SALEM SECURITY CAMERA REPLACEMENT and INSTAL Federal contract opportunity
Solicitation number
140L4324Q0068
Issued by
Department of the Interior Bureau of Land Management Oregon-Washington

About this file

This document is a Request for Proposal (RFP) for the Security Camera Replacement and Installation project in Salem, Oregon. The Bureau of Land Management's (BLM) Northwest Oregon District has a requirement to replace the existing security camera system with NDAA-compliant equipment, including outdoor cameras with a minimum of 8MP resolution, indoor cameras with a minimum of 5MP resolution, and a 40+ channel NVR with 30-day storage capability. The contractor will also be required to reconfigure the IT demarcation point panel and components. The period of performance is 180 days after award, with 60 days for installation once cameras and components are received. This is a firm-fixed price commercial services contract with a total set-aside for small business. Potential offerors are encouraged to schedule a site visit from April 8-12, 2024 to obtain any sensitive information not included in the specifications. Proposals are due by April 19, 2024 at 12:00 PM PDT.

View the file

Other files for this federal contract opportunity

Other files attached to SALEM SECURITY CAMERA REPLACEMENT and INSTAL, newest first.
File Type Posted
Sol_140L4324Q0068_Amd_0002.pdf PDF
Q_A_Document_0002.pdf PDF
B08_Soliciation_Amend_2_0002.pdf PDF
Sol_140L4324Q0068_Amd_0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

LHA

PORTLAND OR 97204

1220 SW 3rd Avenue, 12th Floor

BLM OR-ST OFC PROC MGMT BR(OR952)

0004276581 CODE 16. ADMINISTERED BYCODE

X

X

X

561621

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED ORLHA

REQUEST FOR

PROPOSAL

(RFP)

INVITATION

FOR BID (IFB)

10. THIS ACQUISITION ISCODE

REQUEST FOR

QUOTE (RFQ)

14. METHOD OF SOLICITATION

13b. RATING

NORTH AMERICAN INDUSTRY

CLASSIFICATION STANDARD

(NAICS):

SMALL BUSINESS

04/19/2024 1200 PD

03/20/2024

5038086545Benjamin Becker (No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

140L4324Q0068

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 87 0040649739OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

SALEM OR 97306

1717 FABRY RD SE

BLM-OR NORTHWEST OR (ADMIN|ENG|REC)

15. DELIVER TO

PORTLAND OR 97204

1220 SW 3rd Avenue, 12th Floor

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$25

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FREE ON BOARD

(FOB) DESTINATION UNLESS

BLOCK IS MARKED

11.

SEE SCHEDULEX

12. DISCOUNT TERMS THIS CONTRACT IS A RATED

ORDER UNDER THE DEFENSE

PRIORITIES AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

8(A)

BLM OR-ST OFC PROC MGMT BR(OR952)

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

Company Name:__________________

Total Quote: $_________________

Unique Entity Identifier

(UEI):___________________________

Delivery: 11/01/2024 Continued ...

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

XX

DATED

Matthew Duane

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Government Use Only)

OFFER

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT: REFERENCE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 11/2021) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

00010 Security Camera Replacement and installation, Salem, OR

Product/Service Code: R430

Product/Service Description: SUPPORT-

PROFESSIONAL: PHYSICAL SECURITY AND BADGING

Period of Performance: 05/01/2024 to 11/01/2024

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

87 2 of

SECURITY CAMERA REPLACEMENT, SALEM, OREGON SOLICITATION NO. 140L4323Q0068

BLM, NORTHWEST OREGON DISTRICT Page 3 of 64

SERVICES AND PRICES

This requirement is for one(1) Firm Fixed Price Commercial Services Contract for Security Camera Replacement, Salem, Oregon.

BASE

Item no. Item Description Quantity Unit of

Measure

Total

10 Camera System Replacement 1 EA $

20 Reconfigeration 1 EA $

GRAND TOTAL $

PERIOD OF PERFORMANCE: see section F.

(End of Supplies/Services and Prices/Costs)

BLM, NORTHWEST OREGON DISTRICT Page 4 of 64

STATEMENT OF WORK

C.1.0 GENERAL

Replacement of existing security camera system in compliance with the National Defense Authorization Act

(NDAA). Supply, install, and program security cameras and system components (including all cabling, conduit, hardware, software, licenses, etc.) to provide a complete and functioning system at the Bureau of Land

Management’s Northwest Oregon District (NWOD) Office.

Additional work includes reconfiguration of the Information Technology (IT) demarcation point component panel.

Specific information has been withheld from the drawings and specifications due to security concerns. Potential bidders shall schedule a site visit to obtain any specific information concerning the existing camera configuration, cabling routes, and anything else deemed as sensitive information that was not included in the drawings and specifications.

C.1.1 DESCRIPTION OF WORK

Replacement of Security Camera System

• Provide cabling, conduit, hardware, licenses, setup, programming, and necessary appurtenances to provide a complete and functioning system, compliant with the NDAA guidance.

Reconfiguration of the existing component panel at the Information Technology (IT) demarcation point.

• Provide cabinet, cabling, conduit, and appurtenances to relocate existing internet and utility components.

C.1.2 LOCATION OF WORK

Northwest Oregon District (NWOD) Office, located at 1717 Fabry Rd. SE, Salem, Oregon 97306.

Business hours are 8 am to 4 pm Monday through Friday.

Closed All Federal Holidays.

C.2.0 INTRODUCTION:

Site Visits are highly recommended and encouraged. If your firm is interested in conducting a site visit, please follow instructions in section L.1.3 (Request For Information), by contacting the Contract Specialist

Benjamin Becker at babecker@blm.gov. Contractors shall submit their firm’s Unique Entity Identifier (UEI) when submitting any requests for information or scheduling a site visit. Site Visits will be available to be scheduled the from April 8-12, 2024. Any site visit outside those dates can be requested, but there is no guarantee dates outside will be accommodated.

All site visits shall be coordinated in advance with Benjamin Becker.

The Bureau of Land Management (BLM) NWOD District Office, located at 1717 Fabry Rd SE, has a requirement for security camera system replacement and reconfiguration of the network demarcation point.

The BLM office consists of open office space on the second and third floors of the building. An elevator accesses each floor.

The lobby level entrance is situated between the second and third floor elevations. The second and third floors have entrance doors on the north and south sides of the building that are situated between the floors at the same elevation as the lobby level.

BLM, NORTHWEST OREGON DISTRICT Page 5 of 64

The first floor consists of a warehouse and loading dock, walk-in cooler, gym, law enforcement offices, locker rooms, main electrical room, and boiler room. All first-floor exterior access is located on the west side of the building.

C.3.0 SPECIFICATIONS

C.3.1 Item # 1 - Replace the existing camera system with NDAA compliant equipment.

Supply and install a Network system that provides camera coverage for the required areas highlighted in the drawing set.

The new system minimum requirements shall include:

• NDAA compliant components and equipment.

• Outdoor cameras shall be a minimum 8 MP resolution.

• Indoor cameras shall be a minimum of 5 MP resolution.

• All cameras shall connect to the existing Exacq server.

• Remote access capability and application.

• CAT 6 or better network cable. Use duct-rated (Plenum) cable as required in exposed and ceiling runs.

• Six (6) network connected monitoring stations, provide mini personal computer at each station. (BLM shall supply monitors).

• 40+ Channel NVR (Minimum 4 extra channels for future expansion).

• Hard Drive in the main monitoring station to allow 30-day storage, with expansion capability.

• Install required fiber and/or wireless equipment for exterior runs and outbuilding connections.

• New watertight metal conduit shall be installed for the exterior cameras where the existing conduit is damaged or inadequate.

• Provide 3-year warranty.

• Provide end user response to any potential system operability issues within five (5) business days of end user notification.

• Provide network diagram and as-builts of the system.

Not all existing cameras are functional in the current working system and vary in resolution, type, and color. All working cameras and those that cover unique areas shall be replaced. Cameras not necessary for complete coverage shall be removed.

Existing system includes:

Two (2) viewing stations (network connected)

Interior Cameras (17 total cameras, styles listed below)

Dome, wall mounted

(3) PTZ, wall mounted, 2K

Mini Dome, wall mounted

Exterior Cameras (23 total weather resistant cameras,styles listed below)

(1) PTZ, wall mounted, wireless

(6) PTZ, pole mounted

(3) Dome, wall / pole mounted

(12) Bullet w/ hood, wall / pole mounted

(1) Internal to 6-inch diameter metal bollard

The existing cameras shall remain the property of the Government.

C.3.2 Item # 2 – Reconfigure demarcation point panel and components.

BLM, NORTHWEST OREGON DISTRICT Page 6 of 64

Supply/install a two-post, 7-foot tall, floor-mounted, open frame rack with a 10 ft x 12-inch ladder rack and seismic bracing which can mount all components.

Remove the existing wall rack.

Install camera switches in new rack.

Relocate existing network provider equipment into the new rack.

Install 12-strand fiber from the Server Room to the new rack.

Relocate existing wall-mounted fiber into new rack.

Organize cabling.

C.4.0 GOVERNMENT FURNISHED PROPERTY

Existing CAT 6 cable already in place being used for cameras. No guarantee of cable condition. Contractor to verify cable is in good working order and meets code requirements (Duct-rated/Plenum where required) before reuse.

Computer monitors for each of the six (6) monitoring stations.

C.5.0 CONTRACTOR RESPONSIBILITIES

The contractor shall be responsible for all the following items:

• Determine camera locations, cabling routes, and all necessary accessories to provide camera coverage of the required areas.

• Configure and program all systems to operate the complete system to the capabilities of all installed equipment and according to the manufacturer's requirements.

• Test all equipment, wiring and functions of components and related hardware to make sure the entire system works correctly.

• Provide all training to government personnel for the operation of the camera monitoring system.

• Provide power to all locations needing power. Bring power to each location from the closest power source within the building and all labor, equipment, and material to provide the required power at each site.

• The contractor will install the necessary client software and drivers onto the viewing station personal computers (PCs).

• The vendor shall guarantee that all installed parts, components, systems, and workmanship meet the specifications set forth in this document.

• Should any vendor supplied part, component, workmanship, or system fail within the warranty period, the vendor shall immediately replace or repair that part, component, or system within five (5) business days at no further cost to the Government.

• Provide all properly configured network drops as required for system connectivity.

• Provide all project supervision during the installation and programming of the system. A designated point of contact from the prime contractor will be available onsite to the COR while performing on the requirement at the government facility.

BLM, NORTHWEST OREGON DISTRICT Page 7 of 64

• All work shall be completed on weekdays (except on legal Federal holidays) between the hours of 8:00 am and 6:00 pm. Any work outside of these hours must be approved in advance by the contracting officer.

No additional cost will be paid to the contractor for any overtime worked by the contractor or of any contractor's employees. All overtime shall be included in the contractor’s bid price for the item of work being performed.

• All work shall be in accordance with the Uniform Building Code (UBC), National Electric Code (NEC), and any other pertinent codes and regulations. Contractor shall attain and pay the cost for any required permits to complete the work and arrange for any required inspection or testing.

• Provide system documentation and government personnel training on system use and operation.

• Provide a three-year warranty of all systems equipment, hardware and software furnished and installed.

The warranty shall include all labor and materials to complete any repairs during the first year following completion of the work under this contract.

• Provide for the storage and delivery of all materials used under this contract. The Government shall not take liability for any material stored on Government property. The Government will not accept any deliveries on behalf of the contractor. The contractor and their employees may use the existing government parking areas to park company and personnel vehicles during the contractor working hours. The contractor shall not store any materials to be used under this contract in existing Government parking areas.

• Provide for the disposal of any unused materials and wastes created during construction. Anything removed during construction which is not reused as part of the work and not desired by the Government will become the property of the contractor and shall be removed from the site before completion of work.

Existing cameras and components removed shall remain the property of the Government.

• The systems furnished under this contract shall provide for possible future expansion of the system.

• Notify the Contracting Officer’s Representative (COR) at least 5 working days prior to start of work to arrange for building access.

• Respond to calls from COR to perform tasks in a timely fashion.

Damage or Loss of the Government’s Property

In the event of loss or damage to Government equipment or property, the Contractor may be held liable. The contractor shall notify the Government of lost or damaged property contractor shall have 72 hours to investigate the situation. Should it be determined that the loss or damage to the property was caused through fault or negligence of a contractor employee, then the extent of the contractor's liability shall be measured by repair or replacement costs, whichever is less: such costs shall be deducted from the contractor's invoice.

Damage or Loss of the Contractor’s Property

The Government will not be responsible in any way for damage to or loss of the Contractor's equipment kept in or near the buildings; or the Contractor's employees personal belongings brought onto Government premises;

occasioned by fire; theft, accident or otherwise.

C.7.0 MEASUREMENT AND PAYMENT

The work described in this section will be measured and paid for on a lump sum basis. Payment for any required design, furnishing and install of each system will be made at the lump sum price bid in the Bid Schedule and shall include full compensation for all the work described in this contract and includes furnishing all labor, equipment and materials.

(End of Statement of Work)

BLM, NORTHWEST OREGON DISTRICT Page 8 of 64

INSPECTION AND ACCEPTANCE

The following clause is incorporated by reference:

Clause Title Date

52.246-1 CONTRACTOR INSPECTION REQUIREMENTS APR 1984

(End of Inspection and Acceptance)

BLM, NORTHWEST OREGON DISTRICT Page 9 of 64

DELIVERIES OR PERFORMANCE

F.1.0 PERIOD OF PERFORMANCE

The contract shall commence from date of award for a period up 180 days after receipt of award. Once cameras and vital components are received, installation will be completed within 60 days.

F.2.0 PROGRESS PLAN

At the prework conference, the Contractor shall provide to the COR a written "work progress plan" that details its proposed work force and schedule to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the Government. At a minimum, the schedule must reflect a work progress rate equal to the available amount of contract performance time.

The following clause is incorporated by reference:

52.242-15 STOP WORK ORDER AUG 1989

(End of Deliveries or Performance)

BLM, NORTHWEST OREGON DISTRICT Page 10 of 64

CONTRACT ADMINISTRATION DATA

The following local clauses are provided in full text:

CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (JULY 2010)

(a) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The

Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System

(CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR42.15.

(b) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available for Government use in evaluating past performance as part of a source selection action.

(c) We request that you furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.

(d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/. The CPARS

User Manual, registration for On Line Training for Contractor Representatives, and a practice application may be found at this site.

(e) Within 60 days after the end of a performance period, the Contracting Officer will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/. Contractor

Representatives may then provide comments in response to the evaluation, or return the evaluation without comment. Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official's narrative and should provide your views on the causes and ramifications of the assessed performance. In addition to the ratings and supporting narratives, blocks 1 - 17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection actions. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating ''No comment" in Block 22, and then signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment." Your response is due within 30 calendar days after receipt of the CPAR.

(f) The following guidelines apply concerning your use of the past performance evaluation:

(1) Protect the evaluation as "source selection information." After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the Contracting Officer for instructions.

(2) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

https://www.cpars.gov/

BLM, NORTHWEST OREGON DISTRICT Page 11 of 64

(3) Prohibit the use of or reference to evaluation data for advertising, promotional material, preaward surveys, responsibility determinations, production readiness reviews, or other similar purposes.

(g) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the

Contracting Officer no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30- day review period.

(h) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for

Government use supporting source selection actions after it has been finalized.

(End of clause)

ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM (IPP)

(APR 2013

Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Invoice

Processing Platform System (IPP).

“Payment request” means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable

Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions –

Commercial Products and Commercial Services included in commercial products and commercial services contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

1. Invoice billed according to contract line items and rates.

2. If final payment is billed, the last invoice shall state “FINAL”.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The

Contractor Government Business Point of Contract (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 – 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP

Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the

Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

(End of Contract Administration Data) https://www.ipp.gov/ mailto:ippgroup@bos.frb.org

BLM, NORTHWEST OREGON DISTRICT Page 12 of 64

SPECIAL CONTRACT REQUIREMENTS

1.0 ACCESS

In the event of a site/facility closure, the Contractor shall not perform or make deliveries to the site/facility until it is reopened by the Government, unless otherwise instructed by the Contracting Officer or their designated representative.

2.0 WORK HOURS

Unless otherwise specified in Section C, Specifications, work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. No work will be done on Saturday, Sunday, or Federal holidays unless authorized by the COR.

3.0 ENVIRONMENTAL INTERRUPTION OF WORK

3.1 Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions, fire danger, or because it is impracticable to work during the winter season. The Contractor will be given a resume work order which will document the date the work suspension ends. An allowance has been included in the contract time for all environmental delays. The count of contract time will therefore continue during all periods of suspension due to normal weather conditions, including fire danger. The Contractor will not be entitled to additional contract time for any suspensions except to the extent that they are due to unusually severe weather conditions. The Contractor will not be entitled to additional monetary compensation for such suspensions regardless of duration.

3.2 Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species

Act of 1973, as amended, or Federal candidate (Category 1 and 2), sensitive or state listed species, identified under BLM Manual 6840, are discovered to be present in or adjacent to the project area.

4.0 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA

4.1 Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of the terrain as a result of any Federal construction project.

4.2 The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, or archeological data the contractor will notify the

Contracting Officer immediately in writing giving the location and nature of the findings.

4.3 Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract

Clauses Section of this contract.

4.4 The Contractor agrees to insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.

5.0 ENVIRONMENTAL IMPACT

All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13

October 1978, Federal Compliance with Pollution Control Standards; the Federal Water Pollution Control

Act, as amended (33 U.S.C. 1251 ET SEQ); the Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ);

the Endangered Species Act, as amended (16 U.S.C. Sec 1531, ET SEQ); the Toxic Substances Control

Act, as amended (15 U.S.C. Sec 2601, ET SEQ); the National Historic Preservation Act, as amended (16

U.S.C. Sec 470, ET SEQ); the Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ); and the

BLM, NORTHWEST OREGON DISTRICT Page 13 of 64

Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ). Should the

United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the

Government for all such liability.

6.0 HAZARDOUS MATERIALS

Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating.

Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR

1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.

7.0 GREEN PROCUREMENT REQUIREMENTS

In the performance of this service or construction contract, the Contractor shall make maximum use of products identified on the mandatory environmental purchasing list at the following links, if applicable:

• U.S. EPA Comprehensive Procurement Guidelines published at www.epa.gov/cpg/products.htm.

• USDA Biobased product listings published at www.biopreferred.gov.

• Energy Star® product listings published at www.energystar.gov/products.

• FEMP Low Standby Power product listings published at http://energy.gov/eere/femp/covered-product-categories

Contractor shall comply with all reporting requirements stated in the applicable clause(s):

• 52.223-1 Biobased Product Certification

• 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts

• 52.223-4 Recovered Material Certification

• 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items

• 52.223-15 Energy Efficiency in Energy Consuming Products

• 52.223-17 Affirmative Procurement of EPA Designated Items in Service and Construction Contracts

8.0 RESTORATION OF RESOURCES

8.1 Cleanup - The Contractor is responsible for cleaning up all camp and worksites before leaving the area.

Final payment or other alternative deemed feasible may be withheld until the Contractor has complied with this requirement.

8.2 Site and Access Roads – Site and public or private access roads damaged by the Contractor shall be restored to the same condition they were in at the commencement of work, at the expense of the Contractor.

9.0 UNAUTHORIZED PERSONNEL

http://www.epa.gov/cpg/products.htm http://www.bioprefferd.gov/ http://www.energystar.gov/products http://energy.gov/eere/femp/covered-product-categories http://energy.gov/eere/femp/covered-product-categories

BLM, NORTHWEST OREGON DISTRICT Page 14 of 64

The contractor shall inform all personnel working under his jurisdiction (including subcontractor and visiting supplier personnel) that access to restricted areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.

10.0 OREGON FARM/FOREST LABOR CONTRACTOR'S LICENSE

If the State of Oregon requires an Oregon Farm/Forest Labor Contractor's License, then the contractor awarded this contract and all first-tier subcontractors shall be required to obtain and maintain, during the term of this contract, such a license. Contractors not having a current license will be required to furnish evidence of having obtained such license within ten (10) days after receipt of written notification of contract award. Failure to obtain, keep and maintain a current license during the term of this contract or the extension thereof shall be a basis for termination for default.

Information on obtaining this license may be obtained from:

Bureau of Labor and Industries Contact: Licensing Unit

Wage and Hour Division Telephone: (503) 373-1463

3865 Wolverine St. NE; E-1 Fax: (503) 373-7636

Salem, OR 97305-1268

11.0 FIRE DANGER SEASON

If the COR allows the Contractor to continue work during periods of declared fire danger or season, the

Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR and outlined in the attachment at the end of this section.

The following clause is provided in full text:

SECURITY REQUIREMENTS: FACILITY ACCESS and INFORMATION TECHNOLOGY (August 2016)

(a) All Contractor employees must have an "Enter on Duty" (EOD) approval issued by the Bureau

Personnel Security Office (PSO) before they begin performing work on any Bureau contract. The Contractor must ensure that all employees requesting an EOD are citizens of the United States of America, or an alien who has been lawfully admitted for permanent residence or employment (indicated by immigration status) as evidenced by

Immigration and Naturalization Service documentation and the employee must have resided in the United States for a minimum of 3 years. The EOD may be issued in advance of a completed Background Investigation and may be rescinded by the PSO at any time. However, all contractors who require network access are required to complete the identity proofing process, and must be able to obtain a successfully adjudicated National Criminal History Check

(NCHC) and National Agency Check with Inquiries (NACI) or higher to stay on the contract.

(b) Starting Work - Contractor employees with an approved EOD may begin performing unsupervised work on Bureau contracts. To remain on the contract, the Contractor employees will need a completed favorable

Background Investigation.

(c) Rescission of EOD - The PSO may rescind the EOD at any time. This may occur as the result of additional information obtained or the final results of the background investigation.

(d) Background Investigation - Contractor employees who will have unsupervised access to Bureau facilities, access to the Department of the Interior (DOI) information technology (IT) systems or DOI data, or will develop custom applications, must have a favorably adjudicated background investigation from the Office of

Personnel Management (OPM). Existing clearances at the same or higher level are acceptable upon the PSO’s review and approval. If the employee does not already have a complete investigation, they must apply for one. The employee may begin work with an EOD, but must receive a favorable background investigation to continue working

BLM, NORTHWEST OREGON DISTRICT Page 15 of 64 on the contract. The background investigation includes obtaining fingerprints through a USAccess Credentialing

Center for an FBI criminal history and a credit report. Once the investigation has been scheduled by OPM, the

Bureau will receive advance reports. If those reports are favorable, the Bureau PSO will issue the EOD. The type of background investigation required is based on the risk/sensitivity level designation. Citizenship requirements and guidance for determining the appropriate type of background investigation required for the designated risk/sensitivity level are contained in DOI Departmental Manual (DM) Part 441. The DM is available on the Internet at http://elips.doi.gov/app_home/index.cfm?fuseaction=home.

(e) Electronic Questionnaire for Investigations Processing (e-QIP) – The Bureau uses the e-QIP for all background investigations or reinvestigations. To initiate an investigation, the Contractor, in collaboration with the

COR, will complete an e-QIP Request Form. This request form is available through the COR. The COR will submit the completed request form to the Bureau PSO. The PSO will enter the information into e-QIP to either establish a new applicant profile or determine if an existing investigation that meets Bureau requirements is on file. The PSO will then contact the applicant to provide additional information and instructions. Generally, the Contractor is required to complete the following forms:

▪ e-QIP application (on-line)

▪ Fair Credit Release

▪ OF-306

▪ Fingerprints via USAccess Credentialing Centers

The Contractor shall complete the required background investigation forms and submit them to the PSO. The PSO shall determine if individuals meet the required background investigation standards and citizenship requirements, and then make a suitability determination. Minimum standards used in suitability determinations are contained in the

DOI Departmental Manual Part 441. The Government will pay for any background investigations required for contractor employees. If the Contractor employee’s background investigation is returned as unfavorable, the

Government reserves the right to request reimbursement of the actual costs for the investigation from the Contractor.

(f) Reinvestigation - Contractor employees occupying high risk public trust positions must be reinvestigated every 5 years. A reinvestigation may be initiated prior to the normal periodic reinvestigation schedule when an individual’s continued ability to meet the minimum background investigation standards is in question. The electronic fingerprints on file in the USAccess system will be electronically submitted to OPM for the reinvestigation. The PSO shall review the records and documentation and make the suitability determination.

(g) Disputes - In the event of a disagreement between the Contractor and the Government concerning the suitability of a particular employee to perform work under this contract, the Government has the right of final determination. Determinations under this requirement are subject to the Disputes Clause, FAR 52.233-1. Failure of the Contractor to comply with the requirements of this clause could constitute grounds for termination for default.

(h) Physical Security Requirements - DOI Access Cards.

(1) Contractor employees must have a DOI Access Card before being given unsupervised access to a Government facility.

(2) To gain unsupervised access to Government facilities, Contractor employees must present their

DOI Access Card for examination by the security guard or electronically authenticate their DOI Access Card, as required. Contractor employees must keep their DOI Access Card in a shielded card holder, and visually display the card at all times while in the facility. Refusal or repeated neglect to display the DOI Access Card may result in limiting Contractor employee’s access to Government facilities or revoking of authorized access.

(3) When a Contractor employee is no longer working under this award, the Contractor is responsible for returning all DOI Access Cards, keys, and other Government property issued to that employee. The

Contactor shall coordinate all returns with the COR. The COR is responsible for ensuring the Contractor complies with these requirements. However, failure by the Contractor to comply with these requirements may result in the

Contractor’s liability for all costs associated with correcting any resultant breech in building security.

BLM, NORTHWEST OREGON DISTRICT Page 16 of 64

(i) Issuance & Maintenance - DOI Access Cards

(1) Process: To obtain a DOI Access Card the COR will use the online DOIAccess System to initiate the access request. Contractor employees will receive email notificat ions to enroll at a USAccess Credentialing Center with two forms of identification, and after adjudication, a second email notification to pick up and activate their DOI Access Card. The Contractor employee shall schedule an enrollment appointment at a USAccess center at least two weeks prior to the targeted EOD.

(2) Contractor Responsibilities: Contractor employees must complete actions in a timely manner to prepare for on-boarding and access to DOI network resources. The Contractor shall allow their personnel sufficient time to schedule and attend an enrollment appointment at the USAccess center prior to the contract start date. If the Contractor employee’s DOI Access Card becomes lost or stolen, the contractor employee shall notify the

COR immediately to request a new DOI Access Card.

(3) COR Responsibilities: The COR (or designated individual) and Contractor shall maintain a listing of all Contractor employees who received a DOI Access Card, the date the card was issued, the date the electronic certificates expire (3 years from issue date), and the date the DOI Access Card expires (5 years from issue date). If the Contractor employee’s DOI Access Card or certificates will expire before the contract is completed, the

COR (or designated individual) and Contractor is responsible for ensuring that the Contractor employee visits a

USAccess center to update certificates on the existing card or obtain a new DOI Access Card. No later than one week prior to the DOI Access Card’s certificate or card expiration, the COR (or designated individual) shall notify the Contractor that DOI Access Card actions are required. The COR (or designated individual) and the Contractor shall update their listing to reflect the new issue date, certificate expiration date and card expiration date.

(j) Information Technology Security Requirements.

(1) Training – If contractor employees require access to any DOI/IT systems, the Contractor shall ensure its employees complete all Bureau/DOI required IT security training. The Contractor’s employees shall complete this training before being granted access to Bureau/DOI data or being issued network access. The current training requirements are: (i) annual end-user IT Security Awareness, (ii) annual IT Resources Rules of Behavior, and (iii) annual Role-Based Security training for IT professionals. The Contractor shall comply with all Bureau/DOI

IT security training requirements in effect during contract performance. The COR will notify the Contractor of all

Bureau mandatory IT training. The Contractor shall submit training completion certificates to the COR for all required training. Failure to meet this training requirement may result in removal of the contractor employee from the contract. The Bureau will determine if the contractor can later return to the contract.

(2) Access to Contractor’s Facilities for IT audit purposes - The Contractor shall afford Bureau and the Department of the Interior Office of Inspector General access to the Contractor’s and subcontractors’ facilities, installations, operations, documentation, databases, and personnel used in performance of the contract.

Access shall be provided to the extent required to carry out a program of IT inspection, investigation, and audit that will safeguard against threats and hazards to the integrity, availability, and confidentiality of Government data or to the function of computer systems operated on behalf of the Government and to preserve evidence of computer crime. If the Contractor questions the Government employee’s right to access its facilities, it should contact the CO for resolution.

(3) Contractor Location - Custom software development and outsourced operations shall be located in the United States to the maximum extent practical. If such services are proposed to be performed abroad, the Contractor shall provide an acceptable security plan that addresses the mitigation of problems related to communication, control, and protecting the confidentiality, integrity, and availability of IT systems and information.

(4) Applicable Standards - The Contractor shall follow all applicable Federal, DOI, and Bureau

Bulletins, Directives, Guidelines, Manuals, Processing Standards, Memoranda, Policies and Standards; applicable

OMB Memoranda; and all current National Institute of Standards & Technology (NIST) Special Publications. To comply with Federal Acquisition Regulation Subpart 39.101(d), contractors shall use the common security

BLM, NORTHWEST OREGON DISTRICT Page 17 of 64 configurations available from the NIST website at http://checklists.nist.gov. NIST documents are available on the internet at http://csrc.nist.gov/publications/PubsSPs.html. OMB memoranda are available on the internet at http://www.whitehouse.gov/omb/memoranda/. The Contractor shall request copies of DOI and Bureau documents by contacting the COR.

(5) Incident Reporting - The Contractor shall immediately report computer security incidents affecting Bureau/DOI data and systems in accordance with the Bureau Computer Incident Response policy. The

Contractor shall request copies of the Bureau Computer Incident Response policy by contacting the COR.

(6) Assessment and Authorization (A&A) and Continuous Monitoring.– The Contractor shall comply with Bureau policy when developing, upgrading, modifying or supporting applications and/or systems that require A&A and Continuous Monitoring. The Contractor shall request copies of Bureau A&A policy by contacting the COR. The A&A requirement does not apply when the Contractor's employees merely access data or have "read only" access.

(k) Documentation - The Contractor shall document all work performed and ensure that the appropriate

Assessment and Authorization (A&A) documents are updated to reflect the work performed and the current state of

Bureau systems and networks. The Documentation requirement does not apply when the Contractor's employees merely access data or have "read only" access.

(l) Personnel Changes, Contractor Request - The Contractor shall immediately notify the COR and PSO when an employee is reassigned or leaves the Contractor’s employment and prior to any termination. The Contractor must adhere to the Bureau or Office’s mandatory exit clearance procedure. Once the COR has been notified that a

Contractor employee is leaving the contract, the COR will initiate the exit clearance process in the DOIAccess

System and forward to the Contractor the necessary instructions and form required to be completed prior to the contractor's employee’s departure. This form must be completed by the Contractor's employee and signed by both the Contractor's employee and the COR and then forwarded to the bureau/office specific program responsible for employee, volunteer, and contractor departures.

(m) Personnel Removal, Government Request - The Government retains the right to direct the Contractor to remove any prime or subcontractor personnel, regardless of prior clearance or background investigation adjudication status, whose actions, while assigned to this contract, clearly conflict with the security interests of the

Government. The justification for the Government’s direction to remove Contractor personnel will be documented and provided to the Contractor by the CO.

(n) Subcontract Inclusion - The requirements of this clause must be incorporated into any subcontract if the subcontractor’s employee must have access to Bureau facilities.

(End of clause)

INTERNET PROTOCOL version 6 (June 2012)

1. Any system hardware, software, firmware and/or networked component (voice, video or data) developed, procured, or acquired in support and/or performance of this contract shall be capable of transmitting, receiving, processing, forwarding and storing digital information across system boundaries utilizing system packets that are formatted in accordance with commercial standards of Internet Protocol (IP) version 6 (IPv6) as set forth in the USGv6 Profile (NIST Special Publication 500-267) and corresponding declarations of conformance defined in the USGv6 Test Program. In addition, this system shall maintain interoperability with IPv4 systems and provide at least the same level of performance and reliability capabilities of IPv4 products.

2. Specifically, any new IP product or system developed, acquired, or produced must:

a. Interoperate with both IPv6 and IPv4 systems and products, and

b. Have available contractor/vendor IPv6 technical support for development and implementation and fielded product management.

3. As IPv6 evolves, the Contractor commits to upgrading or providing an appropriate migration path for each item developed, delivered or utilized at no additional cost to the Government. The Contractor shall retrofit all non-http://www.nist.gov/itl/antd/upload/usgv6-v1.pdf

BLM, NORTHWEST OREGON DISTRICT Page 18 of 64

IPv6 capable equipment, as defined above, that is fielded under this contract with IPv6 capable equipment, at no additional cost to the Government.

4. The contractor shall provide technical support for both IPv4 and IPv6.

5. Any system or software must be able to operate on networks supporting IPv4, IPv6 or one that supports both.

6. Any product whose non-compliance is discovered and made known to the Contractor within one year after acceptance shall be upgraded, modified or replaced to bring it into compliance at no additional cost to the

Government.

FIRE REQUIREMENTS PROCEDURES OUTLINE

This outline covers the fire protection requirements of a contractor or private party who performs service or construction contracts on BLM land. In western Oregon, the BLM allows Oregon Forest Law (ORS) and Oregon

Administrative Rules (OAR) to apply to these operations on BLM lands rather than develop similar rules applicable only to BLM lands.

1. CLOSED FIRE SEASON

The closed fire season means that fire season has been declared. ORS 477.505 gives the State Forester the authority to establish the fire season. The authority has been delegated to the District Foresters around the state who issue public notices through the newspapers and radio when fire season will be closed for their individual districts.

Closed fire season depends upon the drying of forest fuels, rainfall, and time of year.