Site Visit Requirements.pdf

PDF 182 KB Posted

Attached to
Repair Epoxy Floors Federal contract opportunity
Solicitation number
W50S9A-20-B-0002
Issued by
Department of the Army Utah Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Repair Epoxy Floors, newest first.
File Type Posted
W50S9A-20-B-0002 Amendment 0002.pdf PDF
Building 0208 Floor Plan - Rev 1.pdf PDF
W50S9A-20-B-0002 Amendment 0001 Revised SOW Repair Epoxy Floors.pdf PDF
W50S9A-20-B-0002 Amendment 0001 Questions and Answers.pdf PDF
W50S9A20B0002 Amendment 0001.pdf PDF
Building 0208 Floor Plan.pdf PDF
Building 0037 Floor Plan.pdf PDF
W50S9A-20-B-0002.pdf PDF
Building 0023 Floor Plan.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

151st AIR REFUELING WING

ROLAND R. WRIGHT AIR NATIONAL GUARD BASE UTAH

765 NORTH 2200 WEST SALT LAKE CITY, UT 84116

27 April 2020

MEMORANDUM FOR RECORD

FROM: 151 CES/CEC

SUBJECT: Site Visit Requirements: USEB192303 REPAIR EPOXY FLOORS, BLDGs 23, 37, and 208

1. Contractors will need to arrive with a valid identification that meets federal REAL ID Act requirements (https://www.dhs.gov/current-status-states-territories). No weapons are allowed on base. The following personnel will not be allowed on base: non-legal immigration status, SSN cannot be validated, prior barment, wanted fugitive, firearms conviction, or name on federal watch list.

a. No restricted areas will be visited during the site visit, so there are no additional security requirements.

b. 151 CES will provide up to 5 escorts and can assist in requesting additional escorts or LRS bus support if necessary.

2. An in-brief in the large conference room of Building 301 is recommended to familiarize the contractors with the site visit/bid/contract requirements and building locations. Capt Cross, Brian Teel, and George Waller will brief the technical aspects of the project and be available for questions.

3. The contractors will need to visit buildings 23, 37, and 208.

4. An out-brief in the large conference room of Building 301 is recommended to answer any technical questions brought up during the walkthrough.

5. The site visit is expected to take 3-4 hours to complete.

6. Please contact me with any questions or comments at DSN 245-2694 or cameron.l.cross4.mil@mail.mil.

CAMERON L. CROSS, Capt, UTANG, P.E.

Project Engineer