Solicitation - FA448420R0015.pdf
PDF 344 KB Posted
- Attached to
- Vertical Lift Fabric Hangar Doors Federal contract opportunity
- Solicitation number
- FA448420R0015
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA448420R00150001.pdf | ||
| Attachment 1 - Performance Work Statement.docx | DOCX document | |
| Attachment 5 - FAR 52.212-2 Evaluation - Commercial Items.docx | DOCX document | |
| Attachment 6 - Past Performance Questionnaire.docx | DOCX document | |
| Attachment 2 - Wage Determination 2015-4191.pdf | ||
| Attachment 3 - Quality Assurance Surveillance Plan.doc | DOC document | |
| Attachment 4 - Security Forces Appendix.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
RFQ IFB RFP
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF. OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NAICS:
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8 (A)
EDWOSB
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
FA448420R0015
Solicitation/Contract Form
Supplies or Services and Prices/Cost
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
Annual preventative maintenance (O&M).
Contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and maintain continuous and safe operations of vertical lifting fabric hangar doors at building numbers 4401, 3370, and 706 IAW the Performance Work Statement paragraphs
1.1 and 1.2 (O&M funded).
Firm Fixed Price
1.0 Each
Annual preventative maintenance (TWCF).
Contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and maintain continuous and safe operations of vertical lifting fabric hangar doors at building numbers 3211 and 2201 IAW the Performance Work Statement paragraphs
1.1 and 1.2 (TWCF funded).
Firm Fixed Price
1.0 Each
Annual preventative maintenance (NJNG).
Contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and maintain continuous and safe operations of vertical lifting fabric hangar doors at building numbers 7801 IAW the Performance Work Statement paragraphs 1.1 and 1.2 (NJNG funded).
Firm Fixed Price
1.0 Each
Service calls (O&M). Respond to service calls within designated time and repair in accordance with the Performance Work Statement paragraph 1.5 (O&M funded).
Firm Fixed Price
9.0 Each
Service calls (TWCF). Respond to service calls within designated time and repair in accordance with the Performance Work Statement paragraph 1.5 (TWCF funded).
Firm Fixed Price
9.0 Each
Service calls (NJNG). Respond to service calls within designated time and repair in accordance with the Performance Work Statement paragraph 1.5 (NJNG funded).
Firm Fixed Price
9.0 Each
Repair parts & labor (O&M). Repair parts and labor not to exceed the specified dollar amount IAW paragraphs 1.3.1 and 1.3.2 of the Performance Work Statement (O&M Each funded). *DO NOT PRICE* Firm Fixed Price
Repair parts & labor (TWCF). Repair parts and labor not to exceed the specified dollar amount IAW paragraphs 1.3.1 and 1.3.2 of the Performance Work Statement (TWCF funded). *DO NOT PRICE* Firm Fixed Price
Each
Repair parts & labor (NJNG). Repair parts and labor not to exceed the specified dollar amount IAW paragraphs 1.3.1 and 1.3.2 of the Performance Work Statement (NJNG funded). *DO NOT PRICE* Firm Fixed Price
Each
Option Line Item
Annual preventative maintenance (O&M).
Contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and maintain continuous and safe operations of vertical lifting fabric hangar doors at building numbers 4401, 3370, and 706 IAW the Performance Work Statement paragraphs
1.1 and 1.2 (O&M funded).
Firm Fixed Price
1.0 Each
Option Line Item
Annual preventative maintenance (TWCF).
Contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and maintain continuous and safe operations of vertical lifting fabric hangar doors at building numbers 3211 and 2201 IAW the Performance Work Statement paragraphs
1.1 and 1.2 (TWCF funded).
Firm Fixed Price
1.0 Each
Option Line Item
Annual preventative maintenance (NJNG).
Contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and maintain continuous and safe operations of vertical lifting fabric hangar doors at building numbers 7801 IAW the Performance Work Statement paragraphs 1.1 and 1.2 (NJNG funded).
Firm Fixed Price
1.0 Each
Option Line Item
Service calls (O&M). Respond to service calls within designated time and repair in accordance with the Performance Work Statement paragraph 1.5 (O&M funded).
Firm Fixed Price
9.0 Each
Option Line Item
Service calls (TWCF). Respond to service calls within designated time and repair in accordance with the Performance Work Statement paragraph 1.5 (TWCF funded).
Firm Fixed Price
9.0 Each
Option Line
Service calls (NJNG). Respond to service calls within designated time and repair in
Item accordance with the Performance Work Statement paragraph 1.5 (NJNG funded).
