Sol_SOL-CI-15-00017.pdf
PDF 504 KB Posted
- Attached to
- Technical and Analytical Support to OTAQ Federal contract opportunity
- Solicitation number
- SOL-CI-15-00017
About this file
SOL-CI-15-00017
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_SOL-CI-15-00017_Amd_000001.pdf | ||
| Attachment_10_Past_Performance_Questionnaire.docx | DOCX document | |
| Attachment_6_Technical_Proposal_Instructions.docx | DOCX document | |
| SOL-CI-15-00017_Technical_Questions.docx | DOCX document | |
| Attachment_9_Client_Authorization_Letter.docx | DOCX document | |
| Attachment_7_Cost_Proposal_Instructions.docx | DOCX document | |
| Attachment_7_Cost_Proposal_Instructions.docx | DOCX document | |
| Attachment_1_PWS.docx | DOCX document | |
| Attachment_4_Labor_Classifications.docx | DOCX document | |
| Attachment_5_HSPD-12.docx | DOCX document | |
| Attachment_8_Invoice_Preparation_Instructions.docx | DOCX document | |
| Attachment_2_QASP.docx | DOCX document | |
| Attachment_3_Reports_of_Work.docx | DOCX document | |
| Attachment_6_Technical_Proposal_Instructions.docx | DOCX document | |
| Pre-solicitation_Notice_SOL-15-00017.doc | DOC document | |
| PWS_SOL-CI-15-00017.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
CINCINNATI PROCUREMENT OPERATIONS DIVISION
CINCINNATI, OHIO 45268
January 21, 2016
MEMORANDUM
From:
To:
Subject:
Sandra Savage, Contracting Officer
Prospective Off er ors
Solicitation SOL-Cl-15-00017 Technical and Analytical Support to the Office of Transportation and Air Quality for Compliance Fees Tracking, Fuel Economy Analysis, Fuels, Emissions, and Vehicle/Engine Compliance Reporting, Program Benefit Quantification and Outreach, and Web Program Support
The closing date and time for Government receipt of your proposal is February 22, 2016 by 4:30pm Eastern time. Proposals shall be submitted via ww.fedconnect.net in accordance with the provision at Section L, L-24 Local Clauses EPA-L-15-104 Electronic Submission of Proposals/Bids/Offers/Quotes, and one hard copy of each proposal volume (Technical and Cost) shall be delivered to the appropriate address provided in the provision at Section L, L-27 Local Clauses EPA-L-36-10 l Proposal Instructions Alternate Ill.
The fill in under Block 12 of the SF 33 form shall provide for a period of 120 calendar days for acceptance from the date of receipt of the offers.
Offerors with any questions are encouraged to submit technical questions through FedConnect no later than l 0 calendar days after the issuance date of this solicitation in accordance with the provision at Section L, L-23 Local Clauses EPA-L-15-102 Technical Questions.
Sincerely, Contracting Officer V
SOL-CI-15-00017
SOLICITATION, OFFER AND AWARD
4. TYPE OF SOLICITATION2. CONTRACT NUMBER 3. SOLICITATION NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO (If other than Item 7)
ORDER UNDER DPAS (15 CFR 700)
6. REQUISITION/PURCHASE NUMBER
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
NEGOTIATED (RFP)
SEALED BID (IFB)
5. DATE ISSUED
1. THIS CONTRACT IS A RATED RATING PAGE OF PAGES
1 86
C. E-MAIL ADDRESS
EXT.NUMBERAREA CODE
B. TELEPHONE (NO COLLECT CALLS)A. NAME
10. FOR
INFORMATION
CALL:
CAUTION: LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
(Date)(Hour) local timeuntildepository located in copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the
SOLICITATION
9. Sealed offers in original and
PART IV - REPRESENTATIONS AND INSTRUCTIONS
OTHER STATEMENTS OF OFFERORS
EVALUATION FACTORS FOR AWARD
INSTRS., CONDS., AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND
LIST OF ATTACHMENTS
CONTRACT CLAUSES
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.
I
J
K
L
M SPECIAL CONTRACT REQUIREMENTS
CONTRACT ADMINISTRATION DATA
DELIVERIES OR PERFORMANCE
INSPECTION AND ACCEPTANCE
PACKAGING AND MARKING
DESCRIPTION/SPECS./WORK STATEMENT
SUPPLIES OR SERVICES AND PRICES/COSTS
SOLICITATION/CONTRACT FORM
PART II - CONTRACT CLAUSESPART I - THE SCHEDULE
H
G
F
E
D
C
B
A
SEC. DESCRIPTION PAGE(S) (X) DESCRIPTION SEC. (X)
11. TABLE OF CONTENTS
18. OFFER DATE17. SIGNATURE
SUCH ADDRESS IN SCHEDULE.
