Sol_140G0121R0027.pdf

PDF 361 KB Posted

Attached to
CERC Backup Generator Federal contract opportunity
Solicitation number
140G0121R0027
Issued by
Department of the Interior US Geological Survey Office of Acquisitions and Grants

About this file

This solicitation is for a backup generator installation at the Columbia Environmental Research Center in Columbia, Missouri. The contractor shall provide all labor, materials, equipment, and supervision to install a 500 kW generator set, dual wall belly fuel tank, weather-proof enclosure, automatic transfer switches, electrical service disconnect switch, concrete mounting pad, underground conduit and wiring from the generator set to the transfer switches. Written proposals are due by September 15, 2021 in response to solicitation 140G0121R0027. A site visit is required and bonds are required. The acquisition is set aside for small businesses with a NAICS code of 238210 and size standard of $16.5 million. The contractor must be registered in the System for Award Management to be eligible for award.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040547049

USGS OAG RESTON ACQUISITION BRANCH

205 NATIONAL CENTER

12201 SUNRISE VALLEY DRIVE

RESTON VA 20192

GRB

Kimberly Schneider 0000

1x 08/16/2021

140G0121R0027

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

CERC Backup Generator Installation Building A-3

100% Small Business Set-aside

See Section L.1 for Instructions to Offerors and Section M.1 for Evaluation Factors

*Bid Guarantee Required, Ref FAR 52.228-1 and Section F for list of Deliverables*

*Bonds Required*

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 70 calendar days and complete it within ________________ ________________ calendar days after receiving

FAR 52.211-10

09/15/2021

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USGS OAG RESTON ACQUISITION BRANCH

205 NATIONAL CENTER

12201 SUNRISE VALLEY DRIVE

RESTON VA 20192

GRB

Daniel Galvin

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 55

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140G0121R0027

CERC Backup Generator Installation Building A-3

00010 The contractor shall provide all labor, material, tools, equipment, and supervision necessary for the installation of a backup generator for the

Columbia Environmental Research Center (CERC) main A-3 building in accordance with the statement of work (SOW) herein.

Product/Service Code: 6115

Product/Service Description: GENERATORS AND

GENERATOR SETS, ELECTRICAL

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

SECTION B - Supplies or Services B.1 Schedule of Items

SECTION C - Description/Specifications C.1 Statement of Work Reference Attachment 1 C.2 Green Acquisition C.3 Indoor Air Quality During Construction

SECTION D - Packaging and Marking SECTION E - Inspection and Acceptance

E.1 52.246-12 Inspection of Construction. (AUG 1996) SECTION F - Deliveries or Performance

F.1 Deliverables F.2 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) F.3 52.242-14 Suspension of Work. (APR 1984) F.4 Legal Holidays

SECTION G - Contract Administration Data G.1 1452.204-70 Release of Claims (JUL 1996) G.2 Invoicing and Performance Statements G.3 Unilateral Deobligation of Unexpended Funds

G.4 AUTHORITIES AND DELEGATIONS (SEPT 2011)

G.5 Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013)

SECTION H - Special Contract Requirements H.1 Indemnity H.2 Notice to Government of Delays H.3 Compliance with OSHA-Govt owned Facilities/Equipment H.4 Accident Reporting H.5 Wage Determination Applicable

H.6 ORGANIZATIONAL CONFLICT OF INTEREST DISCLOSURE (NOV 2007)

H.7 Notice to Contractors - CPARS (DEC 2015 H.8 SECURITY REQUIREMENTS: FACILITY ACCESS and INFORMATION TECHNOLOGY (AUG 2016)

SECTION I - Contract Clauses I.1 52.203-3 Gratuities. (APR 1984) I.2 52.203-5 Covenant Against Contingent Fees. (MAY 2014) I.3 52.203-7 Anti-Kickback Procedures. (JUN 2020) I.4 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (MAY 2014) I.5 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014) I.6 52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. (SEP 2007) ..21 I.7 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (JUN 2020) I.8 52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights. (JUN 2020) I.9 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. (JAN 2017) I.10 52.204-13 System for Award Management Maintenance. (OCT 2018) I.11 52.204-18 Commercial and Government Entity Code Maintenance. (AUG 2020) I.12 52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014) I.13 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities. (JUL 2018) I.14 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2020) I.15 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. (JUN 2020) I.16 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (NOV 2015) I.17 52.215-8 Order of Precedence - Uniform Contract Format. (OCT 1997) I.18 52.219-8 Utilization of Small Business Concerns. (OCT 2018) I.19 52.219-28 Post-Award Small Business Program Rerepresentation. (NOV 2020) I.20 52.222-4 Contract Work Hours and Safety Standards - Overtime Compensation. (MAY 2018) I.21 52.222-6 Construction Wage Rate Requirements. (AUG 2018) I.22 52.222-7 Withholding of Funds. (MAY 2014)

I.23 52.222-8 Payrolls and Basic Records. (JUL 2021) I.24 52.222-9 Apprentices and Trainees. (JUL 2005) I.25 52.222-10 Compliance With Copeland Act Requirements. (FEB 1988) I.26 52.222-11 Subcontracts (Labor Standards). (MAY 2014) I.27 52.222-12 Contract Termination - Debarment. (MAY 2014) I.28 52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations. (MAY 2014) I.29 52.222-14 Disputes Concerning Labor Standards. (FEB 1988) I.30 52.222-15 Certification of Eligibility. (MAY 2014) I.31 52.222-23 Notice of Requirement for Affirmative Action To Ensure Equal Employment Opportunity for Construction. (FEB 1999) I.32 52.222-26 Equal Opportunity. (SEP 2016) I.33 52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015) I.34 52.222-35 Equal Opportunity for Veterans. (JUN 2020) I.35 52.222-37 Employment Reports on Veterans. (JUN 2020) I.36 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts. (SEP 2013) I.37 52.223-3 Hazardous Material Identification and Material Safety Data. (FEB 2021) I.38 52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2011) I.39 52.223-6 Drug-Free Workplace. (MAY 2001) I.40 52.223-15 Energy Efficiency in Energy-Consuming Products. (MAY 2020) I.41 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts. (AUG 2018)..23 I.42 52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving. (JUN 2020) I.43 52.225-9 Buy American - Construction Materials. (FEB 2021) I.44 52.225-13 Restrictions on Certain Foreign Purchases. (FEB 2021) I.45 52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran- Representation and Certifications. (JUN 2020) I.46 52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007) I.47 52.228-2 Additional Bond Security. (OCT 1997) I.48 52.228-5 Insurance - Work on a Government Installation. (JAN 1997) I.49 52.228-11 Individual Surety-Pledge of Assets. (FEB 2021) I.50 52.228-12 Prospective Subcontractor Requests for Bonds. (MAY 2014) I.51 52.228-14 Irrevocable Letter of Credit. (NOV 2014) I.52 52.228-15 Performance and Payment Bonds - Construction. (JUN 2020) I.53 52.232-5 Payments Under Fixed-Price Construction Contracts. (MAY 2014) I.54 52.232-23 Assignment of Claims. (MAY 2014) I.55 52.232-27 Prompt Payment for Construction Contracts. (JAN 2017) I.56 52.232-33 Payment by Electronic Funds Transfer - System for Award Management. (OCT 2018) I.57 52.232-39 Unenforceability of Unauthorized Obligations. (JUN 2013) I.58 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (DEC 2013) I.59 52.233-1 Disputes. (MAY 2014) I.60 52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004) I.61 52.236-2 Differing Site Conditions. (APR 1984) I.62 52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984) I.63 52.236-5 Material and Workmanship. (APR 1984) I.64 52.236-6 Superintendence by the Contractor. (APR 1984) I.65 52.236-7 Permits and Responsibilities. (NOV 1991) I.66 52.236-8 Other Contracts. (APR 1984) I.67 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984) I.68 52.236-10 Operations and Storage Areas. (APR 1984) I.69 52.236-11 Use and Possession Prior to Completion. (APR 1984) I.70 52.236-12 Cleaning Up. (APR 1984) I.71 52.236-13 Accident Prevention. (NOV 1991) I.72 52.236-15 Schedules for Construction Contracts. (APR 1984) I.73 52.243-4 Changes. (JUN 2007) I.74 52.252-2 Clauses Incorporated by Reference. (FEB 1998) I.75 52.252-6 Authorized Deviations in Clauses. (NOV 2020) I.76 52.253-1 Computer Generated Forms. (JAN 1991)

I.77 1452.228-70 Liability Insurance (JUL 1996) I.78 1452.236-70 Prohibition Against Use of Lead-based Paint (JUL 1996) I.79 Notice of Total Small Business Set-Aside (DEVIATION 2019-01) I.80 Limitations on Subcontracting (DEVIATION 2019-01)

SECTION J - List of Documents, Exhibits, and Other Attachments SECTION K - Representations, Certifications, and Other Statements of Bidders

K.1 52.203-2 Certificate of Independent Price Determination. (APR 1985) K.2 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation. (JAN 2017) K.3 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. (MAY 2011) K.4 52.204-8 Annual Representations and Certifications. (MAR 2020) K.5 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (JUN 2020) K.6 52.204-20 Predecessor of Offeror. (AUG 2020) K.7 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.

(OCT 2020)

K.8 52.209-2 Prohibition on Contracting With Inverted Domestic Corporations-Representation. (NOV 2015) K.9 52.209-5 Certification Regarding Responsibility Matters. (AUG 2020) K.10 52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. (FEB 2016) K.11 52.209-13 Violation of Arms Control Treaties or Agreements-Certification. (FEB 2021) K.12 52.222-22 Previous Contracts and Compliance Reports. (FEB 1999) K.13 52.222-38 Compliance with Veterans' Employment Reporting Requirements. (FEB 2016)

SECTION L - Instructions, Conditions, and Notices to Bidders L.1 Instructions to Offerors L.2 52.204-7 System for Award Management. (OCT 2018) L.3 52.204-16 Commercial and Government Entity Code Reporting. (AUG 2020) L.4 52.204-22 Alternative Line Item Proposal. (JAN 2017) L.5 52.215-1 Instructions to Offerors - Competitive Acquisition. (JAN 2017) L.6 52.216-1 Type of Contract. (APR 1984) L.7 52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work. (MAY 2014) L.8 52.225-10 Notice of Buy American Requirement - Construction Materials. (MAY 2014) L.9 52.228-1 Bid Guarantee. (SEP 1996) L.10 52.236-27 Site Visit (Construction). (FEB 1995) - Alternate I (FEB 1995) L.11 52.236-28 Preparation of Proposals - Construction. (OCT 1997) L.12 52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998) L.13 52.252-5 Authorized Deviations in Provisions. (NOV 2020) L.14 1452.233-2 Service of Protest

SECTION M - Evaluation Factors for Award M.1 GS2320 Evaluation Factors

SECTION B - Supplies or Services

B.1 Schedule of Items

Item No. Description QTY UOM Unit Price

Extended Price

00010 CERC A-3 Backup Generator Requirement IAW the attached SOW 00010A

A 120/240V, WYE, 3PH, 500 KW Generator Set 1 EA

00010A B Generator Set Dual Wall Belly Fuel Tank 1 EA

00010A C Generator Set Weather-Proof Enclosure 1 EA

00010A D 120/240V, 1PH, 1200 AMP Automatic Transfer Switch IAW the attached SOW 1 EA

00010AE 240V, 3PH, 800 AMP Automatic Transfer Switch IAW the attached SOW. 1 EA 00010AFElectrical service disconnect switch 1 EA 00010A

G Concreate mounting pad, underground conduit and wire 1 Job

00010A H

Installation of generator and transfer switching gear in accordance with the statement of work herein. 1 Job

00010AI Payment Protection Costs (i.e. Payment/Performance Bonds if applicable) 1 LS Total

SECTION C - Description/Specifications

C.1 Statement of Work Reference Attachment 1

Statement of Work Reference Attachment 1

C.2 Green Acquisition

"The USGS is committed to promoting the natural environment and protecting the health and well-being of people. In the performance of work under this contract, the Contractor shall exert its best efforts to provide services in a manner that will promote the natural environment and protect health and well-being. Green purchasing or environmentally preferable contracting includes the initiatives described below:

Alternative Fuels and Vehicles are described at http://www.afdc.energy.gov/afdc/

Biobased Products are described at http://www.biopreferred.gov/

Energy efficient products are described at http://energystar.gov/products for Energy Star products and at http://www.eere.energy.gov/femp/procurement for FEMP designated products.

Environmentally Preferable Computers are described at http://www.epeat.net

Significant New Alternatives Program (SNAP) are described at http://www.epa.gov/snap/overview-snap The Comprehensive Procurement Guidelines promote the use of recovered and recycled products at https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program

Water efficient products and services are described at https://www.epa.gov/watersense"

C.3 Indoor Air Quality During Construction

" (a) The contractor shall control contaminants at the source and/or operate the space in such a manner that the GSA indicator levels for carbon monoxide (CO), carbon dioxide (CO2 ), and formaldehyde

(HCHO) are not exceeded. The indicator levels for office areas shall be:

CO - 9 parts per million (ppm) time-weighted average (TWA - 8-hour sample); CO2 - 1000 ppm (TWA); formaldehyde

- 0.1 ppm (TWA).

(b) The contractor shall make a reasonable attempt to apply insecticides, paints, glues, adhesives, and heating, ventilating and air conditioning (HVAC) system cleaning compounds with highly volatile or irritating organic compounds, outside of working hours. The contractor shall provide at least 72 hours advance notice to the Government before applying noxious chemicals in occupied spaces, and adequately ventilate those spaces during and after application.

(c) To the greatest extent possible, contractor shall sequence the installation of finish materials so that materials that will be high emitters of Volatile Organic Compounds (VOCs) are installed and allowed to cure before installing interior finish materials, especially soft materials that are woven, fibrous, or porous in nature, that may adsorb contaminants and release them over time.

(d) Where demolition or construction work occurs adjacent to occupied space, contractor shall erect appropriate barriers (noise, dust, odor, etc.) and take necessary steps to minimize interference with the occupants. This includes maintaining acceptable temperature, humidity and ventilation in the occupied areas during window removal, window replacement, or similar types of work.

(e) A final flush-out period of 48 to 72 hours should be provided before occupancy. Contractor shall ventilate with 100 percent outside air at the recommended air change rate (ASHRAE Standard 62) during installation of materials and finishes. If outside air would cause unacceptable inside temperature levels, humidity levels, and/or air quality, an alternate ventilation plan may be submitted to the Contracting Officer for approval.

(f) The contractor shall promptly investigate indoor air quality (IAQ) complaints and shall implement the necessary controls to address the complaint when requested to do so by the Contracting Officer.

(g) The Government reserves the right to conduct independent IAQ assessments and detailed studies in space it occupies, as well as in space serving the Government-leased space (e.g., common use areas, mechanical rooms, HVAC systems, etc.). The contractor shall assist the Government in its assessments and detailed studies by making available information on building operations and contractor activities, and providing access to space for assessment and testing, if required, and implement corrective measures required by the Contracting Officer."

SECTION D - Packaging and Marking

SECTION E - Inspection and Acceptance

E.1 52.246-12 Inspection of Construction. (AUG 1996)

(a) Definition. Work includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not -

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) below.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer.

The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary.

The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

(End of clause)

SECTION F - Deliveries or Performance

F.1 Deliverables

F.2 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 70 calendar days from the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

F.3 52.242-14 Suspension of Work. (APR 1984)

(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.

(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1) by an act of the Contracting Officer in the administration of this contract, or (2) by the Contracting Officer's failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly.

However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.

(c) A claim under this clause shall not be allowed (1) for any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order), and (2) unless the claim, in an amount stated, is asserted in

Deliverable Reference Due Deliver To

Bid Guarantee Section L: 52.228-1 Closing date of solicitation; Upon submission of proposal CS

Performance and Payment Bond Section I: 52.228-15 Within 10 calendar days after receipt of contract award CS

Proof of Liability Insurance Section I: 1452.228-70 Within 10 calendar days after receipt of contract award CS

Construction Schedule Section I: 52.236-15 Within 5 calendar days after notice to proceed (NTP) is issued COTR

Electrician's License SOW Within 5 calendar days after notice to proceed (NTP) is issued COTR

Invoices Section G: DOI Electronic Invoicing, GS1126

Invoices for progress payments may be submitted no more frequently than monthly IPP, COTR

DI-137 Release of Claims Section I: 1452.204-70 Submitted with final invoice IPP Web Page Final Invoice N/A After final completion IPP We Page

Weekly payrolls for contract and each subcontractor Section I: 52.222-8 Within 7 days after regular payment date of the payroll week covered

CS

Ref: FAR

22.406-6(c) SF1413 Statement and

Acknowledgement of Subcontractor Section I: 52.222-11 Within 5 calendar days after award CS writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.

(End of clause)

F.4 Legal Holidays

"The following legal holidays are observed by this Government agency:

New Year's Day January 01

Martin Luther King's Birthday 3rd Monday in January

Presidents Day 3rd Monday in February

Memorial Day Last Monday in May

Independence Day July 04

Labor Day 1st Monday in September

Columbus Day 2nd Monday in October

Veterans Day November 11

Thanksgiving Day 4th Thursday in November

Christmas Day December 25

When a holiday falls on Saturday or Sunday, it is observed on the adjacent Friday or Monday, respectively.

In addition to the holidays listed above, the contractor agrees to observe leave days or closures designated by Federal Statute, Executive Order, or Presidential Proclamation."

SECTION G - Contract Administration Data

G.1 1452.204-70 Release of Claims (JUL 1996)

After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.

(End of clause)

G.2 Invoicing and Performance Statements

"Invoicing and Performance Statements (Construction)

(a) A copy of each invoice submitted with an IPP payment request must be submitted to:

U.S. Geological Survey

**TO BE PROVIDED UPON AWARD**

Attn: [ ]

(b) Invoices for progress payments may be submitted no more frequently than monthly.

(c) Invoices for progress payments must be accompanied by a contract Performance Statement, which shall show in detail the estimated percentage of completion and value of completed performance for each separately priced line item or, if applicable, each of the significant construction categories contained in the approved Schedule of Prices.

(d) See clause 52.232-5 for certification requirements."

G.3 Unilateral Deobligation of Unexpended Funds

The contractor shall submit all invoices under the award no later than 90 calendar days after the period of performance has expired, unless a request for extension has been submitted to the Contracting Officer. After 120 days has passed since the expiration of the performance period, the government reserves the right to issue a unilateral modification deobligating any unexpended funds, and to initiate closeout procedures.

G.4 AUTHORITIES AND DELEGATIONS (SEPT 2011)

Authorities and Delegations (SEP 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting

Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum.

The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

(End of clause)

G.5 Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013)

Payment requests must be submitted electronically through the U. S.

Department of the Treasury's Invoice Processing Platform System (IPP).

'Payment request' means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause

52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice [Contracting Officer to edit and include the documentation required under this contract]:

Invoices for progress payments must be accompanied by a contract Performance Statement, which shall show in detail the estimated percentage of completion and value of completed performance for each separately priced line item or, if applicable, each of the significant construction categories contained in the approved Schedule of Prices.

See clause 52.232-5 for certification requirements.

Certified payrolls.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email

IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

SECTION H - Special Contract Requirements

H.1 Indemnity

The contractor herein is "an independent contractor" and shall obtain all necessary insurance to protect himself from liability arising out of this contract. The contractor hereby agrees to indemnify and hold the Government harmless in connection with, any loss or liability from damage to or destruction of property or from injuries to or death of persons (including the agents and employees of both parties) if such damage, destruction, injury or death arises out of, or is caused by performance of work under this contract, unless such damage, destruction, injury or death is caused solely by the active negligence of the Government, its agents or employees. The contractor agrees to include this clause, appropriately modified, in all subcontracts to be performed under this contract.

H.2 Notice to Government of Delays

In the event the contractor encounters difficulty in meeting performance requirements, or when it anticipates difficulty in complying with the contract delivery schedule or date, or whenever the contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of this contract, the contractor shall immediately notify the contracting officer and the COR (if one has been designated), in writing, giving pertinent details.

This data shall be informational only in character. Notice under this provision shall not be construed as a waiver by the Government of any delivery schedule or date or of any rights or remedies provided by law or under this contract.

H.3 Compliance with OSHA-Govt owned Facilities/Equipment

"Compliance with Occupational Safety and Health Act -- Government-Owned

Performance of work hereunder shall comply with the provisions of the Occupational Health and Safety Act of 1970, as amended (OSHA). If, at any time during the performance of this contract, the Government-furnished facilities and/or equipment do not conform to OSHA standards, the contractor must so notify the Contracting Officer, in writing, including a recommendation of the corrective action needed."

H.4 Accident Reporting

"Accident Reporting

If an accident occurs on Government-controlled facilities, a report must be provided to the Contracting Officer's Representative and the Contracting Officer within 48 hours. An accident is defined as an event which causes injury, illness, or loss or damage to Government-owned or private property. The contractor will cooperate with any ensuing Government accident investigation."

H.5 Wage Determination Applicable

In the performance of this contract, the contractor shall comply with the requirements of U.S. Department of Labor Wage Determination Number MO20210036 dated 7/23/2021. The wage determination is incorporated into this contract as Attachment 3

H.6 ORGANIZATIONAL CONFLICT OF INTEREST DISCLOSURE (NOV 2007)

1. Definition. Organizational conflict of interest means that because of other activities or relationships with other persons, a person is unable or potentially unable to render impartial assistance or advice to the Government, or the person�s objectivity in performing the contract work is or might be otherwise impaired, or a person has an unfair competitive advantage.

2. Disclosure. By submission of this offer, offeror represents that it is not aware of any information bearing on the existence of any actual or potential organizational conflicts of interest in connection with this solicitation or any resulting contract, except as provided in its disclosure statement. In the disclosure statement, list any potential or actual organizational conflicts of interest. Describe all relevant information concerning any past, present, or planned interests bearing on whether this firm (including its chief executives and directors, any proposed consultants or subcontractors) may have a potential organizational conflict of interest. If no potential or actual conflicts exist, so indicate with a check mark:

____ No potential or actual organizational conflicts of interest are known.

3. Failure to provide the disclosure or representation will be deemed a minor informality (FAR 14.405) and the offeror will be required to promptly correct the omission. Refusal to provide the disclosure or representation and any additional information as required will result in disqualification of the offeror for award.

4. The contractor agrees that, if after award he discovers an organizational conflict of interest with respect to this contract, he shall make an immediate and full disclosure in writing to the Contracting Officer, which shall include a description of the action which the contractor has taken or proposes to take to avoid, eliminate, or neutralize the conflict. The Government may, however, terminate the contract for the convenience of the Government if it would be in the best interests of the Government.

5. In the event that the contractor was aware of organizational conflict of interest prior to the award of this contract and failed to disclose the conflict to the Contracting Officer, the Government may terminate the contract at no cost to the Government.

6. If the Contracting Officer determines that a potential or actual conflict exists, the offeror will not receive an award unless the conflict can be avoided or otherwise resolved through the inclusion of a special contract clause or other appropriate means. The terms of any special clause are subject to negotiation. Offerors should refer to FAR Subpart 9.5 for policies and procedures for avoiding, neutralizing, or mitigating organizational conflicts of interest.

Alternate 1:

When a potential or actual organizational conflict of interest is known to the Government, replace paragraph 2 with:

2. The contracting officer considers that there is potential for organizational conflicts of interest involving this procurement or services to be performed under the resultant contract, as follows:

[ CO fill in ]

By submission of this offer, offeror represents that it is not aware of any information bearing on the existence of any actual or potential organizational conflicts of interest in connection with this solicitation or any resulting contract, except as provided in its disclosure statement. In the disclosure statement, list any potential or actual organizational conflicts of interest. Describe all relevant information concerning any past, present, or planned interests bearing on whether this firm (including its chief executives and directors, any proposed consultants or subcontractors) may have a potential organizational conflict of interest. If no potential or actual conflicts exist, so indicate with a check mark:

____ No potential or actual organizational conflicts of interest exist.

(End of Clause)

H.7 Notice to Contractors - CPARS (DEC 2015

NOTICE TO CONTRACTORS

Contractor Performance Assessment Reporting System (December 2015)

1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.

2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.

3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.

4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.

5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.

a) Contractor Representatives may then provide comments in response to the 6.evaluation, or return the evaluation without comment.

b) Your comments should focus on objective facts in the AO's narrative and should a)provide your views on the causes and ramifications of the assessed performance.

c) All information provided should be reviewed for accuracy prior to submission.

d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting "Accept the Ratings and Close the Evaluation".

e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as "Pending" with or without comments and whether or not it has been closed.

f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."

6) The following guidelines apply concerning your use of the past performance evaluation:

a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.

b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.

7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.

8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

(End of notice)

H.8 SECURITY REQUIREMENTS: FACILITY ACCESS and INFORMATION TECHNOLOGY (AUG 2016)

N/A

SECTION I - Contract Clauses

I.1 52.203-3 Gratuities. (APR 1984)

I.2 52.203-5 Covenant Against Contingent Fees. (MAY 2014)

I.3 52.203-7 Anti-Kickback Procedures. (JUN 2020)

I.4 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (MAY 2014)

I.5 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014)

I.6 52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. (SEP 2007)

I.7 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (JUN 2020)

I.8 52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights. (JUN 2020)

I.9 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. (JAN 2017)

I.10 52.204-13 System for Award Management Maintenance. (OCT 2018)

I.11 52.204-18 Commercial and Government Entity Code Maintenance. (AUG 2020)

I.12 52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014)

I.13 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities. (JUL 2018)

I.14 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2020)

I.15 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. (JUN 2020)

I.16 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (NOV 2015)

I.17 52.215-8 Order of Precedence - Uniform Contract Format. (OCT 1997)

I.18 52.219-8 Utilization of Small Business Concerns. (OCT 2018)

I.19 52.219-28 Post-Award Small Business Program Rerepresentation. (NOV 2020)

I.20 52.222-4 Contract Work Hours and Safety Standards - Overtime Compensation. (MAY 2018)

I.21 52.222-6 Construction Wage Rate Requirements. (AUG 2018)

I.22 52.222-7 Withholding of Funds. (MAY 2014)

I.23 52.222-8 Payrolls and Basic Records. (JUL 2021)

I.24 52.222-9 Apprentices and Trainees. (JUL 2005)

I.25 52.222-10 Compliance With Copeland Act Requirements. (FEB 1988)

I.26 52.222-11 Subcontracts (Labor Standards). (MAY 2014)

I.27 52.222-12 Contract Termination - Debarment. (MAY 2014)

I.28 52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations. (MAY 2014)

I.29 52.222-14 Disputes Concerning Labor Standards. (FEB 1988)

I.30 52.222-15 Certification of Eligibility. (MAY 2014)

I.31 52.222-23 Notice of Requirement for Affirmative Action To Ensure Equal Employment Opportunity for Construction. (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

6.3%

Goals for female participation for each trade

6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled Affirmative Action Compliance Requirements for Construction, and (3) its efforts to meet the goals.

The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade.