (IFB).
1.3 Issuing Office: This Invitation for Bid (IFB) is issued by the City of Grand Junction. All contact regarding this IFB is to be directed to:
Dolly Daniels; Purchasing Agent
With the exception of Pre-Bid or Site Visit Meeting(s) all questions, inquiries, comments, or communication pertaining to this Solicitation (whether process, specifications, scope, etc.) must be directed (in writing) to the Purchasing Agent. Other communication may result in disqualification.
1.4 Non-Mandatory Pre-Bid Meeting: Prospective Bidders are encouraged to attend a non-mandatory pre-bid meeting. The meeting will be held at the City Hall Auditorium located at 250 N. 5th St on Monday, June 9, 2025, at 11:00 AM. The purpose of this meeting will be to inspect and to clarify the contents of this Invitation for Bids (IFB).
1.5 Prequalification Requirement: Contractors submitting bids over $500,000 must be pre-qualified in accordance with the City's "Contractors Prequalification Application". All bids received by the specified time will be opened, but the City will reject bids over $500,000 from contractors who have not been prequalified. Application forms for prequalification are available by clicking the Application Link Call 970-256-4082 for additional information.
Due to the time required to process applications, all applications must be submitted no later than the application due date stated in the Solicitation document. Contractors may view its approved pre-qualified categories by clicking the Pre-Qualification List Link.
1.6 Purpose: The City of Grand Junction (City) is soliciting competitive bids from qualified and interested Contractors for all labor, equipment, and materials required for the Four Canyons Parkway Phase 2B Project. All dimensions and Scope of Work shall be verified by Contractors prior to submission of bids.
1.7 The Owner: The Owner is the City and is referred to throughout this Solicitation. The term
Owner means the Owner or its authorized representative.
mailto:dollyd@gjcity.org http://trimview.gjcity.org/?=SOLDOC/23660 http://trimview.gjcity.org/?=SOLDOC/23910
1.8 Compliance: All Bidders, by submitting a bid, agree to comply with all conditions, requirements, and instructions of this IFB as stated or implied herein. Should the Owner omit anything which is necessary to clear understanding of the requirements, or should it appear that various instructions are in conflict, the Bidder(s) shall secure instructions from the Purchasing Agent prior to submittal deadline.
1.9 Procurement Process: The most current version of the City Purchasing Policy and Procedure Manual is contracting and applies to this Solicitation.
1.10 Submission: Each bid shall be submitted in electronic format only, and only through the Rocky Mountain E-Purchasing website (wwwbidnetdirect.com/colorado). This site offers both “free” and “paying” registration options that allow for full access of the Owner’s documents and for electronic submission of bids. (Note: “free” registration may take up to 24 hours to process. Please Plan accordingly.) Please view our “Electronic Vendor Registration Guide” at https://co-grandjunction.civicplus.com/501/Purchasing-Bids for details.
(Purchasing Representative does not have access or control of the vendor side of RMEPS. If the website or other problems arise during response submission, the vendor MUST contact RMEPS to resolve the issue prior to the response deadline 800-835-4603).
Bids shall be formatted as directed in Section 4.0, Contractor’s Bid Form and Price Bid
Schedule. Submittals that fail to follow this format may be ruled nonresponsive. The uploaded response shall be a single PDF document with all required information included.
The virtual bid opening can be accessed by the following means:
Bid Opening Four Canyons Parkway Phase 2B June 30, 2025, 2:00 – 2:30 PM (America/Denver) Please join my meeting from your computer, tablet or smartphone.
https://meet.goto.com/455490645 You can also dial in using your phone. Access Code: 455-490-645 United States: +1 (872) 240-3412 Join from a video-conferencing room or system.
Meeting ID: 455-490-645 Dial in or type: 67.217.95.2 or inroomlink.goto.com Or dial directly: 455490645@67.217.95.2 or 67.217.95.2##455490645 Get the app now and be ready when your first meeting starts:
https://meet.goto.com/install
1.11 Modification and Withdrawal of Bids Before Opening Bids may be modified or withdrawn in writing by the Bidder, duly executing and submitting to the place where Bids are to be submitted at any time prior to Bid Opening.
1.12 Form for Price Bid: All Price Bids must be made upon the Price Bid Schedule attached and state the amounts both in words and in figures and must be signed and acknowledged by the Bidder.
The Bidder shall specify a unit price in figures for each pay item for which a quantity is given and shall provide the products (in numbers) of the respective unit prices and quantities in http://trimview.gjcity.org/?=POLPROEV/222 http://trimview.gjcity.org/?=POLPROEV/222 https://www.rockymountainbidsystem.com/default.asp https://co-grandjunction.civicplus.com/501/Purchasing-Bids https://meet.goto.com/455490645 tel:+18722403412,,455490645 https://meet.goto.com/install the Extended Amount column. The total Bid price shall be equal to the sum of all extended amount prices. When an item in the Price Bid Schedule provides a choice to be made by the Bidder, Bidder's choice shall be indicated in accordance with the specifications for that particular item and thereafter no further choice shall be permitted.
Where the unit of a pay item is lump sum, the lump sum amount shall be shown in the "extended amount" column and included in the summation of the total Bid.
All blank spaces in the Price Bid Schedule must be properly filled out.
Bids by Corporations must be executed in the corporate name by the president or vice president, or other business officer accompanied by evidence of authority to sign. The entity address and state of organization of the entity shall be shown below the signature.
All names must be typed or printed below the signature.
Bids by partnerships must be executed in the partnership name and signed by a partner whose title must appear under the signature and the official address of the partnership must be shown below the signature.
The Bidder’s Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of which shall be filled in on the Contractor’s Bid Form.
The contact information to which communications regarding the Bid are to be directed must be shown.
1.13 Exclusions: No oral, telephonic, emailed, or facsimile bid will be considered.
1.14 Contract Documents: The complete IFB and Bidder’s response compose the Contract
Documents. Copies of bid documents can be obtained from the City Purchasing website, https://co-grandjunction.civicplus.com/501/Purchasing-Bids .
1.15 Additional Documents: The July 2010 edition of the “City Standard Contract Documents for Capital Improvements Construction”, Plans, Specifications and other Bid Documents are available for review or download on the Purchasing Bids page at https://co-grandjunction.civicplus.com/501/Purchasing-Bids.
1.16 Definitions and Terms: See Article I, Section 3 of the General Contract Conditions in the
Standard Contract Documents for Capital Improvements Construction.
1.17 Examination of Specifications: Bidders shall thoroughly examine and be familiar with the Project Statement of Work. The failure or omission of any Bidder to receive or examine any form, addendum, or other document shall in no way relieve any Bidder from any obligation with respect to its bid. The submission of a bid shall be taken as evidence of compliance with this section. Prior to submitting a bid, each Bidder shall, at a minimum:
a. Examine the Contract Documents thoroughly, and;
b. Visit the site to familiarize itself with local conditions that may in any manner affect cost, progress, or performance of the Work, and;
https://co-grandjunction.civicplus.com/501/Purchasing-Bids https://co-grandjunction.civicplus.com/501/Purchasing-Bids
c. Study and carefully correlate Bidder's observations with the Contract Documents, and;
d. Notify the Purchasing Agent of all conflicts, errors, ambiguities, or discrepancies in or among the Contract Documents within the designated inquiry period.
On request, the Owner will provide each Bidder access to the site to conduct such investigations and tests as each Bidder deems necessary for submission of a Bid. It shall be the Bidder’s responsibility to make or obtain any additional examinations, investigations, explorations, tests and studies and obtain any additional information and data which pertain to the physical conditions (including without limitation, surface, subsurface and underground utilities) at or contiguous to the site or otherwise which may affect cost, progress or performance of the Work and which the Bidder deems necessary to determine its Bid for performing the Work in accordance with the time, price and other terms and conditions of the Contract Documents.
The lands upon which the Work is to be performed, rights of way, and access thereto, and other lands designated for use by Contractor in performing the Work, are identified on the Drawings.
Information and data reflected in the Contract Documents with respect to underground utilities at or contiguous to the site are based upon information and data furnished to the Owner and the Engineer by the owners of such underground utilities or others, and the Owner does not assume responsibility for the accuracy or completeness thereof, unless it is expressly provided otherwise in the Contract Documents.
By submission of a Bid, the Bidder shall be conclusively presumed to represent that the Bidder has complied with every requirement of these Instructions to Bidders, that the Contract Documents are not ambiguous and are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance of the Work.
1.18 Questions Regarding Statement of Work: Any information relative to interpretation of
Scope of Work or specifications shall be requested of the Purchasing Agent, in writing, in ample time, prior to the inquiry deadline.
1.19 Addenda & Interpretations: If it becomes necessary to revise any part of this Solicitation, a written addendum will be posted electronically on the City’s website at https://co-grandjunction.civicplus.com/501/Purchasing-Bids.The Owner is not bound by any oral representations, clarifications, or changes made in the written specifications by Owner, unless such clarification or change is provided in written addendum form from the City Purchasing Agent.
1.20 Taxes: The Owner is exempt from State, County, and Municipal Sales Tax and Federal
Excise Tax, therefore, all fees and costs should not include taxes.
1.21 Sales and Use Taxes: The Contractor and all Subcontractors are required to obtain exemption certificates from the Colorado Department of Revenue for sales and use taxes in accordance with the provisions of the General Contract Conditions, Section XVI
“Taxes”. Bids shall reflect this method of accounting for sales and use taxes on materials, fixtures, and equipment.
1.22 Offers Binding 60 Days: Unless additional time is required by the Owner, or otherwise specified, all formal offers submitted shall be binding for sixty (60) calendar days following opening date, unless the Bidder, upon request of the Purchasing Agent, agrees to an extension.
1.23 Exceptions and Substitutions: All bids meeting the intent of this IFB shall be considered for award. A Bidder taking exception to the specifications does so at the Bidder’s risk. The Owner reserves the right to accept or reject any or all substitutions or alternatives. When offering substitutions and/or alternatives, Bidder must state any exception(s) in the section to which the exception(s) pertain. Exception/substitution, if accepted, must meet, or exceed the stated intent and/or specifications. The absence of stated exception(s) indicates that the Bidder has not taken exception, and if awarded a Contract shall hold the Bidder responsible to perform in strict accordance with the specifications or scope of the bid and Contract Documents.
1.24 Collusion Clause: Each Bidder by submitting a bid certifies that it is not party to any collusive action or any action that may be in violation of the Sherman Antitrust Act. Any and all bids shall be rejected if there is evidence or reason for believing that collusion exists among Bidders. The Owner may, or may not, accept future bids for the same Work or commodities from participants in such collusion.
1.25 Disqualification of Bidders: A Bid will not be accepted from, nor shall a Contract be awarded to, any person, Contractor, or corporation that is in arrears to the Owner, upon debt or Contract, or that has defaulted, as surety or otherwise, upon any obligation to the Owner, or that is deemed irresponsible or unreliable.
Bidders may be required to submit satisfactory evidence of responsibility, have a practical knowledge of the project bid upon and that has the necessary financial and other resources to complete the proposed Work.
Either of the following reasons, without limitation, shall be considered sufficient to disqualify a Bidder and Bid:
a. More than one Bid is submitted for the same Work from an individual, Contractor, or corporation under the same or different name: and
b. Evidence of collusion among Bidders. Any participant in such collusion shall not receive recognition as a Bidder for any future Work of the Owner until such participant has been reinstated as a qualified Bidder.
1.26 Public Disclosure Record: If the Bidder has knowledge of its employee(s) or sub-contractors having an immediate family relationship with an Owner employee or elected official, the Bidder must provide the Purchasing Agent with the name(s) of the individuals.
The individuals are required to file a “Public Disclosure Record”, a statement of financial interest, before conducting business with the Owner.
2. General Contract Conditions for Construction Projects
2.1 The Contract: This Invitation for Bid, submitted documents, and any negotiations, when properly accepted by the Owner, shall constitute an enforceable Contract equally binding between the Owner and Contractor. The Contract represents the entire and integrated agreement between the Owner and the Contractor and supersedes all prior negotiations, representations, or agreements, either written or oral including the bid documents. The Contract may be amended or modified with Change Orders, Field Orders, or Addendums.
2.2. The Work: The term Work includes all labor necessary to construct the Project required by the Contract Documents, and all materials and equipment incorporated or to be incorporated in such construction.
2.3. Execution, Correlation, Intent, and Interpretations: The Contract Documents shall be signed by the Owner and Contractor. By executing the Contract, the Contractor represents that it has familiarized itself with the local conditions under which the Work is to be performed and correlated its observations with the requirements of the Contract Documents. The Contract Documents are complementary, and what is required by anyone, shall be as binding as if required by all. The intention of the Contract Documents is to include all labor, materials, equipment, services, and other items necessary for the proper execution and completion of the Scope of Work as defined in the technical specifications and drawings contained herein. All drawings, specifications and copies furnished by the Owner are, and shall remain, Owner property. It is not to be used on any other project.
2.4. The Owner: The Owner is the City and is referred to throughout the Contract Documents.
The term Owner means the Owner or its authorized representative. The Owner shall, at all times, have access to the Work wherever it is in preparation and progress. The Contractor shall provide facilities for such access. The Owner will make periodic visits to the site to familiarize itself generally with the progress and quality of Work and to determine, in general, if the Work is proceeding in accordance with the Contract Documents. Based on such observations and the Contractor’s Application for Payment, the Owner will determine the amounts owing to the Contractor and will issue Certificates for Payment in such amounts as provided in the Contract. The Owner will have authority to reject Work which does not conform to the Contract Documents. Whenever, in its reasonable opinion, considers it necessary or advisable to ensure the proper implementation of the intent of the Contract Documents, it will have authority to require the Contractor to stop the Work or any portion, or to require special inspection or testing of the Work, whether or not such Work can be then be fabricated, installed, or completed.
The Owner will not be responsible for the acts or omissions of the Contractor, and Sub- Contractor, or any of its agents or employees, or any other persons performing any of the Work.
2.5. Contractor: The Contractor is the person or organization identified as such in the
Agreement and is referred to throughout the Contract Documents. The term Contractor means the Contractor or its authorized representative. The Contractor shall carefully study and compare the General Contract Conditions of the Contract, Specification and
Drawings, Scope of Work, Addenda and Modifications and shall at once report to the Owner any error, inconsistency, or omission it may discover. Contractor shall not be liable to the Owner for any damage resulting from such errors, inconsistencies, or omissions.
The Contractor shall not commence Work without clarifying Drawings, Specifications, or Interpretations.
2.6. Sub-Contractors: A Sub-Contractor is a person or organization that has a direct
Contract with the Contractor to perform any of the Work at the site. The term Sub- Contractor is referred to throughout the Contract Documents and means a Sub-Contractor or its authorized representative.
2.7. Award of Sub-Contractors & Other Contracts for Portions of the Work: Contractor shall submit with its bid response to the Owner, in writing for acceptance, a list of the names of the sub-contractors or other persons or organizations proposed for such portions of the Work as may be designated in the bid requirements, or, if none is so designated, the names of the sub-contractors proposed for the principal portions of the Work. Prior to the award of the Contract, the Owner shall notify the successful Contractor in writing if, after due investigation, has reasonable objection to any person or organization on such list. If, prior to the award of the Contract, the Owner has a reasonable and substantial objection to any person or organization on such list and refuses in writing to accept such person or organization, the successful Contractor may, prior to the award, withdraw its bid without forfeiture of bid security. If the successful Contractor submits an acceptable substitute with an increase in the proposed price to cover the difference in cost occasioned by the substitution, the Owner may, at its discretion, accept the increased bid or may disqualify the Contractor. If, after the award, the Owner refuses to accept any person or organization on such list, the Contractor shall submit an acceptable substitute and the Contract sum shall be increased or decreased by the difference in cost occasioned by such substitution and an appropriate Change Order shall be issued. No increase in the Contract sum shall be allowed for any such substitution unless the Contractor has acted promptly and responsively in submitting a name with respect thereto prior to the award.
2.8. Quantities of Work and Unit Price: Materials or quantities stated as unit price items in the Bid are supplied only to give an indication of the general scope of the Work, and are, as such, estimates only. The Owner does not expressly or by implication agree that the actual amount of Work or material will correspond therewith and reserves the right after award to increase or decrease the quantity of any unit item of the Work without a change in the unit price except as set forth in Article VIII, Section 70 of the General Contract Conditions. The City also reserves the right to make changes in the Work (including the right to delete any bid item in its entirety or add additional bid items) as set forth in Article VIII, Sections 69 through 71 of the General Contract Conditions.
2.9. Substitutions: The materials, products and equipment described in the Solicitation
Documents shall be regarded as establishing a standard of required performance, function, dimension, appearance, or quality to be met by any proposed substitution. No substitution will be considered prior to receipt of Bids unless the Bidder submits a written request for approval to the Purchasing Agent at least ten (10) days prior to the date for receipt of Bids. Such requests for approval shall include the name of the material or equipment for which substitution is sought and a complete description of the proposed substitution including drawings, performance and test data, and other information necessary for evaluation, including samples if requested. The Bidder shall set forth changes in other materials, equipment, or other portions of the Work, including changes of the Work of other Contracts which incorporation of the proposed substitution would require to be included. The Owner’s decision of approval or disapproval of a proposed substitution shall be final. If the Owner approves a proposed substitution before receipt of Bids, such approval will be set forth in an Addendum. Bidders shall not rely upon approvals made in any other manner.
2.10. Supervision and Construction Procedures: The Contractor shall supervise and direct the Work, using its best skill and attention. It shall be solely responsible for all construction means, methods, techniques, sequences, and procedures and for coordinating all portions of the Work under the Contract.
2.11. Warranty: The Contractor warrants to the Owner that all materials and equipment furnished under the Contract will be new unless otherwise specified, and that all Work will be of good quality, free from faults and defects and in conformance with the Contract Documents. All Work not conforming to these standards may be considered defective. If required by Owner, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. If within ten (10) days after written notice to the Contractor requesting such repairs or replacement, the Contractor should neglect to make or undertake with due diligence to the same, the City may make such repairs or replacements. All indirect and direct costs of such correction or removal or replacement shall be at the Contractor’s expense. The Contractor will also bear the expenses of making good all Work of others destroyed or damaged by the correction, removal, or replacement of its defective Work.
2.12. Permits, Fees, & Notices: The Contractor shall secure and pay for all permits, fees, and licenses necessary for the proper execution and completion of the Work. The Contractor shall give all notices and comply with all laws, ordinances, rules, regulations, and orders of any public authority, including the City, bearing on the performance of the Work. If the Contractor observes that any of the Contract Documents are at variance in any respect, it shall promptly notify the Purchasing Agent in writing, and any necessary changes shall be adjusted. If the Contractor performs any Work knowing it to be contrary to such laws, ordinances, rules, and regulations, and without such notice to the Owner, it shall assume full responsibility and shall bear all costs attributable to the non-conforming Work.
2.13. Responsibility for Those Performing the Work: The Contractor shall be responsible to the Owner for the acts and omissions of all its employees and all sub-contractors, its agents and employees, and all other persons performing any of the Work under a Contract with the Contractor.
2.14. Use of the Site: The Contractor shall confine operations at the site to areas permitted by law, ordinances, permits and the Contract Documents, and shall not unreasonably encumber the site with any materials or equipment.
2.15. Cleanup: The Contractor at all times shall keep the premises free from accumulation of waste materials or rubbish caused by its operations. At the completion of Work, it shall remove all its waste materials and rubbish from and about the project, as well as all its tools, construction equipment, machinery, and surplus materials.
2.16. Insurance Requirements: The selected Contractor agrees to procure and maintain, at its own cost, policies of insurance sufficient to insure against all liability, claims, demands, and other obligations assumed by the Contractor pursuant to the Contract. Such insurance shall be in addition to any other insurance requirements imposed by the Contract and/or by law. The Contractor shall not be relieved of any liability, claims, demands, or other obligations assumed pursuant to the Contract by reason of its failure to procure or maintain insurance in sufficient amounts, durations, or types.
Contractor shall procure and maintain and, if applicable, shall cause any Sub-contractor of the Contractor to procure and maintain insurance coverage listed below. Such coverage shall be procured and maintained with forms and insurers acceptable to Owner.
All coverage shall be continuously maintained to cover all liability, claims, demands, and other obligations assumed by the Contractor pursuant to the Contractor. In the case of any claims-made policy, the necessary retroactive dates and extended reporting periods shall be procured to maintain such continuous coverage. Minimum coverage limits shall be as indicated below unless specified otherwise in the Special Conditions:
(a) Worker Compensation: Contractor shall comply with all State of Colorado Regulations concerning Workers’ Compensation insurance coverage.
(b) General Liability insurance with minimum limits of:
FIVE MILLION DOLLARS ($5,000,000) each occurrence and FIVE MILLION DOLLARS ($5,000,000) per job aggregate.
The policy shall be applicable to all premises, products, and completed operations. The policy shall include coverage for bodily injury, broad form property damage (including completed operations), personal injury (including coverage for contractual and employee acts), blanket contractual, products, and completed operations. The policy shall include coverage for explosion, collapse, and underground (XCU) hazards. The policy shall contain a severability of interests’ provision.
(c) Comprehensive Automobile Liability insurance with minimum limits for bodily injury and property damage of not less than:
ONE MILLION DOLLARS ($1,000,000) each occurrence and ONE MILLION DOLLARS ($1,000,000) aggregate
(d) Professional Liability & Errors and Omissions Insurance policy with a minimum of:
ONE MILLION DOLLARS ($1,000,000) per claim
This policy shall provide coverage to protect the City against liability incurred as a result of the professional Services performed as a result of responding to this Solicitation.
With respect to each of Contractors owned, hired, or non-owned vehicles assigned to be used in performance of the Work. The policy shall contain a severability of interest provision.
2.16.1 Additional Insured Endorsement: The policies required by paragraphs (b), and
(c) above shall be endorsed to include the City, its Elected and Appointed Officials, Employees and Volunteers as Additional Insured. Every required policy above shall be primary insurance, and any insurance carried by the Owner, its officers, or its employees, or carried by or provided through any insurance pool of the Owner, shall be excess and not contributory insurance to that provided by the Contractor. The Contractor shall be solely responsible for any deductible losses under any policy required above.
2.17. Indemnification: The Contractor shall defend, indemnify and save harmless the Owner, and all its officers, employees, insurers, and self-insurance pool, from and against all liability, suits, actions, or other claims of any character, name and description brought for or on account of any injuries or damages received or sustained by any person, persons, or property on account of any negligent act or fault of the Contractor, or of any Contractor’s agent, employee, Sub-Contractor or supplier in the execution of, or performance under, any Contract which may result from bid award. Contractor shall pay any judgment with cost which may be obtained by and/or against the Owner growing out of or under the performance.
2.18. Miscellaneous Conditions: Material Availability: The Contractor must accept responsibility for verification of material availability, production schedules, and other pertinent data prior to submission of bid. It is the responsibility of the Bidder to notify the Owner immediately if materials specified are discontinued, replaced, or not available for an extended period of time.
2.19. Time: Time is of the essence with respect to the Project and any other milestones or deadline which are part of the Contract. It will be necessary for each Bidder to satisfy the City of its ability to complete the Work within the Contract time set forth in the Contract Documents. The Contract time is the period of time allotted in the Contract Documents for completion of the Work. The date of commencement of the Work is the date established in a Notice to Proceed. If there is no Notice to Proceed, it shall be the date of the Contract, or such other date as may be established therein, or as established as entered on the Bid Form. The Date of Final Completion of the Work is the date certified by the Owner when all construction, and all other Work including, but not be limited to:
testing, QA/QC, receipt of required reports and/or forms, grant requirements (if applicable), punch list items, clean-up, receipt of drawings and/or as-builts, etc., is fully complete, and in accordance with the Contract Documents.
2.20. Progress & Completion: The Contractor shall begin the Work on the Commencement Date as noted on the Notice to Proceed and perform the Work expeditiously with adequate forces to complete the Work within the Contract time/by the Completion date.
2.21. Payment & Completion: The Contract Sum is stated in the Contract and is the total amount payable by the Owner to the Contractor for the performance of the Work under the Contract Documents. Upon receipt of written notice that the Work is ready for final inspection and acceptance and upon receipt of application for payment, the Owner’s
Project Manager will promptly make such inspection and, when it finds the Work acceptable under the Contract Documents and the Contract fully performed, the Owner shall make payment in the manner provided in the Contract Documents.
2.22. Bid Bond: Each bid shall as a guaranty of good faith on the part of the Offeror be accompanied by a Bid Guaranty consisting of a certified or cashier's check drawn on an approved national bank or trust company in the State of Colorado and made payable without condition to the City; or a Bid Bond written by an approved corporate surety in favor of the City. The amount of the Bid Guaranty shall not be less than 5% of the total Bid amount. Once a Bid is accepted and a Contract is awarded, the apparent successful Offeror has ten calendar days to enter into a Contract in the form prescribed and to furnish the bonds with a legally responsible and approved surety. Failure to do so will result in forfeiture of the Bid Guaranty to the City as Liquidated Damages.
Each Offeror shall guarantee its total bid price for a period of sixty (60) Calendar Days from the date of the bid opening.
2.23. Performance & Payment Bonds: The Contractor shall furnish a Performance and a
Payment Bond, each in an amount at least equal to that specified for the Contract amount as security for the faithful performance and payment of all Contractor's obligations under the Contract Documents. These bonds shall remain in effect for the duration of the Warranty Period (as specified in the Special Conditions). The Contractor shall also furnish any other bonds that may be required by the Special Conditions. All bonds shall be in the forms prescribed by the Contract Documents and be executed by such sureties as (1) are licensed to conduct business in the State of Colorado and (2) are named in the current list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Audit Staff, Bureau of Accounts, U.S. Treasury Department. All bonds signed by an agent must be accompanied by a certified copy of the Authority Act. If the surety on any bond furnished by the Contractor is declared bankrupt or becomes insolvent, or its rights to do business in Colorado are terminated, or it ceases to meet the requirements of clauses (1) and (2) of this section, the Contractor shall within five (5) days thereafter substitute another bond and surety, both of which shall be acceptable to the City.
2.24. Retention: The Owner will deduct money from the partial payments in amounts considered necessary to protect the interest of the Owner and will retain this money until after completion of the entire Contract. The amount to be retained from partial payments will be five (5) percent of the value of the completed Work, and not greater than five (5) percent of the amount of the Contract. When the retainage has reached five (5) percent of the amount of the Contract no further retainage will be made and this amount will be retained until such time as final payment is made.
2.25. Liquidated Damages for Failure to Enter Into Contract: Should the Successful Bidder fail or refuse to enter into the Contract within ten Calendar Days from the issuance of the Notice of Award, the City shall be entitled to collect the amount of such Bidder’s Bid Guaranty as Liquidated Damages, not as a penalty but in consideration of the mutual release by the City and the Successful Bidder of all claims arising from the City’s issuance of the Notice of Award and the Successful Bidder’s failure to enter into the Contract and the costs to award the Contract to any other Bidder, to readvertise, or otherwise dispose of the Work as the City may determine best serves its interest.
2.26. Delay Damages for Failure to Meet Project Completion Schedule: If the Contractor does not achieve Final Completion by the required date, whether by neglect, refusal or any other reason, the Parties agree and stipulate that the Contractor shall pay liquidated damages to the City for each such day that final completion is late. As provided elsewhere, this provision does not apply for delays caused by the City. The date for Final Completion may be extended in writing by the Owner.
The Contractor agrees that as a part of the consideration for the City’s awarding of this Contract liquidated damages in the daily amount of $2,500.00 is reasonable and necessary to pay for the actual damages resulting from such delay. The parties agree that the real costs and injury to the City for such delay include hard to quantify items such as: additional engineering, inspection and oversight by the City and its agents; additional Contract administration; inability to apply the efforts of those employees to the other Work of the City; perceived inefficiency of the City; citizens having to deal with the construction and the Work, rather than having the benefit of completed Work, on time; inconvenience to the public; loss of reputation and community standing for the City during times when such things are very important and very difficult to maintain.
The Contractor must complete the Work and achieve final completion included under the Bid Schedule in the number of consecutive calendar days after the City gives is written Notice to Proceed. When the Contractor considers the entire Work ready for its intended use, Contractor shall certify in writing that the Work is fully complete. Final Completion date is the date by which the Contractor shall have fully completed all clean-up, and all items that were identified by the City in the inspection for final completion. Unless otherwise stated in the Special Conditions, for purposes of this liquidated damages clause, the Work shall not be finished, and the Contract time shall continue to accrue until the City gives its written Final Acceptance.
If the Contractor shall fail to pay said liquidated damages promptly upon demand thereof after having failed to achieve Final Completion on time, the City shall first look to any retainage or other funds from which to pay said liquidated damages; if retainage or other liquid funds are not available to pay said liquidated damages amounts, the Surety on the Contractor’s Performance Bond and Payment Bond shall pay such liquidated damages.
In addition, the City may withhold all, or any part of, such liquidated damages from any payment otherwise due the Contractor.
Liquidated damages as provided do not include any sums to reimburse the City for extra costs which the City may become obligated to pay on other Contracts which were delayed or extended because of the Contractor’s failure to complete the Work within the Contract Time. Should the City incur additional costs because of delays or extensions to other Contracts resulting from the Contractor’s failure of timely performance, the Contractor agrees to pay these costs that the City incurs because of the Contractor’s delay, and these payments are separate from and in addition to any liquidated damages.
The Contractor agrees that the City may use its own forces or hire other parties to obtain Final Completion of the Work if the time of completion has elapsed and the Contractor is not diligently pursuing completion. In addition to the Liquidated Damages provided for, the Contractor agrees to reimburse the City for all expenses thus incurred.
2.27. Contingency/Force Account/Minor Contract Revisions: Contingency/Force Account/Minor Contract Revisions Work will be authorized by the Owner’s Project Manager and is defined as minor expenses to cover miscellaneous or unforeseen expenses related to the project. The expenses are not included in the Drawings, Specifications, or Scope of Work and are necessary to accomplish the scope of this Contract. Contingency/Force Account/Minor Contract Revisions Authorization will be directed by the Owner through an approved form. Contingency/Force Account/Minor Contract Revisions funds are the property of the Owner and any Contingency/Force Account/Minor Contract Revisions funds, not required for project completion, shall remain the property of the Owner. Contractor is not entitled to any Contingency/Force Account/Minor Contract Revisions funds, that are not authorized by Owner or Owner’s Project Manager.
2.28. Protection of Persons & Property: The Contractor shall comply with all applicable laws, ordinances, rules, regulations, and orders of any public authority having jurisdiction for the safety of persons or property or to protect it from damage, injury, or loss. Contractor shall erect and maintain, as required by existing safeguards for safety and protection, and all reasonable precautions, including posting danger signs or other warnings against hazards promulgating safety regulations and notifying owners and users of adjacent utilities. When or where any direct or indirect damage or injury is done to public or private property by or on account of any act, omission, neglect, or misconduct by the Contractor in the execution of the Work, or in consequence of the non-execution thereof by the Contractor, it shall restore, at its own expense, such property to a condition similar or equal to that existing before such damage or injury was done, by repairing, rebuilding, or otherwise restoring as may be directed, or it shall make good such damage or injury in an acceptable manner.
2.29. Changes in the Work: The Owner, without invalidating the Contract, may order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract sum and the Contract time being adjusted accordingly. All such changes in the Work shall be authorized by Change Order and shall be executed under the applicable conditions of the contract documents. A Change Order is a written order to the Contractor signed by the Owner issued after the execution of the Contract, authorizing a change in the Work or an adjustment in the contract sum or the Contract time. The Contract sum and the Contract time may be changed only by Change Order.
2.30. Claims for Additional Cost or Time: If the Contractor wishes to make a claim for an increase in the Contract sum or an extension in the Contract time, it shall give the Owner written notice thereof within a reasonable time after the occurrence of the event giving rise to such claim. This notice shall be given by the Contractor before proceeding to execute the Work, except in an emergency endangering life or property in which case the Contractor shall proceed in accordance with the regulations on safety. No such claim shall be valid unless so made. Any change in the Contract sum or Contract time resulting from such claim shall be authorized by Change Order.
2.31. Minor Changes in the Work: The Owner shall have authority to order minor changes in the Work not involving an adjustment to the Contract sum or an extension of the Contract time and not inconsistent with the intent of the Contract Documents.
2.32. Field Orders: The Owner may issue written Field Orders which interpret the Contract
Documents in accordance with the specifications, or which order minor changes in the Work in accordance with the agreement, without change in the Contract sum or time. The Contractor shall carry out such Field Orders promptly.
2.33. Uncovering & Correction of Work: The Contractor shall promptly correct all Work rejected by the Owner as defective or as failing to conform to the Contract Documents whether observed before or after substantial completion and whether or not fabricated installed or competed. The Contractor shall bear all costs of correcting such rejected Work, including the cost of the Owner’s additional services thereby made necessary. If within one (1) year after the date of completion or within such longer period of time as may be prescribed by law or by the terms of any applicable special guarantee required by the Contract Documents, any of the Work found to be defective or not in accordance with the Contract documents, the Contractor shall correct it promptly after receipt of a written notice from the Owner to do so unless the Owner has previously given the Contractor a written acceptance of such condition. The Owner shall give such notice promptly after discovery of condition. All such defective or non-conforming Work under the above paragraphs shall be removed from the site where necessary and the Work shall be corrected to comply with the Contract Documents without cost to the Owner. The Contractor shall bear the cost of making good all Work of separate Contractors destroyed or damaged by such removal or correction. If the Owner prefers to accept defective or non-conforming Work, it may do so instead of requiring its removal and correction, in which case a Change Order will be issued to reflect an appropriate reduction in the payment or Contract sum, or, if the amount is determined after final payment, it shall be paid by the Contractor.
2.34 Amendment: No oral statement of any person shall modify or otherwise change, or affect the terms, conditions or specifications stated in the resulting Contract. All amendments to the Contract shall be made in writing by the Owner.
2.35 Assignment: The Contractor shall not sell, assign, transfer or convey any Contract resulting from this IFB, in whole or in part, without the prior written approval from the Owner.
2.36 Compliance with Laws: Bids must comply with all Federal, State, County, and local laws governing its Work and the fulfillment of the Work for and on behalf of the public.
Contractor hereby warrants that it is qualified to assume the responsibilities and render the Work described herein and has all requisite corporate authority and professional licenses in good standing as required by law.
2.37 Confidentiality: All information disclosed by the Owner to the Contractor for the purpose of the Work to be done, or information that comes to the attention of the Contractor during the course of performing such Work, is to be kept strictly confidential.
2.38 Conflict of Interest: No public official and/or City/County employee shall have interest in any Contract resulting from this Invitation for Bid.
2.39 Contract Termination: This Contract shall remain in effect until any of the following occurs: (1) Contract expires; (2) completion of Work; (3) final acceptance of Work or, (4) for convenience terminated by either party with a written Notice of Cancellation stating therein the reasons for such cancellation and the effective date of cancellation at least thirty (30) days past notification.
2.40 Employment Discrimination: During the performance of any Work, the Contractor, by submitting a Bid, agrees to the following conditions:
2.40.1 The Contractor shall not discriminate against any employee or applicant for employment because of race, religion, color, sex, age, handicap, or national origin except when such condition is a legitimate occupational qualification reasonably necessary for the normal operations of the Contractor. The Contractor agrees to post in conspicuous places, visible to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause.
2.40.2 The Contractor, in all Solicitations or advertisements for employees placed by or on behalf of the Contractor, shall state that such Contractor is an Equal Opportunity Employer.
2.40.3 Notices, advertisements, and Solicitations placed in accordance with federal law, rule, or regulation shall be deemed sufficient for the purpose of meeting the requirements of this section.
2.41 Affirmative Action: In executing a Contract with the City, the Contractor agrees to comply with Affirmative Action and Equal Employment Opportunity regulations presented in the General Contract Conditions Section 9 “Affirmative Action/EEO.
2.42 Immigration Reform and Control Act of 1986 and Immigration Compliance: The
Contractor certifies that it does not and will not during the performance of the Contract employ workers without authorization or otherwise violate the provisions of the Federal Immigration Reform and Control Act of 1986 and/or laws regulating immigration compliance.
2.43 Ethics: The Contractor shall not accept or offer gifts or anything of value nor enter into any business arrangement with any employee, official, or agent of the Owner.
2.44. Failure to Deliver: In the event of failure of the Contractor to perform in accordance with the Contract Documents, the Owner, after due oral or written notice, may procure the Work from other sources and hold the Contractor responsible for any costs resulting in additional Work, materials and/or administration services necessary to perform the Work.
This remedy shall…