IS DIFFERENT FROM ABOVE - ENTER
15C. CHECK IF REMITTANCE ADDRESS
EXT.NUMBERAREA CODE
15B. TELEPHONE NUMBER
(Type or print)AND
ADDRESS
OF
OFFEROR
CODE FACILITY
16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER15A. NAME
DATEAMENDMENT NO.DATEAMENDMENT NO.
and related documents numbered and dated):
amendments to the SOLICITATION for offerors
(The offeror acknowledges receipt of
14. ACKNOWLEDGEMENT OF AMENDMENTS
CALENDAR DAYS (%)30 CALENDAR DAYS (%)20 CALENDAR DAYS (%)10 CALENDAR DAYS (%)
(See Section I, Clause No. 52.232.8)
13. DISCOUNT FOR PROMPT PAYMENT
designated point(s), within the time specified in the schedule.
by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the
12. In compliance with the above, the undersigned agrees, if this offer is accepted within ______________ calendar days (60 calendar days unless a different period is inserted
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
28. AWARD DATE
(Signature of Contracting Officer)
27. UNITED STATES OF AMERICA
25. PAYMENT WILL BE MADE BY
26. NAME OF CONTRACTING OFFICER (Type or print)
CODE 24. ADMINISTERED BY (If other than Item 7)
ITEM
(4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
41 U.S.C. 253 (c) ( 10 U.S.C. 2304 (c) (
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
21. ACCOUNTING AND APPROPRIATION20. AMOUNT19. ACCEPTED AS TO ITEMS NUMBERED
AWARD (To be completed by government)
CODE
PR-OAR-15-0044701/21/2016
X
CPOD
CPOD
US Environmental Protection Agency 26 West Martin Luther King Drive Mail Code: NWD Cincinnati OH 45268
1630 ES 02/22/2016
Jose Ortiz 202 Ortiz.Jose@epa.gov
564-6762
X
X
X
X
X
X
X
X
X
X
X
X
X
PAGE(S)
Sandra Savage
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
STANDARD FORM 33 (Rev. 9-97)
Prescribed by GSA - FAR (48 CFR) 53.214(c)
7-8
11-13 15-22 23-44
45-58
60-67
68-83
84-86
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 86
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
SOL-CI-15-00017
(A) (B) (C) (D) (E) (F)
Delivery Location Code: NVFEL SHIPPING
NVFEL - Shipping and Receiving
US Environmental Protection Agency
National Vehicle and Fuel Emissions
2565 Plymouth Road
Ann Arbor MI 48105 USA
0001 Base Period Contract Ceiling and Funding
Period of Performance: 01/01/2016 to 12/31/2016
0002 Base Period Level of Effort 36550 LH
Period of Performance: 01/01/2016 to 12/31/2016
0003 Optional Base Period Contract Ceiling and Funding
(Option Line Item)
01/01/2016
Period of Performance: 01/01/2016 to 12/31/2016
0004 Optional Base Period Level of Effort 36550 LH
(Option Line Item)
01/01/2016
Period of Performance: 01/01/2016 to 12/31/2016
0005 Option Period 1 Contract Ceiling and Funding
(Option Line Item)
01/01/2017
Period of Performance: 01/01/2017 to 12/31/2017
0006 Option Period 1 Level of Effort 36550 LH
(Option Line Item)
01/01/2017
Period of Performance: 01/01/2017 to 12/31/2017
0007 Optional Option Period 1 Contract Ceiling and
Funding
(Option Line Item)
01/01/2017
Period of Performance: 01/01/2017 to 12/31/2017
0008 Optional Option Period 1 Level of Effort 36550 LH
(Option Line Item)
01/01/2017
Period of Performance: 01/01/2017 to 12/31/2017
0009 Option Period 2 Contract Ceiling and Funding
(Option Line Item)
01/01/2018
Period of Performance: 01/01/2018 to 12/31/2018
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
NSN 7540-01-152-8067
3 86
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
SOL-CI-15-00017
(A) (B) (C) (D) (E) (F)
0010 Option Period 2 Level of Effort 36550 LH
(Option Line Item)
01/01/2018
Period of Performance: 01/01/2018 to 12/31/2018
0011 Optional Option Period 2 Contract Ceiling and
Funding
(Option Line Item)
01/01/2018
Period of Performance: 01/01/2018 to 12/31/2018
0012 Optional Option Period 2 Level of Effort 36550 LH
(Option Line Item)
01/01/2018
Period of Performance: 01/01/2018 to 12/31/2018
0013 Option Period 3 Contract Ceiling and Funding
(Option Line Item)
01/01/2019
Period of Performance: 01/01/2019 to 12/31/2019
0014 Option Period 3 Level of Effort 36550 LH
(Option Line Item)
01/01/2019
Period of Performance: 01/01/2019 to 12/31/2019
0015 Optional Option Period 3 Contract Ceiling and
Funding
(Option Line Item)
01/01/2019
Period of Performance: 01/01/2019 to 12/31/2019
0016 Optional Option Period 3 Level of Effort 36550 LH
(Option Line Item)
01/01/2019
Period of Performance: 01/01/2019 to 12/31/2019
0017 Option Period 4 Contract Ceiling and Funding
(Option Line Item)
01/01/2020
Period of Performance: 01/01/2020 to 12/31/2020
0018 Option Period 4 Level of Effort 36550 LH
(Option Line Item)
01/01/2020
Period of Performance: 01/01/2020 to 12/31/2020
0019 Optional Option Period 4 Contract Ceiling and
Continued ...
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
4 86
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
SOL-CI-15-00017
(A) (B) (C) (D) (E) (F)
Funding
(Option Line Item)
01/01/2020
Period of Performance: 01/01/2020 to 12/31/2020
0020 Optional Option Period 4 Level of Effort 36550 LH
(Option Line Item)
01/01/2020
Period of Performance: 01/01/2020 to 12/31/2020
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
SOL-CI-15-00017 Page 5 of 86
SECTION A - Solicitation/Contract Form SECTION B - Supplies or Services/Prices SECTION C - Description/Specifications SECTION D - Packaging and Marking SECTION E - Inspection and Acceptance SECTION F - Deliveries or Performance SECTION G - Contract Administration Data SECTION H - Special Contract Requirements SECTION I - Contract Clauses SECTION J - List of Documents, Exhibits and Other Attachments SECTION K - Representations, Certifications, and Other Statements of Bidders SECTION L - Instructions, Conditions, and Notices to Bidders SECTION M - Evaluation Factors for Award
SOL-CI-15-00017 Page 6 of 86
SECTION A - Solicitation/Contract Form
THIS SECTION INTENTIONALLY BLANK
SOL-CI-15-00017 Page 7 of 86
SECTION B - Supplies or Services/Prices
B-1 EPAAR 1552.211-73 LEVEL OF EFFORT-COST-REIMBURSEMENT TERM CONTRACT. (APR
1984)
(a) The Contractor shall perform all work and provide all required reports within the level of effort specified below.
The Government hereby orders 36,550 direct labor hours for the base period, which represents the Government's best estimate of the level of effort to fulfill these requirements.
(b) Direct labor includes personnel such as engineers, scientists, draftsmen, technicians, statisticians, and programmers and not support personnel such as company management, typists, and key punch operators even though such support personnel are normally treated as direct labor by the Contractor. The level of effort specified in paragraph (a) includes Contractor, subcontractor, and consultant labor hours.
(c) If the Contractor provides less than 90 percent of the level of effort specified for the base period or any optional period ordered, an equitable downward adjustment of the fixed fee, if any, for that period will be made. The Government may require the Contractor to provide additional effort up to 110 percent of the level of effort for any period until the estimated cost for that period has been reached. However, this additional effort shall not result in any increase in the fixed fee, if any. If this is a cost-plus-incentive-fee (CPIF) contract, the term "fee" in this paragraph means "base fee and incentive fee." If this is a cost-plus-award-fee (CPAF) contract, the term "fee" in this paragraph means "base fee and award fee."
(d) If the level of effort specified to be ordered during a given base or option period is not ordered during that period, that level of effort may not be accumulated and ordered during a subsequent period.
(e) These terms and conditions do not supersede the requirements of either the "Limitation of Cost" or "Limitation of Funds" clauses.
B-2 EPAAR 1552.211-74 WORK ASSIGNMENTS. (DEC 2014) - ALTERNATE III (DEC 2014)
(a) The contractor shall perform work under this contract as specified in written work assignments issued by the Contracting Officer.
(b) Each work assignment may include (1) a numerical designation, (2) approved workplan labor hours or an estimated initial level of effort provided in accordance with 1511.011-74, (3) the period of performance and schedule of deliverables, and (4) the description of the work.
(c) The Contractor shall acknowledge receipt of each work assignment by returning to the Contracting Officer a signed copy of the work assignment within 5 calendar days after its receipt. The Contractor shall begin working on a work plan immediately upon receipt of a work assignment. Within 15 calendar days after receipt of a work assignment, the Contractor shall submit 1 copies of a work plan to the Contract-level Contracting Officer's Representative and 1 copies to the Contracting Officer. The work plan shall include a detailed technical and staffing plan and a detailed cost estimate. Within 30 calendar days after receipt of the work plan, the Contracting Officer will provide written approval or disapproval of it to the Contractor. The Contractor is not authorized to start work without an approved work plan unless approved by the Contracting Officer or otherwise specified. Also, if the Contracting Officer disapproves a work plan, the Contractor shall stop work until the problem causing the disapproval is resolved. In either case, the Contractor shall resume work only when the Contracting Officer approves the work plan.
(d) This clause does not change the requirements of the "Level of Effort" clause, nor the notification requirements of either the "Limitation of Cost" or "Limitation of Funds" clauses.
SOL-CI-15-00017 Page 8 of 86
(e) Work assignments shall not allow for any change to the terms or conditions of the contract. Where any language in the work assignment may suggest a change to the terms or conditions, the Contractor shall immediately notify the Contracting Officer.
(f) Within 20 days of receipt of the work assignment or similar tasking document, the Contractor shall provide a conflict of interest (COI) certification.
Before submitting the COI certification, the Contractor shall search its records accumulated, at a minimum, over the past three years immediately prior to the receipt of the work assignment or similar tasking document. In the COI certification, the Contractor must certify to the best of the Contractor's knowledge and belief that all actual or potential organizational COIs have been reported to the Contracting Officer, or that to the best of the Contractor's knowledge and belief, no actual or potential organizational COIs exist. In addition, the Contractor must certify that its personnel who perform work under this work assignment or relating to this work assignment have been informed of their obligation to report personal and organizational COIs to the Contractor. The COI certification shall also include a statement that the Contractor recognizes its continuing obligation to identify and report any actual or potential COI arising during performance of this work assignment.
B-3 Local Clauses EPA-B-16-102 ESTIMATED COST AND FIXED FEE
(a) The estimated cost of this contract is TO BE DETERMINED AT CONTRACT AWARD.
(b) The fixed fee is TO BE DETERMINED AT CONTRACT AWARD.
(c) The total estimated cost and fixed fee is TO BE DETERMINED AT CONTRACT AWARD.
B-4 Local Clauses EPA-B-32-101 LIMITATION OF FUNDS NOTICE
(a) Pursuant to the Limitation of Funds clause, incremental funding in the amount of $TO BE DETERMINED AT CONTRACT AWARD is allotted to cover estimated cost. Funding in the amount of $TO BE DETERMINED AT CONTRACT AWARD is provided to cover the corresponding increment of fixed fee. The amount allotted for costs is estimated to cover the contractor's performance through TO BE DETERMINED AT CONTRACT AWARD.
(b) When the contract is fully funded as specified in the Estimated Cost and Fixed Fee Clause (EPA-B-16-102), the Limitation of Cost clause shall become applicable.
(c) Recapitulation of Funds
TO BE DETERMINED AT CONTRACT AWARD
SOL-CI-15-00017 Page 9 of 86
SECTION C - Description/Specifications
C-1 EPAAR 1552.211-79 COMPLIANCE WITH EPA POLICIES FOR INFORMATION RESOURCES
MANAGEMENT. (JAN 2012)
(a) Definition. Information Resources Management (IRM) is defined as any planning, budgeting, organizing, directing, training, promoting, controlling, and managing activities associated with the burden, collection, creation, use and dissemination of information. IRM includes both information itself and the management of information and related resources such as personnel, equipment, funds, and technology. Examples of these services include but are not limited to the following:
(1) The acquisition, creation, or modification of a computer program or automated data base for delivery to EPA or use by EPA or contractors operating EPA programs.
(2) The analysis of requirements for, study of the feasibility of, evaluation of alternatives for, or design and development of a computer program or automated data base for use by EPA or contractors operating EPA programs.
(3) Services that provide EPA personnel access to or use of computer or word processing equipment, software, or related services.
(4) Services that provide EPA personnel access to or use of: Data communications; electronic messaging services or capabilities; electronic bulletin boards, or other forms of electronic information dissemination;
electronic record-keeping; or any other automated information services.
(b) General. The Contractor shall perform any IRM-related work under this contract in accordance with the IRM policies, standards, and procedures set forth on the Office of Environmental Information policy Web site. Upon receipt of a work request (i.e. delivery order, task order, or work assignment), the Contractor shall check this listing of directives. The applicable directives for performance of the work request are those in effect on the date of issuance of the work request. The 2100 Series (2100-2199) of the Agency's Directive System contains the majority of the Agency's IRM policies, standards, and procedures.
(c) Section 508 requirements (accessibility). Contract deliverables are required to be compliant with Section 508 requirements (accessibility for people with disabilities). The Environmental Protection Agency policy for 508 compliance can be found at www.epa.gov/accessibility.
(d) Electronic access. A complete listing, including full text, of documents included in the 2100 Series of the Agency's Directive System is maintained on the EPA Public Access Server on the Internet at http://epa.gov/docs/irmpoli8/policies/index.html.
C-2 Local Clauses EPA-C-10-101 STATEMENT OF WORK/PERFORMANCE WORK
STATEMENT/SPECIFICATIONS
The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities (except as otherwise specified), to perform the Performance Work Statement included in Attachment 1. Work will be ordered against the subject Performance Work Statement through Contracting Officer issuance of Work Assignments.
C-3 Local Clauses EPA-C-10-103 INCORPORATION OF CONTRACTOR'S QUALITY ASSURANCE
(QA) PLAN
The Contractor shall adhere to the procedures set forth in its QA plan dated TO BE DETERMINED AT CONTRACT AWARD, which is incorporated by reference.
SOL-CI-15-00017 Page 10 of 86
SECTION D - Packaging and Marking
THIS SECTION INTENTIONALLY BLANK
SOL-CI-15-00017 Page 11 of 86
SECTION E - Inspection and Acceptance
E-1 FAR 52.246-5 INSPECTION OF SERVICES - COST-REIMBURSEMENT. (APR 1984)
E-2 FAR 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT. (DEC 2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
Title Number Date Tailoring
[X] Specifications and Guidelines ANSI/ASQC E4 1994 See below for Quality Systems for Environmental Data Collection and Environmental Technology Program
As authorized by FAR 52.246-11, the higher-level quality standard ANSI/ASQC E4 is tailored as follows:
The solicitation and contract require the offeror/contractor to demonstrate conformance to ANSI/ASQC E4 by submitting the quality documentation described below.
In addition, after award of the contract, the Contractor shall revise, when applicable, quality documentation submitted before award to address specific comments provided by EPA and submit the revised documentation to the Contracting Officer’s Representative.
After award of the contract, the Contractor shall also implement all quality documentation approved by the Government and specified under this contract.
A. Quality Documentation: The offeror must submit the following quality system documentation:
Pre-award Documentation: The offeror must submit the following quality system documentation as a separate and identifiable part of its technical proposal:
Documentation Specifications
[X] Quality Management Plan EPA Requirements for Quality Management Plans (QA/R-2) [dated 03/20/01]
[ ] Joint Quality Management EPA Requirements for Quality Plan/Quality Assurance Management Plans (QA/R-2) [dated Project Plan for the 03/20/01] and EPA Requirements for contract Quality Assurance Project Plans (QA/R) [dated 03/20/01]
[ ] Programmatic Quality EPA Requirements for Quality Assurance Project Plan Assurance Project Plans (QA/R-5) for the entire program [dated 03/20/01] (contract)
[ ] Other Equivalent:
This documentation will be prepared in accordance with the specifications identified above, or equivalent specifications defined by EPA. The offeror shall describe their plan for covering the costs associated with the required documentation. Work involving environmental data generation or use shall not commence until the Government has approved this documentation and incorporated it into the contract.
SOL-CI-15-00017 Page 12 of 86
B. Post-award Documentation: The Contractor shall submit the following quality system documentation to the Contracting Officer’s Representative at the time frames identified below:
C.