Firm Fixed Price
9.0 Each
Option Line Item
Repair parts & labor (O&M). Repair parts and labor not to exceed the specified dollar amount IAW paragraphs 1.3.1 and 1.3.2 of the Performance Work Statement (O&M funded). *DO NOT PRICE* Firm Fixed Price
Each
Option Line Item
Repair parts & labor (TWCF). Repair parts and labor not to exceed the specified dollar amount IAW paragraphs 1.3.1 and 1.3.2 of the Performance Work Statement (TWCF funded). *DO NOT PRICE* Firm Fixed Price
Each
Option Line Item
Repair parts & labor (NJNG). Repair parts and labor not to exceed the specified dollar amount IAW paragraphs 1.3.1 and 1.3.2 of the Performance Work Statement (NJNG funded). *DO NOT PRICE* Firm Fixed Price
Each
Option Line Item
Annual preventative maintenance (O&M).
Contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and maintain continuous and safe operations of vertical lifting fabric hangar doors at building numbers 4401, 3370, and 706 IAW the Performance Work Statement paragraphs
1.1 and 1.2 (O&M funded).
Firm Fixed Price
1.0 Each
Option Line Item
Annual preventative maintenance (TWCF).
Contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and maintain continuous and safe operations of vertical lifting fabric hangar doors at building numbers 3211 and 2201 IAW the Performance Work Statement paragraphs
1.1 and 1.2 (TWCF funded).
Firm Fixed Price
1.0 Each
Option Line Item
Annual preventative maintenance (NJNG).
Contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and maintain continuous and safe operations of vertical lifting fabric hangar doors at building numbers 7801 IAW the Performance Work Statement paragraphs 1.1 and 1.2 (NJNG funded).
Firm Fixed Price
1.0 Each
Option Line Item
Service calls (O&M). Respond to service calls within designated time and repair in accordance with the Performance Work Statement paragraph 1.5 (O&M funded).
Firm Fixed Price
9.0 Each
Option Line Item
Service calls (TWCF). Respond to service calls within designated time and repair in accordance with the Performance Work Statement paragraph 1.5 (TWCF funded).
Firm Fixed Price
9.0 Each
Option Line Item
Service calls (NJNG). Respond to service calls within designated time and repair in accordance with the Performance Work Statement paragraph 1.5 (NJNG funded).
Firm Fixed Price
9.0 Each
Option Line Item
Repair parts & labor (O&M). Repair parts and labor not to exceed the specified dollar amount IAW paragraphs 1.3.1 and 1.3.2 of the Performance Work Statement (O&M funded). *DO NOT PRICE* Firm Fixed Price
Each
Option Line Item
Repair parts & labor (TWCF). Repair parts and labor not to exceed the specified dollar amount IAW paragraphs 1.3.1 and 1.3.2 of the Performance Work Statement (TWCF funded). *DO NOT PRICE* Firm Fixed Price
Each
Option Line Item
Repair parts & labor (NJNG). Repair parts and labor not to exceed the specified dollar amount IAW paragraphs 1.3.1 and 1.3.2 of the Performance Work Statement (NJNG funded). *DO NOT PRICE* Firm Fixed Price
Each
Option Line Item
Annual preventative maintenance (O&M).
Contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and maintain continuous and safe operations of vertical lifting fabric hangar doors at building numbers 4401, 3370, and 706 IAW the Performance Work Statement paragraphs
1.1 and 1.2 (O&M funded).
Firm Fixed Price
1.0 Each
Option Line Item
Annual preventative maintenance (TWCF).
Contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and maintain continuous and safe operations of vertical lifting fabric hangar doors at building numbers 3211 and 2201 IAW the Performance Work Statement paragraphs
1.1 and 1.2 (TWCF funded).
Firm Fixed Price
1.0 Each
Option Line Item
Annual preventative maintenance (NJNG).
Contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and maintain continuous and safe operations of vertical lifting fabric hangar doors at building numbers 7801 IAW the Performance Work Statement paragraphs 1.1 and 1.2 (NJNG funded).
Firm Fixed Price
1.0 Each
Line Item
Service calls (O&M). Respond to service calls within designated time and repair in accordance with the Performance Work Statement paragraph 1.5 (O&M funded).
Firm Fixed Price
9.0 Each
Option Line Item
Service calls (TWCF). Respond to service calls within designated time and repair in accordance with the Performance Work Statement paragraph 1.5 (TWCF funded).
Firm Fixed Price
9.0 Each
Option Line Item
Service calls (NJNG). Respond to service calls within designated time and repair in accordance with the Performance Work Statement paragraph 1.5 (NJNG funded).
