RFQ_Amendment_1_-_Q&A.pdf
PDF 76 KB Posted
- Attached to
- Automated Microbial Culture, Sample Preparation, and Analysis System Federal contract opportunity
- Solicitation number
- SB134117RQ0418
About this file
RFQ Amendment 1 - Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ_ATTACHMENT_2_-_APPLICABLE_PROVISIONS_&_CLAUSES.docx | DOCX document | |
| RFQ_ATTACHMENT_3_-_LINE_ITEM_SCHEDULE.pdf | ||
| RFQ_ATTACHMENT_4_-_DRAFT_RFQ_WITH_AMENDMENTS_1-3_&_Q&A.pdf | ||
| RFQ_ATTACHMENT_1_-_SOW.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT 1
RFQ SB134117RQ0418
Q&A
Question 1: As we put together our response, are we allowed to submit a digital portion with our proposal? This portion would be a short video of a part of the SAT protocol, written in our software and ready to go.
Answer 1: No.
Question 2: Regarding your time lines of the SAT and FAT. They are listed as a 2‐day duration. I assume that this means that the protocol can’t last longer than 2 days and the optimization and development of the method are not included in those 2 days?
Answer 2: The FAT/SAT protocol shall not exceed 2 days, and optimization and development of the
FAT /SAT protocol is not included in those days (that would be covered by Option Line Item 0012).
This concludes Q&A as the deadline for question submission has now lapsed.