Documentation Specification Due After
[ ] Quality Management Plan EPA Requirements for Award of Quality Management Plans contract (QA/R-2) [dated 03/20/01]
[ ] Joint Quality Management EPA Requirements for Award of Plan/Quality Assurance Quality Management Plans contract Project Plan for the (QA/R-2) [dated 03/20/01] contract and EPA Requirements for Quality Assurance Project Plans (QA/R-5) [dated 03/20/02]
[ ] Quality Assurance EPA Requirements for Award of Project Plan for the Quality Assurance Project contract contract Plans (QA/R-5 [dated 03/20/01]
[ ] Programmatic Quality EPA Requirements for Award of Assurance Project Plan Quality Assurance Project contract for the entire program Plans (QA/R-5) [dated (contract) 03/20/01]
[X] Quality Assurance EPA Requirements for Issuance of Project Plan for each Quality Assurance Project statement of applicable project Plans (QA/R-5 [dated work for the 03/20/01] project
[ ] Project-specific EPA Requirements for Issuance of supplement to Quality Assurance Project statement of Programmatic Quality Plans (QA/R-5 [dated work for the Assurance Project Plan 03/20/01] project for each applicable project.
[ ] Other Equivalent: [ ] award of contract [ ] issuance of statement of work for the project
This documentation will be prepared in accordance with the specifications identified above or equivalent
SOL-CI-15-00017 Page 13 of 86 specifications defined by EPA. The offeror shall describe their plan for covering the costs associated with the required documentation.
The Government will review and return the quality documentation, with comments, and indicating approval or disapproval. If the quality documentation is not approved or if otherwise necessary, the contractor shall revise the documentation to address all comments and shall submit the revised documentation to the government for approval.
The Contractor shall not commence work involving environmental data generation or use until the Government has approved the quality documentation.
(Note: Statement of work includes statements of work to perform projects under work assignments, task orders, delivery orders, etc.)
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph
(a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require-
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
SOL-CI-15-00017 Page 14 of 86
SECTION F - Deliveries or Performance
F-1 FAR 52.242-15 STOP-WORK ORDER. (AUG 1989) - ALTERNATE I (APR 1984)
F-2 EPAAR 1552.211-70 REPORTS OF WORK. (OCT 2000)
The Contractor shall prepare and deliver reports, including plans, evaluations, studies, analyses and manuals in accordance with Attachment 2. Each report shall cite the contract number, identify the U.S. Environmental Protection Agency as the sponsoring agency, and identify the name of the Contractor preparing the report.
The OMB clearance number for progress reports delivered under this contract is 2030-0005.
F-3 EPAAR 1552.211-75 WORKING FILES. (APR 1984)
The Contractor shall maintain accurate working files (by task or work assignment) on all work documentation including calculations, assumptions, interpretations of regulations, sources of information, and other raw data required in the performance of this contract. The Contractor shall provide the information contained in the contractor's working files upon request of the Contracting Officer.
F-4 EPAAR 1552.211-78 ADVISORY AND ASSISTANCE SERVICES. (JUL 2015)
All reports containing recommendations to the Environmental Protection Agency shall include the following information on the cover of each report: (a) Name and business address of the contractor; (b) contract number; (c) contract dollar amount; (d) whether the contract was subject to full and open competition or a sole source acquisition; (e) name of the EPA Project Officer and the EPA Project Officer's office identification and location; and
(f) date of report.
F-5 Local Clauses EPA-F-12-101 PERIOD OF PERFORMANCE
The period of performance of this contract shall be from July 1, 2016 through June 30, 2017 inclusive of all required reports.
SOL-CI-15-00017 Page 15 of 86
SECTION G - Contract Administration Data
G-1 EPAAR 1552.216-74 PAYMENT OF FEE. (MAY 1991)
(a) The term fee in this clause refers to either the fixed fee under a cost-plus-fixed-fee type contract, or the base fee under a cost-plus-award-fee type contract.
(b) The Government will make provisional fee payments on the basis of percentage of work completed. Percentage of work completed is the ratio of direct labor hours performed to the direct labor hours set forth in clause 1552.211- 73, Level of Effort-Cost-Reimbursement Term Contract.
G-2 EPAAR 1552.232-70 SUBMISSION OF INVOICES. (JUN 1996) (DEVIATION)
In order to be considered properly submitted, an invoice or request for contract financing payment must meet the following contract requirements in addition to the requirements of FAR 32.905:
(a) Unless otherwise specified in the contract, an invoice or request for contract financing payment shall be submitted as an original and five copies. The Contractor shall submit the invoice or request for contract financing payment to the following offices/individuals designated in the contract: the original and two copies to the Accounting Operations Office shown in Block 12 on the cover of the contract; two copies to the Project Officer (the Project Officer may direct one of these copies to a separate address); and one copy to the Contracting Officer.
(b) The Contractor shall prepare its invoice or request for contract financing payment on the prescribed Government forms. See Attachment 8 – Invoice Preparation Instructions for details on preparing the following Standard Forms.
Standard Form Number 1034, Public Voucher for Purchases and Services other than Personal, shall be used by contractors to show the amount claimed for reimbursement. Standard Form 1035, Public Voucher for Purchases and Services other than Personal - Continuation Sheet, shall be used to furnish the necessary supporting detail or additional information required by the Contracting Officer. The Contractor may submit self-designed forms which contain the required information.
(c) (1) The Contractor shall prepare a contract level invoice or request for contract financing payment in accordance with the invoice preparation instructions identified as a separate attachment in Section J of the contract.
If contract work is authorized by individual work assignments, the invoice or request for contract financing payment shall also include a summary of the current and cumulative amounts claimed by cost element for each work assignment and for the contract total, as well as any supporting data for each work assignment as identified in the instructions.
(2) The invoice or request for contract financing payment shall include current and cumulative charges by major cost element such as direct labor, overhead, travel, equipment, and other direct costs. For current costs, each major cost element shall include the appropriate supporting schedule identified in the invoice preparation instructions. Cumulative charges represent the net sum of current charges by cost element for the contract period.
(d) (1) The charges for subcontracts shall be further detailed in a supporting schedule showing the major cost elements for each subcontract.
(2) On a case-by-case basis, when needed to verify the reasonableness of subcontractor costs, the Contracting Officer may require that the contractor obtain from the subcontractor cost information in the detail set forth in (c)(2). This information should be obtained through a means which maintains subcontractor confidentiality (for example, via sealed envelopes), if the subcontractor expresses CBI concerns.
(e) Invoices or requests for contract financing payment must clearly indicate the period of performance for which payment is requested. Separate invoices or requests for contract financing payment are required for charges applicable to the basic contract and each option period.
SOL-CI-15-00017 Page 16 of 86
(f) (1) Notwithstanding the provisions of the clause of this contract at FAR 52.216-7, Allowable Cost and Payment, invoices or requests for contract financing payment shall be submitted once per month unless there has been a demonstrated need and Contracting Officer approval for more frequent billings. When submitted on a monthly basis, the period covered by invoices or requests for contractor financing payments shall be the same as the period for monthly progress reports required under this contract.
(2) If the Contracting Officer allows submissions more frequently than monthly, one submittal each month shall have the same ending period of performance as the monthly progress report.
(3) Where cumulative amounts on the monthly progress report differ from the aggregate amounts claimed in the invoice(s) or request(s) for contract financing payments covering the same period, the contractor shall provide a reconciliation of the difference as part of the payment request.
G-3 EPAAR 1552.245-70 GOVERNMENT PROPERTY. (SEP 2009)
(a) The contractor shall not fabricate or acquire, on behalf of the Government, either directly or indirectly through a subcontract, any item of property without prior written approval from the Contracting Officer. If the Contracting Officer authorizes the contractor to acquire and/or fabricate equipment for use in the performance of this contract, the equipment shall be subject to the provisions of the "Government Property" clause and listed on the contract via contract modification.
(b) If the Government provides item(s) of Government property to the contractor for use in the performance of this contract, this property shall be used and maintained by the contractor in accordance with the provisions of the "Government Property" clause.
The "EPA Contract Property Administration Requirements" provided below apply to this contract.
U.S. Environmental Protection Agency
Contract Property Administration Requirements
1. Purpose. This document sets forth the requirements for the U.S. Environmental Protection Agency (EPA) contractors performing Government property management responsibilities under EPA contracts.
These requirements supplement those contained in the Government Property clause(s) and Part 45 Government Property of the Federal Acquisition Regulation (FAR).
2. Contract Property Administration (CPAR)
a. EPA Delegation. EPA delegates all contract property administration to the EPA Contract Property Coordinator (CPC). The delegations apply to all EPA contracts issued with or that have the potential to receive, purchase or acquire Government Property or include the Government Property clauses. In addition to administering all contract property, the CPC provides technical expertise and assistance to the Contracting Officer (CO) and Contracting Officer Technical Representative (COTR) relative to Government Property.
b. DCMA Re-delegation. The CPC may request support for contract property management oversight, including property administration and plant clearance, from the Defense Contract Management Agency (DCMA). If DCMA agrees to provide support, DCMA will notify the contractor of the assigned property administrator (PA) and plant clearance officer (PLCO). The DCMA PA is available to the contractor for assistance in all matters of property administration. Notwithstanding the delegation, as necessary, the contractor may contact the EPA CO. In the event of a disagreement between the contractor and the DCMA PA, the contractor should seek resolution from the CO. Unless, otherwise directed in the contract, or this document, all originals of written information or reports, except direct correspondence between the
SOL-CI-15-00017 Page 17 of 86 contractor and the DCMA PA, relative to Government property, should be forwarded to the administrative CO assigned to this contract and the CPC.
c. Disagreements. Notwithstanding the delegation(s), as necessary, the contractor may contact the CO. In the event of a disagreement between the contractor and the PA or the CPC the contractor should seek resolution from the CO.
3. Requests for Government Property.
In accordance with FAR 45.102, the contractor shall furnish all property required for performing Government contracts. If a contractor believes that Government property is required for performance of the contract, the contractor shall submit a written request to the CO. At a minimum, the request shall contain the following elements:
a. Contract number for which the property is required.
b. An item(s) description, quantity and estimated cost.
c. Certification that no like contractor property exists which could be utilized.
d. A detailed description of the task-related purpose of the property.
e. Explanation of negative impact if property is not provided by the Government.
f. Lease versus purchase analysis shall be furnished with the request to acquire property on behalf of the Government, with the exception of requests for material purchases. The contractor may not proceed with acquisition of property on behalf of the Government until receipt of written authorization from the Contracting Officer.
4. Transfer of Government Property. The Contracting Officer initiates the transfer of the government property via a contract modification. The transferor (EPA or another contractor) shall provide to the transferee, the receiving contractor, the information needed to establish and maintain the property records required of FAR 52.245-1, as well as all of the applicable data elements required by Attachment 1 of this clause. The transferee, the receiving contractor, should perform a complete inventory of the property before signing the acceptance document for the property. Accountability will transfer to the receiving contractor upon receipt and acceptance of the property, in accordance with FAR 45.106.
5. Records of Government Property.
a. In accordance with FAR 52.245-1, the contractor shall create and maintain records of all Government property, regardless of value, including property provided to and in the possession of a subcontractor.
