This document is a combined synopsis/solicitation for commercial items issued as a Request for Proposal (RFP) by the Department of the Interior National Park Service for Morristown National Historical Park. The contractor shall provide all services including labor, materials, equipment, facilities, and travel necessary to perform planning, designing, fabrication, removal/installation of waysides.

The key details are:

  • Solicitation Number 140P2124R0029, issued as a small business set-aside with NAICS code 541490 (Other Specialized Design Services) and a $13.5M size standard
  • The government anticipates award of one firm-fixed price contract
  • The period of performance is from 09/01/2024 to 09/09/2026
  • Quotes are due by 5:00 pm ED on 5/1/2024, and can only be submitted electronically
  • The contractor shall provide up to 55 wayside interpretive exhibits and 7 orientation kiosks, including planning, design, fabrication, and installation services
  • Additional requirements include developing wayside exhibit proposals, plans, illustrations, tactile elements, and audio descriptions, as well as removing up to 46 existing waysides
  • Payment will be made via firm-fixed price deliverables, and the contractor will be required to provide warranties on the work

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. Solicitation Number 140P2124R0029 is issued as a Request for Proposal (RFP) which constitutes the entire solicitation. This acquisition will be conducted pursuant to FAR Part 13. This solicitation document incorporates all mandatory commercial item provisions and clauses in effect through Federal Acquisition Circular 2024-03, effective 23 February 2024. This is a small business set-aside. The North American Industry Classification System (NAICS) code is 541490, Other Specialized Design Services and the related small business size standard is $13.5M.

The government anticipates award of one (1), firm-fixed price contract.

REQUIREMENT: Independently, and not as an agent of the government, the contractor shall provide all services including labor, materials, equipment, facilities, and travel necessary to perform planning, designing, fabrication, removal/installation of waysides for Morristown National Historical Park in Morristown, New Jersey.

Due to space limitations, the complete commercial item specifications are contained in Solicitation Number 140P2124R0029. Interested contractors should download this document. The National Park Service is not responsible for locating or securing any information that is not identified in the proposal.

The following Federal Acquisition Regulation (FAR) clauses and provisions are applicable to this announcement and are available at www.acquisition.gov.

52.212-1 Instructions to Offerors-Commercial Products and Commercial Services and addendum; 52.212-2 Evaluation-Commercial Products and Commercial Services and addendum; 52.212-3 Offeror Representations and Certifications-Commercial Products and Commercial Services; 52.212-4 Contract Terms and Conditions-Commercial Products and Commercial Services; 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Products and Commercial Services; 52.232-33 Payment by Electronic Funds Transfer-System for Award Management; 52.233-4 Applicable Law for Breach of Contract Claim; and 52.245-1 Government Property.

Questions shall be sent via email to robert_adamson@nps.gov by 5:00 pm ED 11 April 2024.

Questions submitted using any other method will not be entertained. The Point of Contact for this requirement is Robert Adamson, Contracting Officer. Offerors who contact anyone outside of the Office of Acquisition Management regarding this requirement, may automatically be excluded from competition.

All quote information shall be submitted for receipt no later than 5:00 pm ED, on 1 May 2024. Offerors are hereby notified that if your quote is not received by the date/time and at the location specified in this announcement, that it will be considered late. The proposal shall be submitted electronically via email to robert_adamson@nps.gov with the subject line clearly identifying “Solicitation Number 140P2124R0029 – MORR Design Build.” Offers by telephone, transmitted via facsimile (fax), or submitted using any other method will not be accepted.

All contractors must be registered in www.SAM.gov to be considered eligible for award.

http://www.sam.gov/

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

PHF

Harpers Ferry WV 25425 IDC Building 67 Mather Place DOI, NPS, HFC - Acquisition Managem

0009060803 CODE 16. ADMINISTERED BYCODE

X

X

X

541490

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED ORPWA

REQUEST FOR

PROPOSAL

(RFP)

INVITATION

FOR BID (IFB)

10. THIS ACQUISITION ISCODE

REQUEST FOR

QUOTE (RFQ)

14. METHOD OF SOLICITATION

13b. RATING

NORTH AMERICAN INDUSTRY

CLASSIFICATION STANDARD

(NAICS):

SMALL BUSINESS

05/01/2024 1700 ED

04/01/2024

3015020076Robert Adamson (No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

140P2124R0029

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 67 0040654664OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

Harpers Ferry WV 25425 IDC Building, 67 Mather Place NPS, Harpers Ferry Center

15. DELIVER TO

Denver CO 80225 P.O.Box 25287 MS WCP

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$13.5

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FREE ON BOARD

(FOB) DESTINATION UNLESS

BLOCK IS MARKED

11.

SEE SCHEDULEX

12. DISCOUNT TERMS THIS CONTRACT IS A RATED

ORDER UNDER THE DEFENSE

PRIORITIES AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

8(A)

NPS, WASO - WCP Contracting

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

The contractor shall provide all services including labor, materials, equipment, facilities, and travel necessary to provide for the removal of existing exhibits and planning, design, audio description, fabrication, and installation of new wayside exhibits for Morristown National Historical Park in Morristown, New Jersey.

Delivery: 09/09/2026

Continued ...

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

XX

DATED

Robert Adamson

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Government Use Only)

OFFER

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT: REFERENCE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 11/2021) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

00010 MORR Wayside Planning, Design, Fabrication &

Installation

Product/Service Code: M1PB

Product/Service Description: OPERATION OF EXHIBIT

DESIGN (NON-BUILDING)

Period of Performance: 09/01/2024 to 09/09/2026

00020 MORR Wayside Planning, Design, Fabrication &

Installation Travel

Product/Service Code: M1PB

Product/Service Description: OPERATION OF EXHIBIT

DESIGN (NON-BUILDING)

Period of Performance: 09/01/2024 to 09/09/2026

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

67 2 of

Solicitation 140P2124R0029

TABLE OF CONTENTS

SCOPE 4

PLANNING & DESIGN SERVICES 6

FABRICATION, REMOVAL & INSTALLATION 8

PACKAGING & DELIVERY 10

WARRANTY 16

PAYMENT SCHEDULE 19

LIST OF ATTACHMENTS 20

CLAUSES 21

PROVISIONS 32

INSTRUCTIONS TO OFFERORS 59

EVALUATION FACTORS & CRITERIA 65

SCOPE OF WORK

Wayside Exhibit Planning, Design, Fabrication, and Installation Services

MORRISTOWN NATIONAL HISTORICAL PARK

1. PROJECT BACKGROUND

This park commemorates the sites of General Washington and four different winter encampments of the Continental Army. Morristown National Historical Park consists of four important sites: Washington’s Headquarters, Fort Nonsense, Jockey Hollow, and New Jersey Brigade Area including the historic Cross Estate.

Existing outdoor interpretation at these non-contiguous areas are up to 50 years old. These need to be updated to meet accessibility and National Park Service graphical identity standards and replaced in time for the America 250 commemoration and 250th anniversary of the 1777 winter encampment.

2. SCOPE AND OBJECTIVES

The project shall be for the removal of existing exhibits and planning, design, audio description, fabrication, and installation of new wayside exhibits for Morristown National Historical Park in Morristown, New Jersey. The project includes coordination with the Contracting Officer (CO), Contracting Officer’s Representative (COR), and park staff.

The contractor shall provide all services including labor, materials, equipment, facilities, and travel necessary to perform the work in accordance with the specifications as detailed in this contract and its attachments.

2.1 General Requirements

2.1.1 Project Management

The Project Manager shall schedule, coordinate, oversee, and manage work produced under this contract.

The Project Manager shall be the single point of contact between the contractor and the COR. The Project Manager shall be in contact with the COR on no less than a monthly basis.

In addition, the Project Manager shall perform the following work:

1. Quality Control

Provide quality control to ensure that all elements of project work meet the requirements of the contract specifications. Provide routine inspections of in-house work and subcontracted work.

Ensure that all work not acceptable or compliant with the specifications is corrected prior to inspection or review by the

COR.

2. Schedule

The contractor shall prepare an overall project schedule including milestone dates for all submittals, fabrication, installation, and submit to the COR for approval. The contractor shall track all work progress to ensure that the project is completed according to the schedule. The contractor shall coordinate and confirm the dates for all work with the COR. The contractor shall notify the COR in advance, in writing when work shall not be completed by the dates in this contract and provide an updated schedule for completion.

3. Meetings

The project manager shall be present at all project meetings. The contractor shall coordinate with the COR to schedule the following meetings:

Meeting Purpose

Location or Type Required Contractor Attendees

Duration/Days on site

Post-award call Virtual meeting Project Manager 15 minutes Site Visit At park Project Manager, Planner/Writer, and Designer, and Audio Describer

Four 8-hour days

Shop Inspection

Contractor’s facilities or virtual meeting

Project Manager One (1) 8-hour day or as needed

Installation At park Project Manager and installers

TBD by Contractor

Comment discussion and reconciliation

Virtual meeting Project Manager Six (6), 1-hour meetings and as needed

4. Submittals

At any point in the planning and design process the COR may require informal submittals of the contractor’s work-in-progress to document the current status and level of production of the project.

Coordinate all contractor and subcontractor submittals and review them for legibility, accuracy, completeness, and compliance with contract requirements prior to submitting to the COR for distribution.

Forward all submittals to the COR for distribution, review, and approval. Receive all reviewed submittals and take appropriate action according to the approval or rejection by the COR.

1) Approved Submittals

Ensure that all changes, revisions, or additions are noted, and shop drawings, and instructions are revised, updated, and forwarded to the COR.

2) Rejected Submittals

When submittals are rejected, the COR shall notify the Project Manager, in writing, identifying the reasons for rejection. The Project Manager shall revise and/or correct and resubmit, identifying changes.

2.1.2 Accessibility

Wayside exhibits planned, designed, and fabricated for the National Park Service (NPS) shall follow the latest published version of Attachment B, Programmatic Accessibility Guidelines for National Park Service Interpretive Media. These guidelines are a combination of best practices, NPS and Department of the Interior directives, and federal laws. Federal laws include the Architectural Barriers Act, Sections 504 and 508 of the Rehabilitation Act as amended, and the 21st Century Communications and Video Accessibility Act.

Accessibility requirements for visitors with specific disabilities shall be addressed within the designed exhibits. If design decisions pose challenges to accessibility (such as inaccessible location of outdoor exhibit), additional attention shall be paid to a full description of the accessibility solutions. See Attachment B, Programmatic Accessibility Guidelines for National Park Service Interpretive Media requirements addressed under specific disabilities.

3. PLANNING AND DESIGN SERVICES

Work shall include planning and designing wayside exhibits services including audio description of all fabricated wayside exhibit elements. See Attachment A, Wayside Exhibit Planning Design Fabrication and Installation Specifications. and Attachment J, Wayside Exhibits File Naming and Folder Structure.

3.1 Wayside Exhibit Proposal – See Attachment C, Sample Wayside Proposal & Attachment D, Wayside Exhibit Planner.

Create a wayside exhibit proposal for up to fifty-five (55) wayside interpretive exhibits and seven (7) orientation kiosks across four distinct units of the park. In addition to a standard proposal, include the following:

- Proposal to include options for bulletin case solutions including orientation panel, bulletin case materials, brochure rack, or other options as discussed during site visit o Six orientation kiosks to use existing wooden structures

- Two maps o Locations of proposed exhibits o Locations of exhibits to be removed

- Estimated cost of each new illustration

- Estimated cost of each tactile element

- Estimated cost of relocation of Jockey Hollow Visitor Center orientation kiosk including at least three (3) methods of relocation o Cost estimate may include alternative mounting options, total replacement, or a variety other options discussed during site visit

3.2 Wayside Exhibit Plan – See Attachment H, Sample Wayside Design.

Create production-ready InDesign files for up to fifty-five (55) wayside interpretive exhibits and seven (7) orientation kiosks. The plan shall incorporate text, graphics, and tactile elements.

3.3 Text—Contractor shall research and create all text following NPS standards found in Attachment I, Typographic Standards and Attachment K, HFC Editorial Style Guide.

3.4 Graphics—Contractor shall research and obtain use rights (outside of stock photography or government furnished materials) for up to ten (10) images that allows for an image or PDF of the wayside exhibit to be displayed by the government in other media to promote or display the wayside exhibit. See Attachment E, Intellectual Property Guidelines for Harpers Ferry Center Interpretive Media. Existing images and/or illustrations to be provided by the government upon request.

3.5 Maps—create the following maps according to Attachment F, Wayside Map Standards.

3.5.1 Update up to eleven (11) existing maps

3.5.2 Create up to six (6) new maps

3.6 Interactive Tactiles—Create up to five (5) interactive tactile elements. Tactiles shall contain scale, raised lettering, and braille labels.

3.6.1 Two (2) – Scale replicas of Ford Mansion, Wick House, & soldier’s hut for size/construction comparison; in bronze. Approximately 36” x 24” x 10”.

Exact dimension to be determined during site visit.

3.6.2 One (1) – Tactile map of Morristown in 1777; in bronze. Approximately 15” x 20” x 0.5”. Exact dimensions to be determined during site visit.

3.6.3 One (1) – Ft. Nonsense replica; in bronze. Approximately 24” x 16” x 4”.

Exact dimensions to be determined during site visit.

3.6.4 One (1) – Replica pipe artifact; in bronze. Approximately 6” x 3” x 1” in bronze. Exact dimensions to be determined by contractor.

3.7 Audio Description – Create audio description scripts for all wayside exhibits.

Audio description content shall describe each wayside element, images/items within the wayside element, tactile elements, all text within the wayside element, and what the sighted visitor sees in the surrounding vistas related to subject being interpreted.

4. FABRICATION, REMOVAL, AND INSTALLATION

Work shall include the creation of illustrations, fabrication of panels, bases, and tactile elements, shipping of all fabricated elements, removal of existing exhibits, relocation of Jockey Hollow Visitor Center orientation kiosk, and installation of fabricated items. See Attachment G, VIS Hardware Manual.

4.1 Illustrations – Create up to fourteen (14) new illustrations as determined in final proposal.

4.2 Panels – Fabricate up to sixty (60) high-pressure laminate (HPL) panels for outdoor use as determined in final proposal. All panels shall have a 10-year warrantee against fading, warping, and delaminating.

4.3 Bulletin Board Cases – Fabricate up to seven (7) orientation kiosk bulletin case/brochure rack combinations. Exact materials, functionality, and sizes (not to exceed 36”x48”) to be determined during site visit and approved Final Wayside Proposal.

4.4 Tactile elements – Design, create prototypes, and fabricate up to five (5) tactile elements in bronze as determined in the final proposal. All tactile elements shall have scale, raised lettering, and braille. Contractor shall provide final prismatic braille translation in accordance with 2010 ABAAS standards. Use braille code as specified from the Braille Authority of North America, Unified English Braille.

All raised, domes characters must have a height of 5/8”. All raised lettering and braille shall be on a smooth background. All prototypes shall be produced at 25% to 50% of actual size as noted in Section 5 – Packaging and Delivery. Contractor shall determine prototype material as long as it can be shipped for review for accuracy.

4.4.1 Two (2) – Housing Comparison; in bronze – Scale replica models of Ford Mansion, Wick House, and a soldier’s hut on to compare sizes of various housing. Approximately 36” x 24” x 10”. Exact dimensions to be determined during site visit.

4.4.1.1 Tactile to be mounted horizontally to painted aluminum table attached to low profile, in-ground base. Exact dimensions to be determined during site visit. See Attachment L, Tactile Reference.

4.4.2 One (1) – 3D Tactile Map, Morristown in 1777; in bronze – Map to include notable location in Morristown and surrounding areas.

Approximately 15” x 20” x 0.5”. Exact dimensions to be determined during site visit.

4.4.3 One (1) – Fort Nonsense replica; in bronze – Model of fort with defensive structures identified and You Are Here marker.

Approximately 24” x 16” x 4”. Exact dimensions to be determined during site visit.

4.4.3.1 Tactile to be mounted horizontally to painted aluminum base/table, 24” x 16” x 36” tall with cane detection bar at 27” high

4.4.4 One (1) – Pipe artifact replica; in bronze – replica of clay pipe artifact. Approximately 6” x 3” x 1”. Exact dimensions to be determined during site visit.

4.5 Base Hardware – Fabricate up to sixty (60) painted aluminum bases as determined in the final proposal. Types of bases may include low profile, Plant ID, double-inline upright, wall-mounted frames, bulletin cases, accessory bars with brochure holders, and mounting options including in-ground, baseplate, socket, and wall-mount. Paint color shall be NPS Dark Brown. All bases shall have a 10-year warranty against structural failure.

4.4 Relocate existing large wooden kiosk structure at Jockey Hollow Visitor Center parking lot to center of traffic island. Exact method of relocation and installation to be determined during site visit.

4.5 Remove up to forty-six (46) existing waysides exhibits as determined in final proposal. Of these, up to ten (10) existing wayside bases will be relocated/reinstalled. The park will make a selection of up to five (5) removed exhibit bases to be retained for future use based on an assessment of their condition after removal. Contractor is responsible for removing and recycling all remaining wayside exhibit elements. The immediate area where work is occurring shall be closed off by contractor’s stanchions, caution tape, and/or “Do Not Enter” signs. Contractor shall provide all equipment and hardware necessary to remove existing wayside exhibits. Contractor shall not use Government equipment. All surfaces shall be made smooth with no exposed openings or rough edges.

4.6 Installation of all fabricated panels, bases, and tactile elements. All items shall be packaged, shipped to the park, unpackaged, assembled, and installed according to approved fabrication/shop drawings. Contractor is responsible for removing and recycle shipping containers and packing materials. The general installation site shall remain open to visitors during the installation period. The immediate area where the work is occurring shall be closed off by contractors’ stanchions, caution tape, and “Do Not Enter” signs. Contractor shall provide all equipment and hardware necessary to install all items fabricated. Contractor shall not use Government equipment. Any damage to paint on base structures shall be touched up. All wayside exhibit structures shall be thoroughly cleaned to remove dirt, prints, and smears from all surface areas.

5. PACKAGING AND DELIVERY

All deliverables shall be shipped Free On Board (FOB) destination, within consignee’s premises, with all shipping and transportation costs prepaid, unless otherwise specified below. Deliverables shall be shipped by either registered or certified mail to ensure that shipments can be traced, if lost. No loading dock is available at park—ensure lift gate is included with delivery vehicle for unloading. Park must be notified no less than three (3) days prior to final delivery of panels, bases, and tactile element. Delivery will only be accepted Monday through Thursday.

5.1 Deliverables Shall Include the Following

5.1.1 Post-award Conference Call, uploaded to Teams folder

- Word document of notes

- PDF of draft schedule

5.1.2 Trip Report, uploaded to Teams folder

- Word document describing what was discussed at each site noting agreed upon changes to contract, if any

- All raw photography from site visit

- PDF of updated schedule

5.1.3 Wayside Exhibit Proposal, uploaded to Teams folder

- PDF of proposal, to include o Bulletin case material and configuration options o Jockey Hollow Visitor Center orientation kiosk relocation options, minimum of three (3), including estimated costs

- PDF of map with location of proposed exhibits and exhibits to be removed

- PDF of thumbnails of illustrations with cost estimates

- PDF of thumbnails of tactile elements with cost estimates

- PDF of map thumbnails for the new and updated maps

- PDF of updated schedule

5.1.4 Final Wayside Exhibit Proposal, uploaded to Teams folder

- PDF of final proposal with all NPS comments incorporated

- PDF of map with updated locations of proposed exhibits and exhibits to be removed

- PDF of refined thumbnail of selected illustrations

- PDF of refined thumbnails for selected tactile elements

- PDF of map refined thumbnails for maps

- PDF of updated schedule

5.1.5 Draft Wayside Exhibit Plan, uploaded to TEAMS folder, draft color.

- PDF of layouts, including:

▪ map of wayside exhibit locations

▪ detailed black and white illustrations

▪ revised new and existing maps

▪ revised drawings or renderings of tactile elements

- PDF of draft tactile element designs

- PDF of updated schedule

5.1.6 Revised Wayside Exhibit Plan, uploaded to TEAMS folder, draft color.

- PDF of layouts, including:

▪ revised, detailed color illustrations

▪ revised maps

▪ revised drawings/renderings of tactile elements

- PDF of drawings and reference package for tactile elements

- PDF of draft design intent drawings for each unique exhibit base

- PDF of updated schedule

5.1.7 Final Wayside Exhibit Plan, uploaded to Teams folder, final color.

- PDF of layouts with final text and graphics

- PDF of documentation of all image sources and use rights

- PDF of illustrations

- PDF of final maps

- Word Document of draft audio description scripts

- PDF of revised reference package for tactile elements

- PDF of revised design intent drawings for each unique exhibit base

- PDF of updated schedule

5.1.8 Production-Ready Files and Sample Materials, mailed to park/HFC

- Two (2) sets of full-size color prints of each wayside exhibit. One (1) set mailed to the COR and one (1) set mailed to the park.

- Two (2) sets of sample materials. All samples shall be larger than 2”x2” but not larger than 10”x10”. One (1) set mailed to the COR and one (1) set mailed to the park. Samples shall be representative of final product.

Each set shall contain:

▪ One (1) painted aluminum base

▪ One (1) HPL panel

▪ One (1) bronze with sample finish

- PDF of final fabrication drawings for hardware and interactive tactile elements.

- PDF of updated schedule, emailed to COR.

- Word Document of revised audio description script

5.1.9 Prototypes of interactive tactile elements, mailed to the park.

- One (1) 25% to scale 3D printed model of Ford Mansion, Wick House, & soldier’s hut comparison.

- One (1) 50% to scale 3D printed model of Morristown map

- One (1) 50% to scale 3D printed model of Ft. Nonsense replica

- One (1) 50% to scale 3D printed model of clay pipe artifact

5.1.10 Fabricated wayside exhibit elements including panels, bases, interactive tactile, and two (2) 1/2 pints of NPS Brown touch up paint for the bases, mailed to the park. No loading dock is available at park—ensure lift gate is included with delivery vehicle for unloading.

5.1.11 Trip Report for installation/removal, uploaded to Teams folder

- PDF identifying all work that was completed during site visit, includes any deviations to propose locations

- Photos of all installed exhibits

5.1.12 Close-out package, uploaded to Teams folder

- Final InDesign files with linked images and fonts for each layout, including all revisions and corrections made during production

- Raw scans and layered graphic production files

- Source files for as-built three-dimensional elements

- Source file for final proposal

- Final production PDFs for each layout

- Section 508-compliant PDFs for each wayside exhibit, without printer’s marks

- Section 508-compliant Word document of final audio description text

- Final resource list

- Graphic use rights and license information

- Warranties

- Instructions for maintenance, cleaning, repair, and handling of wayside exhibits.

- Excel document of the lifecycle costs for each as-built wayside exhibit, including panel base, and tactile elements.

5.2 Deliverables Shall Be Sent to the Following:

5.2.1 Items 5.1.1 through 5.1.8 (only one set of full-size prints and sample materials), 5.1.11, and 5.1.12 shall be sent to:

COR

Brad Sutton Harpers Ferry Center 67 Mather Place Harpers Ferry, WV

5.2.2 Items 5.1.8 (only one set of full-size prints and sample materials) and 5.1.9 shall be sent to:

Morristown National Historical Park ATTN: Karen Sloat-Olsen 30 Washington Place Morristown, NJ 07960

5.2.3 Items 5.1.10 shall be sent to:

Morristown National Historical Park ATTN: Karen Sloat-Olsen 717 Jockey Hollow Road Morristown, NJ 07960

6. PERIOD OF PERFORMANCE

All work, including review and approval, shall be completed on or before 9 September, 2026.

7. REVIEW AND APPROVAL

Review and approval of the deliverables shall be completed within 28 calendar days. The COR shall notify the Contractor, in writing, of approval or rejection of the work.

CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM

NOTICE TO CONTRACTORS

Contractor Performance Assessment Reporting System (December 2015)

A. FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.

B. The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.

C. We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO).

Information in the report must be protected as source selection sensitive information not releasable to the public.

D. When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.

E. Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.

1. Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.

2. Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.

3. All information provided should be reviewed for accuracy prior to submission.

https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.cpars.gov/ https://www.cpars.csd.disa.mil/ https://www.cpars.gov/

4. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.

5. Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.

6. If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."

F. The following guidelines apply concerning your use of the past performance evaluation:

a. Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.

b. Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

c. Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.

G. If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.

H. A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

ADDITIONAL WORK

Any additional work not detailed in this contract shall be approved, in writing, by the Contracting Officer via a bilateral modification.

LOSS OR DAMAGE

The contractor shall be liable for any loss or damage to any government property caused by negligence, theft, or willful misconduct of the contractor, his agents, servants, and employees, and shall indemnify and save the government harmless against all actions, proceedings, claims, demands, costs, damages, and expenses, including attorney’s fees, by reason of any suit or action brought for any actual or alleged injury to or resulting from the performance of this contract. The contractor shall submit a full written report to the Contracting Officer within 24 hours following the occurrence of such damage, loss, or injury.

If due to fault, neglect, dishonesty of the contractor, his agency or employees, loss or damage to government property is incurred during the performance of this contract, the contractor shall be responsible for same. The government, at its option, may in lieu of repayment, require the contractor to replace at his own expense, all such property as directed by the Contracting Officer. Until the equipment is repaired or replaced, the contractor shall furnish similar, adequate replacement property and/or equipment at no charge to the government, within two working days of the date the equipment has been lost, stolen, or damaged.

CONTRACT ADMINISTRATION

A. The National Park Service, Contract Specialist / Contracting Officer address is: National Park Service, Harpers Ferry Center, Office of Acquisition Management, P.O. Box 50, 67 Mather Place, Harpers Ferry, West Virginia 25425-0050.

The contractor shall use the Contracting Officer as a point of contact on all business and administrative matters concerning this contract. All correspondence, other than that of a technical nature, shall be addressed to the Contracting Officer, with information copies of the basic correspondence to the COR.

B. The National Park Service, COR address is: National Park Service, Harpers Ferry Center, Attention: COR, P.O. Box 50, Harpers Ferry, West Virginia 25425-0050.

The contractor shall use the COR as the point of contact for all technical matters under the contract. Technical correspondence shall be addressed to the NPS COR, with an information copy of the basic correspondence to the Contracting Officer.

FACILITY SECURITY POLICY

Contractors attending meetings or accomplishing work within the buildings or real property of the National Park Service shall adhere to the security policy of each office. It shall be the responsibility of the contractor to contact the office before work begins for a briefing on security policies.

WARRANTY

The contractor shall guarantee the workmanship against defects in work and material that might appear under extremely high visitor use and variable weather and climate conditions for a minimum of two (2) years. The warranty period shall commence with final acceptance of work. This shall include all labor and parts at no additional cost to the government.

If during this warranty period, defective workmanship, materials, or equipment are identified by the government, the contractor will be notified, in writing, as to liability and responsibility for corrective action at no cost to the government.

Action may include but is not limited to:

A. Placing all work into satisfactory condition;

B. Making good all damages to equipment, the site, the building, or contents thereof, that have resulted from such unsatisfactory work; and

C. Making good any work, materials, or equipment that are disturbed in fulfilling the guarantee including any work, materials, or equipment that may have been guaranteed under another contract.

Should the contractor fail to proceed with work in accordance with the guarantee within seven calendar days from the notice of corrective action(s), the government will have such work performed at the expense of the contractor.

In no event will the government be responsible for any extension or delays in the scheduled deliverables or periods of performance under this contract as a result of the contractor’s obligations to correct defects, nor shall there be any adjustment of the delivery schedule or period of performance as a result of the correction of defects unless provided by a supplemental agreement with adequate consideration.

If the government returns any work to the contractor for correction or replacement under this contract, the contractor shall be liable for transportation charges up to an amount equal to the cost of transportation by the usual commercial method of shipment from the place of delivery specified in the contract (irrespective of the F.O.B.

point or the point of acceptance) to the contractor’s plant and return to the place of delivery specified in the contract. The contractor shall also bear the responsibility for the work while in transit.

The contractor shall be liable for the reasonable costs, including travel of personnel, and disassembly and reassembly of larger items when it is necessary to remove the work to be inspected and returned for correction or replacement.

INQUIRIES

Inquiries and all correspondence concerning this solicitation document shall be submitted via e-mail to robert_adamson@nps.gov.

All questions shall be submitted via email to robert_adamson@nps.gov no later than 5:00 pm EST on 10 April 2024. A response shall not be furnished on questions received after the cutoff date and time. Oral communication/telephone communication is unacceptable. All questions submitted shall reference specific parts of the solicitation including page numbers.

SITE VISITS

The government may conduct site visits during the period of performance of this acquisition.

TECHNICAL DATA CONFIDENTIALITY

The quote submitted in response to this Request for Quote may contain technical data that the offeror or his subcontractor (s) does not want used or disclosed for any purpose other than for evaluation of the quote. The use and disclosure of any such technical data may be restricted, provided that the offeror marks the cover sheet of the quote with the following legend:

“Technical data contained in pages _______ of this quote shall not be used or disclosed, except for evaluation purposes.”

If a contract is awarded as a result of or in connection with the submission of this quote, the government shall have the right to use or disclose this technical data to the extent provided in the contract. This restriction does not limit the government’s right to use or disclose technical data obtained from another source without restrictions. The government assumes no liability for disclosure or use of unmarked technical data and may use or disclose the data for any purpose and may consider that the quote was not submitted in confidence and therefore releasable under the Freedom of Information Act (5 USC 552).

8. PAYMENT SCHEDULE

Upon completion and acceptance of the following deliverables, the contractor shall be paid a firm-fixed-price as shown below:

A. Completion and acceptance of notes from post-award call. $***

B. Completion and acceptance of Trip Report. $***

C. Completion and acceptance of Draft Wayside Exhibit Proposal $***

D. Completion and acceptance of Final Wayside Exhibit Proposal $***

E. Completion and acceptance of Draft Wayside Exhibit Plan $***

F. Completion and acceptance of Revised Wayside Exhibit Plan $***

G. Completion and acceptance of Final Wayside Exhibit Plan $***

H. Completion and acceptance of Production Files, Sample Materials, & Draft Audio Description Script

I. Completion and acceptance of Tactile Element Prototypes $***

J. Completion and acceptance of Shipment of Bases, Panels and Tactile Elements

K. Completion and acceptance of Removal/Installation & Trip Report $***

L. Completion and acceptance of Closeout $***

***The contractor shall propose as part of their quote. All deliverables shall be reviewed and approved by the COR prior to payment.

TOTAL FIXED PRICE: $_____________________

TRAVEL COSTS (FFP) $_____________________

PROJECT TOTAL: $_____________________

9. TRAVEL

In accordance with Public Law 99-234, "Federal Civilian Employee and Contractor Travel Expense Act of 1985", travel-related expenditures for contractor's personnel are restricted to the limits established for federal employees. This includes mileage for company-owned vehicles.

The contractor shall travel as required to support program tasks. All travel arrangements are to be made by the contractor. Payment for transportation, per diem, mileage, parking, and other fair and reasonable travel expenses will be paid in accordance with the effective Federal Travel Regulations as amended and supplemented by the Department of the Interior travel regulations where applicable. No Federal travel authorizations are to be issued. The contractor shall make every effort to keep travel costs to a minimum. No reimbursement will be made for parking at a contractor's normal place of work. No overhead, profit or G&A shall be allowed on travel costs.

Travel costs shall be reimbursed in accordance with the Federal Travel Regulations. Travel is only funded to the extent specified within the travel CLIN. The contractor shall not incur any travel costs in excess of the amount funded within the travel CLIN. The government shall not be liable for any travel related costs incurred by the contractor which are in excess of the total amount funded within the travel CLIN.

If the contractor has reason to believe they may exceed the amount funded on the travel CLIN, they shall notify the government Contracting Office immediately. Additional funding may only be added to the travel CLIN through a formal signed modification issued by a government Contracting Officer. Profit, fee, G&A or overhead may not be incurred on travel costs.

10. ATTACHMENTS

The following listed documents are attached and incorporated into this contract:

Attachment A, Wayside Exhibit Planning Design Fabrication Installation Specifications, November 2023, PDF, 56 pages

Attachment B, Programmatic Accessibility Guidelines for National Park Service Interpretive Media, Version 2.4, October 2019, PDF, 92 pages

Attachment C, Sample Wayside Proposal, March 2019, PDF, 70 pages Attachment D, Wayside Exhibit Planner, 2023, PDF, 9 pages Attachment E, Intellectual Property Guidelines for Harpers Ferry Center Interpretive Media, Version 1.0, September 2010, PDF, 47 pages Attachment F, Wayside Exhibit Map Standards, Version 2.0, PDF, 8 pages Attachment G, VIS Hardware Manual, Revision 5, March 2023, PDF, 188 pages Attachment H, Sample Wayside Design, March 2020, PDF, 24 pages Attachment I, Typographic Standards, January 2023, PDF, 6 pages Attachment J, Wayside Exhibits File Naming and Folder Structure, 2022, PDF, 5 pages Attachment K, Style Guide, January 2024, PDF, 48 pages Attachment L, Tactile Reference, February 2024, PDF, 1 page

CLAUSE SECTION

CLAUSES INCORPORATED BY REFERENCE

CLAUSE TITLE DATE

52.202-1 Definitions Jun 2020 52.203-3 Gratuities Apr 1984 52.203-13 Contractor Code of Business Ethics and Conduct, Alt I Nov 2021 52.204-13 System for Award Management Maintenance Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance Aug 2020 52.204-19 Incorporation by Reference of Representations and Certifications Dec 2014 52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services Nov 2023 52.227-14 Rights in Data – General May 2014 52.227-17 Rights in Data – Special Works Dec 2007 52.232-39 Unenforceability of Unauthorized Obligations Jun 2013

CLAUSES INCORPORATED BY FULL TEXT

52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders- Commercial Products and Commercial Services (Feb 2024)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (Aug 1996) ( 31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108- 78 ( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[Contracting Officer check as appropriate.] __ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I

(Nov 2021) ( 41 U.S.C. 4704 and 10 U.S.C. 4655).

_X_ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) ( 41 U.S.C. 3509)).

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

__ (4) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

_X_ (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).

__ (6) [Reserved].

_X_ (7) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

__ (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

_X_ (9) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of Division R of Pub. L. 117-328).

__ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (Dec 2023) ( Pub. L.

115–390, title II).

__ (11)(i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec 2023) ( Pub. L. 115–390, title II).

__ (ii) Alternate I (Dec 2023) of 52.204–30.

_X_ (12) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Nov 2021) ( 31 U.S.C. 6101 note).

_X_ (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) ( 41 U.S.C. 2313).

__ (14) [Reserved].

__ (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) ( 15 U.S.C. 657a).

__ (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) ( 15 U.S.C.

657a).

__ (17) [Reserved]

_X_ (18) (i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) ( 15 U.S.C. 644).

__ (ii) Alternate I (Mar 2020) of 52.219-6.

__ (19) (i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) ( 15 U.S.C. 644).

__ (ii) Alternate I (Mar 2020) of 52.219-7.

__ (20) 52.219-8, Utilization of Small Business Concerns (Feb 2024) ( 15 U.S.C. 637(d)(2) and (3)).

__ (21) (i) 52.219-9, Small Business Subcontracting Plan (Sep 2023) ( 15 U.S.C. 637(d)(4)).

__ (ii) Alternate I (Nov 2016) of 52.219-9.

__ (iii) Alternate II (Nov 2016) of 52.219-9.

__ (iv) Alternate III (Jun 2020) of 52.219-9.

__ (v) Alternate IV (Sep 2023) of 52.219-9.

__ (22) (i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) ( 15 U.S.C. 644(r)).

__ (ii) Alternate I (Mar 2020) of 52.219-13.

__ (23) 52.219-14, Limitations on Subcontracting (Oct 2022) ( 15 U.S.C. 637s).

__ (24) 52.219-16, Liquidated Damages—Subcontracting Plan (Sep 2021) ( 15 U.S.C. 637(d)(4)(F)(i)).

__ (25) 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (Feb 2024) ( 15 U.S.C. 657f).

_X_ (26) (i) 52.219-28, Post Award Small Business Program Rerepresentation (Feb 2024) ( 15 U.S.C.

632(a)(2)).

__ (ii) Alternate I (Mar 2020) of 52.219-28.

__ (27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Oct 2022) ( 15 U.S.C. 637(m)).

__ (28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .