Section_J_-_Att_No__003_Division_1_Specifications.pdf
PDF 753 KB Posted
- Attached to
- RELOCATE SAND AT OCEAN BEACH Federal contract opportunity
- Solicitation number
- 140P8623Q0022
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8623Q0022_Amd_0001.pdf | ||
| Section_J_-_Att_No__007_Site_Visit_Log_0001.pdf | ||
| Section_J_-_Att_No__005_GDN_CA_20230018_Mod_10_4_14_2023.pdf | ||
| Section_J_-_Att_No__004_Photo.pdf | ||
| Sol_140P8623Q0022.pdf | ||
| Section_J_-_Att_No__002_SOW.pdf | ||
| Section_J_-_Att_No__001_Contract_Price_Schedule.xls | XLS spreadsheet | |
| Section_J_-_Att_No__006_Technical_Information_Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01 10 00 - 1
General Requirements
OVERHEAD
SECTIONAL
DOORS
GOGA
PMIS – 253799
Sand Relocation at Ocean Beach
SECTION 01 10 00
GENERAL REQUIREMENTS
PART 1 - DESCRIPTION OF WORK
1.1 BACKGROUND: Historically in the past, storms and normal wind currents have driven the sand up against the sea wall, topped the wall and blew sand into piles on the promenade, parking lots and the Great Highway. The roads crew would constantly get calls to clear the sand but due to short staffing, did not have time to address the whole beach and only did the necessary cleaning to restore access and accessibility at the problem area.
1.2 The goal of this project is to contract sand relocation on a cyclic schedule and the object of these contracts is to clear sand away from half of the O’Shaughnessy Seawall and access points to the beach along the Great Highway at a time. This relocation of sand will stop the sand from impeding upon the promenade, parking lots and Great
Highway providing access and accessibility to, from, and along the beach. There may be an option to this contract.
1.2.1 The contractor will be pushing sand away from the seawall to the edge of the high-water line/mark. CO will determine what area to be worked per year via site visit.
Work site will be level or smoothed to the extent possible for visitor use.
1.3 All work will be performed under a single contract.
PART 2 - EXISTING UTILITIES
2.1 There should be no need for any excavation during this project or utility location.
However all locates will be the responsibility of the contractor.
PART 3 - CONTRACTOR’S USE OF PREMISES
3.1 ON-SITE WORK HOURS: Work shall be generally performed during normal business working hours of 7 a.m. to 6 p.m., Monday through Friday, except when otherwise indicated.
3.2 CONSTRUCTION CAMP: N/A
3.3 STORAGE – STAGING AREAS:
A. Confine Storage of materials and equipment to the project area. Contractor can use an area of the parking lot but must acquire permits from the city. All permitting needs will be the responsibility of the contractor. Limits of use and control shall be subject to Contracting Officer’s approval.
3.4 PRESERVATION OF NATURAL FEATURES: N/A
RFQ 140P8623Q0022
Section J - Att No. 003
01 10 00 - 2
OVERHEAD
SECTIONAL
DOORS
GOGA
PMIS – 253799
Sand Relocation at Ocean Beach
3.5 HAULING RESTRICTIONS: N/A
3.6 HOUSEKEEPING:
A. Keep project neat, orderly, and in a safe condition always. Store and use equipment, tools, and materials in a manner that does not present a hazard. Immediately remove all hazardous rubbish. Do not allow rubbish to accumulate. Provide onsite containers for collection of rubbish and dispose of it at frequent intervals during progress of work which will include grease cartridges, rags or other materials used to maintain the equipment.
B. Dispose of waste materials legally using park trash receptacles along the promenade, which will include food waste, wrappers, bottles and cans used for personal consumption of workers during their workday.
PART 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION
4.1 The Contractor shall commence work within 10 calendar days after the date of receipt of the "Notice to Proceed."
PART 5 - EXAMINATION OF THE SITE
5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids. All bidders will be held to have the same knowledge concerning the site and the on-ground conditions as if they had inspected the job site.
PART 6 - ABBREVIATIONS
6.1 The following list of abbreviations, which may be used in the Construction Specifications or Special Provisions, refer to the organizations and specifications of the organizations listed below:
AASHTO - American Association of State Highway and Transportation Officials
ACI - American Concrete Institute
AISC - American Institute of Steel Construction
AI - Asphalt Institute
ANSI - American National Standards Institute
ASTM - American Society for Testing and Materials
AWWA - American Water Works Association
Caltrans- State of California Department of Transportation
FHWA - Federal Highway Administration
FS - Federal Specifications
MSHA - Mine Safety and Health Administration
MUTCD - Manual on Uniform Traffic Control Devices
NEC - National Electric Code
NEMA - National Electrical Manufacturers Association
NFPA - National Fire Protection Association
NIOSH - National Institute of Occupational Safety and Health
NPS - National Park Service
NSF - National Sanitation Foundation
01 10 00 - 3
OVERHEAD
OSHA - Occupational Safety and Health Administration
PCA _ Portland Cement Association
UBC - Uniform Building Code
UL - Underwriters Laboratories, Inc.
PART 7 - ACCIDENT PREVENTION
7.1 DESCRIPTION: The work of this section consists of establishing and implementing an effective accident prevention program and providing a safe environment for all personnel and visitors.
7.2 SUBMITTALS:
A. ACCIDENT PREVENTION PROGRAM: At the preconstruction conference submit for approval an accident prevention program. The program shall include:
1. Name of responsible supervisor to carry out the program.
2. First aid procedures.
3. Training, both initial and continuing.
4. Planning for possible emergency situations.
5. Contractor to identify nearest location of medical facility for emergencies.
6. Recognition that work will be performed in remote areas with limited communication or cell phone coverage.
B. MEETING AND INSPECTION REPORTS: Submit a report of safety meetings and of inspections.
7.3 QUALIFICATIONS OF EMPLOYEES:
A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner.
B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
C. Operators of vehicles, mobile equipment, hoisting equipment, and hazardous plant equipment shall be able to understand signs, signals, and operating instructions, and be capable of operating such equipment. Provide operating instructions for all equipment.
D. Newly hired operators shall be individually tested by an experienced operator or supervisor to determine if they are capable of safely operating equipment.
7.4 ACCIDENT REPORTING: The Contractor shall report all accidents to the Contracting
Officer as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.
7.5 FIRST AID FACILITIES: Provide adequate facilities for the number of employees and the type of construction at the site.
01 10 00 - 4
OVERHEAD
7.6 PERSONNEL PROTECTIVE EQUIPMENT: Meet requirements of NIOSH and MSHA, where applicable, as well as ANSI.
7.7 EMERGENCY INSTRUCTIONS: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
7.8 PROTECTIVE EQUIPMENT:
A. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.
B. It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.
7.9 SAFETY MEETINGS: As a minimum, conduct 15 minute "toolbox" safety meetings.
These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite.
7.10 HAZARDOUS MATERIAL ACTION: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state and local regulations, and as outlined within the operator's Safety or Hazardous Materials
Business Plan.
A. If a spill, leak or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the National Park Service Emergency Dispatch.
PART 8 - PRECONSTRUCTION CONFERENCE:
8.1 PRECONSTRUCTION CONFERENCE: Before start of construction, Contracting
Officer will arrange an on-site meeting with Contractor. The meeting agenda will include the following:
Roles and Responsibilities
Key Personnel
National Park Service regulations
Documents required under the contract
Subcontractors
Labor standards provisions
Modifications
Payments to Contractor
Payroll reports
Technical Issues
Correspondence procedures
Acceptance/Rejection of Work
Construction Meetings
Submittal of shop drawings, project data, and samples
01 10 00 - 5
OVERHEAD
Accident prevention program (including name of responsible supervisor)
Accident reporting
Safety program (compliance with the "Accident Prevention" clause of the General
Provisions)
Spill Response Plan
Saturday, Sunday, holiday and night work
Contract Time
Tentative construction schedule
Notice to Proceed
PART 9 - SUBMITTALS
9.1 DESCRIPTION: The work of this section consists of submittal requirements before and during construction.
9.2 Equipment: Sand equipment and vehicles
Shop Drawings: Not Applicable (N/A)
Product Data: Provide construction equipment and vehicles to be used for this project.
Samples: N/A
A. For submittals specified above, forward submittals to Contracting Officer at least
15 days before need for approval.
B. After approving submittals, Contracting Officer will return one copy to the
Contractor.
C. If submittals are not approved, Contracting Officer will return all copies to
Contractor with reasons for rejection. Resubmit, identifying changes.
D. Any work done before approval shall be at Contractor's own risk.
9.3 APPROVED EQUALS: A request for approval constitutes a representation that
Contractor:
A. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
B. Will provide the same warranties for the proposed item as for the item specified.
C. Has determined that the proposed item is compatible with interfacing items.
D. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
E. Waives all claims for additional expenses that may be incurred as a result of the substitution.
01 10 00 - 6
OVERHEAD
9.4 PROGRESS SCHEDULES: As soon as possible after Notice of Award and before beginning any work, submit Progress Schedule. Contracting Officer will review the
Progress Schedule for format and content. Submit four copies of Progress Schedule
(normally in bar chart form) showing estimated starting and completion dates for each part of the work. The first progress payment will not be issued until an acceptable progress schedule is submitted.
PART 10 - TEMPORARY SERVICES
10.1 DESCRIPTION: The work of this section consists of providing temporary services required for Contractor's performance of the work of this Contract.
10.2 FIRE PREVENTION AND PROTECTION:
A. Hazard Control: Take all necessary precautions to prevent fire during construction.
Provide adequate ventilation during use of volatile or noxious substances.
PART 11 - PROJECT CLOSEOUT
11.1 DESCRIPTION: The work of this section consists of final cleanup, closeout submittals, final inspection procedures, and safety precautions.
11.2 CLEANING: Remove all tools, equipment, surplus materials, and rubbish. At time of final inspection, project shall be thoroughly clean and ready for use.
11.3 SUBSTANTIAL COMPLETION AND FINAL INSPECTION: Submit written certification that project is substantially complete, and a final inspection is requested.
Contracting Officer will make an inspection within 10 days of receipt of request.
A. When Contracting Officer determines that the work is substantially complete; he will prepare a list of deficiencies (“Punch List”) to be corrected before final acceptance and issue a Letter of
B. Substantial Completion.
C. If Contracting Officer determines that the work is not substantially complete; he will immediately notify Contractor in writing, stating reasons. After completing work, Contractor shall resubmit certification and request a new final inspection.
11.4 ACCEPTANCE OF THE WORK: After all deficiencies have been corrected, a Letter of
Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.
END OF SECTION