Sol_140A2322Q0233.pdf
PDF 634 KB Posted
- Attached to
- Replace and Extend Fencing Federal contract opportunity
- Solicitation number
- 140A2322Q0233
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140A2322Q0233_Amd_0003.pdf | ||
| D31N21 Wingate High School Fort Wingate NM Utility Lines.pdf | ||
| Sol_140A2322Q0233_Amd_0002.pdf | ||
| Statement_of_Work_3252022_0001.pdf | ||
| Sol_140A2322Q0233_Amd_0001.pdf | ||
| Attachment_1_Wage_Determination_NM20210024_02252022.pdf | ||
| Attachment_2_Applicable_Federal_Health_and_Safety_Codes_and_Standards.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040568825
Indian Education Acquisition Office
1011 Indian School Rd.
Suite 352A Albuquerque NM 87104
A23
Matthew Lucas at matthew.lucas@bie.edu
Matthew Lucas 941-304-2333
103/23/2022
140A2322Q0233
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Project Title: Removal, Replacement and Installation of Fencing at FT. Wingate High
School FMS
Project Location: Ft. Wingate High School, 1737 Shush Dr, Ft. Wingate, NM 87316
NAICS - 238990 - All Other Specialty Trade Contractors, Size Standard $16.5M
PSC Code - Z1AZ - Maintenance of Other Administrative Facilities and Service
Buildings
Project Description: All labor, supervision, parts and equipment to remove, replace and install fencing supporting building 631 and Building 521
This requirement is set-aside for small business.
- SECTION A - CONTRACT FORM
- SECTION B - SUPPLIES OR SERVICES AND PRICES
- SECTION C - DESCRIPTION AND SPECIFICATIONS
- SECTION D - PACKAGING AND MARKING
- SECTION E - INSPECTION AND ACCEPTANCE
- SECTION F - DELIVERIES OR PERFORMANCE
- SECTION G - CONTRACT ADMINISTRATION DATA
- SECTION H - SPECIAL CONTRACT REQUIREMENTS
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
2 30 calendar days and complete it within ________________ ________________ calendar days after receiving
52.211-10
04/07/2022
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Indian Education Acquisition Office 1011 Indian School Rd.
Suite 352A Albuquerque NM 87104
A23
Matthew Lucas
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 35
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140A2322Q0233
- SECTION I - CONTRACT CLAUSES
- SECTION J - LIST OF ATTACHMENTS
- SECTION K - REPRESENTATIONS, CERTIFICATIONS,
AND OTHER STATEMENTS OF OFFERORS OR RESPONDENTS
- SECTION L - INSTRUCTIONS, CONDITIONS, and
NOTICES TO OFFERORS
- SECTION M - EVALUATION FACTORS FOR AWARD
Local Time in Block 13 is defined as Eastern
Daylight Time.
AT THE TIME OF PROPOSAL SUBMISSION, interested contractors MUST be actively registered in the
System for Award Management at https://www.sam.gov.
Delivery Location Code: 0011147517
BIE NMNS Facility Management
521 Shush Drive
Ft. Wingate NM 87316 US
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
REQUEST FOR QUOTE: 140A2322Q0233
Contents
SECTION B – PRICE SCHEDULE
B1. PRICE SCHEDULE
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C1. STATEMENT OF WORK
SECTION D – PACKAGING AND MARKING
D1. PACKAGING AND MARKING
SECTION E – INSPECTION AND ACCEPTANCE
E1. 52.252-02 CLAUSES INCORPORATED BY REFERENCE FEB 1998
E2. DAILY REPORTING REQUIREMENT
E3. FINAL INSPECTION
SECTION F -- DELIVERIES OR PERFORMANCE
F1. 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK APRIL 1984
F2. NOTICE OF DELAY
F3. CONTINUITY OF FACILITIES OPERATION
F4. RECYCLING AND DISPOSAL OF REFUSE
SECTION G – CONTRACT ADMINISTATION DATA
G1. 1452.201-70 AUTHORITIES AND DELEGATIONS (SEP 2011)
G2. CONTRACT ADMINISTRATION GOVERNMENT
G3. CONTRACT ADMINISTRATION – CONTRACTOR
G4. CONTRACTING OFFICER'S REPRESENTATIVE
G5. INVOICE AND PAYMENT
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H1. TRIBAL TAXES, REQUIREMENTS AND/OR RESTRICTIONS:
H2. WORK OUTSIDE REGULAR WORK HOURS
H3. DRAWINGS AND OTHER DATA TO BECOME PROPERTY OF GOVERNMENT
H4. WAGE RATES
H5. SUBCONTRACT DATA
H6. CONTRACTOR SECURITY REQUIREMENTS
H7. REAL ID ACT OF 2005
H8. EXISTING UTILITIES
H9. DIFFERING SITE CONDITION NOTICE
H10. DOCUMENTATION OF PROPOSALS FOR EQUITABLE ADJUSTMENTS
H11. NON-COMPLIANCE WITH CONTRACT REQUIREMENTS
H12. COVID-19 GUIDELINES
H13. BACKGROUND INVESTIGATION
H14. REMOVAL OF PERSONNEL
Part II - Contract Clauses
SECTION I – CONTRACT CLAUSES
I1. 52.252-02 CLAUSES INCORPORATED BY REFERENCE FEB 1998
CLAUSES INCORPORATED BY FULL TEXT
I2. 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS
(OCT 2021) (DEVIATION)
I3. 52.225-9 BUY AMERICAN–CONSTRUCTION MATERIALS (Feb 2021)
Part III - List of Documents, Exhibits, and Other Attachments
SECTION J LIST OF ATTACHMENTS
Part IV - Representations and Instructions
SECTION K REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS
K1. 52.204-8 Annual Representations and Certifications (Jan 2022) K2. 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021) K3. 52.225-10 Notice of Buy American Requirement-Construction Materials MAY 2014
K4. 52.252-01 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE FEB 1998
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
L1. 52.252-01 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE FEB 1998
L2. SOLICITATION PROVISIONS IN FULL TEXT
L3. 52.233-2 Service Of Protest SEP 2006 L4. DIAR 1452.233-2 Service of Protest Department of the Interior (JUL 1996) (Deviation)
L5. INSTRUCTION TO OFFERORS:
GENERAL INFORMATION
SECTION M – EVALUATION FACTORS FOR AWARD
M1. Per FAR 13.106‐2 - Evaluation of Quotations or offers:
SECTION B – PRICE SCHEDULE
B1. PRICE SCHEDULE
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Contractor is required to furnish all labor, supervision, transportation, tools, and materials required to install new, replace and extend fencing system associated with Building 631 and install new fencing system associated with Building 521 in accordance with the Statement of Work.
1.00 JB _____________ ______________
Project Location: Ft. Wingate High School 1737 Shush Dr, Fort Wingate, NM 87316
FOB: Destination
Subtotal $_________ Navajo Nation Taxes $_________
All State Taxes (as applicable) $_________
Grand Total $_________
END OF SECTION B – PRICE SCHEDULE
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C1.STATEMENT OF WORK
New Mexico Navajo South Agency Wingate High School Facility Management & Agency Office
February 25, 2022
Fort Wingate, New Mexico, N.M.N.S Agency Parking lot for Bldg. 521 & Maintenance Shop Parking Lot Bldg. 631
Overview:
Wingate Facility Management Agency Office, Bldg. 521, and School Maintenance Shop Building 631 has requirements for fencing for security purposes.
Bldg.631 is in need of new chain link fencing to replace an old, aged fencing and 20 ft. gate, located at the Maintenance Bldg. 631. The current fencing is unsuitable for parking as it is inadequate in size and needs to be extended approximately 12 ft. Contractors are to field verify the actual dimensions, materials, angles, alignment, and all existing conditions shall be the sole responsibility of the Contractor. Please see Drawing 1 below.
The area west of the existing Building 521 and its associated parking and storage yard require new fencing and 20 ft. gate that can be secured. The new chain link fencing should extend from the current yard, please see Drawing 1 below, out to the street, given any required offset from a public road. This fence will be required to be topped with 3 strands of barbwire. Contractors are to field verify the actual dimensions, materials, angles, alignment, and all existing conditions shall be the sole responsibility of the Contractor.
Contractor is to ensure that the fence is within the confines of the property managed by the owner and to coordinate efforts if the information is not presently discernable prior to starting work.
Work Requirements:
Removal of old existing fencing and materials at Bldg. 631 Maintenance Shop yard and provide appropriate disposal.
Install post and fence fabric onto new guideposts.
Install gate posts and new 20 ft. gate. The gate to be provided is a like for like replacement.
Installation of new fencing and gates at new Agency Bldg. 521 GSA parking lot. Gates are highlighted in green on the attached drawing. As depicted one side next to Bldg. 521 is existing and is not to be replaced however may require modification for entrance/gate.
Install post and fence fabric onto new guideposts, 20 ft. entry, drive through gate.
Contractor's Responsibilities/Conditions:
All labor; equipment; materials/supplies; rentals; tools; insurances; taxes; safety; security;
staging/storage; full time supervision; worker/owner/property protection; temporary utilities/hookups.
Traffic control; fall protection; deliveries; notifications/filings; permits, control measures on dust, noise, contamination; general ground/soil restoration; daily & final site cleanup;
housekeeping; trash/debris disposal, etc. Any & all damages that may evolve from carelessness, negligence, irresponsibleness, including accidents to, but not limited to the BIE and their tenant's property, assets, investments, etc. Any discoveries of hazardous and contaminant materials shall be reported immediately.
Any and all damages to existing property caused by contractor as result of but not limited to demolition, installation, and deliveries, including the patching and repair of existing fencing, utilities, building equipment, components and/or systems. All costs to repair, patch, finish, replace and fixes shall be the responsibility of the contractor and will carry or warrant no time extensions or contract modifications.
Shall at all times adhere to and be compliant with any and all applicable Federal, State, City & pertinent Local regulations, statues and laws.
Warranty all work, installation and materials for one (1) years of the new fencing. Warranties shall start from the final completion date or Owner's acceptance, but not limited to defective materials, workmanship, malfunctions, etc. Manufacturer warranty document shall contain school name and location. Include a one (1) year workmanship warranty for all work.
Considerations and Factors:
Proposing Contractors are asked to factor in or take into consideration the following as part of their bid/proposals and projected schedules while undertaking this project.
The pertinent contents of this Statement of Work as applicable to the Project's requirements, protocols, scheduling, particularly the work scope and materials shall become and made a binding part of and in conjunction with the Contractor's overall Construction Contract with the BIE, thereby contractors are specifically asked to pay careful attention in their examination and familiarity with the documents.
Coordination and cooperation with Wingate High School and BIE employees/vehicle traffic, their accesses & exits, control and coordination of noise, odors, vibration, and other distracting or disruptive activities that will impact operations.
All work to take place only during normal workdays with no weekends or holidays only in the event special prior approval is obtained from the Contracting Officer through arrangements with the Contracting Officers Representative.
Temporary Facilities & Utilities:
Contractor shall provide a secure staging and storage area near the site build locations. It shall be the responsibility of the Contractor to provide their own temporary electrical power with generators and portable toilets for their workers. No part of the Agency building, or facilities will be used for storage or administrative purposes by the contractor.
Close out Requirements:
As requisite for final payment, the Contractor shall provide to the BIE's Contracting Officer and its COR the following:
Specified quantities of extra/spare materials for each of the different materials, products used.
Manufacturer Warranties for each fencing section which identifies each location for entire new work/installation against defective materials workmanship, etc. Include a one (l) year workmanship warranty for all work.
Demolition debris haulage tickets, manifests, landfill tickets for all disposed of material to be provided to the COR.
Contractor to provide as built shop drawings, systems demonstration of maintenance and upkeep.
Performance Specification/Requirements:
Proposing Contractors shall prepare and submit their bids/cost proposals in accordance with and predicated on using the following Owner's Performance Specifications as the baseline guide/requirement to furnish, install, and execute the new soccer field.
Provide new fencing and components from a single fencing manufacturer or supplier.
Proposed systems shall meet or exceed the performance requirements of, but not limited to IBC, NRCA, ASTM standards in their respective resistance testing for breaking strength, tearing strength, brittleness point, resistance to water absorption, water vapor permeance, puncture resistance, and other applicable properties.
Contractor is required to submit shop drawings that show plans and sections details of the new fencing. Those reviewed and approved by the COR within 5 days.
Provide fencing manufacturer data sheets and include other materials to be used for new fencing installation.
Period of Performance Period of Performance will be 30 calendar days from issuance of Notice to Proceed by the Contracting Officer.
Drawing 1:
END OF SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SECTION D – PACKAGING AND MARKING
D1. PACKAGING AND MARKING
A. All shipments of materials, equipment and/or supplies to the project site shall be addressed to the Contractor and not the Government. Preservation, packaging, and packing shall be in accordance with standard practices for commercial packaging.
B. Government personnel are not authorized to accept deliveries for the contractor, nor are they responsible for off-loading shipments. A contractor representative must be present to accept deliveries.
END OF SECTION D – PACKAGING AND MARKING
SECTION E – INSPECTION AND ACCEPTANCE
E1. 52.252-02 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: https://www.acquisition.gov/far and https://www.acquisition.gov/diar
CLAUSES TITLE DATE
52.246-12 Inspection of Construction AUG 1996
E2. DAILY REPORTING REQUIREMENT
A. The Contractor shall prepare and file a "Contractor's Daily Report", for each day of contract performance.
Description must include contract number and work being performed. These reports shall be delivered to, or if directed, mailed to the Contracting Officer’s Representative on Fridays. The daily report shall include the name of Contractors and Subcontractors on-site, the number of workers and their labor categories employed on-site, the work being performed, the type of equipment on-site, any change order work being performed, and whether the work being performed is on schedule. Reports shall be numbered, dated and signed by the Contractor or his Project Manager. Failure to submit the daily reports could result in payments being withheld until such time as all daily reports are current.
E3. FINAL INSPECTION
A. Contractor Self-Inspection. Prior to the completion date, the Contractor’s Quality Control Manager shall conduct a self-inspection of the site and document all items needing correction by means of a punch list. The corrected punch list shall be provided to the Contracting Officer’s Representative at the same time the pre-final inspection is requested. All punch list items must be corrected prior to requesting the pre-final inspection.
B. The Contractor and the Contracting Officer’s Representative will jointly conduct a pre-final inspection prior to requesting a final inspection. Any item needing correction shall be noted on the Pre-Final Inspection Punch List. Any discrepancies noted will be corrected prior to any final inspection. The Contracting Officer Representative may schedule more than one pre-final inspection if he determines it necessary.
C. When the Contractor is ready for final inspection, he will request final inspection in writing to the Contracting Officer and Contracting Officer’s Representative (COR). A copy of the Pre-Final Punch List shall be attached to this request with the corrective action taken noted. The final inspection will be requested at least 48 hours before the desired date.
D. The final inspection shall be performed with the Contractor by the COR, Contracting Officer, Safety Officer, and representatives of the using activity. Any discrepancies noted will be corrected within the time specified in the contract for the completion of work.
1. Prior to close-out and final payment of the contract, the following are required:
2. All submittals; to be submitted as required by the contract and may include product submittals, as-built drawings, manuals, etc.
3. All warranties; to be submitted with the request for Final Inspection.
4. Contractor’s Release; to be submitted with the Contractor’s final invoice.
END OF SECTION E – INSPECTION AND ACCEPTANCE
https://www.acquisition.gov/far https://www.acquisition.gov/diar
SECTION F -- DELIVERIES OR PERFORMANCE
F1. 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK APRIL 1984
The Contractor shall be required to (a) commence work under this contract receipt within (2) days of award, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than thirty (30) calendar days. The time stated for completion shall include final cleanup of the premises.
(End of Clause)
F2. NOTICE OF DELAY
If the Contractor receives a notice of any change in the work, or if any other conditions arise which are likely to cause or are causing delays which the Contractor believes may result in late completion of the project, the Contractor shall notify the Contracting Officer. The Contractor’s notice shall state the effect, if any, of such change or other conditions upon the approved schedule, and shall state in what respects, if any, the relevant schedule, or the completion date should be revised. The Contractor shall give this notice not more than three (3) days after the first event-giving rise to the delay or prospective delay. Only the Contracting Officer may revise the approved time schedule.
(End of Local Clause)
F3. CONTINUITY OF FACILITIES OPERATION
Schedule work to minimize interference with any on-site housing residents and the facilities normal operations.
Notify the Contracting Officer and Project Manager 24 hours in advance of any shutdowns. Perform all on-site work between the hours of 7:00 AM and 5:00 PM, Monday through Friday (Federal Holidays excluded), unless otherwise approved by the Contracting Officer.
(End of Local Clause)
F4. RECYCLING AND DISPOSAL OF REFUSE
With the exception of materials specifically indicated or specified to be salvaged for reuse in construction, or turned over to the Government, all refuse, excess or waste materials resulting from construction operations shall become the property of the Contractor and shall be recycled and/or disposed of off Government property. All disposal shall be done in accordance with federal, state, and local laws and regulations.
(End of Local Clause)
END OF SECTION F – DELIVERIES OR PERFORMANCE
SECTION G – CONTRACT ADMINISTATION DATA
G1. 1452.201-70 AUTHORITIES AND DELEGATIONS (SEP 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b)The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The
COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1)Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2)Waive or agree to modification of the delivery schedule;
(3)Make any final decision on any contract matter subject to the Disputes Clause;
(4)Terminate, for any reason, the Contractor's right to proceed;
(5)Obligate in any way, the payment of money by the Government.
(d)The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g)Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the
Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
(End of clause)
G2. CONTRACT ADMINISTRATION GOVERNMENT
All administrative questions shall be directed to the below:
Matthew Lucas, Contract Specialist, 1011 Indian School Rd NW Albuquerque, NM 87104 Phone: 941-304-2333 Email: matthew.lucas@bie.edu
(End of Local Clause)
G3. CONTRACT ADMINISTRATION – CONTRACTOR
Designate a person whom the Government may contact during the period of the contract for prompt action on matters pertaining to the administration of the contract. Authorized Administrator is:
Company Name: ______________ Point of Contact: ______________ Email: ______________ Address: ______________ Telephone Number: ______________ mailto:matthew.lucas@bie.edu
G4. CONTRACTING OFFICER'S REPRESENTATIVE
A. The Contracting Officer shall designate a Contracting Officer's Representative (COR) who will represent the Contracting Officer in the technical phase of the work. The COR's duties, responsibilities, and limitations of authority will be set forth in a written COR designation letter. A copy of the COR designation letter will be made available to the Contractor.
B. The COR is not authorized to make any changes to the terms and conditions of this contract. Only the Contracting Officer is authorized to make any changes to the contract by a properly written signed modification to the contract.
C. The Contracting Officer is the only official who can legally commit or obligate the Government for expenditure of public funds.
(End of Local Clause)
G5. INVOICE AND PAYMENT
Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (April 2013)
Payment requests must be submitted electronically through the U.S. Department of the Treasury's Invoice Processing Platform system (IPP). "Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: A copy of the contractor’s invoice shall be included with the IPP invoice. If no invoice is attached, the Invoice will be rejected.
The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date.
Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131. If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
END OF SECTION G – CONTRACT ADMINISTATION DATA
https://www.ipp.gov/ mailto:ippgroup@bos.frb.org
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H1. TRIBAL TAXES, REQUIREMENTS AND/OR RESTRICTIONS:
a. Special attention is called to FAR Clause 52.236-7, Permits and Responsibilities and FAR Clause 52.229-3, Federal, State, and Local Taxes. Offerors are responsible for contacting the tribe or tribal organization involved with regard to any requirements regarding tribal taxes, royalties and/or other applicable tribal laws or ordinances. Any costs associated with this section shall be included in the contractor's bid.
b. Offerors are responsible for contacting the Office of the Navajo Nation Tax Commission and the Office of Labor Relations for tribal taxes. Current available information is identified below: Forms (navajo-nsn.gov)
(End of Local Clause)
H2. WORK OUTSIDE REGULAR WORK HOURS
If the contractor desires to perform work under this contract outside regular work hours or on Saturdays, Sundays or holidays, he shall apply, in writing, to the Contracting Officer no less than 10 calendar days prior to the planned start of such work. Regular work hours are, for the purpose of this clause, those hours the activity or Command where the work is to be performed normally works on a day-by-day basis. Application by the Contractor does not imply consent by the Government. Each application will be considered, and a decision made, on the potential benefit of permitting such work. Approval of a Contractor's application under this clause will be, unless otherwise agreed in writing, at no additional cost to the Government.
(End of Local Clause)
H3. DRAWINGS AND OTHER DATA TO BECOME PROPERTY OF GOVERNMENT
All designs, drawings, specifications, notes and other works developed in the performance of this contract shall become the sole property of the Government and may be used on any other design or construction without additional compensation to the Contractor. The Government shall be considered the "person for whom the work was prepared" for the purpose of authorship in any copyrightable work under 17 U.S.C. 201(b). With respect thereto, the Contractor agrees not to assert or authorize others to assert any rights nor establish any claim under the design patent or copyright laws.
(End of Local Clause)
H4. WAGE RATES
Applicable Construction Wage Rate Requirements are in effect at the time of contract and will apply. If crafts or trades are required in the performance of this project for which no wage is listed in the Department of Labor Wage Decision, the Contracting Officer shall be notified in writing.
(End of Local Clause)
H5. SUBCONTRACT DATA
The Contractor shall submit an executed Statement and Acknowledgment Standard Form 1413, to the Contracting Officer for every subcontractor (including every subcontractor of the second or lower tier) that will be performing work at the construction site. This shall be done before the subcontractor begins work. This form provides an acknowledgment by the subcontractor that mandatory "flow-down" contract clauses have been included in his contract in accordance with FAR Clause 52.222-11. The Prime Contractors will be given copies of Form SF 1413 after award of a contract. Completing this form creates no contractual relationship between subcontractors and the Government.
https://www.onlr.navajo-nsn.gov/Forms
H6. CONTRACTOR SECURITY REQUIREMENTS
At the Pre-construction Conference [or prior to beginning work on the contract], the Contractor shall provide a list of all on-site personnel, including sub-contractors (including second and third-tier subcontractors) and suppliers, to the Contracting Officer. The contractor shall update this list when changes occur. Contractor personnel not listed may be denied access to the Coast Guard facility. Contractor personnel will be restricted to designated working areas. Any personnel violating this policy may lose access to the facility. Contractor personnel shall have photo identification at all times while working on BIA facilities. Contractors shall provide the COR with 24 hours of advance notice of every delivery to the site (e.g., concrete, lumber, etc...) and provide the company name, delivery person, and phone number of the firm(s) making deliveries. Otherwise access to the BIA facility may be denied. Special security provisions may apply to some task orders. Employees may be required to submit to a background check and be United States citizens.
(End of Local Clause)
H7. REAL ID ACT OF 2005
The Real ID Act of 2005 established minimum security standards for license issuance and production and prohibits Federal agencies from accepting for certain purposes driver's licenses and identification cards from states not meeting the Act's minimum standards. To this purpose there are five states that are not in compliance with the Act nor have they received an extension to come into compliance with the act. Those states are Illinois, Minnesota, Missouri, New Mexico and Washington State. Anyone under this contract, to include subcontractors, who holds a driver's license from any of states without approved licenses and require access to a military facility will be required to provide identification other than a driver's license to gain access. It is the responsibility of the Contractor to ensure that they are in accordance with the Real ID Act and any other requirements for base access.
For the states of Washington and Minnesota an enhanced driver's license is acceptable to gain access. Other forms of identification that are acceptable for military facility access are included as an attachment to this modification.
Further information on the Real ID Act can be found here: http://www.dhs.gov/real-id-enforcement-brief#
H8. EXISTING UTILITIES
Utility locations when shown are approximate. The contractor shall field verify all utility locations before digging or trenching. This shall include but not be limited to the use of sonic, electronic, or magnetic detection devices, by noting pull box and utility box locations at the surface, and by potholing. Contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government.
(End of Local Clause)
H9. DIFFERING SITE CONDITION NOTICE
The Contractor shall provide written notice to the Contracting Officer of a differing site condition within 1 day of occurrence following FAR 52.236-2, Differing Site Conditions.
(End of Local Clause)
H10. DOCUMENTATION OF PROPOSALS FOR EQUITABLE ADJUSTMENTS
a. ITEMIZATION OF PROPOSALS AND REQUESTS. The Contractor shall submit any request for equitable adjustment in the contract price, including any change proposal submitted in accordance with the "Changes" clause, in the form of a lump sum proposal supported with an itemized breakdown of all increases and decreases in the contract price in the detail required by the Contracting Officer, The request shall include all costs and delays related to or arising out of the change or event giving rise to the proposed adjustment, including any delay damages and additional overhead costs.
b. PROPOSED TIME ADJUSTMENTS. The Contractor shall submit a proposed time extension (if applicable) with any request for an equitable adjustment or change proposal. The request shall include sufficient information to demonstrate whether and to what extent the change will delay the completion of the contract.
c. RELEASE BY CONTRACTOR. The price and time adjustment made in any contract modification issued as a result of a change proposal or request for an equitable adjustment shall be considered to account for all items affected by the change or other circumstances giving rise to an equitable adjustment. Upon issuance of such contract modification, the Government shall be released from any and all liability under this contract for further equitable adjustments attributable to the facts and circumstances giving rise to the change proposal or request for equitable adjustment.
http://www.dhs.gov/real-id-enforcement-brief
H11. NON-COMPLIANCE WITH CONTRACT REQUIREMENTS
If the Contractor, after receiving written notice from the Contracting Officer of noncompliance with any requirement of this contract, fails to initiate promptly appropriate action(s) to bring performance/work into compliance with a contract requirement within a reasonable period of time, the Contracting Officer shall have the right to order the Contractor to suspend any or all work under the contract. This order shall be in force until the Contractor has complied or has initiated such action as may be appropriate to comply within a reasonable period of time. The Contractor will not be entitled to any extension of contract time or payment for any costs incurred as a result of being ordered to suspend work for such a cause.
(End of Local Clause)
H12. COVID-19 GUIDELINES
The following guidelines will be adhered to at BIE facilities as preventive health strategy in response to the COVID-19 health pandemic. These guidelines are based on the Centers for Disease Control and Prevention (CDC) and Occupational Safety and Health Administration (OSHA) best practices to minimize risk of coronavirus transmission as employees return to the workplace.
(a) COVID Symptoms. Any Contractor personnel, employees, subcontractors, partners, or workers who are experiencing symptoms of COVID-19, including but not limited to cough, shortness of breath or difficulty breathing, fever, chills, muscle pain, sore throat, new loss of taste or smell should not report to work.
Employees may be allowed to return to work after 14 days of having no symptoms. Contractor’s project managers and site superintendents are responsible to monitor employees for symptoms before and during work, and follow appropriate precautions in accordance with CDC Guidance –Safety Practices for Critical Infrastructure Workers. https://www.cdc.gov/coronavirus/2019-ncov/community/critical-workers/implementing-safety-practices.html. If a Contractor’s employee is unsure if they are sick, they should consult their supervisor. Visitors exhibiting or reporting COVID-19 symptoms (i.e., cough or shortness of breath or difficulty breathing fever, chills, muscle pain, sore throat, new loss of taste or smell) should be encouraged through notice and signage to leave the facility and reschedule their meeting/visit for a future time when they are in good health.
(b) Face Covers. Contractor personnel are required to wear cloth face coverings while onsite. Cloth face coverings may prevent people who do not know they have the virus from transmitting it to others. CDC does not recommend the general public wear surgical masks or N-95 respirators to protect themselves from respiratory diseases, including coronavirus (COVID-19). N-95s and other filtering face piece respirators should continue to be reserved for those at increased risk of exposure including health care workers and other medical first responders, as recommended by current CDC guidance and a job hazard analysis.
Appropriate Personal Protective Equipment (PPE). Cloth face coverings are not respirators and are not appropriate substitutes where filtering face piece respirators are required. Employees who are performing tasks at elevated risk requiring respirators as identified through the job hazards analysis will be provided with the appropriate Personal Protective Equipment (PPE) to perform their jobs safely.
(c) Social Distancing. The CDC guidance includes a primary objective of disease mitigation through good hygiene, staying home when sick, and social distancing. Social distancing is a set of actions taken to stop or slow the spread of a highly contagious disease. The CDC has determined that social distancing is an essential step in preventing the spread of COVID-19. The goal of social distancing is to limit face-to-face contact to decrease the spread of illness among people in community settings. Employees should practice social distancing by putting space (currently six feet) between themselves and others. Visitors that exceed the maximum occupancy for the space should not enter the space. Any waiting area should also be structured to limit aggregation of people to avoid crowding and maintain social distancing. Waiting areas should have suitable floor markings to facilitate social distancing.
(d) Hygiene. Contractors will have an overall cleaning schedule that is consistent with CDC cleaning recommendations including using Environmental Protection Agency (EPA) recommended cleaning and disinfecting solutions (https://www.cdc.gov/coronavirus/2019-ncov/community/disinfecting-building-http://www.cdc.gov/coronavirus/2019-ncov/community/critical-workers/implementing-safety-practices.html http://www.cdc.gov/coronavirus/2019-ncov/community/critical-workers/implementing-safety-practices.html http://www.cdc.gov/coronavirus/2019-ncov/community/disinfecting-building-facility.html). Additionally, the Contractor shall encourage and support frequent hand washing, hand sanitizing and wiping down of surfaces in high traffic, shared spaces (e.g., elevator lobbies, community desk, pantry, nooks, meeting rooms, restrooms, phone booths). Workstation configurations and schedules should accommodate simplified cleaning measures wherever possible.
H13. BACKGROUND INVESTIGATION
In accordance with 25 U.S.C. § 3201 et seq. (Pub. L. 101-630), the Indian Child Protection and Family Violence Prevention Act; 34 U.C.C. § 20351, et seq. (Pub. L. 101-647), the Crime Control Act of 1990,as amended; and 441 Departmental Manual, Personnel Security and Suitability Requirements, all positions with duties and responsibilities involving regular contact with or control over Indian children are subject to a background investigation and determination of suitability for employment.
Accordingly, all such positions require a favorable background screening by the Bureau of Indian Education (BIE), Personnel Security and Suitability Program and a favorable background investigation by the Defense Counterintelligence Service Agency (DCSA). The documentation required to initiate a background investigation shall be completed for any Contractor employee that will be onsite during thecontract’s performance or have access to Personally Identifiable Information (PII). The complete submittal of the background investigation paperwork to the BIA/BIE will be accomplished within 14 days after contract award for service contracts or, for construction contracts, before a Notice to Proceed(NTP) is issued by the Contracting Officer. Pending the successful completion of a background investigation by the BIA/BIE and/or DCSA, the Contractor who has been granted a favorable screening(applicant and suitability) determination must, at all times, remain within sight and under the supervision of a Government employee (or other person designated by the Contracting Officer Representative (COR), who has successfully completed the background investigation. If an unfavorablescreening (applicant and suitability) determination is made, an employee shall not be allowed onsite. If the Contractor’s employees are found onsite, without the proper authorization, the employee will face legal liability and the Contractor may have their contract terminated for default. Additionally, the individual and/or the company who proposed to employ this individual may be determined to be non- responsible if an unfavorable screening (applicant and suitability) determination is made and may be deemed ineligible for contract award. If an unfavorable final background investigation determination ismade, the contract may be terminated and the employee in question shall not be authorized to provide service to the BIA/BIE if the services involve contact with or regular control over Indian children. It is solely the COR’s responsibility to initiate background checks for all Contractors and their employees inthe BIE BEARCUBS system, which includes but is not limited to appropriate investigative forms and/or inquiries about their previous investigation; and, obtain a screening (applicant and suitability) determination, and subsequent final background investigation.
The Contracting Officer will consult with the COR when questions arise as to whether or not the scopeof work of a contract requires background investigations for contractor personnel. If the Contracting Officer or COR believes the scope of work performed by contract personnel should not require a background investigation, the Personnel Security Officer will be contacted for concurrence and has thefinal authority to determine if background investigation(s) are required.
(End of Local Clause)
H14. REMOVAL OF PERSONNEL
The Contractor shall maintain discipline at the site and at all times take all reasonable precautions to prevent any unlawful, riotous, or disorderly conduct by or among those at the site. The Contractor shall ensure the preservation of peace and protection of persons and property in the vicinity of the project. The Contracting Officer may require, in writing, that the Contractor remove from the work any employee that the Contracting Officer deems incompetent, careless, insubordinate or otherwise objectionable, or whose continued employment on the project is deemed by the Contracting Officer to be contrary to the Government's interests.
END OF SECTION H – SPECIAL CONTRACT REQUIREMENTS
Part II - Contract Clauses
SECTION I – CONTRACT CLAUSES
I1. 52.252-02 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: https://www.acquisition.gov/far and https://www.acquisition.gov/diar
CLAUSES TITLE DATE
52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements and
Statements
JAN 2017
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards JUN 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and Certifications DEC 2014 52.204-13 System for Award Management Maintenance OCT 2018 52.204-23 Prohibition of Contracting for Hardware, Software, and Services
Developed or Provided by Kaspersky Lab and Other Covered Entities
NOV 2021
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
AUG 2020
52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment
JUN 2020
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations NOV 2015 52.211-13 Time Extensions SEPT 2000 52.211-18 Variation in Estimated Quantity APR 1984 52.215-8 Order Precedence – Uniform Contract Format OCT 1997 52.219-6 Notice of Total Small Business Set-Aside NOV 2020 52.219-8 Utilization of Small Business Concerns OCT 2018 52.219-9 Small Business Subcontracting Plan SEP 2021 52.219-14 Limitations on Subcontracting SEP 2021 52.219-28 Post-Award Small Business Program Representation SEP 2021 52.222-1 Notice to the Government of Labor Disputes FEB 1997 52.222-3 Convict Labor JUNE 2003 52.222-4 Contract Work Hours and Safety Standards-Overtime Compensation MAY 2018 52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records JUL 2021 52.222-9 Apprentices and Trainees JULY 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontractors (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related
Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition of Segregated Facilities APR 2015 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal
Employment Opportunity for Construction
FEB 1999
52.222-26 Equal Opportunity SEPT 2016 52.222-27 Affirmative Action Compliance Requirements for Construction APR 2015 52.222-36 Affirmative Action for Workers with Disabilities JUN 2020 52.222-50 Combating Trafficking in Persons OCT 2020
52.222-55 Minimum Wages Under Executive Order 13658 JAN 2022 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 52.223-2 Affirmative Procurement of Biobased Products Under Service and
Construction Contracts
SEP 2013
52.223-3 Hazardous Material Identification And Material Safety Data FEB 2021 52.223-5 Pollution Prevention and Right to Know Information MAY 2011 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving JUN 2020 52.225-13 Restriction on Certain Foreign Purchases FEB 2021 52.226-1 Utilization of Indian Organizations and Indian-Owned Economic
Enterprises
JUNE 2000
52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-5 Insurance – Work on a Government Installation JAN 1997 52.232-5 Payments Under Fixed-Price Construction Contracts MAY 2014 52.232-23…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .