Site Visit Requirements.pdf
PDF 182 KB Posted
- Attached to
- Repair Epoxy Floors Federal contract opportunity
- Solicitation number
- W50S9A-20-B-0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W50S9A-20-B-0002 Amendment 0002.pdf | ||
| Building 0208 Floor Plan - Rev 1.pdf | ||
| W50S9A-20-B-0002 Amendment 0001 Revised SOW Repair Epoxy Floors.pdf | ||
| W50S9A-20-B-0002 Amendment 0001 Questions and Answers.pdf | ||
| W50S9A20B0002 Amendment 0001.pdf | ||
| Building 0208 Floor Plan.pdf | ||
| Building 0037 Floor Plan.pdf | ||
| W50S9A-20-B-0002.pdf | ||
| Building 0023 Floor Plan.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
151st AIR REFUELING WING
ROLAND R. WRIGHT AIR NATIONAL GUARD BASE UTAH
765 NORTH 2200 WEST SALT LAKE CITY, UT 84116
27 April 2020
MEMORANDUM FOR RECORD
FROM: 151 CES/CEC
SUBJECT: Site Visit Requirements: USEB192303 REPAIR EPOXY FLOORS, BLDGs 23, 37, and 208
1. Contractors will need to arrive with a valid identification that meets federal REAL ID Act requirements (https://www.dhs.gov/current-status-states-territories). No weapons are allowed on base. The following personnel will not be allowed on base: non-legal immigration status, SSN cannot be validated, prior barment, wanted fugitive, firearms conviction, or name on federal watch list.
a. No restricted areas will be visited during the site visit, so there are no additional security requirements.
b. 151 CES will provide up to 5 escorts and can assist in requesting additional escorts or LRS bus support if necessary.
2. An in-brief in the large conference room of Building 301 is recommended to familiarize the contractors with the site visit/bid/contract requirements and building locations. Capt Cross, Brian Teel, and George Waller will brief the technical aspects of the project and be available for questions.
3. The contractors will need to visit buildings 23, 37, and 208.
4. An out-brief in the large conference room of Building 301 is recommended to answer any technical questions brought up during the walkthrough.
5. The site visit is expected to take 3-4 hours to complete.
6. Please contact me with any questions or comments at DSN 245-2694 or cameron.l.cross4.mil@mail.mil.
CAMERON L. CROSS, Capt, UTANG, P.E.
Project Engineer