Material provided by the Government or acquired by the contractor and billed as a direct charge to the contract is Government property and records must be established as such.
b. The Contractor shall identify all Superfund property and designate it as such both on the item and on the Government property record. If it is not practicable to tag the item, the contractor shall write the ID number on a tag, card or other entity that may be kept with the item or in a file.
c. Support documentation used for posting entries to the property record shall provide complete, current and auditable data. Entries shall be posted to the record in a timely manner following an action.
d. For Government vehicles, in addition to the data elements required by EPA, the contractor shall also comply with the General Services Administration (GSA) and Department of Energy (DOE) record and
SOL-CI-15-00017 Page 18 of 86 report requirements supplied with all EPA provided motor vehicles. If the above requirements were not provided with the vehicle, the contractor shall notify the designated CPC and the Fleet Manager.
e. When Government property is disclosed to be in the management and/or control of the contractor but not provided under any contract, the contractor shall record and report the property in accordance with FAR 52.245-1.
6. Inventories of Government Property. The contractor shall conduct a complete physical inventory of EPA property at least once per year. The contractor shall report the results of the inventory, including any discrepancies, to the CO. Reconciliation of discrepancies shall be completed in accordance with the schedule negotiated with the CO. See section 10 herein, Contract Closeout, for information on final inventories.
7. Reports of Government Property. EPA requires an annual summary report, for each contract, by contract number, of Government property in the contractor's possession. The annual summary is due as of September 30th of each year, and upon contract termination or expiration.
a. For each classification listed on the EPA Property Report form, with the exception of material, the contractor shall provide the total acquisition cost and total quantity. If there are zero items in a classification, or if there is an ending balance of zero, the classification must be listed with zeros in the quantity and acquisition cost columns.
b. For material, the contractor shall provide the total acquisition cost only.
c. Property classified as Plant Equipment, Superfund and Special Test Equipment must be reported on two separate lines. The first line shall include the total acquisition cost and quantity of all items or systems with a unit acquisition cost of $25,000 or more. The second line shall include the total acquisition cost and quantity of all items with a unit acquisition cost of less than $25,000.
d. For items comprising a system, which is defined as "a group of interacting items functioning as a complex whole," the contractor may maintain the record as a system noting all components of the system under the main component or maintain individual records for each item. However, for the annual report of Government property the components must be reported as a system with one total dollar amount for the system, if that system total is $25,000 or more.
e. The reports are to be received at EPA by the CPC by October 5th of each year.
f. Distribution shall be as follows:
Original to: CPC
One copy: CO
g. Contractors are required to comply with GSA and DOE special reporting requirements for motor vehicles. A statement of these requirements will be provided by the EPA Facility Management and Services Division (FMSD) concurrent with receipt of each vehicle.
h. The contractor shall provide detailed reports on an as-needed basis, as may be requested by the CO or the
CPC.
8. Disposition of Government Property. The disposition process is composed of three distinct phases:
identification, reporting, and final disposition.
SOL-CI-15-00017 Page 19 of 86
a. Identification. The disposition process begins with the contractor identifying Government property that is no longer required for contract performance. Effective contract property management systems provide for identification of excess as it occurs. Once Government property has been determined to be excess to the accountable contract, it must be screened against the contractor's other EPA contracts for further use. If the property may be reutilized, the contractor shall notify the CO in writing. Government property will be transferred via contract modifications to other contracts only when the COs on both the current contract and the receiving contract authorize the transfer.
b. Reporting.
(i) EPA. Government property shall be reported in accordance with FAR 52.245-1. The Standard Form, SF 1428, Inventory Disposal Schedule, provides the format for reporting excess Government property.
Instructions for completing and when to use the form may be found at FAR 52.245-1(j). Forward the completed SF 1428 to the CPC. The SF 1428 is available at http://www.arnet.gov/far/current/html/FormsStandard54.html. Superfund property must contain a Superfund notification and the following language must be displayed on the form: "Note to CO:
Reimbursement to the EPA Superfund is required."
(ii) DCMA. If the EPA contract has been re-delegated to DCMA, the excess items will be entered into the Plant Clearance Automated Reutilization Screening System (PCARSS). Access and information pertaining to this system may be addressed to the DCMA Plant Clearance Officer (PLCO).
c. Disposition Instructions.
(i) Retention. When Government property is identified as excess, the CO may direct the contractor in writing to retain all or part of the excess Government Property under the current contract for possible future requirements.
(ii) Return to EPA. When Government property is identified as excess, the CO may direct the contractor in writing to return those items to EPA inventory. The contractor shall ship/deliver the property in accordance with the instructions provided by the CO.
(iii) Transfer. When Government property is identified as excess, the CO may direct the contractor in writing to transfer the property to another EPA contractor. The contractor shall transfer the property by shipping it in accordance with the instructions provided by the CO. To effect transfer of accountability, the contractor shall provide the recipient of the property with the applicable data elements set forth in Attachment 1 of this clause.
(iv) Sale. If GSA or the DCMA PLCO conducts a sale of the excess Government property, the contractor shall allow prospective bidders access to property offered for sale.
(v) Abandonment. Abandoned property must be disposed of in a manner that does not endanger the health and safety of the public. If the contract is delegated to DCMA and the contractor has input EPA property into the PCARSS system, the EPA Property Utilization Officer (PUO) shall notify the CO. The CO shall notify the contractor in writing of those items EPA would like to retain, have returned or transferred to another EPA contractor. The contractor shall notify the DCMA PLCO and request withdrawal of those items from the inventory schedule. The contractor shall update the Government property record to indicate the disposition of the item and to close the record. The contractor shall also obtain either a signed receipt or proof of shipment from the recipient. The contractor shall notify the CO when all actions pertaining to disposition have been completed. The contractor shall complete an EPA Property report with changes, to include supporting documentation of completed disposition actions and submit it to the CPC.
SOL-CI-15-00017 Page 20 of 86
9. Decontamination. In addition to the requirements of the "Government Property" clause and prior to performing disposition of any EPA Government Property, the contractor shall certify in writing that the property is free from contamination by any hazardous or toxic substances.
10. Contract Closeout. The contractor shall complete a physical inventory of all Government property at contract completion and the results, including any discrepancies, shall be reported to the CO. If the contract is delegated to DCMA, the physical inventory report will be submitted to the EPA CO and a copy submitted to the DCMA PA. In the case of a terminated contract, the contractor shall comply with the inventory requirements set forth in the applicable termination clause. The results of the inventory, as well as a detailed inventory listing, must be forwarded to the CO and if delegated, a copy to the DCMA PA. In order to expedite the disposal process, contractors may be required to, or may elect to submit to the CPC, an inventory schedule for disposal purposes up to six (6) months prior to contract completion. If such an inventory schedule is prepared, the contractor must indicate the earliest date that each item may be disposed. The contractor shall update all property records to show disposal action. The contractor shall notify the CO, and, if delegated, the DCMA PA, in writing, when all work has been completed under the contract and all Government property accountable to the contract has been disposed. The contractor shall complete a FINAL EPA Property report with all supporting documentation to the CPC.
Attachment 1
Required Data Element--In addition to the requirements of FAR 52.245-1(f) (vi), Reports of Government Property, the contractor is required to maintain, and report the following data elements for EPA Government property (all elements are not applicable to material):
Name and address of the administrative Contracting Officer; Name of the contractor representative;
Business type; Name and address of the contract property coordinator; Superfund (Yes/No); No. of Subcontractor/Alternate Locations.
Note: For items comprising a system which is defined as, "a group of interacting items functioning as a complex whole," the contractor may maintain the record as a system noting all components of the system under the main component or maintain individual records for each item. However, for the Annual Report of Government Property, the components must be reported as a system with one total dollar amount for the system, if that system total is $25,000 or more.
G-4 EPAAR 1552.245-71 GOVERNMENT-FURNISHED DATA. (SEP 2009)
(a) The Government shall deliver to the Contractor the Government-furnished data described in the contract. If the data, suitable for its intended use, is not delivered to the Contractor, the Contracting Officer shall equitably adjust affected provisions of this contract in accordance with the "Changes" clause when:
(1) The Contractor submits a timely written request for an equitable adjustment; and
(2) The facts warrant an equitable adjustment.
(b) Title to Government-furnished data shall remain in the Government.
(c) The Contractor shall use the Government-furnished data only in connection with this contract.
(d) The following data will be furnished to the Contractor on or about the time indicated: When applicable, data will be furnished to the contractor under individual work assignments during administration of the contract.
SOL-CI-15-00017 Page 21 of 86
G-5 Local Clauses 1552.242-70 INDIRECT COSTS (APR 1984) (DEVIATION) (JUN 1992)
(a) In accordance with paragraph (d) of the 'Allowable Costs and Payment' clause, the final indirect cost rates applicable to this contract shall be established between the Contractor and the appropriate Government representative (EPA, other Government agency, or auditor), as provided by FAR 42.703(a). EPA's procedures require a Contracting Officer determination of indirect cost rates for its contracts. In those cases where EPA is the cognizant agency (see FAR 42.705-1), the final rate proposal shall be submitted to the cognizant audit activity and to the following:
Environmental Protection Agency Chief, Cost Policy and Rate Negotiation Section Procurement and Contracts Management Division
(PM-214F)
401 M St., S.W.
Washington, D.C. 20460
The Contractor shall also follow the notification and cost impact procedures prescribed in paragraph (b) below.
Where EPA is not the cognizant agency, the final rate proposal shall be submitted to the above-cited address, to the cognizant audit agency, and to the designated Contracting Officer of the cognizant agency. Upon establishment of the final indirect cost rates, the Contractor shall submit an executed Certificate of Current Cost or Pricing Data (see FAR 15.804-4) applicable to the data furnished in connection with the final rates to the cognizant audit agency. The final rates shall be contained in a written understanding between the Contractor and the appropriate Government representative. Pursuant to the 'Allowable Costs and Payment' clause, the allowable indirect costs under this contract shall be obtained by applying the final agreed upon rate(s) to the appropriate bases.
(b) Until final annual indirect cost rates are established for any period, the Government shall reimburse the Contractor at billing rates established by the appropriate Government representative in accordance with FAR 42.704, subject to adjustment when the final rates established. The established billing rates are currently as follows:
Cost Center TO BE DETERMINED Period TO BE DETERMINED Rate TO BE DETERMINED Base TO BE DETERMINED
These billing rates may be prospectively or retroactively revised by mutual agreement, at the request of either the Government or the Contractor, to prevent substantial overpayment or underpayment.
(1) For any retroactive indirect cost rate adjustments (i.e., indirect costs already billed), including final indirect cost rate adjustments, the Contractor shall provide to the Cost Policy and Rate Negotiation Section, with copies to the current EPA Contracting Officers of active contracts, a cost impact statement showing the effect of the indirect cost rate changes for each contract. This statement shall compare the cost billed to the cost the Contractor proposes to bill.
(2) For prospective indirect cost rate adjustments only, the Contractor shall notify the current EPA Contracting Officers of the new proposed rates when it proposes rates to the cost Policy and Rate Negotiation Section.
(3) For either prospective or retroactive indirect cost rate adjustments,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .