Sol_140P2121R0053.pdf
PDF 859 KB Posted
- Attached to
- HAFC_SEMO ORAL HISTORY INTERVIEWS Federal contract opportunity
- Solicitation number
- 140P2121R0053
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P2121R0053_Amd_0001.pdf | ||
| SEMO_RFP_SOW_-_Rev_8-18-2021_0001.pdf | ||
| Attachment_D_Wage_Determinations.pdf | ||
| Attachment_A_NPS_Release_Form.pdf | ||
| Attachment_E_Past_Performance_Questionnaire.pdf | ||
| Attachment_B_RequirementsForCompletionReport.doc | DOC document | |
| Attachment_C_SEMO_ContractPricingForm.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS IS A NOTICE OF INTENT FOR REQUEST FOR QUOTE.
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. Solicitation Number 140P2121R0053 is issued as a Request for Quote (RFQ) constitutes the entire solicitation.
Offers and price quotations with detailed breakdown are being requested. This acquisition will be conducted pursuant to FAR Part 13. This solicitation document incorporates all mandatory commercial item provisions and clauses in effect through Federal Acquisition Circular 2021-06, effective July 12, 2021.
This is set aside for small business concerns under the North American Industry Classification System (NAICS) 512110, Administrative Management and General Management Consulting Services with a size standard of $35 million dollars.
REQUIREMENT: The contractor shall provide all audiovisual services to produce 100 ultra-high-definition (UHD) video interviews for Selma to Montgomery National Historic Trail (SEMO) in Selma, Alabama in accordance with the specifications as detailed in this solicitation and its attachments.
Due to space limitations, the complete commercial item specifications are contained in Solicitation No.
140P2121R0053. Interested contractors should download this document. The National Park Service is not responsible for locating or securing any information that is not identified in the quotation.
The government contemplates award of one best value, firm-fixed price contract resulting from this solicitation.
The following Federal Acquisition Regulation (FAR) clauses and provisions are applicable to this announcement and are available at www.acquisition.gov.
52.212-1 Instructions to Offerors-Commercial Items; 52.212-2 Evaluation-Commercial Items; 52.212-3 Offeror Representations and Certifications-Commercial Items; 52.212-4 Contract Terms and Conditions-Commercial Items; 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Items; 52.232-33 Payment by Electronic Funds Transfer- Central Contractor Registration; 52.233-1 Disputes in Solicitations and Contracts; 52.233-4 Applicable Law for Breach of Contract Claim; and 52.245-1 Government Property.
Offers shall be prepared in accordance with the attached solicitation. Failure to adhere to these instructions may render your offer unacceptable.
Questions to the solicitation are due via email by 10:00 AM ED on August 17, 2021. Questions submitted using any other method will not be entertained. Questions received after this date and time will not be entertained. All questions concerning this request for quote should be referred to Lauren Brauer, Contracting Officer via email at lauren_brauer@nps.gov.Offerors who contact anyone outside of the Office of Acquisition Management regarding this requirement, may automatically be excluded from competition.
Offers are due by 10:00 AM ED on August 27, 2021. Submissions must reference the solicitation number in the email subject line.
All offerors shall be registered in the System for Award Management (SAM) through the website SAM.gov to be considered eligible for award and shall be considered a small business for the size standard associated with the NAICS code.
mailto:lauren_brauer@nps.gov
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
0009060803 CODE 16. ADMINISTERED BYCODE
X
X
X
512110
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED ORPWA
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
08/27/2021 1000 ED
08/02/2021
2409975826Lauren Brauer (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
140P2121R0053
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 91 0040540554OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
Harpers Ferry WV 25425 IDC Building, 67 Mather Place NPS, Harpers Ferry Center
15. DELIVER TO
Denver CO 80225 P.O.Box 25287 MS WCP
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$35.00
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
NPS, WASO - WCP Contracting
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Selma to Montgomery National Historic Trail (SEMO)
This is a combined synopsis/solicitation for commercial items prepared in accordance with Sub-Part 12.6, as supplemental with additional information included in this notice.
The contractor shall provide all equipment, services, labor, and materials to perform audiovisual services to produce 100 ultra-high-definition (UHD) video interviews for
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
X
XX
DATED
Lauren Brauer
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 2/2012) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Selma to Montgomery National Historic Trail
(SEMO) in accordance with the specifications as detailed in this solicitation and its attachments.
Delivery: 10/01/2023
00010 Oral History Interviews
00020 Oral History Interviews - Travel
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
91 2 of
Solicitation Number 140P2121R0053
SCOPE OF WORK
100 ORAL HISTORY INTERVIEWS
SELMA TO MONTGOMERY NATIONAL HISTORIC TRAIL
I. BACKGROUND AND PURPOSE
Selma to Montgomery National Historic Trail was established by Congress in
1996 to commemorate the events, people, and route of the Selma to Montgomery
Voting Rights March of 1965. The 54-mile march from Selma, Alabama, to the state capitol in Montgomery culminated a journey of a hundred years by African
Americans to gain one of the most fundamental of American freedoms: the right to vote. Events associated with the march, and from what came to be known as
“Bloody Sunday,” sent shock waves around the world, raised the nation’s consciousness, and convinced political leaders that the time had come for voting rights legislation. The march was the major catalyst for passage of the Voting
Rights Act of 1965, which prohibited racial discrimination in voting. This act changed and continues to change the political, economic, and social fabric of
American society, and the march that inspired it remains one of the most significant civil rights protests in American history.
The National Historic Trail follows the actual march route, which began at Brown
Chapel African Methodist Episcopal Church near downtown Selma. From there, the trail crosses the historic Edmund Pettus Bridge—site of the event known as
“Bloody Sunday”—and follows US Highway 80 through Lowndes County to the steps of the Alabama State Capitol in Montgomery. The park has three visitor centers: the Selma Interpretive Center in Selma, the Lowndes Interpretive Center in White Hall, and the Montgomery Interpretive Center in Montgomery.
Since its establishment in 1996, the park has been engaged in an ongoing effort to document and record accounts of the Selma to Montgomery Voting Rights March from multiple perspectives—most importantly from people who directly participated in the march and the struggle for voting rights. The park has an existing collection of oral history interviews in a variety of formats, both audio and video. The park seeks to conduct 100 new oral history interviews—primarily with individuals who were directly involved in or eyewitness to the 1965 march— to supplement that collection. The interviews shall become part of the park’s permanent archives and shall be used in future interpretive and educational efforts.
Additional information about the park is available at www.nps.gov/semo.
The purpose of this contract is to provide all audiovisual services to produce 100 ultra-high-definition (UHD) video interviews for Selma to Montgomery National
Historic Trail in Selma, Alabama.
II. SCOPE AND OBJECTIVES
II.1 SCOPE OF WORK
The project shall be the production of 100 ultra-high-definition (UHD) video interviews for Selma to Montgomery National Historic Trail in Selma, Alabama.
A. General Requirements
The contractor shall provide all services, including labor, materials, equipment, facilities, fees, research, licensing, and travel necessary to produce all audiovisual media in accordance with the specifications as detailed in this contract and its attachments.
B. Specific Requirements
The contractor shall:
1. Provide the following personnel. Specific duties are listed in Section
II.2.B, Personnel.
a. One Project Manager
b. One Interviewer
c. One Cinematographer
d. One Sound Recordist
e. One Makeup Artist
2. Contact all interviewees and schedule all interviews as described in
Section II.2.C, Production Process and Section II.2.D, Technical
Specifications. The government shall furnish a list of interview candidates with contact information at the Post-Award
Videoconference.
3. Provide all equipment and supplies necessary for acquisition of required video footage, including professional grade 4K UHD video camera, lens, tripod, video monitor, audio equipment, lighting equipment, and backdrop. Equipment requirements are listed in
Section II.2.D, Technical Specifications.
4. Provide a venue to shoot the interviews in each of the five Alabama cities listed below. The contractor shall secure a suitable space such as a hotel suite, conference facility, or studio in each city to conduct the interviews. The government shall furnish a list of potential venues at the Post-Award Videoconference, but the contractor shall be responsible for booking the venues and paying all associated expenses.
Requirements for the venues are listed in Section II.2.D, Technical
Specifications.
5. Conduct and film a total of 100 interviews as described in Section
II.2.C, Production Process and Section II.2.D, Technical
Specifications.
a. The contractor shall shoot the interviews during four separate trips to Alabama. The number of shooting days and interviews per shoot shall vary depending on availability of interviewees in each location, but for budgeting purposes, bidders shall assume the following:
i. Selma, AL. This trip shall consist of seven 10-hour days, during which the contractor shall shoot approximately 25 interviews at a single location.
ii. Montgomery, AL. This shoot shall consist of seven 10-hour days, during which the contractor shall shoot approximately
25 interviews at a single location.
iii. Lowndes County, AL. This shoot shall consist of seven 10-hour days, during which the contractor shall shoot approximately 25 interviews at a single location.
iv. Marion and Camden, AL. This shoot shall consist of seven
10-hour days, during which the contractor shall shoot approximately 13 interviews at a single location in Marion, and approximately 12 interviews at a single location in
Camden.
b. The order and dates of the shoots shall be determined during the
Post-Award Videoconference (see Section II.2.C, Production
Process).
c. Each interview shall be approximately 60 to 90 minutes in duration, depending on the comfort level of the interviewee.
6. Pay an honorarium in the amount of $250 to each interviewee.
Payment shall be made by cash or check at the time of the interview session.
7. Provide accurate written transcriptions of each interview as described in Section II.2.D, Technical Specifications.
8. Submit all deliverables to the Contracting Officer’s Representative
(COR) as described in Section II.2.D, Technical Specifications.
II.2: SPECIFICATIONS AND SUBMITTALS
This contract includes the following specifications and required submittals as detailed below:
A. OVERALL SPECIFICATIONS:
1. Project Management
The contractor shall assign a Project Manager to oversee the contract. The
Project Manager shall:
a. Be the primary point of contact between the contractor and the
Contracting Officer (CO) and the Contracting Officer’s Representative
(COR).
b. Have full authority to act for the contractor on all matters.
c. Provide quality control to ensure that all elements of project work meet the requirements of the contract specifications as follows:
1) Provide routine inspections of ongoing work.
2) Inform the COR of any issues that could affect work quality or schedule.
3) Ensure that all work not acceptable or compliant with the specifications is corrected prior to review by the COR.
d. Track work progress to ensure that the project is completed according to the schedule. Coordinate and confirm the dates for all submittals and meetings with the COR.
e. Ensure that contractor staff adhere to the communication protocol set forth by the Contracting Officer (CO), as follows:
1) The contactor shall only communicate with the Contracting Officer and COR.
2) Unless otherwise specified by the COR, no direct contractor-to-park communication is permitted except during phone calls, meetings, or site visits arranged and attended by the COR.
f. Initiate, participate, and provide the agenda for monthly telephone conference progress meetings with the COR and, as needed, other
National Park Service (NPS) and contractor staff. The contractor shall provide a toll-free conference number for the calls. The contractor shall submit meeting notes to the COR no later than five business days after each meeting.
2. Format and Method for Submitting Deliverable Documents
a. All documents shall be submitted to the COR electronically via email, unless otherwise approved by the COR.
b. All documents shall be created in the latest version of Microsoft Word.
Documents shall be dated, with headers and page numbers.
c. Document file names shall include the park alpha code (SEMO), deliverable description, version number, and date submitted. File names shall use camel case when needed. Per best practices, no spaces or punctuation other than underscores shall be used.
Example: SEMO_ProductionPlan_v1_date.
3. NPS Release Form
The contractor shall obtain a signed release form from each interviewee at the time of the interview using Attachment A, NPS Release Form.
B. PERSONNEL
1. Project Manager and Interviewer
The Project Manager shall ensure that scheduling, coordination, overseeing, and managing are effectively accomplished for all work produced under this contract. The Interviewer shall conduct research on each interviewee, write interview questions, and conduct the interviews.
One person can serve as both Project Manager and Interviewer if they meet the required minimum qualifications for both roles as described in
Section XX.B(2), Factor B: Proposed Personnel. In addition to the duties describe above in Section II.2.A.1, Project Management, the Project
Manager and Interviewer shall perform the following work:
a. Participate in the Post-Award Videoconference as described in Section
II.2.C, Production Process.
b. Develop a Production Plan as described in Section II.2.C, Production
Process.
c. Contact all individuals on the government-furnished list of prospective interviewees to confirm their interest in participating and to schedule a date and time for their interview as described in Section II.2.C, Production Process. (NOTE: Prior to developing the list of interviewees, the government shall send an invitation to prospective candidates to explain the project and solicit their participation. Those who accept the invitation will be included on the government-furnished list.)
d. Conduct research on each interviewee prior to each shoot to become familiar with their role and connection to the Selma to Montgomery
March.
e. Develop a list of questions for each interview. The government shall furnish a preliminary list of interview questions at the Post-Award
Videoconference. The contractor shall refine these questions in order to capture the unique experiences and perspectives of each interviewee, based on the contractor’s independent research.
f. Scout and book the interview venues.
g. Schedule and coordinate video production personnel to ensure that all work is performed in accordance with contract requirements.
h. Coordinate the payment of honoraria to interviewees.
i. Obtain a signed release form from each interviewee at the time of the interview using Attachment A, NPS Release Form.
j. Conduct a total of 100 interviews as described below in Section II.2.C, Production Process and Section II.2.D, Technical Specifications.
k. Oversee the preparation of interview transcripts and proofread all transcripts for accuracy prior to delivery to the COR.
l. Oversee the preparation of deliverables. Inspect completed work prior to shipment or final inspection by the COR to ensure that the work meets the standards of quality specified in this contract.
2. Cinematographer
The Cinematographer shall perform the following duties:
a. Set up and operate a professional 4K ultra-high-definition camera system to record 100 interviews over the course of the project. Each interview shall be approximately 60-90 minutes in length.
b. Set-up and adjust 3-point lighting and backdrop for all interviews to match government-furnished interview samples.
c. Correctly adjust camera exposure and white balance according to lighting; ensure all footage is in sharp focus; consult with COR on framing prior to recording; adjust camera angle and framing between responses as directed by COR; avoid pans, zooms, and camera movements during interview responses except as needed to keep interviewee in focus and within frame; ensure lens is free from dirt and dust; avoid lens flares; use a tripod at all times.
d. Coordinate with the COR regarding color management settings and desired aesthetics and style of the production.
3. Sound Recordist
The Sound Recordist shall perform the following duties:
a. Record synchronous audio for 100 interviews over the course of the project. Each interview shall be approximately 60-90 minutes in length.
b. Set up and operate all audio equipment including wireless lavaliere microphones, shotgun microphones, microphone stands, cables, and field mixer.
4. Makeup Artist
The Makeup Artist shall perform the following duties:
a. Apply makeup to 100 interviewees over the course of the project.
Makeup shall be applied as needed to reduce shininess and to complement the natural appearance of each interviewee.
b. Provide makeup supplies appropriate for a variety of races, ethnicities, genders, and ages, including African Americans and senior citizens.
c. The Makeup Artist can be hired locally as needed to minimize travel costs.
C. PRODUCTION PROCESS
1. Post-Award Videoconference
a. The contractor shall participate in a two-hour post-award videoconference with the Contracting Officer, COR, and park staff.
Date and time shall be determined between the COR and contractor after award. At a minimum, the Project Manager and Interviewer shall participate in the call.
b. The contractor shall provide a toll-free videoconferencing service for the meeting.
c. The agenda shall include:
i. Orientation to key team members and the park.
ii. Review the Scope of Work, project schedule, and deliverables.
iii. Review and discuss interview themes, goals, and objectives.
iv. Review and discuss government-furnished list of prospective interviewees.
v. Review and discuss government-furnished list of preliminary interview questions.
vi. Discuss possible sources for background research.
vii. Review and discuss protocols for scheduling and conducting interviews, obtaining release forms, and paying honoraria.
viii. Review and discuss COVID-19 filming protocols.
ix. Review and discuss production and technical parameters.
x. Discuss potential filming venues and dates.
2. Production Plan
Within 30 calendar days after the Post-Award Videoconference, the contractor shall submit a Production Plan to the COR via email in the latest version of Microsoft Word. The contractor shall revise the
Production Plan as needed in response to comments by the COR. The
Production Plan shall include the following:
a. A summary the key points shared and decisions reached during the
Post-Award Videoconference.
b. A description of the contractor’s proposed approach and timeline for contacting prospective interviewees and scheduling the interviews.
c. A description of the proposed approach for conducting research on the interviewees, revising the interview questions, and conducting the interviews.
d. A description of the proposed technical approach for filming the interviews, observing COVID-19 filming protocols, paying honoraria to interviewees, and obtaining release forms.
e. Names and locations of proposed venues, to include photos of interview rooms and greenrooms.
f. Name(s) and qualifications of proposed Makeup Artist(s) for each location shoot.
g. List of all proposed production equipment.
h. A description of the proposed approach for transcribing the interviews and preparing the interim and final deliverables.
i. A production schedule with proposed dates for the four location shoots.
3. Research
The contractor shall be responsible for researching the topics to be discussed in the oral history interviews. The contractor shall acquire sufficient knowledge of the Selma to Montgomery Voting Rights
March of 1965, and of the biographies and accomplishments of each interviewee, to conduct in-depth interviews that elicit detailed, candid accounts of their personal experiences and reflections. The park has a limited collection of reference materials that shall be made available to the contractor upon request, but the contractor shall conduct independent research as necessary to prepare for the interviews.
4. Interview Scheduling
Upon approval of the Production Plan, the contractor shall:
a. Contact each person on the government-furnished list of interviewees to confirm their interest in participating, and to schedule a date and time for their interview. This process shall be accomplished in four phases to coincide with the four location shoots.
b. If an interview candidate declines or cannot be reached, the contractor shall immediately notify the COR, and the COR shall work with the park to identify a suitable replacement.
c. The contractor shall follow up with each interviewee at least one week but not more than 10 calendar days before the shoot to remind them of their appointment.
5. Interview Schedule and Questions
At least 30 calendar days prior to each location shoot, the contractor shall submit the following documents via email in the latest version of
Microsoft Word to the COR for review and approval. The contractor shall revise the documents as needed in response to comments by the
COR.
a. Interview Schedule. The Interview Schedule shall provide the date, time, and location for each interview; the name of each person to be interviewed; and a brief (100-word maximum) biography of each interviewee that describes their connection to the Selma-to-Montgomery story.
b. Interview Questions. The interview questions shall reflect the unique experiences and perspectives of each interviewee, based on the contractor’s independent research.
c. Crew Info. Travel and lodging information for all crew members, daily crew call times, and emergency contact numbers for crew members.
6. Interview Shoots
a. The contractor shall shoot the interviews during four separate trips to
Alabama. The contractor shall propose the dates, locations, and venues for each shoot as part of the Production Plan. The number of shooting days and interviews per shoot shall vary depending on availability of interviewees in each location, but for budgeting purposes, bidders shall assume the following:
i. Selma, AL. This trip shall consist of seven 10-hour days, during which the contractor shall shoot approximately 25 interviews at a single location.
ii. Montgomery, AL. This shoot shall consist of seven 10-hour days, during which the contractor shall shoot approximately
25 interviews at a single location.
iii. Lowndes County, AL. This shoot shall consist of seven 10-hour days, during which the contractor shall shoot approximately 25 interviews at a single location.
iv. Marion and Camden, AL. This shoot shall consist of seven
10-hour days, during which the contractor shall shoot approximately 13 interviews at a single location in Marion, and approximately 12 interviews at a single location in
Camden.
b. The contractor shall obtain a signed release form from each interviewee at the time of the interview, using Attachment A, NPS
Release Form. The contractor shall digitally scan each signed release form as a PDF file for delivery on hard drive as per Section II.2.E, Post-Shoot Deliverables. The contractor shall deliver the original signed release forms to the COR with the hard copy of the
Completion Report as described in Section II.2.F, Final Deliverables and Closeout.
c. The contractor shall observe current Centers for Disease Control
(CDC), state, and local COVID-19 guidelines and protocols at all times while on location for this project. Refer to CDC guidelines at https://www.cdc.gov/coronavirus/2019-ncov/communication/guidance.html, and Alabama state guidelines at https://www.alabamapublichealth.gov/covid19/. At a minimum, the following protocols shall be observed throughout the project:
https://www.cdc.gov/coronavirus/2019-ncov/communication/guidance.html https://www.cdc.gov/coronavirus/2019-ncov/communication/guidance.html https://www.alabamapublichealth.gov/covid19/
i. The contractor shall notify the COR immediately upon potential exposure and/or a positive COVID-19 test result for any crew member.
ii. The contractor shall designate backup crew member(s) should any crew member(s) test positive prior to travel to set.
iii. If a crew member tests positive for COVID-19, they may not report to set until they have received two negative test results and are cleared by their healthcare provider.
iv. Crew members shall wash hands or sanitize upon arriving on set, and after breaks and meals.
v. Crew members shall remain six feet apart from each other and from interviewees and government personnel except as approved by the COR.
vi. Crew members shall wear KN95 or N95 masks at all times while inside, and while directly interacting with other crew and/or talent.
vii. The contractor shall provide hand sanitizer, cleaning wipes, gloves, and spare masks for all crew members and interviewees.
viii. The contractor shall ensure that filming sites are cleaned and sanitized at the end of each day.
ix. Each piece of equipment shall be handled, assembled, and set up by only one crew member whenever possible.
x. Each time equipment changes hands, it shall be freshly sanitized. Equipment shall be periodically sanitized during each day on set.
xi. Filming venues shall be large enough to accommodate social distancing and shall have good ventilation and easy access to the outdoors.
xii. Camera, camera operator, and interviewer shall be positioned a minimum of six feet away from the interview subject when filming interviews.
xiii. Field monitor shall be positioned so that COR can view the monitor while maintaining a six-foot distance from interviewees and crew members.
xiv. Sound recordist shall disinfect lavalier microphones before the shooting day and between interviews, sealing them in new plastic baggies. The sound recordist shall give the baggies to interviewees through a contactless transfer whenever possible, and shall verbally instruct interviewees on the positioning of the microphones.
xv. Equipment shall be sanitized after each talent use.
xvi. Makeup artist shall wear KN95 or N95 masks and disposable gloves when interacting with interviewees. Face shields may also be worn but not as a replacement for masks. Gloves shall be replaced between interviews.
xvii. Makeup and supplies shall not be shared among interviewees.
7. Interim Deliverables
Within 30 calendar days of each shoot, the contractor shall provide one hard drive to the COR per the requirements in Section II.2.D, Technical
Specifications. The hard drive shall contain the following:
a. Original unedited, uncompressed 4K UHD footage of all interviews from that shoot
b. High-definition (1080p) MP4 proxy files of all interviews from that shoot
c. Transcripts of all interviews in the latest version of Microsoft Word
d. Scanned NPS Release Form for each interviewee in the latest version of Adobe PDF
e. Footage logs in Microsoft Word, Excel, or PDF format
D. TECHNICAL SPECIFICATIONS
1. Each interview shall be approximately 60-90 minutes in length, depending on the comfort level of the interviewee.
2. All interview questions shall be approved in advance by the COR. The interviewer shall ask open-ended questions designed to elicit detailed, candid, personal responses.
3. The interviewer shall not interrupt or talk over the interviewee in a way that would prevent their responses from being used as standalone soundbites in a documentary film.
4. The interviewer shall adhere to best practices for conducting oral history interviews as established by the Oral History Association
(http://www.oralhistory.org/about/principles-and-practices/), the
Smithsonian Institution (http://www.folklife.si.edu/the-smithsonian-folklife-and-oral-history-interviewing-guide/smithsonian), and the
Library of Congress American Folklife Center
(https://www.loc.gov/folklife/familyfolklife/oralhistory.html) http://www.oralhistory.org/about/principles-and-practices/ http://www.folklife.si.edu/the-smithsonian-folklife-and-oral-history-interviewing-guide/smithsonian http://www.folklife.si.edu/the-smithsonian-folklife-and-oral-history-interviewing-guide/smithsonian https://www.loc.gov/folklife/familyfolklife/oralhistory.html
5. All footage shall originate in Ultra-High-Definition (4K UHD, 3840 x
2160 resolution) using a professional camera and lens pre-approved by the COR.
a. Minimum of 13 stops of dynamic range
b. Minimum sensor size of “Super 35” or 35mm Full Frame
c. Camera raw file format
6. The contractor shall produce lower-resolution (high definition 1080p)
MP4 proxy files—either synchronous in camera or by using a post-production process—that can be played using the latest version of
QuickTime Player.
7. The frame rate shall be 23.97P.
8. The camera shall be mounted on a sturdy tripod with fluid head at all times.
9. All interviews shall be professionally lit using three-point soft lighting against a solid black backdrop to match the look of the government-furnished interview sample. No furniture shall appear in the shots, including the chair that the interviewee sits in. The contractor shall provide a black director’s chair or similar for interviewees if a suitable chair is not available at the venue.
10. Audio shall be recorded using a lavaliere microphone on the interviewee
(but not visible in the shot) and a boom shotgun microphone aimed at the interviewee. Audio from the two microphones shall be recorded on separate channels. Audio from the interviewer shall be clearly audible from the shotgun mic and/or the lavaliere for transcription purposes.
11. The equipment package for each shoot shall include:
a. One professional 4K ultra-high-definition camera
b. Media cards and batteries (sufficient quantity for ten hours of filming and sound recording per day); battery charger(s); cables
c. Laptop computer for downloading footage with capability to review dailies
d. External hard drive(s) for footage backup
e. One professional tripod with fluid head
f. Zoom lens to accommodate medium to close-up shots
g. One high-definition field monitor
h. Dimmable LED (Light Emitting Diode) lighting kit with stands, reflectors, flags, and diffusion material.
i. Lavaliere and shotgun microphones; microphone stands; cables;
field mixer.
j. Solid black backdrop with stands.
12. All interview venues shall be quiet and acoustically “dead” (i.e. with carpeting, drapes, and/or other sound-absorbing materials), with adjustable temperature and lighting controls. The venue shall be large enough to accommodate social distancing and shall have good ventilation and easy access to the outdoors. The venue shall have an adjacent or nearby greenroom where arriving interviewees can await their recording session. The venue and greenroom shall be accessible for people with mobility impairments, including those who use wheelchairs.
The venue and greenroom shall be sufficiently separated or acoustically isolated so that chatter from the greenroom is not audible during interview recording.
13. Approval or rejection of the contractor’s work shall first occur on-site during location filming. The COR shall be present during the film shoots and shall review the footage on-location to ensure that the government’s requirements are being met.
14. Interview transcripts shall be produced in the latest version of Microsoft
Word. Transcripts shall include the full name of the interviewee and interviewer, the date and location of the interview, and timecode reference numbers at the beginning of each question and each response.
Word files shall be labeled as follows:
SEMO_Lastname_Firstname_Transcript.docx
E. POST-SHOOT DELIVERABLES
1. The contractor shall back up all digital files on a minimum of three redundant hard drives for each shoot.
a. Hard drives shall be industry-standard USB-3, USB-C or faster connection.
b. Hard drives shall be 7200rpm (revolutions per minute) or higher.
c. Total space used shall not exceed 75% percent of the hard drive space (for example, a 10TB drive shall only carry 7.5TB of data)
d. All power and connector cords shall be provided.
e. Two of the three hard drives shall be formatted for Apple File
System (HFS+).
f. One of the three hard drives shall be formatted for Microsoft NTFS.
g. Encryption is required on all hard drives. Encryption software shall be approved by the COR prior to compiling the hard drives.
h. Two of the three hard drives shall be encrypted for Mac (FileVault).
i. One of the three hard drives shall be encrypted for PC (Bitlocker).
j. Hard drives and boxes shall be physically labeled as follows:
i. Park alpha code (SEMO)
ii. Project Number (AV-0099)
iii. Drive sequence number (i.e. Drive 1 of 3)
iv. Description of contents
2. The contractor shall ship one of the Mac-formatted hard drives to the
COR for review and approval no later than 30 calendar days after completion of each shoot.
3. The contractor shall deliver the remaining two hard drives as part of the final deliverable package.
4. In addition to the three required hard drives, the contractor shall back up all digital files to a minimum of two physical locations and shall ensure the safety of all assets until the final deliverables are submitted and accepted.
5. After each shoot, the contractor shall deliver the following files to the
COR on one of the Mac-formatted hard drives:
a. Original unedited 4K UHD video files in native camera file format or uncompressed QuickTime ProRes. All files shall have unique file names, and the file name shall include the park alpha code (SEMO).
b. MP4 proxy files at 1080p (produced synchronously in camera or using a post-process) for playback using standard office software such as Quicktime Media Player.
c. Interview transcripts in the latest version of Microsoft Word
d. Scanned NPS Release Form for each interviewee in the latest version of Adobe PDF
e. Footage logs in Microsoft Word, Excel, or PDF format to include the following information:
i. Date of filming
ii. Location of filming
iii. File name
iv. Brief description of each file (i.e. “Interview with Jane Doe, part 1 of 3”)
v. Duration of each file
vi. Camera used
vii. Type of audio recorded
viii. Other information pertinent to identifying the footage
ix. Identification of interviewees and interviewer
x. Thumbnail image of each interviewee
F. FINAL DELIVERABLES AND CLOSEOUT
Upon completion of the project, the following Final Deliverables shall be submitted to the COR:
1. Four Mac-formatted hard drives (one from each shoot) containing the files listed in Section II.2.E, Post-Shoot Deliverables.
2. Four PC-formatted hard drives (one from each shoot) containing the files listed in Section II.2.E, Post-Shoot Deliverables.
3. Completion Report (See Attachment B – Requirements for Completion
Report)
a. The contractor shall deliver one hard copy of the Completion Report in a three-ring binder which shall include all original signed release forms.
b. The contractor shall deliver one digital copy of the Completion
Report to the COR via email or electronic file transfer in the latest version of Microsoft Word. File formats for attachments are specified below.
c. The descriptions of the required attachments are revised as follows:
i. Attachment A: Release Forms. All original signed release forms shall be provided in the hard-copy binder. All scanned release forms shall be included in the digital copy as individual
PDF files.
ii. Attachment B: Source Material List. Not required
iii. Attachment C: Credits. Not required
iv. Attachment D: Final Scripts. This attachment shall include all interview transcripts, in alphabetical order by last name. Digital copies of transcripts shall be provided as Microsoft Word documents.
v. Attachment E: Sequence Information. Not required
vi. Attachment F: Original Footage and Sound Logs. This attachment shall include the footage logs from each of the four shoots as described in Section II.2.E, Post-Shoot Deliverables.
Digital copies of footage logs shall be provided in Microsoft
Word, Excel, or PDF format.
vii. Attachment G: Music Cue Sheet. Not required
III. INVOICING
Electronic Invoicing and Payment Requirements - Invoice Processing
Platform (IPP) (May 2016)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and
Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: none
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of
Contact (as listed in SAM) will receive enrollment instructions via email from the
Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
IV. PERIOD OF PERFORMANCE (POP)
All work, including review and approval, shall be completed on or before
October 1, 2023.
V. REVIEW AND APPROVAL
The COR shall notify the contractor, in writing, of approval or rejection of the work within 20 business days. For each deliverable, multiple drafts may be https://www.ipp.gov/ required until approved by the COR and shall be accounted for in the project schedule. Any additions or corrections shall be completed within 15 business days. For each revised deliverable, the COR shall have 20 business days to approve or reject the new deliverable.
VI. CONTRACT TYPE
The NPS anticipates awarding a firm fixed price contract.
VII. TRAVEL
In accordance with Public Law 99-234, "Federal Civilian Employee and
Contractor Travel Expense Act of 1985", travel-related expenditures for
Contractor's personnel are restricted to the limits established for federal employees. This includes mileage for company-owned vehicles.
The Contractor shall travel as required to support program tasks. All travel arrangements are to be made by the Contractor. Payment for transportation, per diem, mileage, parking, and other fair and reasonable travel expenses will be paid in accordance with the effective Federal Travel Regulations as amended and supplemented by the Department of the Interior travel regulations where applicable. No Federal travel authorizations are to be issued. The Contractor shall make every effort to keep travel costs to a minimum. No reimbursement will be made for parking at a Contractor's normal place of work. No overhead, profit or G&A shall be allowed on travel costs.
Travel costs shall be reimbursed in accordance with the Federal Travel
Regulations. Travel is only funded to the extent specified within the travel
CLIN. The contractor shall not incur any travel costs in excess of the amount funded within the travel CLIN. The Government shall not be liable for any travel related costs incurred by the contractor which are in excess of the total amount funded within the travel CLIN.
If the contractor has reason to believe they may exceed the amount funded on the travel CLIN, they shall notify the Government Contracting Office immediately. Additional funding may only be added to the travel CLIN through a formal signed modification issued by a Government Contracting Officer. Profit, fee, G&A or overhead may not be incurred on travel costs.
VIII. DELIVERABLES AND DESTINATION POINT
1. The contractor shall deliver the following:
A. Production Plan, and Response to COR comments
B. Interview Schedule and Questions for Shoot #1, and Response to COR comments
C. Post-Shoot Deliverables for Shoot #1, and Response to COR comments
D. Interview Schedule and Questions for Shoot #2, and Response to COR comments
E. Post-Shoot Deliverables for Shoot #2, and Response to COR comments
F. Interview Schedule and Questions for Shoot #3, and Response to COR comments
G. Post-Shoot Deliverables for Shoot #3, and Response to COR comments
H. Interview Schedule and Questions for Shoot #4, and Response to COR comments
I. Post-Shoot Deliverables for Shoot #4, and Response to COR comments
J. Final Deliverables, and Response to COR comments
1) Four Mac-formatted hard drives (one per shoot)
2) Four PC-formatted hard drives (one per shoot)
3) Completion Report
2. The contractor shall ship the deliverables to the following destination:
National Park Service
[Name of COR]
Harpers Ferry Center
IDC Building
P.O. Box 50 / 67 Mather Place
Harpers Ferry, West Virginia 25425
IX. GOVERNMENT-FURNISHED PROPERTY
The government shall furnish the following items to the contractor via encrypted hard drive prior to the Post-Award Videoconference. The contractor shall return the hard drive to the COR within 30 calendar days of receipt.
1. List of interview candidates with contact information
2. List of potential filming venues
3. Oral history interview samples
X. CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM
NOTICE TO CONTRACTORS
Contractor Performance Assessment Reporting System (December 2015)
A. FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System
(CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
B. The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval
System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
C. We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 calendar days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO).
Information in the report must be protected as source selection sensitive information not releasable to the public.
D. When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
E. Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.cpars.gov/ https://www.cpars.csd.disa.mil/ https://www.cpars.gov/
1. Contractor resentatives may then provide comments in response to the evaluation, or return the evaluation without comment.
2. Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
3. All information provided should be reviewed for accuracy prior to submission.
4. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and
Close the Evaluation”.
5. Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in
PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
6. If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
F. The following guidelines apply concerning your use of the past performance evaluation:
a. Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b. Strictly control access to the evaluation within your organization.
Ensure the evaluation is never released to persons or entities outside of your control.
c. Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
G. If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
H. A copy of the completed past performance evaluation will be available in
CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
XI. ADDITIONAL WORK
Any additional work not detailed in this contract shall be approved, in writing, by the Contracting Officer via a bilateral modification.
XII. LOSS OR DAMAGE
The contractor shall be liable for any loss or damage to any government property caused by negligence, theft, or willful misconduct of the contractor, his agents, servants, and employees, and shall indemnify and save the government harmless against all actions, proceedings, claims, demands, costs, damages, and expenses, including attorney’s fees, by reason of any suit or action brought for any actual or alleged injury to or resulting from the performance of this contract.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .