Sol_140A1624R0001.pdf
PDF 562 KB Posted
- Attached to
- IT Support Services (ITSS) IDIQ Federal contract opportunity
- Solicitation number
- 140A1624R0001
About this file
This solicitation is for an Indefinite Delivery Indefinite Quantity (IDIQ) multiple award contract for Information Technology Support Services (ITSS). The Bureau of Indian Affairs seeks to acquire IT support services including labor categories such as IT project managers, systems administrators, network engineers, and help desk technicians. The period of performance for the IDIQ contracts is ten years. Task orders will range from one to five years.
The solicitation is a 100% set-aside for Indian Small Business Economic Enterprises. The place of performance for task orders will be defined at the order level. Pricing will include fixed labor rates by category. Travel may be authorized on orders as a direct reimbursable not-to-exceed amount. Minimum and maximum order guarantees and ceilings apply. The contract type for orders will be firm-fixed-price, labor-hour, time-and-materials, or a hybrid. Responses are requested by the specified closing date to obtain consideration for award.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140A1624R0001
SOLICITATION, OFFER AND AWARD
4. TYPE OF SOLICITATION2. CONTRACT NUMBER 3. SOLICITATION NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO (If other than Item 7)
System (DPAS) - Code of Federal Regulations - at 15 CFR 700.
6. REQUISITION/PURCHASE NUMBER
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
NEGOTIATED (RFP) REQUEST FOR
SEALED BID (IFB) INVITATION FOR BID
5. DATE ISSUED
1. This Contract is a Rated Order under the Defense Priorities and Allocations RATING PAGE OF PAGES
1 96
C. E-MAIL ADDRESS
EXT.NUMBERAREA CODE
B. TELEPHONE (NO COLLECT CALLS)A. NAME
10. FOR
INFORMATION
CALL:
CAUTION: LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
(Date)(Hour) local timeuntildepository located in copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the
SOLICITATION
9. Sealed offers in original and
PART IV - REPRESENTATIONS AND INSTRUCTIONS
OTHER STATEMENTS OF OFFERORS
EVALUATION FACTORS FOR AWARD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND
LIST OF ATTACHMENTS
CONTRACT CLAUSES
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
I
J
K
L
M SPECIAL CONTRACT REQUIREMENTS
CONTRACT ADMINISTRATION DATA
DELIVERIES OR PERFORMANCE
INSPECTION AND ACCEPTANCE
PACKAGING AND MARKING
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
SUPPLIES OR SERVICES AND PRICES/COSTS
SOLICITATION/CONTRACT FORM
PART II - CONTRACT CLAUSESPART I - THE SCHEDULE
H
G
F
E
D
C
B
A
SEC. DESCRIPTION PAGE(S) (X) DESCRIPTION SEC. (X)
11. TABLE OF CONTENTS
18. OFFER DATE17. SIGNATURE
SUCH ADDRESS IN SCHEDULE.
IS DIFFERENT FROM ABOVE - ENTER
15C. CHECK IF REMITTANCE ADDRESS
EXTENSIONNUMBERAREA CODE
15B. TELEPHONE NUMBER
(Type or print)AND
ADDRESS
OF
OFFEROR
CODE FACILITY
16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER15A. NAME
DATEAMENDMENT NO.DATEAMENDMENT NO.
and related documents numbered and dated):
amendments to the SOLICITATION for offerors
(The offeror acknowledges receipt of
14. ACKNOWLEDGEMENT OF AMENDMENTS
CALENDAR DAYS (%)30 CALENDAR DAYS (%)20 CALENDAR DAYS (%)10 CALENDAR DAYS (%)
(See Section I, Clause No. 52.232.8)
13. DISCOUNT FOR PROMPT PAYMENT
designated point(s), within the time specified in the schedule.
by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
28. AWARD DATE
(Signature of Contracting Officer)
27. UNITED STATES OF AMERICA
25. PAYMENT WILL BE MADE BY
26. NAME OF CONTRACTING OFFICER (Type or print)
CODE 24. ADMINISTERED BY (If other than Item 7)
ITEM
(4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
41 U.S.C. 3304 (a) ( 10 U.S.C. 3204 (a) (
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION UNDER THE
21. ACCOUNTING AND APPROPRIATION20. AMOUNT19. ACCEPTED AS TO ITEMS NUMBERED
AWARD (To be completed by government)
CODE
02/21/2024 X
A16
BIA CENTRAL 00016
12201 Sunrise Valley Drive Contracting Office Mail Stop-244 Reston VA 20192
0900 ED 04/23/2024
Lesly Hill 313 Lesly.Hill@bia.gov
364-9251
X
X
X
X
X
X
X
X
X
X
X
X
X
PAGE(S)
Jeffrey Pearson
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
STANDARD FORM 33 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.214(c)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____120_________ calendar days (60 calendar days unless a different period is inserted
PROPOSAL
UNITED STATES CODE AT:
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 96
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140A1624R0001
(A) (B) (C) (D) (E) (F)
Period of Performance: 07/01/2024 to 06/30/2034
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
NSN 7540-01-152-8067
Document Number
Document Title Indian Affairs Information Technology Support Services (ITSS) IDIQ Page 3 of 96
Table of Contents
SF1449 Blocks Continued Section A Solicitation
A.1 Solicitation Type A.2 Set-Aside A.3 Contract Type A.4 Contract Dollars Limitations A.5 Individual Task Orders
Section B Supplies or services and prices/costs B.1 Statement of Work (SOW) B.2 Pricing Schedule B.3 Labor Rates B.4 Productive Direct Labor-Hours (non FFP orders only) B.5 Travel B.6 Federal Travel Regulations B.7 Overtime (non FFP orders only) B.8 Type of Contract
Section C Description/Specifications/Statement of Work Section D Packaging and Marking Section E Inspection and Acceptance
E.1 Inspection and Acceptance E.2 Authorized Representative for Inspection and Acceptance E.3 Correspondence E.4 Points of Contact E.5 Permits and Licenses E.6 Confidentiality E.7 Quality Assurance
Section F Deliveries or Performance F.1 Period of Performance F.2 IDIQ and Task Order Period of Performance F.3 Deliverables and Submittals F.4 Task Order Transition Plans F.5 Special Provisions
Section G Contract Administration Data G.1 Federal Holidays G.2 Reporting Matters Involving Fraud, Mismanagement, Waste and Abuse G.3 Non-Payment for Unauthorized Work G.4 Non-Displacement of Qualified Workers
Section H Special Contract Requirements H.1 Off-Ramping H.2 On-Ramping H.3 Contractor Identification H.4 Key Personnel H.5 Personnel Performance and Replacement H.6 Security Requirements H.7 Use of Government Computer System
Document Title Indian Affairs Information Technology Support Services (ITSS) IDIQ Page 4 of 96
H.8 Dissemination of Contract Performance Information H.9 Mandatory Requirement for Contractor Return of all DOI-Owned and Leased Computing and Information Storage Equipment H.10 Disclosure of Information H.11 Non-Personal Services and Inherently Governmental Functions H.12 Personal Conflicts of Interest and Procurement Integrity H.13 Closeout H.14 Emergency or Special Event Services H.15 Government-Furnished Property H.16 Contractor Interfaces H.17 Limited Use of Data H.18 Hours of Work H.19 Deliverable Rights
Section I Contract Clauses Section J List of Attachments Section K Representations, Certifications, and Other Statements of Offerors or Respondents ...47 Section L Instructions, Conditions, and Notices to Offerors or Respondents
L.1 Addendum to FAR Clause 52.212-1 Section M Evaluation Factors for Award
M.1 Evaluation
Document Title Indian Affairs Information Technology Support Services (ITSS) IDIQ Page 5 of 96
SF1449 Blocks Continued
Block 10 The Department of the Interior (DOI), Bureau of Indian Affairs (BIA) is issuing this Request for Proposals (RFP) / Solicitation as a 100% set-aside for Indian Small Business Economic Enterprises (ISBEEs).
Block 15 Delivery locations will be defined at the Task Order (TO) level.
Block 18a Payment will be defined at the TO level.
Document Title Indian Affairs Information Technology Support Services (ITSS) IDIQ Page 6 of 96
Section A Solicitation
A.1 Solicitation Type
This requirement is being solicited in accordance with Federal Acquisition Regulation (FAR) Part 12, Acquisition of Commercial Items and Part 15, Contracting by Negotiation. The Government does not intend to enter into discussions with offerors but reserves the right to do so, if deemed necessary.
A.2 Set-Aside
This requirement is 100% set-aside for Indian-owned Small Business Economic Enterprises (ISBEEs). Prime offerors must meet the eligibility requirements as stated in the Buy Indian Act and NAICS 541519 Other Computer Related Services with a small business size standard of $34M.
Prime offerors must also meet the limitation on subcontracting requirements as stated in FAR clause 52.219-14 and Department of the Interior Acquisition Regulation (DIAR) 1452.280-3.
A.3 Contract Type
The Government anticipates awarding multiple award Indefinite Delivery Indefinite Quantity (IDIQ) with hybrid Time and Material (T&M) / Labor-Hour (LH) / Firm-Fixed-Price (FFP) Task Orders which may include NTE for travel to be direct reimbursable allowable fee in accordance with the Federal Travel (FTR).
The IDIQ contracts will consist of ten years with no options.
A.4 Contract Dollars Limitations
Per FAR clause 52.216-22 Indefinite Quantity the minimum for this indefinite quantity contract shall be any quantity or combination of supplies and services equal to the amount(s) set forth below. The Department does not guarantee any other work during the 10-year period of performance.
• The minimum order amount the contractor must accept is $10,000.00.
• The maximum for the group of indefinite quantity contracts (including options) shall be any quantity or combination of supplies and services not to exceed $500,000,000.00.
The maximum/ceiling of this IDIQ:
1. Includes direct costs, indirect costs, and profit;
2. Is cumulative for all years of performance;
3. Serves as a ceiling amount;
4. Is not funded/obligated, as funding/obligation occurs at the order level;
5. Does not commit the Government to any liability; and
Document Title Indian Affairs Information Technology Support Services (ITSS) IDIQ Page 7 of 96
6. Cannot be exceeded unless the Contractor submits advance written notice to the Contracting Officer, and the IDIQ is modified to reflect a new contract maximum/ceiling.
The Government is obligated only to the extent of the guaranteed minimum and any authorized orders issued under this IDIQ.
A.5 Individual Task Orders
The Contractor shall perform work under this IDIQ as specified in written individual TOs issued by a Contracting Officer (CO).
The following information will be included in each individual TO that is issued against the master IDIQ Contract:
• Date of order
• Contract number and order number
• Labor category, description, quantity in terms of hours, and unit price
• For travel, not-to-exceed amount
• TO Statement of Work
• Delivery or performance schedule
• Place of delivery or performance
• Accounting and appropriation data
TOs shall not include language that is contradictory to that of what is included in this master IDIQ Contract. In instances where language contradicts between the TO and IDIQ level, the IDIQ shall take precedence and be the binding terms of the contact and order.
Document Title Indian Affairs Information Technology Support Services (ITSS) IDIQ Page 8 of 96
Section B Supplies or services and prices/costs
B.1 Statement of Work (SOW)
See Attachment 1 SOW for full details of this requirement for ITSS.
B.2 Pricing Schedule
Offerors shall provide fully burdened, fixed-price labor rates for each of the labor categories listed in Attachment 2 IDIQ Pricing Schedule. Positions may have multiple levels associated with one position to cover different job duties, responsibilities and salary requirements.
B.3 Labor Rates
The Contractor shall provide pricing for all labor categories. The Labor Categories are further defined in Attachment 3, Labor Category Descriptions. The proposed fully burdened, fixed labor rates will be available for ordering under all resultant TOs. The labor category rates proposed will become the maximum threshold that the Government will pay for the labor category under this contract and all subsequent individual TOs. Contractors are expected to adjust their rates accordingly at the TO level. Labor rates may be discounted at the TO level;
however, in the base year, no additional sums will be payable on account of any escalation in the cost of labor or because of the Contractor’s failure to properly estimate or accurately predict these prices or difficulty of achieving the results required by the TO.
The pricing schedules in Attachment 2 shall reflect labor categories and fully burdened hourly labor rates for on-site personnel (on location or remote). Fully burdened hourly labor rates are inclusive of profit, fringe benefits, salary, general and administrative, and indirect costs. In addition, the fully burdened on-site hourly labor rates shall reflect that all services performed are on a Government site and the Government is providing all necessary equipment, materials, and other items necessary to perform these services. Location of personnel and the ability to remote work will be provided at the TO level.
B.4 Productive Direct Labor-Hours (non FFP orders only)
The Contractor can only charge the Government for productive direct Labor-Hours which are defined as those hours expended by Contractor personnel in performing work under the IDIQ Contract/individual TOs. This does not include sick leave, vacation, Government or Contractor holidays, jury duty, military leave, or any other kind of administrative leave such as acts of God (i.e. hurricanes, snowstorms, tornadoes, etc.), Presidential funerals, or any other unexpected Government closures.
Productive direct Labor-Hours may still be applicable in cases of national emergency or other disaster recovery operation as Contractor personnel may be required to work from their home on either Government furnished equipment or using their personal computer.
Labor categories and fully burdened hourly labor rates that are within the scope may be added to the IDIQ as needed throughout the life of the IDIQ. As the Government fully anticipates all
Document Title Indian Affairs Information Technology Support Services (ITSS) IDIQ Page 9 of 96 applicable labor categories will be established at the award of the IDIQ, this shall be a rare instance to add a labor category at the IDIQ level.
B.5 Travel
Travel may be included on individual TOs as a direct reimbursable with a not-to-exceed (NTE) amount. General and Administrative (G&A) costs are allowed for travel. Contractor shall provide supporting documents for all travel costs with submitted invoices.
Individual TOs will identify the specific place(s) of performance. If travel is required to a location that is over fifty (50) miles one-way from the individual TO place of performance and the individual TO includes funding for travel; then, allowable direct reimbursable travel charges may be invoiced in accordance with the current Federal Travel Regulations. Fee, profit, or general and administrative fee will not be allowable on travel expenses.
All reimbursable travel must be submitted to and approved in writing in advance by the Contracting Officer’s Representative (COR) or CO. Requests for travel shall include at a minimum:
• Name and title of traveler
• Purpose of travel
• Dates of travel
• To/From Locations
• Mode of transportation
• Estimated total travel costs broken down by transportation, lodging, meals and incidentals
B.6 Federal Travel Regulations
Travel costs incurred for transportation, lodging, meals, and incidental expenses (as defined in the regulation cited in FAR 31.205-46) shall be considered to be reasonable and allowable only to the extent that they do not exceed on a daily basis the maximum per diem rates in effect at the time of travel as set forth in the Federal Travel Regulation.
The Contractor may be reimbursed for travel to provide support at a government site or other site as may be specified and approved by the COR under this effort. All travel shall be pre-approved in writing by the COR prior to commencement of travel. Consultant shall provide supporting documentation and a detailed breakdown of incurred travel costs with each invoice.
B.7 Overtime (non FFP orders only)
The Government generally discourages overtime, so the Contractor agrees to use its best efforts to avoid (and when applicable, control) overtime. The following additional terms apply to overtime under this contract:
Document Title Indian Affairs Information Technology Support Services (ITSS) IDIQ Page 10 of 96
a. Overtime is defined as time worked in excess of the number of hours in a normal workweek.
b. “Number of hours” includes productive time hours, travel time hours, and paid time off hours (e.g., sick, vacation, holiday).
c. “Productive time hours” consist of hours that, other than travel time hours, directly benefit the order.
d. “Travel time hours” consist of hours spent by the employee traveling to or from authorized work locations.
e. Payment for overtime must be authorized in writing by the Contracting Officer and prior to the employee performing any overtime.
f. Payment for overtime must not conflict with any Contractor uncompensated overtime policy or practice.
g. For fixed-price arrangements, the Government will not pay for overtime.
h. For labor-hour arrangements and the time portion of time-and-materials arrangements, any Government payment for Contracting Officer-authorized-employee overtime will be made at the fixed fully-loaded hourly labor rates negotiated in the order for normal workweek performance.
i. A Contracting Officer-authorized employee is a contractor employee who has been granted permission by the Contracting Officer to work overtime.
B.8 Type of Contract
This is an indefinite-delivery, indefinite-quantity (IDIQ) contract. The contract type(s) for an individual task order will be one or a combination of Firm Fixed Price, Time and Materials, and/or Labor Hours in FAR part 16 (Types of Contracts) depending on one or more factors identified in FAR 16.104 (Factors in Selecting Contract Types). To the extent practicable the Government plans to award on a fixed price basis as defined in FAR 16.202. The Government anticipates each task order issued under a resulting IDIQ to be one of, or a combination of, the following:
• Firm-fixed-price, as defined in FAR 16.202;
• Labor-hour, as defined in FAR 16.602; and/or
• Time-and-materials, as defined in FAR 16.601.
Document Title Indian Affairs Information Technology Support Services (ITSS) IDIQ Page 11 of 96
Section C Description/Specifications/Statement of Work
See Attachment 1 SOW
Document Title Indian Affairs Information Technology Support Services (ITSS) IDIQ Page 12 of 96
Section D Packaging and Marking
1. Use of this section is not required as this is a Contract for services and the Government does not anticipate packaging or marking requirements for deliveries. However, specific submission requirements for reports will be designated at the individual TO level.
2. All pre-award written and electronic correspondences shall include the solicitation number:
140A1624R0001.
All post-award written and electronic correspondences, invoices, and all other documents shall include the master award number.
Solicitation Number: 140A1624R0001 Contract Number: 140A1624##### (to be added post award)
For submission of questions and proposals, see Section L.
Document Title Indian Affairs Information Technology Support Services (ITSS) IDIQ Page 13 of 96
Section E Inspection and Acceptance
E.1 Inspection and Acceptance
Inspection of the Supplies/Services provided hereunder shall be made by the COR or any Inspectors designated by the CO. The place of inspection for reports required under this contract shall be at the addresses for deliverables set forth in Section F. Final acceptance of Supplies/Services shall be made by the COR designated in the contract or as specified in individual TOs.
E.2 Authorized Representative for Inspection and Acceptance
Services to be inspected and accepted by the COR, whose duties will be delegated by the Contracting Officer.
E.3 Correspondence
To promote timely and effective administration, correspondence shall be subject to the following procedures:
a. Technical correspondence (where technical issues relating to compliance with the requirements herein) shall be addressed to the COR with an information copy to the CO and the Contract Administrator (CA).
b. All other correspondence, including invoices, (that which proposes or otherwise involves waivers, deviations or modifications to the requirements, terms or conditions of this requirement) shall be addressed to the Contracting Officer with an information copy to the COR.
E.4 Points of Contact
Contracting Officer’s Representative (COR)
a) The Contracting Officer’s authorized technical representative, for this effort is as follows:
{COR name and email will be provided at IDIQ contract award.}
b) The COR is the individual within the Program Management function who has overall technical responsibility for this effort. The COR supports the CO and the CA during administration of this effort by:
1) Making final decisions regarding any recommended rejection of deliverables;
2) Providing technical clarification relative to overall workload matters;
3) Providing advice and guidance to the Contractor in the preparation of deliverables and services;
4) Providing acceptance of deliverable products to assure compliance with requirements.
c) The COR also provides technical direction to the Contractor, i.e., shifting work emphasis between areas of work; fills in details, or otherwise serves to accomplish the purposes of this effort. Technical direction shall be within the general statement of work for this effort. The COR does NOT have the authority to and may NOT issue any technical direction which:
1) Constitutes an assignment of work outside the general scope of this effort;
Document Title Indian Affairs Information Technology Support Services (ITSS) IDIQ Page 14 of 96
2) Constitutes a change as defined in the “Changes” clause;
3) In any way causes an increase or decrease in cost or the time required for performance;
4) Changes any of the terms, conditions, or other requirements of this effort; and
5) Suspends or terminates any portion of this effort.
d) All technical direction shall be issued in writing by the COR or will be confirmed by the COR in writing within 10 calendar days after verbal issuance. A copy of the written direction shall be furnished to the CO and the CS.
e) In addition to providing technical direction, the COR will:
1) Monitor the Contractor’s technical progress, including surveillance and assessment of performance, and recommend to the CO and CA, any changes in the requirement;
2) Assist the Contractor in the resolution of technical problems encountered during performance; and
3) Perform inspection and acceptance or recommendation for rejection of Contractor deliverables and identify deficiencies in delivered items. This does not replace any other quality assurance inspection requirements that are specified elsewhere within this SOW.
f) If in the opinion of the Contractor, any instruction or direction issued by the COR is outside of their specific authority, the Contractor shall not proceed but shall notify the CO in writing within 5 working days after receipt of any instruction or direction, with an informational copy to the CA.
Contracting Officer
a) All contract questions and concerns will be directed to the CO. The CO is the only individual with the authority to financially obligate the government and to make changes to original terms and conditions of this contract.
The Contractor is responsible for notifying the contracting officer of any potential issues or concerns – technical, scope or financial, concerning this contract.
The CO for this effort is as follows:
Jeffrey Pearson jeffrey.pearson@bia.gov
The Contract Specialist (CS) for this effort is as follows:
Lesly Hill lesly.hill@bia.gov mailto:jeffrey.pearson@bia.gov mailto:lesly.hill@bia.gov
Document Title Indian Affairs Information Technology Support Services (ITSS) IDIQ Page 15 of 96
E.5 Permits and Licenses
In performance of work under each individual TO, the Contractor must, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work.
E.6 Confidentiality
All information regarding the procedures developed under the IDIQ contract, as well as each individual TO, must be regarded as sensitive information by the Contractor and not to be disclosed to anyone outside the Contractor’s organization without the written permission of the Contracting Officer.
E.7 Quality Assurance
The COR or designated inspector will review, for completeness, preliminary or draft documentation that the Contractor submits, and may return it to the Contractor for correction.
Absence of any comments by the COR will not relieve the Contractor of the responsibility for complying with the requirements of this work statement. Final approval and acceptance of documentation required herein shall be by letter of approval and acceptance by COR. The Contractor shall not construe any letter of acknowledgment of receipt material as a waiver of review, or as an acknowledgment that the material is in conformance with this work statement.
Any approval given during preparation of the documentation, or approval for shipment shall not guarantee the final acceptance of the completed documentation.
Document Title Indian Affairs Information Technology Support Services (ITSS) IDIQ Page 16 of 96
Section F Deliveries or Performance
Solicitation Provisions Incorporated by Reference
CLAUSE TITLE DATE
52.247-34 F.o.b. Destination NOV 1991
F.1 Period of Performance
The period of performance for the initial IDIQ(s) will be ten years from the effective start date listed on each respective contract.
F.2 IDIQ and Task Order Period of Performance
For those TOs issued before the expiration of the IDIQ contract, the period of performance may extend up to twelve months after the expiration of the IDIQ contract.
F.3 Deliverables and Submittals
Deliverables/Deliverable Schedule will be provided at the individual TO level.
F.4 Task Order Transition Plans
A. Transition-In Plan. The Contractor shall assure that it transitions task orders in a manner that assures little or no service delivery degradation from the expiring contract for similar services. The Contractor shall ensure that there will be minimum service disruption to vital Government business and no service degradation during and after transition. The Contractor shall provide a final Transition-In Plan that will be based on the Contractor’s proposal Transition-in Plan, within five calendar-days of project start. All transition activities shall be completed 15 calendar days after Task Order start. The contactor can utilize all existing ITS infrastructure during transition as long as risks are appropriately mitigated. The Contractor shall begin implementation of its Transition-In Plan no later than (NLT) five (5) calendar days after Task Order award.
The Transition Plan shall, unless otherwise specified at the task order level:
• Document the strategic approach
• Identify equipment, hardware, software, documents and other artifacts that are included in the transition
• Establish milestones and schedules
• Establish activities
• Identify transition risks and risk mitigation
• Define roles and responsibilities
• Define transition approval authorities and lines of communication
• Define a knowledge transfer approach
• Define a property inventory and transition approach
• Create bi-party or tri-party agreements
• Provide checklists
Document Title Indian Affairs Information Technology Support Services (ITSS) IDIQ Page 17 of 96
B. Transition-Out Plan. The Contractor shall provide a Transition-Out Plan that facilitates the accomplishment of a seamless transition from the incumbent to an incoming Contractor/Government personnel at the expiration of the contract.
The Contractor shall provide a final Transition-Out Plan NLT 60 calendar days after the Government requests the deliverable, during the final option year of the contract. The Contractor shall update the plan through-out the performance of the contract as necessary reflecting current operations and service levels and provide these updates at the appropriate MPSR. The Contractor shall identify how it will coordinate with the incoming Contractor and/or Government personnel to transfer knowledge to include the following:
• Project management processes.
• Points of contact.
• Location of technical and project management documentation, data, and methods of providing these to the incoming service provider.
• Status of ongoing technical initiatives (inflight projects).
• Appropriate Contractor-to-Contractor coordination to ensure a seamless transition.
• Transition of Key Personnel.
• Schedules and milestones.
• Actions required of the Government.
• Methods of measuring transition risks that includes a complete inventory of transition risks with assigned severity and probability, and response plans to address the risks either through avoidance, mitigation, or other means.
• Method of permitting the successor service provider to observe and become familiar with any and all operations specified in this PWS for a minimum of 30 calendar days prior to the expiration or termination of the contract.
• Method of establishing and maintaining effective communication with the incoming service provider for the period of the transition via weekly status meetings.
• Detail knowledge transfer including the following:
• Method for ensuring that all information assets and related configuration information is up-to-date and available for the Government’s review at least 30 calendar days prior to the end of the contract.
• Deliver to DOI electronic copies of all Government data and information stored in the Contractor’s systems in the format requested by DOI within 15 business days from the DOI request.
• Provide process descriptions and detailed procedures for all systems management and support processes and update as necessary during the transition-out.
• Method for adherence to the approved Transition-Out Plan once phase-out activities are initiated.
• Method for conducting a joint Contractor and Government inventory of GFE and all operational, engineering, procedural, educational, and any other documentation
Document Title Indian Affairs Information Technology Support Services (ITSS) IDIQ Page 18 of 96 and presentations produced as part of delivering the PWS services within ten business days of an DOI request.
• Method for certifying that all Government information has been purged from any Contractor-owned system used to process Government information.
• The Contractor will implement the requirements of the Government approved Transition-Out Plan at the direction of the Government in support of transitioning to a new service provider.
F.5 Special Provisions
A. Section 508 Accessibility Standards Notice, all deliverables (including, but not limited to, electronic and information technology (EIT)) procured through this IDIQ must meet the applicable accessibility standards at 36 CFR § 1194, U.S. Architectural and Transportation Barriers Compliance Board (Access Board) under the authority of Section 508 of the Rehabilitation Act Amendment of 1998, unless an agency exception to this requirement exists. 36 CFR § 1194, U.S. Architectural and Transportation Barriers Compliance Board (Access Board) is viewable at http:// www.section508.gov. The Contractor shall indicate for each line item in the schedule whether each product or service is compliant or noncompliant with the accessibility standards at 36 CFR § 1194.
Further, the proposal must indicate where full details of compliance can be found (e.g., vendor’s website or other exact location).
B. Non-Disclosure Policies, the work to be performed by, and the data released to, the Contractor’s personnel shall be treated as sensitive and confidential in nature and is not to be discussed with or released to anyone except DOI (or other bureau or agency-specific personnel at the task order level) employees assigned to work with the Contractor and other Contractor personnel working on a given Task Order. The Contractor is responsible for requiring all of its employees working under this IDIQ, who have access to privileged information under this IDIQ to execute all Certifications required by DOI. DOI, as it deems appropriate, may require additional certifications be completed by the contractor at any time during a task order’s period of performance.
Document Title Indian Affairs Information Technology Support Services (ITSS) IDIQ Page 19 of 96
Section G Contract Administration Data
All invoices shall be submitted via https://www.ipp.gov on a monthly basis or in accordance with individual TOs.
Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013) Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP). "Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:
https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
• A copy of the Contractor’s invoice shall be included with the IPP invoice. If no invoice is attached, the Invoice will be rejected;
• List of deliverables;
• Timesheet - Number of hours worked with corresponding labor category and rate information;
• Any additional information requested at the individual TO level.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of a TO award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone
(866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of local clause)
G.1 Federal Holidays
Unless otherwise notified in writing by the CO or COR, no services will be required on the following list of observed federal holidays. An up-to-date list of all federal holidays for each calendar year is available at https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/.
The Contractor shall observe Inauguration Day as a holiday for Washington, D.C. based Contractor employees. Federal Agencies in the Washington, D.C. metro area are closed on Inauguration Day. However, Inauguration Day is not observed outside of the Washington, D.C.
https://www.ipp.gov/ https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/ https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/
Document Title Indian Affairs Information Technology Support Services (ITSS) IDIQ Page 20 of 96 area and Contractor employees in those areas should report to their established duty station.
NOTE: If a Public Holiday (observed on a specific calendar date) occurs on a Saturday, the holiday is observed on the preceding Friday; if the holiday occurs on Sunday, the holiday is observed by the Federal Government on Monday.
If Government facilities are closed nationwide or in specific locations for other than listed holidays by direction of the U.S. Office of Personnel Management, the Office of Management and Budget, Executive Order of the President or other Official Government entity, Contractor staff shall not report to Government facilities (except for positions designated as 24/7). If Government offices close early and federal employees are dismissed, the COR in consultation with the Program Managers and/or the Contracting Officer will make a determination on a case-by-case basis regarding dismissal of Contractor employees.
G.2 Reporting Matters Involving Fraud, Mismanagement, Waste and Abuse
Anyone who becomes aware of the existence or apparent existence of fraud, waste and abuse in BIA funded programs is encouraged to report such matters to the DOI Inspector General’s Office in writing or on the Inspector General’s Hotline. The toll-free number is 1-800-424-5081. All telephone calls will be handled confidentially. One may also fill out an online form at http://www.doi.gov/oig/index.cfm. Additionally, the IG may be contacted through its mailing address:
U.S. Department of the Interior Office of Inspector General 1849 C Street NW - Mail Stop 4428 Washington, D.C. 20240
G.3 Non-Payment for Unauthorized Work
No payments will be made for any unauthorized supplies and/or services or for any unauthorized changes to the work specified herein. This includes any services performed by the Contractor of their own volition or at the request of an individual other than a duly appointed Contracting Officer. Only a duly appointed Contracting Officer is authorized to change the specifications, terms, and conditions under this effort.
G.4 Non-Displacement of Qualified Workers
Consistent with the efficient performance of this contract, the contractor and its subcontractors shall, except as otherwise herein, in good faith offer those professional service employees employed under the predecessor contract whose employment will be terminated as a result of award of this contract or the expiration of the contract under which the employees were hired, a right of first refusal of employment under this contract in positions for which employees are qualified.
Document Title Indian Affairs Information Technology Support Services (ITSS) IDIQ Page 21 of 96
Section H Special Contract Requirements
H.1 Off-Ramping
The Government reserves the unilateral right to Off-Ramp Contractors from the IDIQ. Off- Ramping is a mechanism by which the Government can remove contractors who do not provide competitive proposals, and/or the Government determines that they are otherwise not viable to continue as an IDIQ holder under the ITSS program. Off-Ramping from the IDIQ will be accomplished via Termination for Convenience of the IDIQ. If an IDIQ contractor is off-ramped while it is performing active TOs, those TOs may be terminated (for convenience or, if applicable, default), or the IDIQ may be put in a hiatus status with no new TOs awarded until the active TOs are complete and the IDIQ can be terminated for convenience.
Below are example conditions that may lead IDIQ contractors to be removed from the IDIQ:
• The IDIQ contractor does not submit any proposals despite having received four requests for proposal that are within the ordering limitations established in this solicitation under FAR clause 52.216-19 Order Limitations.
• The IDIQ contractor submits proposals that are consistently much higher than competitive proposals. The IDIQ contractor proposed prices are greater than the mean average proposed price by more than 50% for three proposals in a row.
• The IDIQ contractor receives an adverse past performance rating on an IDIQ/TO CPARS, if after the IDIQ contractor uses its opportunity to address the adverse past performance, the Government is still unsatisfied with performance.
Any IDIQ contractor(s) who have been Off-Ramped are not entitled to receive the minimum guarantee established at the time of IDIQ award.
H.2 On-Ramping
The Government reserves the right to utilize an On-Ramping concept, consistent with FAR 16.504(c)(1)(ii)(A), to maintain sufficient competition among the IDIQ awardees by adding IDIQ contractors after the original source selection is made. This will be done by requesting and evaluating proposals in a manner consistent with the original solicitation. The Government may determine at any time that it would be in the Government’s best interest to initiate an open season to add contractors.
If the Government initiates an open season, a notice will be published in SAM.gov in accordance with FAR part 5 Publicizing Contract Action. Any open season solicitation issued will adhere to all Federal procurement law current at the time of solicitation, and the award decision under the open season solicitation will be based upon substantially the same evaluation factors/sub-factors as the original solicitation. The On Ramp solicitation will identify the target number of new contracts intended to be awarded in response to the On Ramp solicitation notice. The terms and conditions of any resulting awards will be materially the same as the existing awards to the original IDIQ awardees. Any new awards will end at the same time as the existing term for all other IDIQ contracts. Immediately upon on-ramping, the new IDIQ contractor will be eligible to submit a proposal in response to any TO solicitation and receive TO awards with the same rights and obligations as any other IDIQ contractor.
Document Title Indian Affairs Information Technology Support Services (ITSS) IDIQ Page 22 of 96
H.3 Contractor Identification
Each contract employee shall identify themselves as a Contractor under this contract both orally and in writing. All Contractor emails (to include the emails from the Government account) and all other written correspondences, shall state the following in their signature line:
• The name of the company that they are employed by.
• Clearly identify themselves as a contract employee by stating “Government Contractor.”
The above identification requirement also applies to the following:
• Voicemails
• Placards
• Office Name Plates
• Any material produced under this contract if a name of a Contractor is provided within.
Under no circumstance shall the Contractor state or imply that they are acting on behalf of the Government.
H.4 Key Personnel
Key Personnel at the IDIQ level consists of the IDIQ Program Manager only.
Key Personnel requested at the TO level will be listed within the individual TO Request for Quote (RFQ) / RFP.
Certain skilled, experienced, professional and technical personnel are essential for accomplishing the work under this contract. These individuals are defined as "Key Personnel" and are those persons whose resumes were submitted and marked by the vendor as "Key Personnel" in response to the positions designated as “Key Personnel” within the TO requirements. During the first six (6) months of performance, no substitutions shall be made of accepted key personnel except for sudden illness or death, or termination of employment. The Government shall accept substitutions only if in compliance with the “Substitution of Key Personnel" provision identified below.
All Contractor requests for approval of substitutions hereunder shall be submitted in writing to the COR and the Contracting Officer at least thirty (30) calendar days in advance of the effective date, whenever possible, and shall provide a detailed explanation of the circumstances necessitating the proposed substitution, a complete resume for the proposed substitute, and any other information requested by the Contracting Officer necessary to approve or disapprove the proposed substitution. Proposed substitutes should have comparable qualifications to those of the person(s) being replaced. The COR and the Contracting Officer will evaluate such requests and promptly notify the Contractor of approval or disapproval in writing.
If the Government agrees to the substitution during the first six (6) months of this contract, the replacement personnel shall sign a letter of commitment to cover the difference of the six-month period, as required under this contract.
Document Title Indian Affairs Information Technology Support Services (ITSS) IDIQ Page 23 of 96
H.5 Personnel Performance and Replacement
The Government reserves the right to assess the qualifications and acceptability of any individual proposed by the Contractor for any position and may require the Contractor to replace an individual whose qualifications and suitability are judged deficient with written notification.
Indian Affairs shall have and exercise complete control over granting, denying, suspending, and removing employment suitability clearances for Contractor employees and prospective Contractor employees. If the Government receives an unsuitable report on any Contractor employee after processing his or her forms or finds a prospective Contractor employee unsuitable or unfit for his or her assigned duties, the COR will advise the Contractor that the employee shall be considered ineligible for contract performance.
Where temporary favorable suitability determinations have been granted, the Government Contracting Officer may request the Contractor to immediately remove any contract employee from the contract who has failed to receive a favorable suitability determination, whose continued employment is deemed contrary to the public interest, inconsistent with the best interests of security, or is identified as a potential threat to the health, safety, security, general well-being or operational mission of the agencies, bureaus, and its population. The Contracting Officer may also request the Contractor to immediately remove any contract employee from the contract should it be determined that the individual being assigned to duty has been disqualified for suitability reasons or has been found to be unfit for performing duties during their tour(s) of duty.
Contractor personnel under this contract shall not be: (1) Placed in a position where they are under the supervision or evaluation of a Government employee; and (2) Placed in a position of command, supervision, administration or control over Government personnel, or personnel of other Contractors. Given the nature of the contract requirements and the working environment, it may be necessary for Government and Contractor personnel to work as a team to accomplish work objectives, share knowledge, and work in a mutually supportive role. This should be accomplished while preserving the non-personal services nature of the contract. The operational need to work in concert should be accomplished in a manner consistent with preserving the management responsibilities of the Contractor. Working in a team environment, may require the Government to provide collaboration among the contract personnel which will require work direction from the Government. Work direction means a communication to Contractor personnel that directs or approves approaches, documents, presentations, or refinements to work; fills in details or otherwise completes the general description of work or documentation items; shifts emphasis among work areas or tasks; or furnishes similar instructions to Contractor personnel.
Work direction includes requiring analyses and development of other products within the scope of work for the contract.
The Contractor is at all times responsible for the quality of Contractor personnel work. It is the direct responsibility of the Contractor to perform all tasks normally associated with an employer-employee relationship, e.g., completing timecards, resolving quality of work issues, ensuring high motivation and morale, and resolving Government-identified Contractor performance concerns. To ensure effective and efficient services, the Contractor supervisory personnel need to establish and maintain work procedures that facilitate close and continuous coordination with
Document Title Indian Affairs Information Technology Support Services (ITSS) IDIQ Page 24 of 96 agency Contracting Officers, Contracting Officer Technical Representatives (CORs), and other program management personnel. The Contractor supervision of Contractor personnel must also reflect the need to sustain a high-performing, highly motivated, and responsive team. The Contractor shall ensure that all Contractor personnel are adequately trained, possess the requisite experience, and are otherwise fully qualified to provide the high level of support required by agency prior to being assigned to this contract.
H.6 Security Requirements
All Contractor personnel will be required to successfully pass a minimum background investigation for any requirement performed under the IDIQs and all Contractor personnel shall comply with Federal laws, regulations, standards, regarding information and information system security. All security requirements and clauses included in the IDIQs will also be applicable and flow down to any TOs awarded under the IDIQs. Security clearance consists of the DOI background check, taking the Federal Information Systems Security Awareness Training (FISSA) training and obtaining a security card.
H.7 Use of Government Computer System
All personnel accessing the Government computer systems can expect their computer activities to be monitored. There should be no reasonable expectation of privacy in the use of any Department of the Interior system. The following notice is posted and provided to each individual upon entry into the IA computer system:
“THIS IS A NOTICE OF MONITORING OF DEPARTMENT OF THE INTERIOR
INFORMATION SYSTEMS. This system and all related equipment may be used only for official US Government business and limited personal use authorized in the Department of the Interior Policy on Limited Personal Use of Government Office Equipment. Notwithstanding this or any other policy guidance, this system may not be connected to the Internet, in any way, unless authorized by the Office of the Secretary. Unauthorized use of this computer system will subject you to disciplinary action or other penalties. Use of this system constitutes consent to monitoring for this purpose.”
Property Rights – IA will own the intellectual property rights to any software developed on its behalf and will retain the right to use, modify, reproduce, perform, display, release, or disclose the data in whole or in part for any purpose, or to have or authorize others to do so. Generally, FAR clause 52.227-14 Rights in Data-General, and its alternates will be used in the contract.
However, deviation from this policy may be necessary as circumstances warrant.
IA data may not be removed from premises without COR written authorization.
The Contractor shall not be allowed to keep any IA Trust Data or copies of Trust Data, reports (draft or final copies).
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .