Sol_140A2324R0080.pdf
PDF 313 KB Posted
- Attached to
- OJO ENCINO PLAYGROUND CONSTRUCTION Federal contract opportunity
- Solicitation number
- 140A2324R0080
About this file
This document is a solicitation for a firm fixed-price construction contract to improve the playground at the Ojo Encino Day School in New Mexico. The contractor shall provide all necessary materials, equipment, labor, and supervision to construct a new playground, including removing and replacing playground equipment, installing a poured-in-place safety surface, and constructing ADA-accessible features. This is a total Indian Economic Enterprise (IEE) set-aside. The estimated price range is between $250,000 and $500,000. Proposals are due by June 25, 2024 at 12:00 PM Mountain Daylight Time. A site visit is scheduled for June 13, 2024, and the period of performance is 150 calendar days from the notice to proceed. Award will be made on the basis of the lowest evaluated price of proposals meeting the technical acceptability standards. The Contracting Officer is Mary Jane Johnson, and the Contracting Officer's Representative is Barbara Hanson.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140A2324R0080_Amd_0001.pdf | ||
| C_-_SF-24_Bid_Bond_Form.pdf | ||
| D_-_SF-25_Performance_Bond_Form.pdf | ||
| F_-_SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting).pdf | ||
| SOW_Ojo_Encino_Lower_Grade_Playground_Rev_April_1__2024.docx | DOCX document | |
| A_-_Davis_Bacon_Wage_Rates.pdf | ||
| B_-_Question_Log.xlsx | XLSX spreadsheet | |
| E_-_SF-25A_Payment_Bond_Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION CALL
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
Indian Education Acquisition Office
1011 Indian School Rd.
Suite 352A Albuquerque NM 87104
A23
Mary Jane Johnson 5058034259
1x 06/17/2024
140A2324R0080
INVITATION FOR BID
REQUEST FOR PROPOSAL
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
This solicitation is for a firm fixed construction for the following project: The contractor is to provide all materials, supplies, incidentals, labor, equipment, and supervision necessary for the construction of a Playground for Ojo Encino Day School in accordance with the statement. This is an Indian Economic Enterprise (IEE) Set
Aside.
1. A single firm fixed price contract will be issued using this solicitation.
2. Contract Clauses: Provisions of this requirement are found within section K and L.
3. Proposal Acceptance Period/Date: The proposal acceptance period shall be ninety
(90) days past the closing date.
4. SOLICITATION Deadline: Tuesday, June 25, 2024, at 12:00 PM Mountain Daylight Time
(MDT)
5. The contractor shall provide their proposal via e-mail to maryjane.johnson@bie.edu.
Continued ...
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 150 calendar days and complete it within ________________ ________________ calendar days after receiving
FAR CLAUSE 52.211-10
06/25/2024
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 12/2022)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Indian Education Acquisition Office 1011 Indian School Rd.
Suite 352A Albuquerque NM 87104
A23
Mary Jane Johnson
28. NEGOTIATED AGREEMENT 29. AWARD
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
10 U.S.C. 3204(a) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 12/2022) BACK
Continued...
and return
(Contractor is not required to sign this document.) Your offer on this
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 24
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140A2324R0080
6. Questions and Answers: Any questions relating to this solicitation shall be submitted to maryjane.johnson@bie.edu no later than 4:00 PM
MST on June 17, 2024. Responses will be provided in the attached Question log.
7. On-site Access: A list of personnel, with all pertinent information, to include, name, phone number, e-mail, and contractor name, shall be submitted to the CO, and COR and is a deliverable under any resulting task order, the day before the site visit.
8. SITE VISIT: A site visit for this requirement is scheduled to occur on Thursday, June 13, 2024, at 11:00 AM. Participants are to meet at the Ojo
Encino Day School. Please e-mail the Contracting
Officer your intent to participate in the site meeting prior to June 12, 2024.
9. WAGE DETERMINATION: Wages for all contractors and subcontractors must comply with Davis Bacon
Wage Determinations. The current determination is
General Decision NM2024004; See Attachment Wage
Rates. Be advised the determination that is current at the time of the Task Order award is the determination that will apply for the project. Current determinations are always available at: https://sam.gov/.
10. Notice to Proceed (NTP): A Notice to Proceed
(NTP) will be issued after the Pre-Construction meeting, Receipt of Bonding and Valid Background
Screening.
11. Period of Performance: One Hundred fifty
(150) Calendar Days from notice to proceed.
12. In accordance with FAR Part 36.204(d)
Disclosure of the Magnitude of Construction
Projects estimated price range is between
$250,000 and $500,000.
13. BONDS (Reference Contract Clause FAR
52.228-15 for further information on applicability): A bid bond is due at the time of proposal submittal. And the payment and
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 24
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140A2324R0080 performance bond shall be provided 10 calendars after receipt of the award of the Task order.
Notice to proceed will not be issued until the
Contractor provides sufficient bonding to cover the work being performed and have favorable background.
14. Special attention is called to FAR Clause
52.236-7, Permits and responsibilities and FAR
Clause 52.229-3, Federal, State, and Local Taxes.
Offerors are responsible for contacting the tax authorities and tribe or tribal organization involved with regard to any requirements regarding state taxes, tribal taxes, royalties and/or other applicable tribal laws or ordinances. Any costs associated with this section shall be included in the contractor's firm fixed price proposal. Contractor is responsible for contacting the appropriate Tribal
Taxation Authority office for coordination and approvals. Please refer to Section H and the applicable clauses for additional information about these requirements.
15. A contract is being competed using the evaluation factors process described in Section L
& M.
16. Point of Contact: Contracting Officer: Mary
Jane Johnson, maryjane.johnson@bie.edu, 505-803-4259.
Improve playground for Safety and Update
Playground equipment for lower grade level.
Period of Performance: 07/15/2024 to 12/16/2024
00010 EQUIPMENT AND MATERIAL
Product/Service Code: E1PA
Product/Service Description: PURCHASE OF
RECREATIONAL FACILITIES (NON-BUILDING)
00020 CONSTRUCITON (LABOR & INSTALLATION)
Product/Service Code: V112
Product/Service Description:
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
5 24
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140A2324R0080
TRANSPORTATION/TRAVEL/RELOCATION- TRANSPORTATION:
MOTOR FREIGHT
00030 GROUND PREPARATION (LABOR)
Product/Service Code: N078
Product/Service Description: INSTALLATION OF
EQUIPMENT- RECREATIONAL AND ATHLETIC EQUIPMENT
00040 MOBLIZATION/DEMOBLIZATION; DISPOSAL FEE; FREIGHT
Product/Service Code: R499
Product/Service Description: SUPPORT-
PROFESSIONAL: OTHER
00050 BONDING; ALL APPLICABLE TAXES; NN TAXES
Product/Service Code: V112
Product/Service Description:
TRANSPORTATION/TRAVEL/RELOCATION- TRANSPORTATION:
MOTOR FREIGHT
COR: Barbara Hanson, barbara.hanson@bie.edu
CO: Mary Jane Johnson, maryjane.johnson@bie.edu
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
SOLICITATION NO.: 140A2324R0080
Ojo Encino Day School – CON Playground
PART I – THE SCHEDULE
SECTION B: SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 SCHEDULE OF ITEMS:
Description Quantity Price
1 CONSTRUCTION (LABOR & INSTALLATION) 1 JOB
2 GROUND PREPARATION (LABOR) 1 JOB
3 MOBILIZATION/DEMOBILIZATION 1 JOB
4 DISPOSAL FEE 1 JOB
5 FREIGHT 1 JOB
SUB-TOTAL (LABOR & INSTALLATION):
6 EQUIPMENT & MATERIALS (BRAND NAME OR EQUAL APPLIES)
Inclusive Play Activities Cocoons 2 EA
Playhouse 1 EA
Log Tunnel 1 EA
Tent Playhouse 1 EA
Planters 2 EA
Sensory Play Music Panels 1 EA
12 Play Event Play Equipment 1 EA
Bike path on the inside perimeter of the playground 1 JOB
New exit gate, to exit out of the playground on the eastside 1 JOB
Poured in place solid surfacing replacing the old rubber tile blocks 1 JOB
ADA accessibility to the play equipment. 1 JOB
ADA accessible play equipment 1 JOB
Shade structure or shade cloth over the new play equipment 1 JOB
Shade structures require drawing of structure. 1 JOB
SUB-TOTAL (Equipment & Materials)
GRAND TOTAL
Bonding Navajo Nation TAXES 6% All Applicable State Taxes
TOTAL:
* UNIT OF ISSUE – LS – Lump Sum; LSQ - Lump Sum Quantities, JB - Job
B.2 PAYMENT FOR BOND PREMIUMS:
Payment for bond premiums, in accordance with FAR Clause 52.232-5, Payments Under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under separate line item.
SECTION C: DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF CONTRACT:
The contractor shall furnish all necessary personnel, supervision, materials, equipment, services and facilities (except as otherwise specified) to perform the construction and renovate the existing playground at Ojo Encino Day School, in Ojo Encino, New Mexico, in the accordance with the Statement of Work or Specifications (attachments to the Statement of Work/ Specifications are listed in Section J and are hereby made part of this solicitation and any resultant contract). The project consists of removal and replacement of playground equipment in accordance with the attached statement of work.
C.2 PROJECT LOCATION:
Ojo Encino Day School
C.3 PROJECT MAGNITUDE:
Pursuant to FAR 36.204, the estimated price range is: Between $250,000 and $500,000.
C.4 TECHNICAL SPECIFICATIONS:
All Project Specifications and Requirements are listed in Attachment 1
SECTION D: PACKAGING AND MARKING
D.1 PACKAGING AND MARKING:
a. All shipments of materials, equipment and/or supplies to the project site shall be addressed to the Contractor and not the Bureau of Indian Education. Preservation, packaging and packing shall be in accordance with standard practice for commercial packaging.
b. Materials provided by the Contractor shall be new and, where appropriate, shall arrive on-site in original containers sealed by the manufacturer. The Government reserves the right to refuse any materials not deemed adequate.
c. Materials damaged by equipment, water, or dirt are not acceptable.
d. Materials shall be stored in a manner acceptable to the manufacturer. Storage requirements include protection from rain, etc. The Contractor shall provide adequate storage; the Government may provide storage if interference with Government operations do not occur. This will be coordinated with the Government prior to mobilization.
Manufacturer's requirements shall be strictly adhered to.
SECTION E: INSPECTION AND ACCEPTANCE
E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/far
Clause Title Date 52.246-12 Inspection of Construction AUG 1996
SECTION F: DELIVERIES OR PERFORMANCE
F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in https://www.acquisition.gov/far full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/far
Clause Title Date 52.211-13 Time Extensions SEP 2000 52.211-18 Variation in Estimated Quantity APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.242-14 Suspension of Work APR 1984 52.242-17 Government Delay of Work APR 1984
F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK APR 1984
The Contractor shall be required to (a) commence work under this contract within ten 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 150 days after NTP. The time stated for completion shall include final cleanup of the premises.
SECTION G: CONTRACT ADMINISTRATION DATA
G.1 POST AWARD CONFERENCE:
A post award conference with the successful offeror is required. It will be scheduled and held within 10 days after the date of contract award. The conference will be held virtually via Microsoft Teams and further information will be provided after award.
G.2 CONTRACT ADMINISTRATION- GOVERNMENT: All administrative questions shall be directed to:
(Note: This is a virtual team - please correspond via email.)
Mary Jane Johnson BIE Contracting Officer – Div. of Acquisition Operations 1011 Indian School RD NW Albuquerque, New Mexico 87104 Telephone No.: (505) 803-4259 Email: maryjane.johnson@bie.edu
G.3 CONTRACT ADMINISTRATION- CONTRACTOR:
Designate a person whom the Government may contact during the period of the contract for prompt action on matters pertaining to the administration of the contract. Authorized Administrator is:
Company Name POC Name POC Email Company Address POC Phone #
G.4 CONTRACTING OFFICER:
The Contracting Officer means a person who is the principal individual and responsible representative of the Government with the authority to enter into, administer and/or terminate contracts and make related determinations and findings pertaining to the contract. The Contracting Officer signs all contractual documents, approves and signs all modifications to contracts, processes and approves payment requests, reviews and makes final decisions on contractual discrepancies, and administers the contract. The Contracting Officer is the only authorized individual to make changes to the contract.
G.5 CONTRACTING OFFICER'S REPRESENTATIVE:
a. The Contracting Officer shall designate a Contracting Officer's Representative (COR) who will represent the Contracting Officer in the technical phase of the work. The COR's duties, responsibilities, and limitations of authority will be set forth in a written COR designation letter. A copy of the COR designation letter will be made available to the Contractor.
b. The COR is not authorized to make any changes to the terms and conditions of this contract. Only the Contracting Officer is authorized to make any changes to the contract by a properly written signed modification to the contract.
c. The Contracting Officer is the only official who can legally commit or obligate the Government for expenditure of public funds.
G.6 DIAR 1452.201-70 AUTHORITIES AND DELEGATIONS SEP 2011
a. The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
b. The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
c. The COR is not authorized to perform, formally or informally, any of the following actions:
a. Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
b. Waive or agree to modification of the delivery schedule;
c. Make any final decision on any contract matter subject to the Disputes Clause;
d. Terminate, for any reason, the Contractor's right to proceed;
e. Obligate in any way, the payment of money by the Government.
d. The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
e. The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
f. The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
g. Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
G.7 INVOICE AND PAYMENT:
Electronic Invoicing and Payment Requirements- Invoice Processing Platform (IPP) (February 2021) Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor.
To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:
https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: Reference FAR 52.232-5, 52.232-16, 52.232-27 and 52.232-33.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment.
The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP https://www.ipp.gov/
Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 TRIBAL TAXES AND/OR TERO FEE REQUIREMENTS:
a. Special attention is called to FAR Clause 52.236-7, Permits and Responsibilities and FAR Clause 52.229- 3, Federal, State, and Local Taxes. Offerors are responsible for contacting the tribe, or tribal organization involved, regarding any requirements pertaining to tribal taxes and/or other applicable tribal laws or ordinances. Any costs associated with this section shall be included in the contractor's bid.
b. Offerors are also responsible for contacting the tribe’s Tribal Employment Rights Ordinance/Office (TERO) to obtain information on applicable TERO requirements or fees. FAQ’s about TERO can be found at councilfortribalemploymentrights.org/tero-faq.
H.2 CONTRACTOR SAFETY PROGRAM REQUIREMENTS:
In accordance with FAR 52.236-13, Accident Prevention - Alternate I,
a. Safety Program Submittal: Prior to commencement of work, submit the written plan for implementing this clause to: maryjane.johnson@bie.edu. The plan shall include an analysis of the significant hazards to life, limb, and property inherent in contract work performance and a plan for controlling these hazards.
b. Pre-Construction Safety Meeting: Meet with representatives of the Contracting Officer to discuss and develop a mutual understanding relative to administration of the overall safety program.
H.3 DRAWINGS AND OTHER DATA TO BECOME PROPERTY OF GOVERNMENT:
In accordance with FAR 52.236-21, Specifications and Drawings for Construction, all designs, drawings, specifications, or other works developed in the performance of this contract shall become the sole property of the Government and may be used on any other design or construction without additional compensation to the Contractor. The Government shall be considered the "person for whom the work was prepared" for the purpose of authorship in any copyrightable work under 17 U.S.C. 201(b). With respect thereto, the Contractor agrees not to assert or authorize others to assert any rights nor establish any claim under the design patent or copyright laws.
H.4 CONTRACTOR SECURITY REQUIREMENTS:
At the Pre-construction Conference (and prior to beginning work on the contract), the Contractor shall provide a list of all on-site personnel, including sub-contractors (including second and third-tier subcontractors) and suppliers, to the Contracting Officer. The contractor shall update this list when changes occur. Contractor personnel not listed may be denied access to a facility. Contractor personnel will be restricted to designated working areas and any personnel violating this policy may lose access to the facility.
Contractor personnel shall have photo identification at all times while working on BIA/BIE facilities.
Contractors shall provide the COR with 24 hours of advance notice of every delivery to the site (e.g., concrete, lumber, etc...) and provide the company name, delivery person, and phone number of the firm(s) making deliveries. Otherwise, access to a facility may be denied.
H.5 REAL ID ACT OF 2005:
The Real ID Act of 2005 established minimum security standards for license issuance and production and prohibits Federal agencies from accepting for certain purposes driver's licenses and identification cards from states not meeting the Act's minimum standards. To this purpose there are five states that are not in compliance with the Act nor have they received an extension to come into compliance with the act. Those states are Illinois, Minnesota, Missouri, New Mexico and Washington State. Anyone under this contract, to include subcontractors, who holds a driver's license from any of states without approved licenses and require access to a military facility will be required to provide identification other than a driver's license to gain access. It is the responsibility of the Contractor to ensure that they are in accordance with the Real ID Act and mailto:IPPCustomerSupport@fiscal.treasury.gov http://www.councilfortribalemploymentrights.org/tero-faq/ any other requirements for base access. For the states of Washington and Minnesota an enhanced driver's license is acceptable to gain access. Other forms of identification that are acceptable for military facility access are included as an attachment to this modification. Further information on the Real ID Act can be found here: http://www.dhs.gov/real-id-enforcement-brief#.
H.6 EXISTING UTILITIES:
Utility locations when shown are approximate. The contractor shall field verify all utility locations before digging or trenching. This shall include but not be limited to the use of sonic, electronic or magnetic detection devices, by noting pull box and utility box locations at the surface, and by potholing. Contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government.
H.7 COVID-19 GUIDELINES:
The following guidelines will be adhered to at BIE facilities as a preventive health strategy in response to the COVID-19 health pandemic. These guidelines are based on the Centers for Disease Control and Prevention (CDC) and Occupational Safety and Health Administration (OSHA) best practices to minimize risk of coronavirus transmission as employees return to the workplace.
a. COVID Symptoms. Any Contractor personnel, employees, subcontractors, partners, or workers who are experiencing symptoms of COVID-19, including but not limited to cough, shortness of breath or difficulty breathing, fever, chills, muscle pain, sore throat, new loss of taste or smell should not report to work. See CDC guidance on Quarantine & Isolation at https://www.cdc.gov/coronavirus/2019-ncov/your-health/quarantine-isolation.html. Contractor’s project managers and site superintendents are responsible to monitor employees for symptoms before and during work, and follow appropriate precautions in accordance with CDC and OSHA Guidance – https://www.cdc.gov/coronavirus/2019-ncov/community/workplaces-businesses/specific-industries.html. If a contractor’s employee is unsure if they are sick, they should consult their supervisor. Visitors exhibiting or reporting COVID-19 symptoms (i.e., cough or shortness of breath or difficulty breathing fever, chills, muscle pain, sore throat, new loss of taste or smell) should be encouraged through notice and signage to leave the facility and reschedule their meeting/visit for a future time when they are in good health.
b. Face Covers. Contractor personnel are required to wear face covers while onsite. Cloth face coverings are not respirators and are not appropriate substitutes where filtering face piece respirators are required. Employees who are performing tasks at elevated risk requiring respirators as identified through the job hazards analysis will be provided with the appropriate Personal Protective Equipment (PPE) to perform their jobs safely.
c. Social Distancing. The CDC guidance includes a primary objective of disease mitigation through good hygiene, staying home when sick, and social distancing. Social distancing is a set of actions taken to stop or slow the spread of a highly contagious disease. The CDC has determined that social distancing is an essential step in preventing the spread of COVID-19. The goal of social distancing is to limit face-to-face contact to decrease the spread of illness among people in community settings. Employees should practice social distancing by putting space (currently six feet) between themselves and others. Visitors that exceed the maximum occupancy for the space should not enter the space. Any waiting area should also be structured to limit aggregation of people to avoid crowding and maintain social distancing. Waiting areas should have suitable floor markings to facilitate social distancing.
d. Hygiene. Contractors will have an overall cleaning schedule that is consistent with CDC cleaning recommendations including using Environmental Protection Agency (EPA) recommended cleaning and disinfecting solutions (https://www.cdc.gov/coronavirus/2019-ncov/community/clean-disinfect/index.html).
Additionally, the Contractor shall encourage and support frequent hand washing, hand sanitizing and wiping down of surfaces in high traffic, shared spaces (e.g., elevator lobbies, community desk, pantry, nooks, meeting rooms, restrooms, phone booths). Workstation configurations and schedules should accommodate simplified cleaning measures wherever possible.
H.8 BACKGROUND INVESTIGATION:
In accordance with 25 U.S.C. § 3201 et seq. (Pub. L. 101-630), the Indian Child Protection and Family Violence Prevention Act; 34 U.C.C. § 20351, et seq. (Pub. L. 101-647), the Crime Control Act of 1990, as amended; and 441 Departmental Manual, Personnel Security and Suitability Requirements, all positions with duties and responsibilities involving regular contact with or control over Indian children are subject to a http://www.dhs.gov/real-id-enforcement-brief https://www.cdc.gov/coronavirus/2019-ncov/your-health/quarantine-isolation.html https://www.cdc.gov/coronavirus/2019-ncov/your-health/quarantine-isolation.html https://www.cdc.gov/coronavirus/2019-ncov/community/workplaces-businesses/specific-industries.html https://www.cdc.gov/coronavirus/2019-ncov/community/workplaces-businesses/specific-industries.html https://www.cdc.gov/coronavirus/2019-ncov/community/clean-disinfect/index.html background investigation and determination of suitability for employment.
Accordingly, all such positions require a favorable background screening by the Bureau of Indian Education (BIE), Personnel Security and Suitability Program and a favorable background investigation by the Defense Counterintelligence Service Agency (DCSA). The documentation required to initiate a background investigation shall be completed for any Contractor employee that will be onsite during the contract’s performance or have access to Personally Identifiable Information (PII). The complete submittal of the background investigation paperwork to the BIA/BIE will be accomplished within 14 days after contract award for service contracts or, for construction contracts, before a Notice to Proceed (NTP) is issued by the Contracting Officer. Pending the successful completion of a background investigation by the BIA/BIE and/or DCSA, the Contractor who has been granted a favorable screening (applicant and suitability) determination must, at all times, remain within sight and under the supervision of a government employee (or other person designated by the Contracting Officer Representative (COR), who has successfully completed the background investigation. If an unfavorable screening (applicant and suitability) determination is made, an employee shall not be allowed onsite. If the Contractor’s employees are found onsite, without the proper authorization, the employee will face legal liability and the Contractor may have their contract terminated for default.
Additionally, the individual and/or the company who proposed to employ this individual may be determined to be non- responsible if an unfavorable screening (applicant and suitability) determination is made and may be deemed ineligible for contract award. If an unfavorable final background investigation determination is made, the contract may be terminated and the employee in question shall not be authorized to provide service to the BIA/BIE if the services involve contact with or regular control over Indian children. It is solely the COR’s responsibility to initiate background checks for all Contractors and their employees in the BIE BEARCUBS system, which includes but is not limited to appropriate investigative forms and/or inquiries about their previous investigation; and, obtain a screening (applicant and suitability) determination, and subsequent final background investigation.
The Contracting Officer will consult with the COR when questions arise as to whether or not the scope of work of a contract requires background investigations for contractor personnel. If the Contracting Officer or COR believes the scope of work performed by contract personnel should not require a background investigation, the Personnel Security Officer will be contacted for concurrence and has the final authority to determine if background investigation(s) are required.
H.9 BONDING REQUIREMENTS:
a. Bid Bond – The amount of the bid bond shall be 20% of the original contract price.
b. Performance Bond – The amount of the performance bond shall be 100% of the original contract price.
c. Payment Bond – The amount of the payment bond shall be 100% of the original contract price.
d. Individual Surety – The bidders shall comply with FAR Clause 52.228-11, Pledge of Assets.
e. Third Party Indemnification Agreements. The bidder shall furnish a copy of any indemnification agreements that it entered into in order to secure the bonds required by the solicitation by the time set for bid opening. If an indemnification agreement was not requirement in order for the bidder to obtain the required bonds, an affidavit to that effect shall be provided by the surety along with the bid bond by the time set for bid opening.
Failure to furnish a copy of the required indemnification agreement or the surety’s affidavit may cause the bid to be rejected.
PART II – CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: https://www.acquisition.gov/far and https://www.acquisition.gov/diar
CLAUSES TITLE DATE
https://www.acquisition.gov/diar
52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions on Subcontractor Sales to the Government JUN 2020 52.203-7 Anti-Kickback Procedures JUN 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity MAY 2014 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity MAY 2014 52.203-12 Limitation on Payments to Influence Certain Federal Transactions JUN 2020 52.203-17 Contractor Employee Whistleblower Rights NOV 2023 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements and
Statements
JAN 2017
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards JUN 2020 52.204-13 System for Award Management Maintenance OCT 2018 52.204-14 Service Contract Reporting Requirement OCT 2016 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and Certifications DEC 2014 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by
Kaspersky Lab and Other Covered Entities
DEC 2023
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
NOV 2021
52.204-27 Prohibition on a ByteDance Covered Application JUN 2023
52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment
NOV 2021
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters OCT 2018 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations NOV 2015 52.215-2 Audit and Records – Negotiation JUN 2020 52.215-8 Order Precedence – Uniform Contract Format OCT 1997 52.219-8 Utilization of Small Business Concerns FEB 2024 52.219-14 Limitations on Subcontracting OCT 2022 52.219-28 Post-Award Small Business Program Representation FEB 2024 52.222-1 Notice to the Government of Labor Disputes FEB 1997 52.222-3 Convict Labor JUNE 2003 52.222-4 Contract Work Hours and Safety Standards-Overtime Compensation MAY 2018 52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records JUL 2021 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations MAY 2014 52-222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for Construction APR 2015 52.222-35 Equal Opportunity for Veterans JUN 2020 52.222-36 Affirmative Action for Workers with Disabilities JUN 2020 52.222-37 Employment Reports on Veterans JUN 2020 52.222-38 Compliance with Veterans’ Employment Reporting Requirements FEB 2016 52.222-40 Notification of Employee Rights Under the National Labor Relations Act DEC 2010 52.222-50 Combating Trafficking in Persons NOV 2021 52.222-54 Employment Eligibility Verification MAY 2022
52.222-55 Minimum Wages Under Executive Order 14026 JAN 2022 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2022 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts MAY 2024 52.223-3 Hazardous Material Identification And Material Safety Data FEB 2021 52.223-5 Pollution Prevention and Right to Know Information MAY 2024 52.223-17 Affirmative Procurement of EPA-designated Items in Services and Construction Contracts AUG 2018 52.223-21 Foams JUN 2016 52.225-9 Buy American – Construction Materials OCT 2022 52.225-13 Restriction on Certain Foreign Purchases FEB 2021 52.226-1 Utilization of Indian Organizations and Indian-Owned Economic Enterprises JUNE 2000 52.226-7 Drug-Free Workplace MAY 2024 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving MAY 2024 52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance – Work on a Government Installation JAN 1997 52.228-11 Individual Surety - Pledges of Assets FEB 2021 52.228-12 Prospective Subcontractor Request for Bonds DEC 2022 52.228-15 Performance and Payment Bonds - Construction JUN 2020 52.229-3 Federal, State, and Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-16 Progress Payment NOV 2021 52.232-17 Interest MAY 2014 52.232-23 Assignment of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer-- System for Award Management OCT 2018 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business Subcontractors MAR 2023 52.233-1 Disputes and Alternate I (DEC1991) MAY 2014 52.233-3 Protest after Award AUG 1996 52.233-4 Applicable Law For Breach Of Contract Claim OCT 2004 52.236-1 Performance of Work by the Contractor APR 1984 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-4 Physical Data APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements APR 1984 52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.243-4 Changes JUN 2007 52.244-6 Subcontracts for Commercial Products and Commercial Services DEC 2023 52.245-1 Government Property SEP 2021 52.245-9 Use and Charges APR 2012 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements AUG 1996
52.246-21 Warranty of Construction MAR 1994 52.249-2 Termination for Convenience of the Government (Fixed Price) and Alternate I (SEP 1996) APR 2012 52.249-10 Default (Fixed-Price Construction) APR 1984 52.249-14 Excusable Delays APR 1984 52.253-1 Computer Generated Forms JAN 1991 1452.203-70 Restriction on Endorsements JUL 1996 1452.215-70 Examination of Records by the Department of the Interior APR 1984 1452.236-70 Prohibition Against Use of Lead-based Paint JUL 1996
I.2 FAR 52.204-1 APPROVAL OF CONTRACT DEC 1989
This contract is subject to the written approval of the Contracting Officer and shall not be binding until so approved.
I. 3 DIAR 1452.204-7 RELEASE OF CLAIMS JUL 1996
After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.
I. 4 DIAR 1452.228-70 LIABILITY INSURANCE JUL 1996
a. The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:
$100,000 each person* $300,000 each occurrence* $10,000 property damage* *These amounts to be set by the Contracting Officer.
b. Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.
I.5 DIAR 1452.280-2 NOTICE OF INDIAN ECONOMIC ENTERPRISE SET-ASIDE FEB 2021
(a) Definitions as used in this clause.
Alaska Native Claims Settlement Act (ANCSA) means Public Law 92-203 (December 18, 1971), 85 Stat. 688, codified at 43 U.S.C.
1601-1629h.
Indian means a person who is an enrolled member of a Federally Recognized Indian Tribe.
Indian Economic Enterprise means any business activity owned by one or more Indians or Federally Recognized Indian Tribes, provided that:
(i) The combined Indian or Federally Recognized Indian Tribe ownership of the enterprise shall constitute not less than 51 percent;
(ii) The Indians or Federally Recognized Indian Tribes shall, together, receive at least 51 percent of the earnings from the contract;
and
(iii) The management and daily business operations of an Indian Economic Enterprise must be controlled by one or more individuals who are Indians. To ensure actual control over the enterprise, the individuals must possess requisite management or technical capabilities directly related to the primary industry in which the enterprise conducts business. Management of Tribally owned Indian Economic Enterprises may be provided by:
(A) Committees, teams, or Boards of Directors which are controlled by one or more members of Tribe, or;
(B) Non-Tribal members if the enterprise can demonstrate that the Tribe can hire and fire those individuals, that it will retain control of all management decisions common to Committees, teams, or Boards of Directors. Common management decisions, include strategic planning, budget approval, and the employment and compensation of officers. A written management development plan must also exist which shows how Tribal members will develop managerial skills sufficient to manage the enterprise or similar enterprises in the future.
The enterprise must meet the requirements of (i) through (iii) throughout the following time periods:
(1) At the time an offer is made in response to a written solicitation;
(2) At the time of contract award; and,
(3) During the full term of the contract.
Federally Recognized Indian Tribe means an Indian Tribe, band, nation, or other Federally recognized group or community on the List of Federally Recognized Tribes. This definition includes any Alaska Native regional or village corporation under the Alaska Native Claims Settlement Act (ANCSA).
List of Federally Recognized Tribes means an entity appearing on the United States Department of the Interior's List of federally recognized Indian Tribes published annually in the Federal Register pursuant to Section 104 of Public Law 103-454, codified at 25 U.S.C. 5131.
Representation means the positive statement by an enterprise of its eligibility for preferential consideration and participation for acquisitions conducted under the Buy Indian Act, 25 U.S.C. 47, in accordance with the procedures in Subpart 1480.8.
(b) General.
(1) Under the Buy Indian Act, offers are solicited only from Indian Economic Enterprises.
(2) The Contracting Officer (CO) will reject all offers received from ineligible enterprises.
(3) Any award resulting from this solicitation will be made to an Indian Economic Enterprise, as defined in paragraph (a) of this clause.
(c) Required Submissions. In response to this solicitation, an offeror must also provide the following:
(1) A description of the required percentage of the work/costs to be provided by the offeror over the contract term as required by section 1452.280-3, Subcontracting Limitations clause; and
(2) Qualifications of the key personnel (if any) that will be assigned to the contract.
(d) Required Assurance. The offeror must provide written assurance to the CO that the offeror is and will remain in compliance with the requirements of this clause. It must do this before the CO awards the Buy Indian contract and upon successful and timely completion of the contract, but before the CO accepts the work or product.
(e) Non-responsiveness. Failure to provide the information required by paragraphs (c) and (d) of this clause may cause the CO to find an offer non-responsive and reject it.
(f) Eligibility.
(1) Participation in the Mentor-Protégé Program established under section 831 of the National Defense Authorization Act for Fiscal Year 1991 (25 U.S.C. 47 note) does not render an Indian Economic Enterprise ineligible for contracts awarded under the Buy Indian Act.
(2) If a contractor no longer meets the definition of an Indian Economic Enterprise after award, the contractor must notify the CO immediately and in writing. The notification must include full disclosure of circumstances causing the contractor to lose eligibility status and a description of any actions that the contractor will take to regain eligibility. If the contract is unable to regain eligibility, then the contractor must revise its the representations and certifications in the System for Award Management. Failure to give the CO immediate written notification means that:
(i) The economic enterprise may be declared ineligible as an IEE for future contract awards under this part; and
(ii) The CO may consider termination for default if it is in the best interest of the government.
I.6 DIAR 1452.280-3 INDIAN ECONOMIC ENTERPRISE SUBCONTRACTING LIMITATIONS FEB 2021
(a) Definitions as used in this clause.
(1) Concern means any business entity with a place of business located in the United States or its outlying areas and that makes a significant contribution to the U.S. economy through payment of taxes and/or use of American products, materials and/or labor, etc.
It includes but is not limited to an individual, partnership, corporation, joint venture, association, or cooperative. For the purpose of making affiliation findings (see FAR 19.101), it includes any business entity, whether or not it is organized for profit or located in the United…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .