Sol_140A2324R0023.pdf
PDF 562 KB Posted
- Attached to
- SWIMMING POOL RENOVATION Federal contract opportunity
- Solicitation number
- 140A2324R0023
About this file
This document is a solicitation for the Swimming Pool Renovation at Sherman Indian High School in Riverside, CA. The solicitation is issued by the Department of the Interior Bureau of Indian Affairs Bureau of Indian Education.
The scope of work includes the design and renovation of an indoor swimming pool. This is a two-phase design-build selection procedure, with only the five highest technically rated offerors from Phase I advancing to the Phase II lowest price technically acceptable source selection process. The estimated price range is between $1,000,000 and $5,000,000. The contract will be a single firm-fixed-price purchase order. The solicitation is set aside for 100% Indian Small Business Economic Enterprises. Proposals are due in Phase I on June 27, 2024 and in Phase II on July 24, 2024. The period of performance is 180 days from the notice to proceed.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER SHEET
ISSUING OFFICE: DOI – BUREAU OF INDIAN EDUCATION
CONSTRUCTION AND A/E SERVICES TEAM
1011 Indian School Rd NW
Albuquerque, NM 87104
SOLICITATION #: 140A2324R0023
PROJECT NAME: Swimming Pool Renovation - Sherman Indian High School
SET-ASIDE TYPE: 1 0 0 % I n d i a n S m a l l B u s i n e s s E c o n o m i c E n t e r p r i s e ( I S B E E ) S e t - A s i d e
Submit Proposal to: yui.hoptowit@bie.edu
WRITE THE SOLICITATION NUMBER IN THE SUBJECT LINE
IMPORTANT NOTES:
All offeror’s must be actively registered in the system for award management database prior to award under this solicitation. See FAR clause 52.204-7, System for Award Management on how to apply.
Offers are being solicited only from Indian economic enterprises (IEEs) that are also small business concerns (ISBEE’s). Offers received from others will not be considered and will be rejected. SEE SECTION I – DIAR clause 1452.280-1 Notice of Indian Small Business Economic Enterprise Set-Aside and 1452.280-2 Notice of Indian Economic Enterprise Set-Aside for full details.
Carefully review the proposal submission instructions in Section L. Note that DIAR 1452.280-2, Notice of IEE Set-aside and 1452.280-4, IEE Representation have a required submission, assurance, and self-certification that must be returned with the proposal submission.
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION CALL
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040640598
Indian Education Acquisition Office
1011 Indian School Rd.
Suite 352A Albuquerque NM 87104
A23
Yui Hoptowit 8089782605
1x 05/28/2024
140A2324R0023
INVITATION FOR BID
REQUEST FOR PROPOSAL
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
This information is provided for the following project: Swimming Pool Renovation -
Sherman Indian High School (SIHS)
This is a TWO-PHASE DESIGN-BUILD Selection Procedure Requirement.
1. Funding: A single firm fixed-price purchase order will be made under this solicitation, as funds are presently available. The Government reserves the right to cancel this solicitation before the closing date.
2. Proposal acceptance period/date: The proposal acceptance period shall extend one hundred twenty (120) days past the solicitation closing date.
3. Solicitation deadline: PHASE I: June 27, 2024, at 5:00 PM MT. The five (5) highest technically rated offerors will be notified via email to proceed to PHASE
II. PHASE II: July 24,2024 at 5:00 PM MT. The Contracting Officer expects prospective contractors to provide their proposal via e-mail to yui.hoptowit@bie.edu
4. Questions and Answers: Any questions relating to this solicitation shall be submitted to the following individuals: Contract Specialist (CS), Contracting
Continued ...
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
15 180 calendar days and complete it within ________________ ________________ calendar days after receiving
FAR 52.211-10
06/28/2024
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 12/2022)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Indian Education Acquisition Office 1011 Indian School Rd.
Suite 352A Albuquerque NM 87104
A23
Dawn Sekayumptewa
28. NEGOTIATED AGREEMENT 29. AWARD
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
10 U.S.C. 3204(a) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 12/2022) BACK
Continued...
and return
(Contractor is not required to sign this document.) Your offer on this
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 30
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140A2324R0023
Officer (CO), and Contracting Officer
Representative (COR) no later than June 14, 2024 at 5:00 PM MT. Any questions sent shall be submitted on the Questions and Answers Log attached to this solicitation.
5. On-site Access: A list of personnel, with all pertinent information, to include, name, phone number, e-mail, and contractor name, shall be submitted to the CS, CO, and COR and is a deliverable under the resulting contract. Site visit: A site visit for this requirement is encouraged. A contractor is allowed up to three
(3) coordinated site visits to assess the site conditions necessary to properly bid this scope.
To assess and acquaint with existing conditions, site visits may be coordinated through Ms.
Carlita Key at carlita.key@bie.edu. A two-day advance notice will be required when scheduling a time and a date for the site visit.
6. Wage Determination: Wages for all contractors and subcontractors must comply with Davis Bacon
Wage Determinations. The current determination is
#CA20240025; see attachment Wage Determination.
Be advised the determination that is current at the time of the Purchase Order awarded is the determination that will apply for the project.
Current determinations are always available at:
https://sam.gov/.
7. Notice to Proceed (NTP): A NTP will be issued after the kick-off/Pre-construction meeting, Receipt of Bonding and Valid Background
Screening.
8. Period of Performance: One hundred eighty
(180) calendar days from the notice to proceed.
9. In accordance with FAR Part 36.204(f)
Disclosure of the Magnitude of Construction
Projects, the estimated price range is between
$1,000,000 and $5,000,000.
10. Special attention is called to FAR Clause
52.236-7, Permits and Responsibilities and FAR
Clause 52.229-3, Federal, State, and Local Taxes.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 30
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140A2324R0023
Offerors are responsible for contacting the tax authorities and tribe or tribal organization involved with regard to any requirements regarding state taxes, tribal taxes, Royalities and/or other applicable tribal laws or ordinances. Any costs associated with this section shall be included in the contractor's firm fixed price proposal. Contractor is responsible for contacting the appropriate TERO and/or appropriate Tribal Taxation Authority office for coordination and approvals. Please refer to Section H and the applicable clauses for additional information about the requirements.
11. A purchase order is being competed using a two-phase design build. Phase II will utilize the Lowest Price Technically Acceptable source selection process described in Section L & M. In accordance with Section M, the total price will be evaluated upon reasonableness and completeness. Note, only the lowest price responsive offer will be evaluated for technical acceptability. If the lowest price responsive officer is technically acceptable, award will be made to that offeror and no other offeror will be reviewed for technical acceptability.
12. Point of Contact: CS/CO/COR:
CS: Yui Hoptowit, yui.hoptowit@bie.edu
CO: Mary Jane Johnson, maryjane.johnson@bie.edu
COR: Carlita Key, carlita.key@bie.edu
Period of Performance: 07/08/2024 to 01/06/2025
00010 SWIMMING POOL RENOVATION
Product/Service Code: Z2FB
Product/Service Description: REPAIR OR ALTERATION
OF RECREATIONAL BUILDINGS
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
SOLICITATION NO.: 140A2324R0023
Swimming Pool Renovation – Sherman Indian High School
PART I – THE SCHEDULE
SECTION B: SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 SCHEDULE OF ITEMS:
Base Items Supplies/Services Qty Unit of Issue*
Unit Price Total Price
1 Swimming Pool Design 1 JB $ $
2 Swimming Pool Renovation 1 JB $ $
Profit: $
Subtotal: $
Bonding: $
All Applicable State Taxes: $
Total Proposed for Base Items $
* UNIT OF ISSUE – LS – Lump Sum; LSQ - Lump Sum Quantities, JB - Job
B.2 PAYMENT FOR BOND PREMIUMS:
Payment for bond premiums, in accordance with FAR Clause 52.232-5, Payments Under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under separate line item.
SECTION C: DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF CONTRACT:
The contractor shall furnish all necessary personnel, supervision, materials, equipment, services and facilities (except as otherwise specified) to perform the Swimming Pool Renovation at Sherman Indian High School in Riverside, CA in the accordance with the Statement of Work or Specifications (attachments to the Statement of Work/ Specifications are listed in Section J and are hereby made part of this solicitation and any resultant contract). The project consists of design and renovation of Indoor Swimming Pool in accordance with Statement of Work.
C.2 PROJECT LOCATION:
Sherman Indian High School 9010 Magnolia Ave Riverside CA 92503
C.3 PROJECT MAGNITUDE:
Pursuant to FAR 36.204, the estimated price range is: Between $1,000,000 and $5,000,000.
C.4 TECHNICAL SPECIFICATIONS:
All Project Specifications and Requirements are listed in Attachment 1
SECTION D: PACKAGING AND MARKING
D.1 PACKAGING AND MARKING:
a. All shipments of materials, equipment and/or supplies to the project site shall be addressed to the Contractor and not the Bureau of Indian Education. Preservation, packaging and packing shall be in accordance with standard practice for commercial packaging.
b. Materials provided by the Contractor shall be new and, where appropriate, shall arrive on-site in original containers sealed by the manufacturer. The Government reserves the right to refuse any materials not deemed adequate.
c. Materials damaged by equipment, water, or dirt are not acceptable.
d. Materials shall be stored in a manner acceptable to the manufacturer. Storage requirements include protection from rain, etc. The Contractor shall provide adequate storage; the Government may provide storage if interference with Government operations do not occur. This will be coordinated with the Government prior to mobilization.
Manufacturer's requirements shall be strictly adhered to.
SECTION E: INSPECTION AND ACCEPTANCE
E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/far
Clause Title Date 52.246-12 Inspection of Construction AUG 1996
SECTION F: DELIVERIES OR PERFORMANCE
F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/far
Clause Title Date 52.211-13 Time Extensions SEP 2000 52.211-18 Variation in Estimated Quantity APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.242-14 Suspension of Work APR 1984
F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK APR 1984
The Contractor shall be required to (a) commence work under this contract within ten 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 days after NTP. The time stated for completion shall include final cleanup of the premises.
SECTION G: CONTRACT ADMINISTRATION DATA
G.1 POST AWARD CONFERENCE:
A post award conference with the successful offeror is required. It will be scheduled and held within _10_ days after the date of contract award. The conference will be held virtually via Microsoft Teams and further information will be provided after award.
G.2 CONTRACT ADMINISTRATION- GOVERNMENT: All administrative questions shall be directed to:
(Note: This is a virtual team - please correspond via email.)
Yui Hoptowit, BIE Contract Specialist – Div. of Acquisition Operations https://www.acquisition.gov/far
1011 Indian School RD NW Albuquerque, New Mexico 87104 Telephone No.: (808)978-2605 Email: yui.hoptowit@bie.edu
G.3 CONTRACT ADMINISTRATION- CONTRACTOR:
Designate a person whom the Government may contact during the period of the contract for prompt action on matters pertaining to the administration of the contract. Authorized Administrator is:
Company Name POC Name POC Email Company Address POC Phone #
G.4 CONTRACTING OFFICER:
The Contracting Officer means a person who is the principal individual and responsible representative of the Government with the authority to enter into, administer and/or terminate contracts and make related determinations and findings pertaining to the contract. The Contracting Officer signs all contractual documents, approves and signs all modifications to contracts, processes and approves payment requests, reviews and makes final decisions on contractual discrepancies, and administers the contract. The Contracting Officer is the only authorized individual to make changes to the contract.
G.5 CONTRACTING OFFICER'S REPRESENTATIVE:
a. The Contracting Officer shall designate a Contracting Officer's Representative (COR) who will represent the Contracting Officer in the technical phase of the work. The COR's duties, responsibilities, and limitations of authority will be set forth in a written COR designation letter. A copy of the COR designation letter will be made available to the Contractor.
b. The COR is not authorized to make any changes to the terms and conditions of this contract. Only the Contracting Officer is authorized to make any changes to the contract by a properly written signed modification to the contract.
c. The Contracting Officer is the only official who can legally commit or obligate the Government for expenditure of public funds.
G.6 DIAR 1452.201-70 AUTHORITIES AND DELEGATIONS SEP 2011
a. The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
b. The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
c. The COR is not authorized to perform, formally or informally, any of the following actions:
a. Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
b. Waive or agree to modification of the delivery schedule;
c. Make any final decision on any contract matter subject to the Disputes Clause;
d. Terminate, for any reason, the Contractor's right to proceed;
e. Obligate in any way, the payment of money by the Government.
d. The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the mailto:yui.hoptowit@bie.edu
Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
e. The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
f. The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
g. Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
G.7 INVOICE AND PAYMENT:
Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (February 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor.
To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:
https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice [Contracting Officer to edit and include the documentation required under this contract]:
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment.
The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 CONTRACTOR SAFETY PROGRAM REQUIREMENTS:
In accordance with FAR 52.236-13, Accident Prevention - Alternate I,
a. Safety Program Submittal: Prior to commencement of work, submit the written plan for implementing this clause to: yui.hoptowit@bie.edu. The plan shall include an analysis of the significant hazards to life, limb, and property inherent in contract work performance and a plan for controlling these hazards.
b. Pre-Construction Safety Meeting: Meet with representatives of the Contracting Officer to discuss and develop a mutual understanding relative to administration of the overall safety program.
H.3 DRAWINGS AND OTHER DATA TO BECOME PROPERTY OF GOVERNMENT:
In accordance with FAR 52.236-21, Specifications and Drawings for Construction, all designs, drawings, specifications, or other works developed in the performance of this contract shall become the sole property of the Government and may be used on any other design or construction without additional compensation to the Contractor. The Government shall be considered the "person for whom the work was prepared" for the purpose of authorship in any copyrightable work under 17 U.S.C. 201(b). With respect thereto, the Contractor agrees not to assert or authorize others to assert any rights nor establish any claim under the design patent or copyright laws.
H.4 CONTRACTOR SECURITY REQUIREMENTS:
At the Pre-construction Conference (and prior to beginning work on the contract), the Contractor shall provide a list of all on-site personnel, including sub-contractors (including second and third-tier subcontractors) and suppliers, to the Contracting Officer. The contractor shall update this list when changes occur. Contractor personnel not listed may be denied access to a facility. Contractor personnel will be restricted to designated working areas and any personnel violating this policy may lose access to the facility.
Contractor personnel shall have photo identification at all times while working on BIA/BIE facilities.
Contractors shall provide the COR with 24 hours of advance notice of every delivery to the site (e.g., concrete, lumber, etc...) and provide the company name, delivery person, and phone number of the firm(s) making deliveries. Otherwise, access to a facility may be denied.
H.5 REAL ID ACT OF 2005:
The Real ID Act of 2005 established minimum security standards for license issuance and production and prohibits Federal agencies from accepting for certain purposes driver's licenses and identification cards from states not meeting the Act's minimum standards. To this purpose there are five states that are not in compliance with the Act nor have they received an extension to come into compliance with the act. Those states are Illinois, Minnesota, Missouri, New Mexico and Washington State. Anyone under this contract, to include subcontractors, who holds a driver's license from any of states without approved licenses and require access to a military facility will be required to provide identification other than a driver's license to gain access. It is the responsibility of the Contractor to ensure that they are in accordance with the Real ID Act and any other requirements for base access. For the states of Washington and Minnesota an enhanced driver's license is acceptable to gain access. Other forms of identification that are acceptable for military facility access are included as an attachment to this modification. Further information on the Real ID Act can be found here: http://www.dhs.gov/real-id-enforcement-brief#.
H.6 EXISTING UTILITIES:
Utility locations when shown are approximate. The contractor shall field verify all utility locations before digging or trenching. This shall include but not be limited to the use of sonic, electronic or magnetic detection devices, by noting pull box and utility box locations at the surface, and by potholing. Contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government.
H.7 COVID-19 GUIDELINES:
The following guidelines will be adhered to at BIE facilities as a preventive health strategy in response to the COVID-19 health pandemic. These guidelines are based on the Centers for Disease Control and Prevention (CDC) and Occupational Safety and Health Administration (OSHA) best practices to minimize risk of coronavirus transmission as employees return to the workplace.
a. COVID Symptoms. Any Contractor personnel, employees, subcontractors, partners, or workers who are experiencing symptoms of COVID-19, including but not limited to cough, shortness of breath or difficulty breathing, fever, chills, muscle pain, sore throat, new loss of taste or smell should not report to work. See CDC guidance on Quarantine & Isolation at https://www.cdc.gov/coronavirus/2019-ncov/your-health/quarantine-isolation.html. Contractor’s project managers and site superintendents are responsible to monitor employees for symptoms before and during work, and follow appropriate precautions in accordance with CDC and OSHA Guidance – https://www.cdc.gov/coronavirus/2019-ncov/community/workplaces-businesses/specific-industries.html. If a contractor’s employee is unsure if they are sick, they should consult their supervisor. Visitors exhibiting or reporting COVID-19 symptoms (i.e., cough or shortness of breath or difficulty breathing fever, chills, muscle pain, sore throat, new loss of taste or smell) should be encouraged through notice and signage to leave the facility and reschedule their meeting/visit for a future time when they are in good health.
b. Face Covers. Contractor personnel are required to wear face covers while onsite. Cloth face coverings are not respirators and are not appropriate substitutes where filtering face piece respirators are required. Employees who are performing tasks at elevated risk requiring respirators as identified through the job hazards analysis will be provided with the appropriate Personal Protective Equipment (PPE) to perform their jobs safely.
c. Social Distancing. The CDC guidance includes a primary objective of disease mitigation through good http://www.dhs.gov/real-id-enforcement-brief https://www.cdc.gov/coronavirus/2019-ncov/your-health/quarantine-isolation.html https://www.cdc.gov/coronavirus/2019-ncov/your-health/quarantine-isolation.html https://www.cdc.gov/coronavirus/2019-ncov/community/workplaces-businesses/specific-industries.html https://www.cdc.gov/coronavirus/2019-ncov/community/workplaces-businesses/specific-industries.html hygiene, staying home when sick, and social distancing. Social distancing is a set of actions taken to stop or slow the spread of a highly contagious disease. The CDC has determined that social distancing is an essential step in preventing the spread of COVID-19. The goal of social distancing is to limit face-to-face contact to decrease the spread of illness among people in community settings. Employees should practice social distancing by putting space (currently six feet) between themselves and others. Visitors that exceed the maximum occupancy for the space should not enter the space. Any waiting area should also be structured to limit aggregation of people to avoid crowding and maintain social distancing. Waiting areas should have suitable floor markings to facilitate social distancing.
d. Hygiene. Contractors will have an overall cleaning schedule that is consistent with CDC cleaning recommendations including using Environmental Protection Agency (EPA) recommended cleaning and disinfecting solutions (https://www.cdc.gov/coronavirus/2019-ncov/community/clean-disinfect/index.html).
Additionally, the Contractor shall encourage and support frequent hand washing, hand sanitizing and wiping down of surfaces in high traffic, shared spaces (e.g., elevator lobbies, community desk, pantry, nooks, meeting rooms, restrooms, phone booths). Workstation configurations and schedules should accommodate simplified cleaning measures wherever possible.
H.8 BACKGROUND INVESTIGATION:
In accordance with 25 U.S.C. § 3201 et seq. (Pub. L. 101-630), the Indian Child Protection and Family Violence Prevention Act; 34 U.C.C. § 20351, et seq. (Pub. L. 101-647), the Crime Control Act of 1990, as amended; and 441 Departmental Manual, Personnel Security and Suitability Requirements, all positions with duties and responsibilities involving regular contact with or control over Indian children are subject to a background investigation and determination of suitability for employment.
Accordingly, all such positions require a favorable background screening by the Bureau of Indian Education (BIE), Personnel Security and Suitability Program and a favorable background investigation by the Defense Counterintelligence Service Agency (DCSA). The documentation required to initiate a background investigation shall be completed for any Contractor employee that will be onsite during the contract’s performance or have access to Personally Identifiable Information (PII). The complete submittal of the background investigation paperwork to the BIA/BIE will be accomplished within 14 days after contract award for service contracts or, for construction contracts, before a Notice to Proceed (NTP) is issued by the Contracting Officer. Pending the successful completion of a background investigation by the BIA/BIE and/or DCSA, the Contractor who has been granted a favorable screening (applicant and suitability) determination must, at all times, remain within sight and under the supervision of a government employee (or other person designated by the Contracting Officer Representative (COR), who has successfully completed the background investigation. If an unfavorable screening (applicant and suitability) determination is made, an employee shall not be allowed onsite. If the Contractor’s employees are found onsite, without the proper authorization, the employee will face legal liability and the Contractor may have their contract terminated for default.
Additionally, the individual and/or the company who proposed to employ this individual may be determined to be non- responsible if an unfavorable screening (applicant and suitability) determination is made and may be deemed ineligible for contract award. If an unfavorable final background investigation determination is made, the contract may be terminated and the employee in question shall not be authorized to provide service to the BIA/BIE if the services involve contact with or regular control over Indian children. It is solely the COR’s responsibility to initiate background checks for all Contractors and their employees in the BIE BEARCUBS system, which includes but is not limited to appropriate investigative forms and/or inquiries about their previous investigation; and, obtain a screening (applicant and suitability) determination, and subsequent final background investigation.
The Contracting Officer will consult with the COR when questions arise as to whether or not the scope of work of a contract requires background investigations for contractor personnel. If the Contracting Officer or COR believes the scope of work performed by contract personnel should not require a background investigation, the Personnel Security Officer will be contacted for concurrence and has the final authority to determine if background investigation(s) are required.
H.9 BONDING REQUIREMENTS:
https://www.cdc.gov/coronavirus/2019-ncov/community/clean-disinfect/index.html
a. Bid Bond – The amount of the bid bond shall be 20% of the original contract price.
b. Performance Bond – The amount of the performance bond shall be 100% of the original contract price.
c. Payment Bond – The amount of the payment bond shall be 100% of the original contract price.
d. Individual Surety – The bidders shall comply with FAR Clause 52.228-11, Pledge of Assets.
e. Third Party Indemnification Agreements. The bidder shall furnish a copy of any indemnification agreements that it entered into in order to secure the bonds required by the solicitation by the time set for bid opening. If an indemnification agreement was not requirement in order for the bidder to obtain the required bonds, an affidavit to that effect shall be provided by the surety along with the bid bond by the time set for bid opening.
Failure to furnish a copy of the required indemnification agreement or the surety’s affidavit may cause the bid to be rejected.
PART II – CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
I.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE FEB 1998
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): https://www.acquisition.gov/far
Clause Title Date 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment
Opportunity for Construction
FEB 1999
I.2 FAR 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT-CONSTRUCTION MATERIALS MAY 2014
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American-Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
Alternate I (May2014).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute shall submit the request with its offer, including the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested-
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
I.3 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: https://www.acquisition.gov/far and https://www.acquisition.gov/diar
CLAUSES TITLE DATE
52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions on Subcontractor Sales to the Government JUN 2020 52.203-7 Anti-Kickback Procedures JUN 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity MAY 2014 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity MAY 2014 52.203-12 Limitation on Payments to Influence Certain Federal Transactions JUN 2020 52.203-17 Contractor Employee Whistleblower Rights NOV 2023 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements and
Statements
JAN 2017
52.204-4 Printed or Copied Double-Sided on Recycled Paper MAY 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards JUN 2020 52.204-13 System for Award Management Maintenance OCT 2018 52.204-14 Service Contract Reporting Requirement OCT 2016 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and Certifications DEC 2014 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by
Kaspersky Lab and Other Covered Entities
DEC 2023
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
NOV 2021
52.204-27 Prohibition on a ByteDance Covered Application JUN 2023
52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment
NOV 2021
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters OCT 2018 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations NOV 2015 52.215-2 Audit and Records – Negotiation JUN 2020 52.215-8 Order Precedence – Uniform Contract Format OCT 1997 52.215-10 Price Reduction for Defective Cost or Pricing Data AUG 2011 52.215-11 Price Reduction for Defective Cost or Pricing Data – Modifications JUN 2020 52.215-12 Subcontractor Certified Cost or Pricing Data JUN 2020 52.215-13 Subcontractor Certified Cost or Pricing Data – Modifications JUN 2020 52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or
Pricing Data - Modifications
NOV 2021
52.219-8 Utilization of Small Business Concerns SEP 2023 52.219-14 Limitations on Subcontracting OCT 2022 52.219-28 Post-Award Small Business Program Representation SEP 2023 52.222-1 Notice to the Government of Labor Disputes FEB 1997 52.222-3 Convict Labor JUNE 2003 52.222-4 Contract Work Hours and Safety Standards-Overtime Compensation MAY 2018 52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work MAY 2014 52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records JUL 2021 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations MAY 2014 https://www.acquisition.gov/diar
52-222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for Construction APR 2015 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified
Pricing Method)
AUG 2018
52.222-35 Equal Opportunity for Veterans JUN 2020 52.222-36 Affirmative Action for Workers with Disabilities JUN 2020 52.222-37 Employment Reports on Veterans JUN 2020 52.222-38 Compliance with Veterans’ Employment Reporting Requirements FEB 2016 52.222-40 Notification of Employee Rights Under the National Labor Relations Act DEC 2010 52.222-50 Combating Trafficking in Persons NOV 2021 52.222-54 Employment Eligibility Verification MAY 2022 52.222-55 Minimum Wages Under Executive Order 14026 JAN 2022 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2022 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts SEP 2013 52.223-3 Hazardous Material Identification And Material Safety Data FEB 2021 52.223-5 Pollution Prevention and Right to Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-17 Affirmative Procurement of EPA-designated Items in Services and Construction Contracts AUG 2018 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving JUN 2020 52.225-13 Restriction on Certain Foreign Purchases FEB 2021 52.226-1 Utilization of Indian Organizations and Indian-Owned Economic Enterprises JUNE 2000 52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance – Work on a Government Installation JAN 1997 52.228-11 Individual Surety - Pledges of Assets FEB 2021 52.228-12 Prospective Subcontractor Request for Bonds DEC 2022 52.228-15 Performance and Payment Bonds - Construction JUN 2020 52.229-3 Federal, State, and Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-16 Progress Payment NOV 2021 52.232-23 Assignment of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer-- System for Award Management OCT 2018 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.233-1 Disputes and Alternate I (DEC1991) MAY 2014 52.233-3 Protest after Award AUG 1996 52.233-4 Applicable Law For Breach Of Contract Claim OCT 2004 52.236-1 Performance of Work by the Contractor APR 1984 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-4 Physical Data APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements APR 1984 52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984
52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction Alt I applies FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.242-17 Government Delay of Work APR 1984 52.243-4 Changes JUN 2007 52.244-6 Subcontracts for Commercial Products and Commercial Services DEC 2023 52.245-1 Government Property SEP 2021 52.245-9 Use and Charges APR 2012 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.249-2 Termination for Convenience of the Government (Fixed Price) and Alternate I (SEP 1996) APR 2012 52.249-10 Default (Fixed-Price Construction) APR 1984 52.249-14 Excusable Delays APR 1984 52.253-1 Computer Generated Forms JAN 1991 1452.203-70 Restriction on Endorsements JUL 1996 1452.215-70 Examination of Records by the Department of the Interior APR 1984 1452.236-70 Prohibition Against Use of Lead-based Paint JUL 1996
I.4 FAR AND DIAR CLAUSES - FULL TEXT
FAR 52.204-1 APPROVAL OF CONTRACT DEC 1989
This contract is subject to the written approval of the Contracting Officer and shall not be binding until so approved.
FAR 52.225-9 BUY AMERICAN–CONSTRUCTION MATERIALS OCT 2022
(a) Definitions. As used in this clause—
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is–
(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation
(FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means—
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.
Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency.
The list of critical items is at FAR 25.105.
Domestic construction material means—
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if– https://www.acquisition.gov/far/2.101#FAR_2_101 https://www.acquisition.gov/far/25.105#FAR_25_105
(A)The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material.