Schedule of Items.xlsx
XLSX spreadsheet 144 KB Posted
- Attached to
- Trailhead Upgrades Shealor, Thunder, Margaret Federal contract opportunity
- Solicitation number
- 127EAX25R0013
- Issued by
- Department of Agriculture Forest Service
About this file
The Schedule of Items (SOI) is a detailed pricing document for the Trailhead Upgrades project for the U.S. Forest Service at Shealor, Thunder, and Margaret trailheads. The document itemizes specific construction and site improvement activities across three Contract Line Item Numbers (CLINs), including mobilization, site preparation, earthwork, roadway construction, and facility installation. Key items include removing trees and metal posts, installing bear-proof trash bins, information kiosks, picnic tables, vault toilets, parking lot improvements, aggregate base construction, asphalt concrete work, pavement markings, and concrete walkways.
The SOI breaks down quantities and line items for each component, with 15 individual tree removals, 3 bear-proof trash bins, 3 information kiosks, 168 tons of asphalt concrete, 172 cubic yards of aggregate base, and 3 single-unit vault toilets. While the current document shows zero dollar amounts, it provides a comprehensive inventory of required construction and site enhancement activities for the trailhead upgrade project, which is being conducted by the Department of Agriculture Forest Service under solicitation number 127EAX25R0013.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Statement of Work.pdf | ||
| Attachment 3 - Wage Determination.pdf | ||
| Attachment 2 - Fire Plan.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOI
| DESCRIPTION | UNIT | QTY | UNIT PRICE | TOTAL PRICE |
| CLIN 0001 | ||||
| Mobilization | LS | 1 | $ - 0 | $ - 0 |
| Temporary Traffic Control | LS | 1 | $ - 0 | $ - 0 |
| Construction Survey and Staking | LS | 1 | $ - 0 | $ - 0 |
| Clearing and Grubbing | LS | 1 | $ - 0 | $ - 0 |
| Removal of Individual Trees, disposal method (FS Permit) | Each | 15 | $ - 0 | $ - 0 |
| Stump Removal | Each | 5 | $ - 0 | $ - 0 |
| Remove and Dispose of Metal Posts (Thunder Mountain) | Each | 20 | $ - 0 | $ - 0 |
| Bear Proof Trash Bin with Concrete Pad | Each | 3 | $ - 0 | $ - 0 |
| Information Kiosk and Aggregate Surface | Each | 3 | $ - 0 | $ - 0 |
| Native Surface Trail | LF | 40 | $ - 0 | $ - 0 |
| Picnic Table | Each | 3 | $ - 0 | $ - 0 |
| Iron Ranger | Each | 3 | $ - 0 | $ - 0 |
| CLIN 0002 | ||||
| Earthwork - Roadway excavation, embankment construction, compaction placement | LS | 1 | $ - 0 | $ - 0 |
| Aggregate Base - CalTrans 3/4" Class 2, Compaction D | CY | 172 | $ - 0 | $ - 0 |
| Asphalt Concrete, CalTrans 1/2" 'B' Type PG64-28 | Ton | 168 | $ - 0 | $ - 0 |
| Rock Slope Protection (Riprap Class 2) | CY | 6 | $ - 0 | $ - 0 |
| Accessible Parking Sign | Each | 1 | $ - 0 | $ - 0 |
| Pavement Markings, Solid Line (4"), Type B | LF | 250 | $ - 0 | $ - 0 |
| Pavement Markings, Accessible Symbol | Each | 1 | $ - 0 | $ - 0 |
| Barrier Rock (Commercial Source) | Each | 50 | $ - 0 | $ - 0 |
| 6' Concrete Curb Stop | Each | 11 | $ - 0 | $ - 0 |
| Rock Lined Ditch and Dissipater (Riprap Class I) | CY | 27.5 | $ - 0 | $ - 0 |
| Concrete Walkway | SF | 80 | $ - 0 | $ - 0 |
| CLIN 0003 | ||||
| Single Unit Vault Toilet | Each | 3 | $ - 0 | $ - 0 |
| SUBTOTAL | $ - 0 |