This is a Scope of Work document for the New York State Office for People With Developmental Disabilities (OPWDD) Rolland Retaining Wall project located at 101 Rolland Terrace, Syracuse, NY 13209. The project requires removal of an approximately 80-inch wood retaining wall and installation of a Versa-Lock block system wall with cap stones to be provided and installed. All prospective bidders are required to attend a mandatory site visit scheduled for Friday, April 17th, 2026 at 10:30 a.m., where measurements and color selections will be determined on-site. Work must be completed within 30 days of award and performed between 8 a.m. and 5 p.m., Monday through Friday. The project is classified as a NYS Public Works project requiring payment of prevailing wages under PRC# 2026009809. Prior to commencement, a meeting with CNYDDSO Operations and Maintenance staff must be held to discuss safety requirements, and quality control and quality assurance inspections must be scheduled with PSES upon completion.
The bid price must include all materials, labor, disposal fees, and site cleanup costs with final acceptance provided by the appropriate Maintenance Supervisor. The contractor is responsible for all property damage caused by work performed, including lawn damage from material delivery or vehicle traffic, and must restore conditions to their pre-work state. Sub-contractors must be pre-approved in writing by the NYS OPWDD CNYDDSO Region 2 Business Office prior to work commencement. Additional requirements include daily site cleanup with all tools, materials, and debris secured, prohibition of smoking at residential and program sites, and coordination of all work with the House Director and Plant Superintendent. Safety Data Sheets applicable to the work must be provided to the Plant Superintendent prior to start of work, and all environmental testing associated with the project will be provided to the contractor beforehand.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| CNY DDSO Contractor Requirements 2026.docx | DOCX document | |
| CNY BID FORM.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SCOPE
DESCRIPTION:
Remove Approx 80” wood retaining wall. Install a Versa-Lock . The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 30 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid, PRC# 2026009809. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of Retaining Wall, before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with PSES.
SCOPE OF WORK includes, but is not necessarily limited to the following:
1. Remove existing wood retaining wall and dispose of.
2. Install a Versa-Lock block system wall, Approx 80” (per manufactures specs)
3. Cap Stones to be provided and Installed
4. Measurements to be taken at Site Visit.
5. Color to be provided at Site Visit
GENERAL REQUIREMENTS:
1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up.
Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor.
2. Work is to be done between the hours of _8 AM__ and _5 PM__, Monday through Friday. Contractor is advised that this is an occupied home and may be occupied during these times.
3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each work day.
4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery.
5. Smoking is prohibited by contractors at all residential and program sites owned by
OPWDD.
6. Prior to the commencement of the work, there shall be a meeting with CNYDDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period.
Facility: Rolland IRA
OPWDD
Facility Address: 101 Rolland Terrace Syracuse, NY. 13209
Point of Contact:
Dan Aksterowicz MS1
Contact Phone Number: (315) 251-4398
Project Title: Replace retaining wall
Summary of Work: See Scope of work
7. The NYS OPWDD CNYDDSO Region 2 Office reserves the right to pre-approve all Sub-contractors. Any Contractor intending to use sub-contractors must provide the NYS OPWDD CNYDDSO Region 2 Business Office with all sub-contractor’s contact information, in writing, prior to the determination of approval.
8. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property.
9. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work.
SITE VISIT
A site visit IS mandatory. The site visit date is scheduled for Friday, April 17th, 2026 at 10:30 a.m.
at the project site. All prospective bidders are encouraged to attend.
A. Lawn Damage/Property Damage
• If the delivery of materials or any other work necessitates the contractor, his suppliers, or sub-contractors to drive on the lawn for ANY reason, the contractor shall be held responsible for the repair of the lawn.
• Personal vehicles are not to be parked on the grass.
• Any property damage caused by work performed is to be corrected to the condition existing prior to start of the job.
B. Continuity of Work/Communication/Scheduling
• Once the job has begun, it is to be worked on continuously until completed.
• If there are any delays, even if due to inclement weather, a Work Control Representative
MUST be contacted.
• Work must be completed within ___ days of receiving the purchase order.
C. House Safety
• The residence will be occupied during the job.
• The contractor must take all reasonable care to safeguard the residents and the staff.
• The contractor shall ensure all tools, materials and other items are picked up, removed or stored and are safely secured at the end of each workday.
• Any ladders, scaffolding or lifts used in conjunction with this job are to be stored to the satisfaction of the House Director at the end of the day.
• The work as indicated above shall be scheduled as not to interfered with other functions of the residence. All work performed as part of this job is to be coordinated with the House
Director and Plant Superintendent listed above.