Firm Fixed Price
9.0 Each
Option Line Item
Repair parts & labor (O&M). Repair parts and labor not to exceed the specified dollar amount IAW paragraphs 1.3.1 and 1.3.2 of the Performance Work Statement (O&M funded). *DO NOT PRICE* Firm Fixed Price
Each
Option Line Item
Repair parts & labor (TWCF). Repair parts and labor not to exceed the specified dollar amount IAW paragraphs 1.3.1 and 1.3.2 of the Performance Work Statement (TWCF funded). *DO NOT PRICE* Firm Fixed Price
Each
Option Line Item
Repair parts & labor (NJNG). Repair parts and labor not to exceed the specified dollar amount IAW paragraphs 1.3.1 and 1.3.2 of the Performance Work Statement (NJNG funded). *DO NOT PRICE* Firm Fixed Price
Each
Option Line Item
Annual preventative maintenance (O&M).
Contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and maintain continuous and safe operations of vertical lifting fabric hangar doors at building numbers 4401, 3370, and 706 IAW the Performance Work Statement paragraphs
1.1 and 1.2 (O&M funded).
Firm Fixed Price
1.0 Each
Option Line Item
Annual preventative maintenance (TWCF).
Contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and maintain continuous and safe operations of vertical lifting fabric hangar doors at building numbers 3211 and 2201 IAW the Performance Work Statement paragraphs
1.1 and 1.2 (TWCF funded).
Firm Fixed Price
1.0 Each
Annual preventative maintenance (NJNG).
Contractor shall provide all management, Line Item tools, supplies, equipment, and labor necessary to repair and maintain continuous and safe operations of vertical lifting fabric hangar doors at building numbers 7801 IAW the Performance Work Statement paragraphs 1.1 and 1.2 (NJNG funded).
Firm Fixed Price
1.0 Each
Option Line Item
Service calls (O&M). Respond to service calls within designated time and repair in accordance with the Performance Work Statement paragraph 1.5 (O&M funded).
Firm Fixed Price
9.0 Each
Option Line Item
Service calls (TWCF). Respond to service calls within designated time and repair in accordance with the Performance Work Statement paragraph 1.5 (TWCF funded).
Firm Fixed Price
9.0 Each
Option Line Item
Service calls (NJNG). Respond to service calls within designated time and repair in accordance with the Performance Work Statement paragraph 1.5 (NJNG funded).
Firm Fixed Price
9.0 Each
Option Line Item
Repair parts & labor (O&M). Repair parts and labor not to exceed the specified dollar amount IAW paragraphs 1.3.1 and 1.3.2 of the Performance Work Statement (O&M funded). *DO NOT PRICE* Firm Fixed Price
Each
Option Line Item
Repair parts & labor (TWCF). Repair parts and labor not to exceed the specified dollar amount IAW paragraphs 1.3.1 and 1.3.2 of the Performance Work Statement (TWCF funded). *DO NOT PRICE* Firm Fixed Price
Each
Option Line Item
Repair parts & labor (NJNG). Repair parts and labor not to exceed the specified dollar amount IAW paragraphs 1.3.1 and 1.3.2 of the Performance Work Statement (NJNG funded). *DO NOT PRICE* Firm Fixed Price
Each
Option Line Item
Annual preventative maintenance (O&M).
Contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and maintain continuous and safe operations of vertical lifting fabric hangar doors at building numbers 4401, 3370, and 706 IAW the Performance Work Statement paragraphs
1.1 and 1.2 (O&M funded).
Firm Fixed Price
1.0 Each
Option Line
Annual preventative maintenance (TWCF).
Contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and maintain continuous and safe operations of vertical 1.0 Each
Item lifting fabric hangar doors at building numbers 3211 and 2201 IAW the Performance Work Statement paragraphs
1.1 and 1.2 (TWCF funded).
Firm Fixed Price
Option Line Item
Annual preventative maintenance (NJNG).
Contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and maintain continuous and safe operations of vertical lifting fabric hangar doors at building numbers 7801 IAW the Performance Work Statement paragraphs 1.1 and 1.2 (NJNG funded).
Firm Fixed Price
1.0 Each
Option Line Item
Service calls (O&M). Respond to service calls within designated time and repair in accordance with the Performance Work Statement paragraph 1.5 (O&M funded).
Firm Fixed Price
9.0 Each
Option Line Item
Service calls (TWCF). Respond to service calls within designated time and repair in accordance with the Performance Work Statement paragraph 1.5 (TWCF funded).
Firm Fixed Price
9.0 Each
Option Line Item
Service calls (NJNG). Respond to service calls within designated time and repair in accordance with the Performance Work Statement paragraph 1.5 (NJNG funded).
Firm Fixed Price
9.0 Each
Option Line Item
Repair parts & labor (O&M). Repair parts and labor not to exceed the specified dollar amount IAW paragraphs 1.3.1 and 1.3.2 of the Performance Work Statement (O&M funded). *DO NOT PRICE* Firm Fixed Price
Each
Option Line Item
Repair parts & labor (TWCF). Repair parts and labor not to exceed the specified dollar amount IAW paragraphs 1.3.1 and 1.3.2 of the Performance Work Statement (TWCF funded). *DO NOT PRICE* Firm Fixed Price
Each
Option Line Item
Repair parts & labor (NJNG). Repair parts and labor not to exceed the specified dollar amount IAW paragraphs 1.3.1 and 1.3.2 of the Performance Work Statement (NJNG funded). *DO NOT PRICE* Firm Fixed Price
Each
Description/Specifications/Statement of Work
Requirements Vertical Lift Fabric Hangar Doors
Packaging and Marking
Inspection and Acceptance
Deliveries or Performance
Delivery Schedule
Period of Performance From
01 OCT 2020
To
30 SEP 2021
Delivery Schedule
Period of Performance From
01 OCT 2020
To
30 SEP 2021
Delivery Schedule
Period of Performance From
01 OCT 2020
To
30 SEP 2021
Delivery Schedule
Period of Performance From
01 OCT 2020
To
30 SEP 2021
Delivery Schedule
Period of Performance From
01 OCT 2020
To
30 SEP 2021
Delivery Schedule
Period of Performance From
01 OCT 2020
To
30 SEP 2021
Delivery Schedule
Period of Performance From
01 OCT 2020
To
30 SEP 2021
Delivery Schedule
Period of Performance From
01 OCT 2020
To
30 SEP 2021
Delivery Schedule
Period of Performance From
01 OCT 2020
To
30 SEP 2021
Option Line Item 1001 Delivery Schedule
Period of Performance From
01 OCT 2021
To
30 SEP 2022
Option Line Item 1002
Delivery Schedule
Period of Performance From
01 OCT 2021
To
30 SEP 2022
Option Line Item 1003 Delivery Schedule
Period of Performance From
01 OCT 2021
To
30 SEP 2022
Option Line Item 1004 Delivery Schedule
Period of Performance From
01 OCT 2021
To
30 SEP 2022
Option Line Item 1005 Delivery Schedule
Period of Performance From
01 OCT 2021
To
30 SEP 2022
Option Line Item 1006 Delivery Schedule
Period of Performance From
01 OCT 2021
To
30 SEP 2022
Option Line Item 1007 Delivery Schedule
Period of Performance From
01 OCT 2021
To
30 SEP 2022
Option Line Item 1008 Delivery Schedule
Period of Performance From
01 OCT 2021
To
30 SEP 2022
Option Line Item 1009 Delivery Schedule
Period of Performance From
01 OCT 2021
To
30 SEP 2022
Option Line Item 2001 Delivery Schedule
Period of Performance From
01 OCT 2022
To
30 SEP 2023
Option Line Item 2002 Delivery Schedule
Period of Performance From
01 OCT 2022
To
30 SEP 2023
Option Line Item 2003 Delivery Schedule
Period of Performance From
01 OCT 2022
To
30 SEP 2023
Option Line Item 2004 Delivery Schedule
Period of Performance From
01 OCT 2022
To
30 SEP 2023
Option Line Item 2005 Delivery Schedule
Period of Performance From
01 OCT 2022
To
30 SEP 2023
Option Line Item 2006 Delivery Schedule
Period of Performance From
01 OCT 2022
To
30 SEP 2023
Option Line Item 2007 Delivery Schedule
Period of Performance From
01 OCT 2022
To
30 SEP 2023
Option Line Item 2008 Delivery Schedule
Period of Performance From
01 OCT 2022
To
30 SEP 2023
Item 2009 Delivery Schedule
Period of Performance From
01 OCT 2022
To
30 SEP 2023
Option Line Item 3001 Delivery Schedule
Period of Performance From
01 OCT 2023
To
30 SEP 2024
Option Line Item 3002 Delivery Schedule
Period of Performance From
01 OCT 2023
To
30 SEP 2024
Option Line Item 3003 Delivery Schedule
Period of Performance From
01 OCT 2023
To
30 SEP 2024
Option Line Item 3004 Delivery Schedule
Period of Performance From
01 OCT 2023
To
30 SEP 2024
Item 3005 Delivery Schedule
Period of Performance From
01 OCT 2023
To
30 SEP 2024
Option Line Item 3006 Delivery Schedule
Period of Performance From
01 OCT 2023
To
30 SEP 2024
Option Line Item 3007 Delivery Schedule
Period of Performance From
01 OCT 2023
To
30 SEP 2024
Option Line Item 3008 Delivery Schedule
Period of Performance From
01 OCT 2023
To
30 SEP 2024
Option Line Item 3009 Delivery Schedule
Period of Performance From
01 OCT 2023
To
30 SEP 2024
Option Line Item 4001 Delivery Schedule
Period of Performance From
01 OCT 2024
To
30 SEP 2025
Option Line Item 4002 Delivery Schedule
Period of Performance From
01 OCT 2024
To
30 SEP 2025
Option Line Item 4003 Delivery Schedule
Period of Performance From
01 OCT 2024
To
30 SEP 2025
Option Line Item 4004 Delivery Schedule
Period of Performance From
01 OCT 2024
To
30 SEP 2025
Option Line Item 4005 Delivery Schedule
Period of Performance From
01 OCT 2024
To
30 SEP 2025
Option Line Item 4006 Delivery Schedule
Period of Performance From
01 OCT 2024
To
30 SEP 2025
Option Line Item 4007 Delivery Schedule
Period of Performance From
01 OCT 2024
To
30 SEP 2025
Option Line Item 4008 Delivery Schedule
Period of Performance From
01 OCT 2024
To
30 SEP 2025
Option Line Item 4009 Delivery Schedule
Period of Performance From
01 OCT 2024
To
30 SEP 2025
Option Line Item 5001 Delivery Schedule
Period of Performance From
01 OCT 2025
To
30 APR 2026
Option Line Item 5002 Delivery Schedule
Period of Performance From
01 OCT 2025
To
30 APR 2026
Item 5003 Delivery Schedule
Period of Performance From
01 OCT 2025
To
30 APR 2026
Option Line Item 5004 Delivery Schedule
Period of Performance From
01 OCT 2025
To
30 APR 2026
Option Line Item 5005 Delivery Schedule
Period of Performance From
01 OCT 2025
To
30 APR 2026
Option Line Item 5006 Delivery Schedule
Period of Performance From
01 OCT 2025
To
30 APR 2026
Option Line Item 5007 Delivery Schedule
Period of Performance From
01 OCT 2025
To
Item 5008 Delivery Schedule
Period of Performance From
01 OCT 2025
To
30 APR 2026
Option Line Item 5009 Delivery Schedule
Period of Performance From
01 OCT 2025
To
Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.201-7000 Contracting Officer's Representative 1991-12 252.204-7006 Billing Instructions. 2005-10 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. 2018-12
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. 2018-12
As prescribed in 232.7004(b), use the following clause:
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause-
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall-
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
COMBO
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
COMBO
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
(f) [Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC F87700 Issue By DoDAAC FA4484 Admin DoDAAC FA4484 Inspect By DoDAAC F3A3Q5 Ship To Code F3A3Q5 Ship From Code N/A Mark For Code N/A Service Approver (DoDAAC) F3A3Q5 Service Acceptor (DoDAAC) F3A3Q5 Accept at Other DoDAAC N/A LPO DoDAAC N/A DCAA Auditor DoDAAC N/A Other DoDAAC(s) N/A
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
ronald.boulanger.1@us.af.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Special Contract Requirements
Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date 52.204-18 Commercial and Government Entity Code Maintenance. 2016-07 52.212-4 Contract Terms and Conditions-Commercial Items. 2018-10 52.219-6 Deviation 2020-O0008 Notice of Total Small Business Set-Aside (DEVIATION 2020-O0008) 2020-03 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. 2013-12 52.237-2 Protection of Government Buildings, Equipment, and Vegetation. 1984-04
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.203-7000 Requirements Relating to Compensation of Former DoD Officials 2011-09 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. 2013-09 252.204-7003 Control of Government Personnel Work Product. 1992-04 252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials. 2014-09 252.223-7008 Prohibition of Hexavalent Chromium. 2013-06 252.225-7002 Qualifying Country Sources as Subcontractors. 2017-12 252.225-7048 Export-Controlled Items. 2013-06 252.232-7010 Levies on Contract Payments. 2006-12 252.243-7001 Pricing of Contract Modifications. 1991-12
FAR Clauses Incorporated by Full Text
52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. 2016-02
As prescribed in (d), insert the following provision:9.104-7
REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A FELONY CONVICTION UNDER ANY
FEDERAL LAW (FEB 2016)
As required by sections 744 and 745 of Division E of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235), (a) and similar provisions, if contained in subsequent appropriations acts, the Government will not enter into a contract with any corporation that-
Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or (1) have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless an agency has considered suspension or debarment of the corporation and made a determination that suspension or debarment is not necessary to protect the interests of the Government; or
Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is (2) aware of the conviction, unless an agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.
The Offeror represents that-(b)
It is is not a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative (1) remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and
It is is not a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.(2)
(End of provision)
52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders-Commercial Items. 2020-
As prescribed in , insert the following clause:12.301(b)(4)
CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS-COMMERCIAL ITEMS
(MAR 2020)
The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by (a) reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, (1) Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other (2) Covered Entities ( 2018) (Section 1634 of Pub. L. 115-91).Jul
52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. ( 2019) (3) Aug (Section 889(a)(1)(A) of Pub. L. 115-232).
52.209-10, Prohibition on Contracting with Inverted Domestic Corporations ( 2015).(4) Nov
52.233-3, Protest After Award ( 1996) (31 U.S.C. 3553).(5) Aug
52.233-4, Applicable Law for Breach of Contract Claim ( (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).(6) Oct 2004)
The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in (b) this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[ .]Contracting Officer check as appropriate
52.203-6, Restrictions on Subcontractor Sales to the Government ( 2006), with Alternate I ( 1995) (41 U.S.C. 4704 and 10 U.S. X (1) Sept Oct
C. 2402).
52.203-13, Contractor Code of Business Ethics and Conduct ( 2015) (41 U.S.C. 3509)). ____ (2) Oct
52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 ( 2010) (Section 1553 of ____ (3) June
Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards ( 2018) (Pub. L. 109-282) (31 U.S.C. 6101 note). X (4) Oct
[Reserved]. ____ (5)
52.204-14, Service Contract Reporting Requirements ( 2016) (Pub. L. 111-117, section 743 of Div. C). ____ (6) Oct
52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts ( 2016) (Pub. L. 111-117, section 743 of ____ (7) Oct
Div. C).
52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for X (8)
Debarment. ( 2015) (31 U.S.C. 6101 note).Oct
52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters ( 2018) (41 U.S.C. 2313). ____ (9) Oct
[Reserved]. ____ (10)
____ (11) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award ( 2011) (15 U.S.C.657a).(i) Nov
Alternate I ( 2011) of 52.219-3. ____ (ii) Nov
____ (12) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns ( 2014) (if the offeror elects to (i) Oct waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
Alternate I ( 2011) of 52.219-4. ____ (ii) Jan
[Reserved] ____ (13)
X (14) 52.219-6, Notice of Total Small Business Set-Aside ( 2011) (15 U.S.C.644).(i) Nov
Alternate I ( 2011). ____ (ii) Nov
Alternate II ( 2011). ____ (iii) Nov
____ (15) 52.219-7, Notice of Partial Small Business Set-Aside ( 2003) (15 U.S.C. 644).(i) June
Alternate I ( 1995) of 52.219-7. ____ (ii) Oct
Alternate II ( 2004) of 52.219-7. ____ (iii) Mar
52.219-8, Utilization of Small Business Concerns ( 2018) (15 U.S.C. 637(d)(2) and (3)). X (16) Oct
____ (17) 52.219-9, Small Business Subcontracting Plan ( 2018) (15 U.S.C. 637(d)(4))(i) Aug
Alternate I ( 2016) of 52.219-9. ____ (ii) Nov
Alternate II ( 2016) of 52.219-9. ____ (iii) Nov
Alternate III ( 2016) of 52.219-9. ____ (iv) Nov
Alternate IV (Aug 2018) of 52.219-9 ____ (v)
52.219-13, Notice of Set-Aside of Orders ( 2011) (15 U.S.C. 644(r)). ____ (18) Nov
52.219-14, Limitations on Subcontracting ( 2017) (15 U.S.C.637(a)(14)). X (19) Jan
52.219-16, Liquidated Damages-Subcontracting Plan ( 1999) (15 U.S.C. 637(d)(4)(F)(i)). ____ (20) Jan
52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside ( (15 U.S.C. 657f). ____ (21) Oct 2019)
52.219-28, Post Award Small Business Program Rerepresentation ( 2013) (15 U.S.C. 632(a)(2)). X (22) Jul
52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business ____ (23)
Concerns ( 2015) (15 U.S.C. 637(m)).Dec
52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women- ____ (24)
Owned Small Business Program ( 2015) (15 U.S.C. 637(m)).Dec
52.222-3, Convict Labor ( 2003) (E.O.11755). X (25) June
(E.O.13126). ____ (26) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (Jan 2020)
52.222-21, Prohibition of Segregated Facilities ( 2015). X (27) Apr
X (28) 52.222-26, Equal Opportunity ( 2016) (E.O.11246).(i) Sept
Alternate I ( 1999) of 52.222-26. ____ (ii) Feb
X (29) 52.222-35, Equal Opportunity for Veterans ( 2015) (38 U.S.C. 4212).(i) Oct
Alternate I ( 2014) of 52.222-35. ____ (ii) July
X (30) 52.222-36, Equal Opportunity for Workers with Disabilities ( 2014) (29 U.S.C.793).(i) Jul
Alternate I (July 2014) of 52.222-36. ____ (ii)
52.222-37, Employment Reports on Veterans ( ) (38 U.S.C. 4212). X (31) Feb 2016
52.222-40, Notification of Employee Rights Under the National Labor Relations Act ( 2010) (E.O. 13496). X (32) Dec
____ (33) 52.222-50, Combating Trafficking in Persons ( 2019) (22 U.S.C. chapter 78 and E.O. 13627).(i) Jan
Alternate I ( 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627). ____ (ii) Mar
52.222-54, Employment Eligibility Verification ( ). (Executive Order 12989). (Not applicable to the acquisition of X (34) Oct 2015 commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
____ (35) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items ( 2008) (42 U.S.C. 6962(c)(3)(i) May
(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
Alternate I ( 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off- ____ (ii) May the-shelf items.)
52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons ( 2016) (E.O. 13693). ____ (36) Jun
52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners ( 2016) (E.O. 13693). ____ (37) Jun
____ (38) 52.223-13, Acquisition of EPEAT?-Registered Imaging Equipment ( ) (E.O.s 13423 and 13514).(i) Jun 2014
Alternate I ( 2015) of 52.223-13. ____ (ii) Oct
____ (39) 52.223-14, Acquisition of EPEAT?-Registered Televisions ( ) (E.O.s 13423 and 13514).(i) Jun 2014
Alternate I ( 2014) of 52.223-14. ____ (ii) Jun
52.223-15, Energy Efficiency in Energy-Consuming Products ( ) (42 U.S.C. 8259b). ____ (40) Dec 2007
____ (41) 52.223-16, Acquisition of EPEAT?-Registered Personal Computer Products ( ) (E.O.s 13423 and 13514).(i) Oct 2015
Alternate I ( 2014) of 52.223-16. ____ (ii) Jun
52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving ( ) (E.O. 13513). X (42) Aug 2011
52.223-20, Aerosols ( 2016) (E.O. 13693). ____ (43) Jun
52.223-21, Foams ( 2016) (E.O. 13693). ____ (44) Jun
____ (45) 52.224-3 Privacy Training ( 2017) (5 U.S.C. 552 a).(i) Jan
Alternate I ( 2017) of 52.224-3. ____ (ii) Jan
52.225-1, Buy American-Supplies ( 2014) (41 U.S.C. chapter 83). ____ (46) May
____ (47) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act ( 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.(i) May
S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
Alternate I ( 2014) of 52.225-3. ____ (ii) May
Alternate II ( 2014) of 52.225-3. ____ (iii) May
Alternate III ( 2014) of 52.225-3. ____ (iv) May
( ) (19 U.S.C. 2501, ., 19 U.S.C. 3301 note). X (48) 52.225-5, Trade Agreements Oct 2019 et seq
52.225-13, Restrictions on Certain Foreign Purchases ( 2008) (E.O.'s, proclamations, and statutes administered by the Office of X (49) June
Foreign Assets Control of the Department of the Treasury).
52.225-26, Contractors Performing Private Security Functions Outside the United States ( 2016) (Section 862, as amended, of ____ (50) Oct the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
52.226-4, Notice of Disaster or Emergency Area Set-Aside ( 2007) (42 U.S.C. 5150). ____ (51) Nov
52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area ( 2007) (42 U.S.C. 5150). ____ (52) Nov
52.232-29, Terms for Financing of Purchases of Commercial Items ( 2002) (41 U.S.C.4505, 10 U.S.C.2307(f)). ____ (53) Feb
52.232-30, Installment Payments for Commercial Items ( 2017) (41 U.S.C.4505, 10 U.S.C.2307(f)). ____ (54) Jan
52.232-33, Payment by Electronic Funds Transfer-System for Award Management ( 2018) (31 U.S.C. 3332). X (55) Oct
52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management ( 2013) (31 U.S.C.3332). ____ (56) Jul
52.232-36, Payment by Third Party ( 2014) (31 U.S.C.3332). ____ (57) May
52.239-1, Privacy or Security Safeguards ( 1996) (5 U.S.C. 552a). ____ (58) Aug
52.242-5, Payments to Small Business Subcontractors ( 2017) ____ (59) Jan (15 U.S.C. 637(d)(13)).
____ (60) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels ( 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.(i) Feb
C. 2631).
Alternate I ( 2003) of 52.247-64. ____ (ii) Apr
Alternate II ( 2006) of 52.247-64. ____ (iii) Feb
The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has (c) indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[ ]Contracting Officer check as appropriate.
52.222-17, Nondisplacement of Qualified Workers ( 2014)(E.O. 13495). X (1) May
52.222-41, Service Contract Labor Standards ( 2018) (41 U.S.C. chapter 67). X (2) Aug
52.222-42, Statement of Equivalent Rates for Federal Hires ( 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67). X (3) May
52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) ( X (4)
2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).Aug
52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment ( 2014) (29 U.S.C. 206 and 41 U. ____ (5) May
S.C. chapter 67).
52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or ____ (6)
Repair of Certain Equipment-Requirements ( 2014) (41 U.S.C. chapter 67).May
52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements ( ____ (7)
2014) (41 U.S.C. chapter 67).May
52.222-55, Minimum Wages Under Executive Order 13658 ( 2015). ____ (8) Dec
52.222-62, Paid Sick Leave Under Executive Order 13706 ( 2017) (E.O. 13706). ____ (9) Jan
52.226-6, Promoting Excess Food Donation to Nonprofit Organizations ( 2014) (42 U.S.C. 1792). ____ (10) May
. The Contractor shall comply with the provisions of this paragraph (d) if this contract was (d) Comptroller General Examination of Record awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.
The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right (1) to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, (2) audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and (3) regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow (1) down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-
52.203-13, Contractor Code of Business Ethics and Conduct ( 2015) (41 U.S.C. 3509).(i) Oct
52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division (ii) E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).
(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Aug 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).
52.219-8, of Small Business Concerns ( 2018) (15 U.S.C.637(d)(2) and (3)), in all subcontracts that offer further (v) Utilization Oct subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
52.222-17, of Qualified Workers ( 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) (vi) Nondisplacement May of FAR clause 52.222-17.
52.222-21, of Segregated Facilities ( 2015).(vii) Prohibition Apr
52.222-26, Opportunity ( 2015) (E.O.11246).(viii) Equal Sept
52.222-35, Opportunity for Veterans ( 2015) (38 U.S.C.4212).(ix) Equal Oct
52.222-36, Opportunity for Workers with Disabilities ( 2014) (29 U.S.C.793).(x) Equal Jul
52.222-37, Reports on Veterans ( 2016) (38 U.S.C.4212)(xi) Employment Feb
52.222-40, of Employee Rights Under the National Labor Relations Act ( 2010) (E.O. 13496). Flow down required (xii) Notification Dec in accordance with paragraph (f) of FAR clause 52.222-40.
52.222-41, Contract Labor Standards ( 2018) (41 U.S.C. chapter 67).(xiii) Service Aug
(xiv) 52.222-50, Trafficking in Persons ( 2019) (22 U.S.C. chapter 78 and E.O 13627).(A) Combating Jan
Alternate I ( 2015) of 52.222-50(22 U.S.C. chapter 78 and E.O 13627).(B) Mar
52.222-51, from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or (xv) Exemption Repair of Certain Equipment-Requirements ( 2014) (41 U.S.C. chapter 67).May
52.222-53, from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements ((xvi) Exemption 2014) (41 U.S.C. chapter 67).May
52.222-54, Eligibility Verification ( ) (E.O. 12989).(xvii) Employment Oct 2015
52.222-55, Wages Under Executive Order 13658 ( 2015).(xviii) Minimum Dec
52.222-62, Sick Leave Under Executive Order 13706 ( 2017) (E.O. 13706).(xix) Paid Jan
(xx) 52.224-3, Training ( 2017) (5 U.S.C. 552a).(A) Privacy Jan
Alternate I ( 2017) of 52.224-3.(B) Jan
52.225-26, Performing Private Security Functions Outside the United States ( 2016) (Section 862, as amended, of (xxi) Contractors Oct the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
52.226-6, Excess Food Donation to Nonprofit Organizations ( 2014) (42 U.S.C. 1792). Flow down required in (xxii) Promoting May accordance with paragraph (e) of FAR clause 52.226-6.
52.247-64, for Privately Owned U.S.-Flag Commercial Vessels ( 2006) (46 U.S.C. Appx.1241(b) and 10 U.S.C.(xxiii) Preference Feb 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
While not required, the Contractor may include in its subcontracts for commercial items a minimal number of additional clauses (2) necessary to satisfy its contractual obligations.
(End of clause)
52.216-21 Requirements. 1995-10
As prescribed in 16.506(d), insert the following clause:
Requirements (Oct 1995)
(a) This is a requirements contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government's requirements do not result in orders in the quantities described as "estimated" or "maximum" in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the Schedule and called for by orders issued in accordance with the Ordering clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the Government activity or activities specified in the Schedule.
(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.
(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.
(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 30 April 2027.
52.217-8 Option to Extend Services. 1999-11
As prescribed in , insert a clause substantially the same as the following:17.208(f)
OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within . [ ]30 days. insert the period of time within which the Contracting Officer may exercise the option
(End of clause)
52.217-9 Option to Extend the Term of the Contract. 2000-03
As prescribed in , insert a clause substantially the same as the following:17.208(g)
OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
The Government may extend the term of this contract by written notice to the Contractor within (a) [30 days insert the period of time within ; provided that the Government gives the Contractor a preliminary written notice of its intent ]which the Contracting Officer may exercise the option to extend at least days[ ] before the contract expires.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .