Sol_140L4325Q0104.pdf
PDF 557 KB Posted
- Attached to
- ESR NORTH BROADCAST SEEDING VDO Federal contract opportunity
- Solicitation number
- 140L4325Q0104
About this file
This is a Request for Proposal (RFP) for broadcast seeding services issued by the Bureau of Land Management (BLM) Vale District Office in Oregon. The solicitation (No. 140L4325Q0104) seeks a contractor to perform aerial broadcast seeding of native herbaceous seeds across three fire-affected areas in Baker and Malheur Counties: Coyote (1,025 acres), Thompson (1,243 acres), and Durkee (8,918 acres), totaling 11,186 acres.
The contract is a firm fixed-price commercial service with a performance period from November 17, 2025 to March 28, 2026. The government will provide all seed materials, and the contractor is responsible for aerial application using equipment capable of precisely distributing seeds across steep, rocky terrain with slopes exceeding 30%. The solicitation is set aside as 100% small business, with evaluation factors including technical approach, relevant experience, past performance, and price. The estimated seed quantities include various native grass and plant species such as bluebunch wheatgrass, Snake River wheatgrass, bottlebrush squirreltail, and Wyoming sagebrush, totaling approximately 297,210 pounds of seed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A04_VDO_ESR_North_Aerial_Seeding_2025_SOW_20250723_REVISED_0001.docx | DOCX document | |
| Sol_140L4325Q0104_Amd_0001.pdf | ||
| Thompson_Native_Broadcast_Seeding_Map_1243ac.pdf | ||
| Coyote_Native_Broadcast_SeedingMap_1025ac.pdf | ||
| Durkee_Native_Boradcast_Seeding_SE_20250722.pdf | ||
| Durkee_Native_Broadcast_Seeding_ALL_20250722.pdf | ||
| Durkee_Native_Broadcast_Seeding_NW_20250722.pdf | ||
| B03_Service_Contract_Act_Wage_Determination_2015-5589_Baker_County__OR.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
LHA
PORTLAND OR 97204
1220 SW 3rd Avenue, 12th Floor
BLM OR-ST OFC PROC MGMT BR(OR952)
0011276562 CODE 16. ADMINISTERED BYCODE
X
X
X
115310
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED ORLHA
REQUEST FOR
PROPOSAL
(RFP)
INVITATION
FOR BID (IFB)
10. THIS ACQUISITION ISCODE
REQUEST FOR
QUOTE (RFQ)
14. METHOD OF SOLICITATION
13b. RATING
NORTH AMERICAN INDUSTRY
CLASSIFICATION STANDARD
(NAICS):
SMALL BUSINESS
08/14/2025 1700 PD
07/25/2025
(503)808-6739Kevin Cochran (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
140L4325Q0104
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 74 OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
VALE OR 97918
102 WAREHOUSE OREGON STREET
BLM-OR VALE DISTRICT OFFICE*
15. DELIVER TO
PORTLAND OR 97204
1220 SW 3rd Avenue, 12th Floor
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$11.5
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FREE ON BOARD
(FOB) DESTINATION UNLESS
BLOCK IS MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS THIS CONTRACT IS A RATED
ORDER UNDER THE DEFENSE
PRIORITIES AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
8(A)
BLM OR-ST OFC PROC MGMT BR(OR952)
WOMEN-OWNED SMALL
BUSINESS (WOSB)
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Contracting POC: Kevin J. Cochran kjcochran@blm.gov, 503-808-6739
VENDOR POC: ________________________________
VENDOR TELEPHONE: __________________________
VENDOR EMAIL ADDRESS: ______________________
VENDOR UEI NUMBER: _________________________
Delivery: 03/28/2026
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
DATED
Matthew Duane
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Government Use Only)
OFFER
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT: REFERENCE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 11/2021) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Period of Performance: 11/17/2025 to 03/28/2026
00010 BROADCAST SEEDING SERVICES
Product/Service Code: F002
Product/Service Description: NATURAL
RESOURCES/CONSERVATION- AERIAL SEEDING
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
74 2 of
ESR NORTH BROADCAST SEEDING, VALE, OR SOLICITATION NO. 140L4325Q0104
BLM VALE DISTRICT OFFICE Page 3 of 74
SECTION B – SERVICES AND PRICES
This requirement is for one(1) Firm Fixed Price Commercial Services Contract for Broadcast Seeding in Baker & Malheur Counties, Oregon.
BASE
Item no. Item Description Quantity Unit of
Measure Unit Price Total
00010 Coyote Native *1,025 AC $ $ 00020 Thompson Native *1,243 AC $ $ 00030 Durkee Native *8,918 AC $ $
GRAND TOTAL –
*Estimated Quantity AC = Acre
PERIOD OF PERFORMANCE: See Section F.
(End of Section B)
BLM VALE DISTRICT OFFICE Page 4 of 74
SECTION C – STATEMENT OF WORK
BUREAU OF LAND MANAGEMENT – Vale District Office Performance Statement of Work
ESR North Aerial Broadcast Seeding
1.1. Description of Services/Introduction: The Vale District Office, Bureau of Land Management (BLM) is acquiring services for seed applications within both Baker and Malheur Counties. The project will be to aerially broadcast seed portions of the Coyote, Thompson, and Durkee fires in 2025 and 2026. Seeding methods used will leave no trace of track or footprint. The Government shall furnish all required seed. Except as otherwise specified herein, the Contractor shall furnish all labor, equipment, tools, materials, supervision, supplies, and incidentals; and perform all work necessary to complete applications in accordance with the specifications provided. The Contractor shall service and maintain such equipment as necessary to maintain satisfactory progress on the work.
1.2. Background: The North ESR Aerial Seeding is a broadcast seeding treatment consisting of 15,298 acres at three (3) different fire locations. The treatment areas consist of sagebrush steppe habitat that has been previously disturbed (wildfire) and is primarily comprised of native and introduced herbaceous vegetation with widely scattered low stature (<8” tall) native shrubs.
Vegetation within the treatment area is typical of the Great Basin and consists primarily of bluebunch wheatgrass and Wyoming big sagebrush along with other native vegetation. The topography of the project area consists of steep hillslopes with associated basalt bluffs and desert playas with elevations ranging from 2,500 to over 5,500-ft above sea level. Slopes within the seeding areas are generally more than thirty percent and are not traversable with agricultural tractors.
1.3. Objectives: The objective of this service is to successfully establish fire tolerant perennial grasses into the designated seeding project areas. Broadcast seeding of the herbaceous seed shall be performed in a uniform fashion across the entirety of the project area.
1.4. Scope: The objective of this treatment is the planting of native herbaceous seed on 1,025 acres of rangeland within the Coyote fire, native herbaceous seed on 1,243 acres of rangeland with the Thompson fire, and native herbaceous seed on 8,918 acres within the Durkee fire. Seed shall be applied at the rates designated in the Work Data Sheet or as directed by the COR.
Line-Item Number Description Estimated Quantity Unit of Issue 0001 Coyote Native 1,025 Acres 0002 Thompson Native 1,243 Acres 0003 Durkee Native 8,918 Acres
1.5. Period of Performance: Application operations will begin on or after November 17, 2025, as soon as weather and ground conditions are favorable. The Contracting Officer’s Representative (COR) will notify the contractor that favorable conditions have been met, and the contractor
BLM VALE DISTRICT OFFICE Page 5 of 74 shall be prepared to commence application operations within 3 calendar days of notification.
The Contractor shall complete operations within 132 calendar days once the application is initiated. This period of performance includes set up, cleanup, and mobilizing equipment between sites. This application may coincide with the early snowfall and/or poor weather and site conditions. During the contract and application period, county, state and BLM jurisdiction roads and remote airstrips may not be suitable for staging areas due to muddy, wet, or snow-covered conditions.
Estimated Start Date: November 17, 2025 Estimated End Date: March 28,2026
1.6. General Information
1.6.1. Hours of Operation: Seed Application Operations will be permitted only during daylight hours. The Contractor will be allowed to work six days per week including Saturdays.
Work will not be permitted on Sundays and holidays, unless authorized by the COR.
1.6.2. Federal Observed Holidays: In addition to any holidays declared by Executive Orders, the following Federal Legal Holidays are observed: New Year’s Day, Martin Luther King Jr. Day, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day.
1.6.3. Place of Performance: The Coyote fire project area is located within Baker County, Oregon and is south of Richland, OR. Access to the site is from State Highway 86 to Sass Road, to Snake River Road. The Thompson fire project area is located within Baker County, Oregon and is east of Durkee, OR. Access to the site is from north on Vandecar Road for main access and eastside access on Manning Creek Road. The Durkee fire project area is located within Malheur County, Oregon and is north of Vale, OR. Access to the site is from State Highway 26 to 5th Ave to Old Oregon Trail Road to McCarthy Ridge Road for the southern polygons and I-84 to Malheur Lane to Benson Creek Road for the northern polygons. All work will be performed on land administered by the BLM.
General-purpose maps will be included with the solicitation to give the minimum information needed for a Contractor’s project bid. Once the project is accepted by the Contractor, final project maps will be provided by Government. See location map for the general location of project area and access.
1.6.4. Access: Legal public access to the project area will be identified on the map prior to the Contractor beginning implementation. Access to the project area and specific units is via unsurfaced low maintenance and/or primitive roads. Roads are passable with a large 4-wheel drive vehicle; however, winter weather conditions may make these roads inaccessible by vehicle. Contractor is responsible for coordinating access across and use of private land and facilities. If roads or any type of access become subject to damage, because of adverse weather conditions or other natural and or political reasons, the Contracting Officer's Representative (COR) will relay information to the Contractor, and
BLM VALE DISTRICT OFFICE Page 6 of 74 a Stop Work Order may be implemented by the Contracting Officer (CO) until other access can be decided.
1.6.5. Pre-work Conference: A pre-work conference will be held prior to the commencement of work. The Contractor will be notified in advance of meeting time, date, and place. The purpose will be to review the required work, specifications, payment, and administrative provisions of the contract. The Contractor and the persons responsible for coordination for the work (Contractor Representative/Foreman) shall be present at the meeting. The Contractor shall be prepared to summarize and explain procedures planned for the project and provide written work progress plan and a schedule to meet the time frames of the project. This work schedule must be acceptable to the Government. At a minimum, the schedule should reflect a work progress rate equal to the available amount of contract performance time. The unit sequence work schedule will be determined by the COR at the prework conference and may be subject to change because of normal variations in weather conditions at no change in the contract time or price.
1.6.6. Invoicing: Invoices shall be submitted through IPP for payment, after services have been performed with supporting invoice on company letterhead and referenced purchase order number. Unit Costs offered must be “All-Inclusive” for materials, labor, transportation, surcharges, fees, and services necessary and incidental to seed application. Invoices shall reflect only those costs indicated in the Price Schedule. All expenses relating to maintenance and operation of equipment shall be considered in the inclusive pricing. The Contract will be considered completed and payment due when all seed furnished to the Contractor by the Government has been seeded to the standards specified above; or when all areas designated under the contract have been seeded to the said standards.
Measurement for payment for seeding will be the actual area, in acres, within the designated boundaries satisfactorily seeded in conformance with these specifications.
Measurement will be made from the ArcGIS polygons provided by the government.
Acreages will be computed from horizontal distances as shown on maps. Payment will be made at the unit price per acre specified in the Pricing Schedule and shall include the cost of all work described in this paragraph and the Detailed Specifications, including any re-seeding, if such work is required. Acreages will not be computed from DGPS acreages covered. The Contractor must factor in additional seeding application time required for coverage of the polygons, complete seeding, and any contour application that may be required to properly cover the area.
1.6.7. Project Boundary Marking: The location and access to the unit(s) are shown on the project area map. The unit boundaries will not be identified by flagging, it will be up to the contractor to identify and verify boundaries in the field using maps and electronic devices to stay within the unit(s).
1.6.8. Cultural Considerations: Because cultural resources may be present in the area, project activities and any other action which causes disturbance to the earth's surface, shall be limited to those areas approved by the BLM. If, in connection with operations under this contract, the Contractor, subcontractors, or the employees of any of them, discovers, BLM VALE DISTRICT OFFICE Page 7 of 74 encounters or becomes aware of any objects or sites of cultural value on the project area, such as historical or prehistorical ruins, graves or grave markers, fossils, or artifacts, the Contractor shall immediately suspend all operations in the vicinity of the cultural value and shall notify the COR in writing of the findings. The Contractor shall insure that they, their employees, or their representatives do not collect or disturb historic or prehistoric artifacts in accordance with the Archaeological Resources Protection Act (43 CFR 7).
1.6.9. Safety Hazards: Any ground or aerial hazards that would pose a danger to the Contractor’s personnel or operating equipment must be identified and mitigated by the Contractor prior to commencing operations.
1.6.10. Notification of Cessation or Restart of Work: The Contractor will have personnel on project site prior to commencing daily application, during application, and will notify Contracting Officers Representative (COR) or Project Inspector (PI) of changing weather conditions. The COR/PI will allow Contractor to continue or stop application if weather factors dictate. The COR/PI will give permission to start approximately one (1) hour from notification of conditions, depending on location of the project from the Vale District Office.
1.6.10.1. Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions or fire danger. The Contractor will be given a resume work order which will document the date the work suspension ends. An allowance has been included in the contract time for short-term environmental delays up to 1-day at a time. The count of contract time will therefore continue during work interruptions of 1-day or less, but the count of contract time will stop during work interruptions in excess of 1-day at a time. All periods of interruptions directed by the Government will be documented. The Contractor will not be entitled to additional monetary compensation for such suspensions regardless of duration.
1.6.10.2. Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, or Federal candidate (Category 1 and 2), sensitive or State listed species, identified under BLM Manual 6840, are discovered to be present in or adjacent to the project area. Actions taken under this paragraph shall be subject to the Suspension of Work clause in Section I, FAR 52.242-14.
1.6.11. Personnel Requirements: The Contractor must always maintain an adequate work force to ensure timely completion of the work and is responsible for the crew knowing the requirements of the contract. The crew is also responsible for maintaining a safe working environment following OSHA standards.
1.6.11.1. Key Personnel: The following personnel are considered key personnel by the Government: A Contractor Representative must be on-site always directing work.
BLM VALE DISTRICT OFFICE Page 8 of 74
This person must be fluent in English and will also serve as an on the ground contact person for the COR/PI. Failure to maintain a Contractor Representative will result in suspension of work until an acceptable on-the-ground Contractor Representative is provided. A maximum of five (5) days will be allowed to produce a qualified Contractor Representative. Failure to do so within five days may result in the Contracting Officer (CO) issuing a Suspend Work Order. CO and COR must be informed of any changes of Contractor Representative. The contractor will furnish a legible list of all contract employees (last name, first name) to the assigned COR. If there are any changes to the list of contract employees during the life of the contract a new list will be provided to the COR.
1.6.11.1.1. Applicators: Shall be furnished by the Contractor and shall be experienced in applying seed in rough, rocky, or mountainous terrain, all equipment, labor, supplies, and materials required to complete the job.
1.6.11.1.2. Work Crew: Shall be furnished by the Contractor for handling, loading, and applying the seed. The Contractor shall furnish the necessary qualified mechanics for maintenance of equipment and shall furnish all fuel, oil, and service required for operation of equipment and vehicles.
1.6.12. Camping: Camping on agency-administered lands will only be allowed on site(s) pre-approved by an authorized officer. Camping areas for crews will be identified and surveyed for cultural resources prior to use of that camp location. The Contractor shall maintain all camping areas in an orderly and sanitary manner. The ordering and maintenance of portable toilets and dumpsters is the responsibility of the contractor. All fire regulations and restrictions shall be followed. All garbage and refuse shall be removed from the camp site(s) by the Contractor and disposed of offsite before final payment is made.
1.6.13. Risk and Damages: The Contractor shall assume all risks in connection with performance of the contract and shall be liable for any damages to persons or property in connection with the prosecution of the work, including the applicator or other employees of the Contractor.
1.6.14. Security of Equipment: The Contractor may leave its equipment at the work site;
however, the Contractor shall be responsible for the equipment if it should be lost, stolen, or damaged.
1.6.15. Regulations: The Contractor shall comply with all applicable Federal, State, and local regulations.
1.6.16. Restoration of Resources: Cleanup - The Contractor is responsible for cleaning up all camp and worksites before leaving the area. Final payment may be withheld until the Contractor has complied with this requirement.
BLM VALE DISTRICT OFFICE Page 9 of 74
Access Roads - Public or private access roads damaged by the Contractor shall be restored, at his expense, to the same condition they were in at the commencement of work.
1.6.17. Fire Danger: If the COR allows the Contractor to continue work during periods of Closed Fire Season, the Contractor shall comply with all applicable State laws relating to fire prevention and with all special conditions of work as directed by the COR.
1.6.18. Improper Disposal of Government-Furnished Material: Improper disposal includes, but is not limited to, the wrongful ditching, hiding or burying of Government-Furnished Material (GFM). The Government may, by issuance of a written order, suspend the Contractor’s right to proceed for improper disposal of GFM. The Contractor may be required to remove from the contract site any individuals involved in the improper disposal of GFM.
2. Definitions
2.1. Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.2. Contracting Officer (CO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.3. Contracting Officer’s Representative (COR): An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such an appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have the authority to change the terms and conditions of the contract.
2.4. Deliverable: Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
2.5. Equipment: A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale and does not ordinarily lose its identity or become a component part of another article when put into use. Equipment does not include material, real property, special test equipment or special tooling.
2.6. Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it
BLM VALE DISTRICT OFFICE Page 10 of 74 does not have a firm commitment from the persons that are listed in the proposal. The prime contractor is responsible for the performance of all subcontractors.
2.7. Quality Control: All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.8. Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.9. Safety Hazards: Any ground or above ground hazards that would pose a danger to the Contractor’s personnel or operating equipment must be identified and mitigated by the Contractor prior to commencing operations.
3. Government Furnished Property and Services
3.1. The Government will provide the following items to the Contractor:
3.1.1. The Government will provide Contractor receiving award with an electronic file containing the Global Positioning System (GPS) coordinates of seeding boundaries that will be determined post burning.
3.1.2. The Government will furnish all seed required for the contract. The Government shall be responsible for loading and hauling the Government furnished seed from the field office to the work site. The seed will be stored in a government furnished trailer.
3.1.2.1. Seed provided:
3.1.2.1.1. Coyote fire area – Snake River wheatgrass (Secar) 11,000 pounds, Western wheatgrass (Arriba) 1,500 pounds, Western wheatgrass (Recovery) 1,500 pounds, bottlebrush squirreltail (Vale) 1,500 pounds, arrowleaf balsamroot 200 pounds, Wyoming sagebrush 200 pounds. Total 15,900 pounds of seed/318 bags (approximate). Seed will be provided in 50-pound bags.
3.1.2.1.2. Thompson Native fire area – bluebunch wheatgrass (Anatone) 11,000 pounds, Snake River wheatgrass (Arriba) 2,000 pounds, Sandberg bluegrass (Vale) 1,000 pounds, bottlebrush squirreltail (Vale) 2,000 pounds, Wyeths buckwheat 150 pounds, Wyoming sagebrush 200 pounds. Total 16,350 pounds of seed/327 bags (approximate). Seed will be provided in 50-pound bags.
3.1.2.1.3. Durkee Native fire area – bluebunch wheatgrass (Anatone) 117,050 pounds, Snake River wheatgrass (Secar) 106,950 pounds, big bluegrass (Sherman) 6,000 pounds, Western wheatgrass (Recovery) 8,500 pounds, slender wheatgrass (Pryor) 8,500 pounds, bottlebrush squirreltail (Vale) 13,500 pounds, Wyeths buckwheat 100 pounds, Wyoming
BLM VALE DISTRICT OFFICE Page 11 of 74 sagebrush 3,560 pounds. Total 264,960 pounds of seed/5,299 bags (approximate). Seed will be provided in 50-pound bags.
3.1.3. Provide various USGS 7.5-minute quadrangles (1:24,000 scales) or GIS equivalent with clear cut project area boundaries clearly identified.
3.1.4. Provide GIS shapefiles of the polygons that are to be seeded.
3.1.5. A georeferenced map file (shapefiles) will be provided that delineates the treatment perimeters. The Contractor must have a smart device capable of accepting and displaying georeferenced map files (shapefiles), such as, but not limited to, Avenza.
3.1.6. A list of contacts, including emergency contacts, will be provided at the pre-work meeting.
4. Contractor -Furnished Items and Services
4.1. Equipment Requirements
a. The Contractor will furnish all tools, labor, supervision, equipment, materials (excluding seed), supplies, transportation, training, and incidentals necessary to accomplish the task in accordance with the specifications provided within the designated performance time.
b. The Contractor shall provide a communication system so that contractor personnel engaged in the project at different locations can communicate at all times with each other and so that BLM PI is provided at all times with an effective, reliable two-way communication in real time so that PI(s) may communicate with the contractor at any time to discuss performance matters. [If contractor chooses to use BLM-compatible radios, by DOI policy, BLM radios must be P25-compliant VHF-FM. Transceiver must provide selection of narrowband analog (12.5kHz) or narrowband digital (12.5kHz) operation on a minimum of 100 channels.]
c. All equipment staging and loading or material transfer sites shall be at least 100 feet away from any perennial or intermittent streams.
d. Seed Application Equipment - The Contractor shall evenly distribute the designated seed at the rates specified. Equipment that cannot perform the specified work shall be modified or replaced by the Contractor within two calendar days. Application equipment shall be equipped for carrying seed with distribution mechanism including release, shutoff, and spreading device which
BLM VALE DISTRICT OFFICE Page 12 of 74 can be calibrated for spreading seed at the prescribed rate in an acceptable manner and uniform pattern. Seed application equipment shall include lids/covers which fasten securely to prevent seed from blowing out.
e. Global Positioning System – All seed application equipment furnished by the Contractor shall be capable of electronically mapping application routes to ensure seed is applied evenly and completely and at the specified rates.
f. Transporting, Passengers and Equipment - Only approved Contractor personnel, Contractor equipment, and Government-provided equipment and materials required for performance of the required seeding will be transported by Contractor vehicles, trailers, animals or equipment.
4.1.1. The Government will have the option to inspect the Contractor's equipment and work before, during, and after completion of this contract.
4.1.2. Application Equipment:
4.1.2.1. Applicators: The Contractor shall furnish the necessary equipment with adequate horsepower to accomplish the seeding requirement within the time limits specified by the government. Contractor is required to demonstrate to the Government that the application equipment can be calibrated and will evenly distribute the designated seed at rates specified during the pre-work meeting.
4.1.2.2. Implements: The Contractor shall furnish the necessary implements to accomplish treatment requirements (rangeland broadcast seeding) within the time limits specified by the government.
4.1.2.3. Motor Vehicles, Trailers, and Transports: The Contractor shall furnish motor vehicles for hauling equipment and personnel to and from the worksite.
The Contractor shall not load or unload equipment on public highways unless authorized by the COR.
4.1.3. Mobilization: Includes all preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies, and incidentals to the project site; and for other work and operations which must be performed, or cost incurred prior to beginning work on the various items on the project site. All costs associated with mobilization will be incorporated into the cost of the contract.
4.2. Materials
BLM VALE DISTRICT OFFICE Page 13 of 74
4.2.1. Transportation of Government supplied seed: Seed will be furnished by the Government. The Government shall load and transport seed from the pickup point to the operational loading sites designated at the pre-work meeting. The Contractor shall be responsible for the seed’s protection from loss or damage due to weather, rodents, insects, theft, or any other hazard. Any seed damaged or lost, while in the custody of the Contractor, will be replaced by the Government, and the actual cost to the Government for replacement will be deducted from payments due the Contractor. All unused seed shall be returned to the pickup point by the Contractor, upon completion of work or termination of the contract. It is the responsibility of the contractor to ensure the seed trailers are locked at night and when away from the project site for an extended period of time. All seed shall be kept covered and off the ground to prevent seed bags from getting wet. All empty seed bags shall be tied in bundles of 25 bags each. No tags, strings, or other trash shall be left in the bundled bags. All bags shall be available for counting by the Government. Empty seed bags which have been blown or otherwise scattered around the work site shall be picked up and bundled. All unused seed and bundled seed bags shall remain in the seed trailer upon completion of the work or termination of the contract.
4.3. Seeding Operations Requirements
4.3.1. It shall be the responsibility of the Contractor (i.e., knowledge and experience of the crew leader) to determine the quantity of work needed to meet specifications identified in this PWS. Acreage of the units were determined by calculations based on a horizontal plane using GIS technology. Electronic mapping data shall be provided and displayed to the Government on request.
4.3.2. Progress Reports: Contractor will provide weekly progress summaries, during treatment, to the BLM Representative (COR and/or PI). Regular communication between BLM Representatives and the Contractor is required to help alleviate any problems or potential delays.
4.3.3. Crew Foreman: A crew foreman must be on-site directing work at all times. This person will also serve as an on-the-ground contact person for the COR/PI. Failure to maintain a crew foreman will result in suspension of work until a crew foreman is provided. A maximum of five (5) days will be allowed to produce a qualified foreman. Failure to produce a qualified on-the-ground foreman within five days may result in the CO issuing a Suspend Work Order. CO and COR must be informed of any changes in Crew Foreman.
4.3.4. Personnel Requirements: The Contractor must always maintain an adequate work force to ensure timely completion of the work and is responsible for the crew knowing the requirements of the contract. The crew is responsible for maintaining a safe working environment following OSHA standards. The Contractor must attend
BLM VALE DISTRICT OFFICE Page 14 of 74 the pre-work conference and provide a written performance plan including crew size prior to beginning work.
4.3.5. Rate of Application: Seed shall be applied at the rates designated in the Work Data Sheet or as directed by the COR. Average depth of cover over seed shall be as designated in the Work data sheet or as directed by the COR. Some seeding rates may be slightly reduced due to availability of seed.
4.3.6. Seed storage and loading: The Contractor shall be responsible for the protection of the seed from loss or damage due to weather, rodents, insects, theft, or any other hazard. All seed shall be kept covered and off the ground to prevent seed bags from getting wet. All empty seed bags shall be tied in bundles of 25 bags each. No tags, strings, or other trash shall be left in the bundled bags. All bags shall be available for counting by the Government. Empty seed bags which have been blown or otherwise scattered around the work site shall be picked up and bundled. All unused seed and bundled seed bags shall remain in the seed trailer upon completion of the work or termination of the contract.
4.3.7. GPS Treatment Data: GPS tracks (line features) will be recorded during broadcast seeding operations. GPS data will be recorded in UTM NAD 1983 Zone 12N and uncorrected GPS files will be submitted to the COR at least two (2) days after the completion of each project area.
4.3.8. Loading records: Contractor shall keep a written log with daily entries indicating the dates and number of bags of seed picked up at the designated sites. The log shall also show the date, time, and number of bags of seed loaded into each load. This log shall be kept current at all times and shall be available for inspection by the Government at the work site during all working hours.
4.3.9. Mechanism Maintenance: Seed openings of the distribution mechanism shall be inspected at sufficient intervals to ensure proper functioning and even distribution of seed. If at any time inspections of equipment reveal that the distribution mechanism of the seeding equipment is not operating properly, the CO may require reseeding of that portion of the area that the Government determined was not properly seeded.
The Government will deduct the cost of additional seed needed to reseed areas improperly seeded by the Contractor from payments due to the Contractor.
4.3.10. Tests for uniformity and rate of application: The Government will make tests as operations progress to determine uniformity of seeding. Standards of performance will be determined by adequate weight records of seed applied on each individual path and for each particular seeding strip covered, and ground recovery of samples of seed actually distributed. All work of weight recording and ground recovery will be done by the Government at no cost to the Contractor.
BLM VALE DISTRICT OFFICE Page 15 of 74
4.3.10.1. Should the Contractor wish to object in any way to the weight recording and/or ground recovery sampling done at any particular time by the Government, the Contractor shall be present in person or by authorized representative to voice said objections when said weight recording and/or ground recovery samplings are done, and to agree upon new records and/or samples at the time, where after the weight recording and ground recovery sampling done by the Government shall be final and binding in the settlement of the contract.
4.3.11.Project Area Completion: Upon completion of each project area, Government-furnished seeding equipment shall be left at the location designated in the Work Data Sheet and shall be in good working condition.
4.3.12. Work Stoppages: The Government reserves the right to stop seeding operations at any time when seeding conditions are considered sufficiently unfavorable to warrant stoppage. Stoppage shall continue until seeding operations are again authorized by the Government. Because of the nature of the work, any time for which work is suspended by the Government because of unsuitable seeding conditions, will not be counted against the contract completion time. However, no monetary compensation will be given to the Contractor by reason of such work suspension. The Contractor agrees to work diligently to complete the seeding application. Partial days on which any amount of seeding was accomplished may be counted as full days of performance time if the Government deems the Contractor is not being diligent in completing the contract.
4.3.13. Measurement and Payment: Measurement for payment for seeding will be the number of acres satisfactorily completed in accordance with these specifications.
Measurements will be made from field traverse, aerial photographs, GPS tracks, or maps at the discretion of the government. Payment will be made at the unit price per acre specified in the Bid Schedule and shall include cost of all work described in these specifications and in the Work Data Sheet. All measurements will be based on horizontal distances. Re-measurements of the acreage under this Contract will be made upon written request of the Contractor. Request for re-measurement must be submitted in writing within 10 calendar days after seeding has been completed. If re-measurement indicates a difference of not more than 5% from the original measurement, the Contractor shall pay the actual cost of the re-measurement.
Payments will be based on the second measurement where the difference between measurements is more than 5%. Where the difference is less than 5% the results of the first measurement will be used.
5. Specific Tasks
5.1. SEED APPLICATION: The Contractor shall perform seed application in designated areas in conformance with these specifications. Unless otherwise specified, the Contractor shall furnish, equipment, labor, supplies, tools, supervision, materials, BLM VALE DISTRICT OFFICE Page 16 of 74 incidentals, and perform all work necessary to complete seed application in accordance with the performance work statement.
Technical Exhibits:
Required services table:
TASK INSPECTION
ITEM
INSPECTION METRIC Acceptable Quality level
Seed application (Para 5.1.)
Uniform coverage
Comparing applicator logs to original polygon to confirm uniform coverage over the application area. Conducting random inspections to observe application and test calibration.
95% ocular and physical compliance with specs of random plots
(End of Statement of Work)
(End of Section C)
DELIVERABLE FREQUENCY REFERENCE MEDIUM/FORMAT SUBMIT
TO
Performance/Work Progress Plan
Once 1.6.5 Pre-work conference
By email in PDF format or hard copy
COR
Crew Manifest Once, and as needed when crew manifest changes.
1.6.11 Personnel Requirements
By email in PDF or scanned or hard copy
COR
Loading Records Once, or as needed for updates
4.3.9 Loading
Records
By email in PDF or scanned or hard copy
COR
Progress Reports Weekly 4.3.2 Progress Reports
By email in PDF or scanned
COR
BLM VALE DISTRICT OFFICE Page 17 of 74
SECTION F – DELIVERIES OR PERFORMANCE
F.1.0 PERIOD OF PERFORMANCE
November 17, 2025 through March 28, 2025
F.2.0 PROGRESS PLAN
At the prework conference, the Contractor shall provide to the COR a written "work progress plan" that details its proposed work force and schedule to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the Government. At a minimum, the schedule must reflect a work progress rate equal to the available amount of contract performance time.
The following clause is incorporated by reference:
Clause Title Date
52.242-15 STOP WORK ORDER AUG 1989
(End of Section F)
BLM VALE DISTRICT OFFICE Page 18 of 74
SECTION G – CONTRACT ADMINISTRATION DATA
The following local clauses are provided in full text:
CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (JULY 2010)
(a) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR42.15.
(b) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available for Government use in evaluating past performance as part of a source selection action.
(c) We request that you furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.
(d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/. The CPARS User Manual, registration for On Line Training for Contractor Representatives, and a practice application may be found at this site.
(e) Within 60 days after the end of a performance period, the Contracting Officer will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/. Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment. Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official's narrative and should provide your views on the causes and ramifications of the assessed performance. In addition to the ratings and supporting narratives, blocks 1 - 17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection actions. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating ''No comment" in Block 22, and then signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment." Your response is due within 30 calendar days after receipt of the CPAR.
(f) The following guidelines apply concerning your use of the past performance evaluation:
(1) Protect the evaluation as "source selection information." After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the Contracting Officer for instructions.
https://www.cpars.gov/ http://www.cpars.csd.disa.milj/ https://www.cpars.gov/ http://www.cpars.csd.disa.mil/
BLM VALE DISTRICT OFFICE Page 19 of 74
(2) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
(3) Prohibit the use of or reference to evaluation data for advertising, promotional material, preaward surveys, responsibility determinations, production readiness reviews, or other similar purposes.
(g) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the Contracting Officer no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30- day review period.
(h) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
(End of clause)
ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING
PLATFORM (IPP) (APR 2013)
Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Invoice Processing Platform System (IPP).
“Payment request” means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Products or Commercial Services included in commercial products or commercial services contracts.
The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice
1. Invoice billed according to contract line items and rates.
2. If partial payment is billed and the invoice states a lump sum, the invoice shall include an itemized breakdown and narrative progress summary of the work performed during this invoice period.
3. If final payment is billed, the last invoice shall state “FINAL”.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contract (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 – 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
(End of Section G) https://www.ipp.gov/ mailto:ippgroup@bos.frb.org
BLM VALE DISTRICT OFFICE Page 20 of 74
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1.0 ACCESS
In the event of a site/facility closure, the Contractor shall not perform or make deliveries to the site/facility until it is reopened by the Government, unless otherwise instructed by the Contracting Officer or their designated representative.
H.2.0 WORK HOURS
Unless otherwise specified in Section C, Specifications, work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. No work will be done on Saturday, Sunday, or Federal holidays unless authorized by the COR.
H.3.0 ENVIRONMENTAL INTERRUPTION OF WORK
H.3.1 Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions, fire danger, or because it is impracticable to work during the winter season. The Contractor will be given a resume work order which will document the date the work suspension ends. An allowance has been included in the contract time for all environmental delays. The count of contract time will therefore continue during all periods of suspension due to normal weather conditions, including fire danger. The Contractor will not be entitled to additional contract time for any suspensions except to the extent that they are due to unusually severe weather conditions. The Contractor will not be entitled to additional monetary compensation for such suspensions regardless of duration.
H.3.2 Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, or Federal candidate (Category 1 and 2), sensitive or state listed species, identified under BLM Manual 6840, are discovered to be present in or adjacent to the project area.
H.4.0 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA
H.4.1 Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of the terrain as a result of any Federal construction project.
H.4.2 The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, or archeological data the contractor will notify the Contracting Officer immediately in writing giving the location and nature of the findings.
H.4.3 Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract Clauses Section of this contract.
H.5.4 The Contractor agrees to insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.
H.5.0 ENVIRONMENTAL IMPACT
All waste materials generated by any work under the contract performed on a Government installation shall at all times be…